SlideShare a Scribd company logo
1 of 4
FARMAN ALI
Home Address: ChahMithayWala P/O Kohiwala The. Kabirwala,
Disst.Khanewal
Cell # +92-345-7384078
E-mail farman_alirao92@yahoo.com
raofarman1984@gmail.com
Objective:
Seeking full time career with an organization, which will permit me to use and contribute my abilities in
petroleum development and also to enhance my knowledge and contribute towards its growth by
committed and high quality work. My motto in life is “Problems are opportunities and never accept defeat
in life.”
Academic Qualifications:
DAE (Civil) 2001-2004 P.B.T.E. Lahore
Matriculation 1999-2001 B.I.S.E Multan
EXPERIENCES:
A promising Era of more than of 10 years accompaniments &subservient
1. DESCON ENGINEERING LIMITED (08-Aug 2014 to Date)
 Designation: Asst. Engineer
 Project: Isomerization Unit, (Conversion of naphtha into Gasoline, 5000 Barrel/Day)
 Client: Pakistan Refinery Limited (PRL)
 Scope of Work:
o Piles (Dia 600 mm x L 25 m) Qty 76
o Concrete M-25 4600 Cu-m
o Excavation 4343.17 Cu-m
o Backfilling 7021 Cu-m
o Road Works 2998.82 Sq-m
o Fire Proofing 449 Cu-m
 Responsibilities :
o Supervising Construction at site
o Ensuring quality of workmanship
o checking plans, drawings and quantities for accuracy of calculations;
o Inspection and Supervision of Concrete Piling by reverse rotary Method and using code ASTM-D1143.
o day-to-day management of the site, including supervising and monitoring the site labour force and the
work of any subcontractors;
2. DESCON ENGINEERING LIMITED (15-Mar-2013 to 07-Aug-2014)
 Designation: Asst. Engineer
 Project: Construction of New Tanks & Major Repairing of Old Tanks
 Client: Pakistan Refinery Limited (PRL)
 Responsibilities :
o Supervising Construction at site
o Taking Responsibility for Health & safety on site
o Scheduling of work
o Ensuring quality of workmanship
3. ABSAR Engineering & Contractor (19-Jul-2010 to 10-Mar-2014)
 Designation: Site Engineer
 Project: Construction of Silos Ammar Rice Mill Kamonki, Quality Breeder form in Hassan Abdal,
Construction of Jaded Hatchery & in Khanewal.
 Responsibilities :
o Supervising Construction at site
o Compiling job specs and supervising tendering procedures
o Scheduling of work
o Ensuring quality of workmanship
4. DARRTUL GHABIRA (10-Jan-2010 to 26-Apr-2010)
 Designation: Site Supervisor
 Project: Building Work In Muscat Oman
5. RESHMA POWER GENERATION LIMITED (05-JUL-2009 TO 31-DEC-2009)
 Designation: Client Asst. Engineer
 Project: Reshma Power Generation
 Responsibilities :
o Supervising Construction at site
o Construction of Cast in place Piles and pile caps
o Internal team meetings to track progress, establish next priorities and plan ahead for the upcoming
activities
o Compiling job specs and supervising tendering procedures
o Ensuring quality of workmanship
6. PROGRESSIVE INTERNATIONAL (22-APR-2006 TO 30-JUN-2009)
 Designation: Sub Engineer
 Project: Gilani Law Collage & UG Department Construction in B.Z.U Multan.
 Responsibilities :
o Supervising Construction at site
o Internal team meetings to track progress, establish next priorities and plan ahead for the upcoming
activities
o Verification of Bills-- claimed from Sub contractors
o Compiling job specs and supervising tendering procedures
o Ensuring quality of workmanship
7. IVCC Engineering Pvt. Ltd (09-OCT-2005 TO 06-APR-2006)
 Designation: Trainee Engineer
 Project: Maple Leaf Cement Factory, New phase 6700 TPD at Sikandr Abad
(Piling Work, Dia 1000mm, 600mm X L 55m, 35m )
 Responsibilities :
o Supervising Construction at site
o Ensuring quality of workmanship
o Construction of Cast in place Piles and pile caps
8. BUILD TECH Construction (04-JAN-2005 TO 30-SEP-2005)
 Designation: Asst. Supervisor
Project: Naseem Enterprises SpinningMill khanewal
Job description:
 Undertaking technical and feasibility studies including site investigations
 Undertaking complex and repetitive calculations
 Liaising with clients and a variety of professionals including architects and subcontractors
 Compiling job specs and supervising tendering procedures
 Resolving design and development problems
 Managing budgets and project resources
 Scheduling material and equipment purchases and deliveries
 Making sure the project complies with legal requirements
 Assessing the sustainability and environmental impact of projects
 Ensuring projects run smoothly and structures are completed within budget and on time
 Liaising and working jointly with the design team (consulting engineers) to implement
refinements
 Dealing skillfully with a diverse range of people including clients, architects, other engineering
professionals, sub-contractors and members of the public
 Taking responsibility for health and safety on site
 Supervising construction
 Scheduling work
 Providing appropriate plans for construction;
 Liaising with and directing the work of sub-contractors employed on the project
 Ensuring quality of workmanship.
Technical skills:
 Auto CAD (2D)& (3D)
 Technical Software’s
Computer skills:
 Microsoft Office pack
 Internet Browsing
Personal Data:
Father’s Name : Munawar Ali
Date of Birth : Jan 01, 1984
Religion : Islam
Nationality : Pakistani
Marital Status : Married
CNIC No : 36102-1948508-3
Passport No : GV1795082
Farman Ali Rao

More Related Content

What's hot

Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cv
WasimIqbal28
 
IBRAHIM_ALBASSEL__ Dec -2014
IBRAHIM_ALBASSEL__ Dec -2014IBRAHIM_ALBASSEL__ Dec -2014
IBRAHIM_ALBASSEL__ Dec -2014
IBRAHIM ALBASSEL
 
Experience certificate of Norul
Experience certificate of NorulExperience certificate of Norul
Experience certificate of Norul
Ahmed Hafez
 
SYED MUHAMMED ANWAR
SYED MUHAMMED ANWARSYED MUHAMMED ANWAR
SYED MUHAMMED ANWAR
syed manwar
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cv
Naveed Shahzad
 
CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)
zeeshan Ali
 
Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)
ALI RZA
 
shakeel cv 19-2-2015
shakeel cv 19-2-2015shakeel cv 19-2-2015
shakeel cv 19-2-2015
shakeel anjum
 

What's hot (20)

Nirav v
Nirav vNirav v
Nirav v
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cv
 
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
IBRAHIM_ALBASSEL__ Dec -2014
IBRAHIM_ALBASSEL__ Dec -2014IBRAHIM_ALBASSEL__ Dec -2014
IBRAHIM_ALBASSEL__ Dec -2014
 
CV -BOSE
CV -BOSECV -BOSE
CV -BOSE
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
Experience certificate of Norul
Experience certificate of NorulExperience certificate of Norul
Experience certificate of Norul
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
Abdul Hameed Civil supervisor
Abdul Hameed Civil supervisorAbdul Hameed Civil supervisor
Abdul Hameed Civil supervisor
 
SYED MUHAMMED ANWAR
SYED MUHAMMED ANWARSYED MUHAMMED ANWAR
SYED MUHAMMED ANWAR
 
Rajbir Singh-2
Rajbir Singh-2Rajbir Singh-2
Rajbir Singh-2
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cv
 
CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
Anees Khan Resume from GK
Anees Khan Resume from GKAnees Khan Resume from GK
Anees Khan Resume from GK
 
Muqeer (civil engineer)
Muqeer (civil engineer)Muqeer (civil engineer)
Muqeer (civil engineer)
 
Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)Ali Raza Land surveyor (1)
Ali Raza Land surveyor (1)
 
CV farooque
CV farooqueCV farooque
CV farooque
 
shakeel cv 19-2-2015
shakeel cv 19-2-2015shakeel cv 19-2-2015
shakeel cv 19-2-2015
 

Viewers also liked

Lista negra de_gasolineras_que_dan_litros_incompletos
Lista negra de_gasolineras_que_dan_litros_incompletosLista negra de_gasolineras_que_dan_litros_incompletos
Lista negra de_gasolineras_que_dan_litros_incompletos
Lucifferus
 

Viewers also liked (14)

Регламент (EU) № 536/2014
Регламент (EU) № 536/2014Регламент (EU) № 536/2014
Регламент (EU) № 536/2014
 
Portfolio edit
Portfolio editPortfolio edit
Portfolio edit
 
Adaptation and selections of words
Adaptation and selections of wordsAdaptation and selections of words
Adaptation and selections of words
 
Amnis Theraputics Corporate Presentation
Amnis Theraputics Corporate PresentationAmnis Theraputics Corporate Presentation
Amnis Theraputics Corporate Presentation
 
Софія Русова
Софія РусоваСофія Русова
Софія Русова
 
Números positivos y negativos
Números positivos y negativosNúmeros positivos y negativos
Números positivos y negativos
 
EL RECICLATE
EL RECICLATEEL RECICLATE
EL RECICLATE
 
jawed Ahmad
jawed Ahmadjawed Ahmad
jawed Ahmad
 
Jawed Cv
Jawed CvJawed Cv
Jawed Cv
 
CV-Zakir
CV-ZakirCV-Zakir
CV-Zakir
 
Farman ali (1)
Farman ali (1)Farman ali (1)
Farman ali (1)
 
Lista negra de_gasolineras_que_dan_litros_incompletos
Lista negra de_gasolineras_que_dan_litros_incompletosLista negra de_gasolineras_que_dan_litros_incompletos
Lista negra de_gasolineras_que_dan_litros_incompletos
 
Cv fayaz
Cv fayazCv fayaz
Cv fayaz
 
Sheikh-Daniyal-Ahmed-CV
Sheikh-Daniyal-Ahmed-CVSheikh-Daniyal-Ahmed-CV
Sheikh-Daniyal-Ahmed-CV
 

Similar to Farman Ali Rao (20)

VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7
 
updated CV
updated CVupdated CV
updated CV
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
CVarjun.
CVarjun.CVarjun.
CVarjun.
 
MOHD.J.ALAM CURRICULUM-VITAE
MOHD.J.ALAM CURRICULUM-VITAEMOHD.J.ALAM CURRICULUM-VITAE
MOHD.J.ALAM CURRICULUM-VITAE
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAE
 
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1
 
anoop-CV 2016
anoop-CV 2016anoop-CV 2016
anoop-CV 2016
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDF
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
kkbiodata 1.6.15
kkbiodata 1.6.15kkbiodata 1.6.15
kkbiodata 1.6.15
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
 
cv of suresh latest (4) (1)
cv of suresh latest (4) (1)cv of suresh latest (4) (1)
cv of suresh latest (4) (1)
 

Farman Ali Rao

  • 1. FARMAN ALI Home Address: ChahMithayWala P/O Kohiwala The. Kabirwala, Disst.Khanewal Cell # +92-345-7384078 E-mail farman_alirao92@yahoo.com raofarman1984@gmail.com Objective: Seeking full time career with an organization, which will permit me to use and contribute my abilities in petroleum development and also to enhance my knowledge and contribute towards its growth by committed and high quality work. My motto in life is “Problems are opportunities and never accept defeat in life.” Academic Qualifications: DAE (Civil) 2001-2004 P.B.T.E. Lahore Matriculation 1999-2001 B.I.S.E Multan EXPERIENCES: A promising Era of more than of 10 years accompaniments &subservient 1. DESCON ENGINEERING LIMITED (08-Aug 2014 to Date)  Designation: Asst. Engineer  Project: Isomerization Unit, (Conversion of naphtha into Gasoline, 5000 Barrel/Day)  Client: Pakistan Refinery Limited (PRL)  Scope of Work: o Piles (Dia 600 mm x L 25 m) Qty 76 o Concrete M-25 4600 Cu-m o Excavation 4343.17 Cu-m o Backfilling 7021 Cu-m o Road Works 2998.82 Sq-m o Fire Proofing 449 Cu-m  Responsibilities : o Supervising Construction at site o Ensuring quality of workmanship o checking plans, drawings and quantities for accuracy of calculations; o Inspection and Supervision of Concrete Piling by reverse rotary Method and using code ASTM-D1143. o day-to-day management of the site, including supervising and monitoring the site labour force and the work of any subcontractors;
  • 2. 2. DESCON ENGINEERING LIMITED (15-Mar-2013 to 07-Aug-2014)  Designation: Asst. Engineer  Project: Construction of New Tanks & Major Repairing of Old Tanks  Client: Pakistan Refinery Limited (PRL)  Responsibilities : o Supervising Construction at site o Taking Responsibility for Health & safety on site o Scheduling of work o Ensuring quality of workmanship 3. ABSAR Engineering & Contractor (19-Jul-2010 to 10-Mar-2014)  Designation: Site Engineer  Project: Construction of Silos Ammar Rice Mill Kamonki, Quality Breeder form in Hassan Abdal, Construction of Jaded Hatchery & in Khanewal.  Responsibilities : o Supervising Construction at site o Compiling job specs and supervising tendering procedures o Scheduling of work o Ensuring quality of workmanship 4. DARRTUL GHABIRA (10-Jan-2010 to 26-Apr-2010)  Designation: Site Supervisor  Project: Building Work In Muscat Oman 5. RESHMA POWER GENERATION LIMITED (05-JUL-2009 TO 31-DEC-2009)  Designation: Client Asst. Engineer  Project: Reshma Power Generation  Responsibilities : o Supervising Construction at site o Construction of Cast in place Piles and pile caps o Internal team meetings to track progress, establish next priorities and plan ahead for the upcoming activities o Compiling job specs and supervising tendering procedures o Ensuring quality of workmanship 6. PROGRESSIVE INTERNATIONAL (22-APR-2006 TO 30-JUN-2009)  Designation: Sub Engineer  Project: Gilani Law Collage & UG Department Construction in B.Z.U Multan.  Responsibilities : o Supervising Construction at site o Internal team meetings to track progress, establish next priorities and plan ahead for the upcoming activities o Verification of Bills-- claimed from Sub contractors o Compiling job specs and supervising tendering procedures o Ensuring quality of workmanship 7. IVCC Engineering Pvt. Ltd (09-OCT-2005 TO 06-APR-2006)  Designation: Trainee Engineer
  • 3.  Project: Maple Leaf Cement Factory, New phase 6700 TPD at Sikandr Abad (Piling Work, Dia 1000mm, 600mm X L 55m, 35m )  Responsibilities : o Supervising Construction at site o Ensuring quality of workmanship o Construction of Cast in place Piles and pile caps 8. BUILD TECH Construction (04-JAN-2005 TO 30-SEP-2005)  Designation: Asst. Supervisor Project: Naseem Enterprises SpinningMill khanewal Job description:  Undertaking technical and feasibility studies including site investigations  Undertaking complex and repetitive calculations  Liaising with clients and a variety of professionals including architects and subcontractors  Compiling job specs and supervising tendering procedures  Resolving design and development problems  Managing budgets and project resources  Scheduling material and equipment purchases and deliveries  Making sure the project complies with legal requirements  Assessing the sustainability and environmental impact of projects  Ensuring projects run smoothly and structures are completed within budget and on time  Liaising and working jointly with the design team (consulting engineers) to implement refinements  Dealing skillfully with a diverse range of people including clients, architects, other engineering professionals, sub-contractors and members of the public  Taking responsibility for health and safety on site  Supervising construction  Scheduling work  Providing appropriate plans for construction;  Liaising with and directing the work of sub-contractors employed on the project  Ensuring quality of workmanship. Technical skills:  Auto CAD (2D)& (3D)  Technical Software’s Computer skills:  Microsoft Office pack  Internet Browsing Personal Data: Father’s Name : Munawar Ali Date of Birth : Jan 01, 1984 Religion : Islam Nationality : Pakistani Marital Status : Married CNIC No : 36102-1948508-3 Passport No : GV1795082