In 2008, Fingrid launched a project, the aim of which was to build a new information system that supported asset and operation management and was based on product-based solutions. This new data system that supports asset and operation management goes by the name of ELVIS (an acronym for ELectricity Verkko Information System).
3. What is good Asset & Operation management...?
Decision making based
on knowledge and
information
Decision making based
on understanding and
assumptions
Fingrid Elvis Event@mstenstrand3
5. Data control in a key role for years
Fingrid Elvis Event@mstenstrand5
1980 1990 2000 2010
1988First
Computerized
maintenance
management
system (CMMS)
2020
1992First
Enterprise Asset
Management
system (EAM)
including Mobile
& GIS
2008ELVIS
kick-off with
present and
future process
modelling
2010ELVIS
invitation for
tenders
2012ELVIS
contract signed
with IBM
2013ELVIS
part 1 in to
operation
2016ELVIS
final parts in to
operation
6. ELVIS main goals
Increasing operative efficiency, lowering risk
and improving decision making
Fingrid Elvis Event@mstenstrand6
Master
Data
Integration
Digitalisation
7. SAP Work Manager
Mobile
Oracle Primavera
Project Portfolio &
Management
Primavera adapter
Maximo Spatial
IBM Maximo Asset
Management
ESRI ArcGIS
GIS
Electron CAPE
Relay simulation
IPS Epis
Relay Management
Siemens PSS®ODMS
Grid modeling
Siemens PSS®E
Grid calculation
OSIsoft PI
AF & ProcessBook
Asset health
OSIsoft PI
Real-time &
data storage
other integrations to Accounting, Metering,
Document Management, Business Intelligens,
Invoicing, among others
SCADA
ELVIS
– THE NEW PLATFORM
FOR ASSET AND OPERATION
MANAGEMENT
Integrated best-of-breed standard
software products
ELVIS
8. Why is information integration so important?
Master Data
Decision making Quality & Speed
Internet of Things
Big Data
Analytics
Visualization
Fingrid Elvis Event@mstenstrand8
Tuo reippaaminen esiin omat taustat ja tiiviimmin
Taustat hyvä tuoda esiin
And why i think it is important for you/ we think you can benefit from this
Give you some backgrounds,
Tell you why integrated infrormation is so important for a good asset and operation manager
WHAT? SO WHAT? WHAT NOW?
PROBLEM SOLUTION BENEFIT
BEFORE NOW IN THE FUTURE
Decison making (Based on knowledge and information)
Elvis background ja miksi tämä on teille merkitystä
Tämä on tärkeätä niille jotka hoitavat Asset Mgmt ja Ops. mgmt, ja pyrin vakuuttumaan teitä seuraavan vartin aikana että kannattaa pysyä tällä päivän loppun saakka.
ELVis goals / inegration
I happen belive is AM crucial for the succes of your organizations success and I also think a good AM should know how many socks you have. We will back to this later in my presentation.
Knowledge is crucial and that is something problay all your organizations have BUT
Information is important for decision making
Correct easy accesible information is important for making the best decisions
And in today's world there are are a lot of information through measurements both on-line and entered by hand, public sources, asset data,
External requiremetns such as safety, security, steategy, legal, cost, risks, performance....
Master Data
When we started the journey...
We wanted to have a system where Master Data would be in control
We wanted that all available data that we posess (+ external data resources) would usable for analytics
Single source for power system information → One version of the truth
Data entered only ONCE into ONE system, other systems uses this data
Integration
Big Data
Combining asset mgmt data with IoT generated data
Enabling industry wide data analytics by integrating all business data
Able to tie data to a physical location
Digitalisation
A common platform for asset and operation management that will fulfill today's and future needs
From performance dashboards to on-line location based heatmaps
Oracle Primavera
Project portfolio
budgeting
project mgmt
Maximo
Asset register (lines, substations, power plant, telecommunication)
Maintenance mgmt
Work packining and work order
Outage planning
Switching planning
Incident & audit register
Fault and disturbance register
(reserve)PowerPlant
ESRI ArcGIS
Geograpical information
Route planning
vegetation mgmt
Envitonmental Impact analysis
SAP workManager
Mobile tool
Inspections
Siemens PSS/ODMS
Grid model database based on CIM v16
Grid model topology and electrical values are automatically inherited from the actual topology and technical data of the asset’s primary equipment. Projects based on an investment programme are also modelled on a centralised database, and schedules are automatically updated from the project management tool.
Live data from SCADA through OSIsoft PI
Siemens PSS/E
And the actual Grid calculation and simulation is done by PSS/E
IPX Relex
is the register for relay settings and configuration
Electron CAPE
and actual protection simulation and protection setting calculations are performed by Electron CAPE
Today
we gather more and more information and more and more external data resources are available, also IoT is producing more information
Big Data is getting even bigger
we want to use all this data and do sophisticated value producing real time analytics with it
to be able to understand all this to be able to interpret results must we have good visualization of our analytics
And so that all this can be done must we ensure that our master data is in control
ALL THIS REQUIRES THAT YOU HAVE STRONG INTERLINKS BETWEEN YOUR DATA SOURCES
And if you have then will your decision making quality and speed improve!
I leave it up to you to judge if we succeeded/ So did we succeed
And if we did I hope you should considering using some same solutions since we are not compiting with each other so we could benefit from this.
Thank you very much