Building information modeling (BIM)
Fitsum Yonas BIM Manager
Zias Design
WHAT IS BIM ?
• A digital model, created at the start of the project and used by project stakeholders
• Linked to a database
• On a collaborative platform which allows each user access to BIM data with his
own tools / software
WHAT IS BIM ?
Building Information Modelling is Digital representation of
physical and functional characteristics of a facility. A BIM is
a shared knowledge resource for information about a facility
forming a reliable basis for decisions during its life-cycle;
defined as existing from earliest conception to demolition.
WHAT IS BIM ?
Use of BIM goes beyond the planning and design phase of the project, extending
throughout the building life cycle, supporting processes including cost management,
construction management, project management and facility operation
BIM Life-cycle
WHY IS BIM IMPORTANT NOW ?
• PRODUCTIVITY
• INTEROPERABILITY
• BUILDING ENERGY EFFICIENCY
WHY IS BIM IMPORTANT NOW ?
• PRODUCTIVITY
WHY IS BIM IMPORTANT NOW ?
• INTEROPERABILITY
– The cost of not addressing interoperability in US is $15bn p.a.
– Probably more
– Perhaps equivalent to £10/m2 in the UK
• 2/3 on Owners,
• 1/3 on Design and Construction
WHY IS BIM IMPORTANT NOW ?
• BUILDING ENERGY EFFICIENCY
– In certain regions highly dependent on traditional biomass, energy use in buildings
represents as much as 80% of total final energy use.
– 64% in US
– 55% in EU
– 48% world wide
– If no action is taken to improve energy efficiency in the buildings sector, energy demand
is expected to rise by 50% by 2050.
THE BIM EXECUTION PLAN (BIMXP)
• To effectively integrate BIM into the
project delivery process, it is important
for the team to develop a detailed
execution plan for BIM
implementation.
THE BIM EXECUTION PLAN (BIMXP)
• By developing a BIM Plan, the project and project team members can achieve the
following value
1. All parties will clearly understand and communicate the strategic goals for
implementing BIM on the project
2. Organizations will understand their roles and responsibilities
3. The team will be able to design an execution process which is well suited for each
team member’s business practices and typical organizational workflows
4. The plan will outline additional resources,
5. The plan will provide a benchmark for describing the process to future participants who
join the project
6. The purchasing divisions will be able to define contract language to ensure that all
project participants fulfill their obligations
7. The baseline plan will provide a goal for measuring progress throughout the project
THE BIM EXECUTION PLAN (BIMXP)
Outline
DEFINE MODEL PROGRESSION
DETERMINE BIM USE
IDENTIFY BIM CONDITION of
SATISFACTIONS
COLLABORATION PROCEDURES
PROJECT INFORMATION
PROJECT INFORMATION
• THE PROJECT INFORMATION
INCLUDES
– PROJECT NAME, ADDRESS
– CONTRACT TYPE AND
DURATION
– PROJECT DESCRIPTIONS
– PROJECT TEAM AND CONTACT
ETC.
COLLABORATION PROCEDURES
• Will define relevant
• collaboration strategies
• Meetings
• Model sharing and exchange schedule
• Technology and infrastructure
• Model submission schedule (Milestones)
BIM CONDITIONS of SATISFACTION (CoS)
• Project scope and Conditions of
Satisfaction (CoS) dictate the BIM
Uses executed on a project
• CoS address the desired process,
decision, and project outcomes
BIM Uses Matrix
• The goal of BIM Use is to align the
Conditions of Satisfaction, with
corresponding BIM uses to support the
project
• According to the CoS priority number
the project team select the final uses
for the project
BIM Uses
1. EXISTING CONDITIONS MODELING
1.1 BIM Project Site Modeling
1.2 Surrounding Site Modeling
1.3 Existing Conditions – Laser Scanning
1.4 Geo-technical Modeling
1.5 Site Modeling – Horizontal Construction
2. DESIGN AND BUILDING SYSTEM AUTHORING
2.1 Architectural Model
2.2 Space, Accessibility, and Circulation
Requirements Modeling
2.3 Structural Model
2.4 HVAC Mechanical Systems
2.5 Plumbing and Fire Protection
2.6 Electrical
2.7 Interiors
2.8 Tenant Build-Out
BIM Uses
3. ANALYSIS AND REPORTING
3.1 Area and Space Program Validation
3.2 Design Options
3.3 Model Checking – Program Compliance
3.4 Clash Avoidance and Detection
3.5 Structural Analysis
3.6 Equipment and Maintenance Clear Space
3.7 Budgetary Costing
3.8 Quantity Take-Off
4. SUSTAINABILITY, LEED, ENERGY
4.1 Energy Modeling, Sun Studies, Day Lighting
4.2 Existing Building – Rapid Energy Modeling
4.3 Mechanical Analysis
4.4 LEED Credit and Certification Reporting
4.5 Lighting Analysis
4.6 Systems Analysis
BIM Uses
5. DESIGN, CONSTRUCTABILITY REVIEWS AND COORDINATION
5.1 BIM Based Progress Meetings, Reviews – “Big Room”
5.2 Digital Details, Mock-ups
5.3 Scheduling – 4D Modeling and Logistics
5.4 Site Safety Review
5.5 In Field – Construction Layout
5.6 Laser Scanning – Construction Phase
5.7 Pre-Fabrication Building Components
6. DOCUMENTATION, DRAWINGS, AND SPECS
6.1 Construction Drawing Production
6.2 Shop Drawing Coordination
6.3 As-Built Models
6.4 Data Normalization
6.5 Lighting Analysis
6.6 Systems Analysis
BIM Uses
7. COMMISSIONING AND HANDOVER
7.1 BIM Based Progress Meetings, Reviews – “Big Room”
7.2 Digital Details, Mock-ups
7.3 Scheduling – 4D Modeling and Logistics
7.4 Site Safety Review
7.5 In Field – Construction Layout
8. FACILITIES AND DATA INTEGRATION
8.1 Assessment Models
8.2 Space Planning – Move Management
8.3 Security
8.4 CMMS and CAFM Data Model Integration
8.5 Resiliency Modeling
8.6 Building Automation Systems BAS Integration
Model progression matrix
• The Model Progression
Worksheet documents the
roles and responsibilities,
model development, BIM
Use execution, and the LOD
of model elements.
• The LOD is a tracking
mechanism . The LOD for
elements will be defined at
the beginning of each phase
and support the highest
requirements of the BIM
uses to be executed during
that phase
Model progression matrix
• The Clash Detection Matrix and the
Results Report are to be used to
document clash detection and resolution
activities
To wrap-up
BIM PLATFORM
• Three key factors for Good BIM Platform
– Process
– Technology
– Behavior
BIM PLATFORM
PROCESS
– New technology in old process
TECHNOLOGY
• Best tool that work and improve our organization
• Align with firm vision
BIM PLATFORM
BEHAVIOR
“BIM is10 percent technology and 90 percent sociology.”
Collaboration vs Closed-minded
“In times of change, learners inherit the Earth, while the
learned find themselves beautifully equipped to deal with a
world that no longer exists.” Eric Hoffer
What can we deliver with BIM?
• “... reducing capital cost and the carbon burden from the construction and
operation of the built environment by 20% ...
• the adoption of … technologies, process and collaborative behaviors that will
unlock new more efficient ways of working at all stages of the project life-
cycle
What can we deliver with BIM?
• Higher quality, more reliable design information
• greater client certainty/predictability (time, cost, quality) earlier
• better visualization
• better multi-disciplinary collaboration
• quicker, more consistent and easier coordination of design documentation
• earlier, accurate, complete procurement data ('smart' BoQs); elimination of
waste and rework
• better construction and project management ('build it once virtually, then build
it for real')
• better 'as-built', whole-life information for O&M
What can we deliver with BIM?
Fully computable, reliable information
– no checking or re-keying of data
– automated compliance checking
“The end-to-end stream of BIM data will help unify the
industry's supply chains, freeing construction from its
craft origins, transforming it into a modern,
sophisticated branch of the manufacturing industry.”
BEWARE BIM WASH
• BIM Wash is a term describing the inflated, and/or deceptive,
claim of using or delivering Building Information Modeling services
or products
The four levels of “BIM-wash”
The four levels of “BIM-wash”
confusion – inexperience – exaggeration – illusion
BIM Wash
• Level 1: CONFUSION or Unintentional BIMwash
This is when BIM processes and protocols are not understood or are perceived to be
similar to CAD. It is when basic model exchanges are confused with model-based
collaboration. It is when a Model Server is confused with a File Server or a Document
Management System.
• Level 2: INEXPERIENCE or Low-Level BIMwash
BIMwash caused by inexperience manifests itself when the link between a BIM
deliverable and its requirements is not acknowledged or when only some BIM
deliverables (the low-hanging fruit) and their requirements are understood
BIM Wash
• Level 2: INEXPERIENCE or Low-Level BIMwash
BIMwash caused by inexperience manifests itself when the link between a BIM
deliverable and its requirements is not acknowledged or when only some BIM
deliverables (the low-hanging fruit) and their requirements are understood
BIM Wash
• Level 3: EXAGGERATION or Mid-Level BIMwash
This is when actual BIM Competencies exist but are intentionally promoted far beyond their
actual level. This is similar to telling a true story yet adding several Hollywood special
effects on top
• Level 4: ILLUSION or Severe BIMwash
This is when the BIM Competency story amounts to pure fiction. This is similar to a Bollywood
movie plot - all song and dance, colourful, and possibly amusing - but the actual story was
never, and may never be, true!
BIM is not
• CAD
“CAD helps people to draw. BIM helps people to
construct.” (Richard Saxon, Ecobuild, February 2009)
“BIM is not CAD. BIM was never meant to be CAD. CAD is a
replacement for pen and paper, a documentation tool. By
comparison, BIM programs are design applications in
which the documentation flows from and is a derivative of the
process, from schematic design to construction to facility
management.” (Pete Zyskowski, Cadalyst)
BIM is not
• ------Software
• ------new
• ------just an IT issue... or just software
• ------3D modeling
• ------something designers do
• ------just about project delivery
• ------a short-lived fad
• ------irrelevant to small projects
• ------“the silver bullet” or “Holy Grail”
• ------optional?
Thank you

More Related Content

What's hot

BIM Presentation
BIM PresentationBIM Presentation
BIM Presentation
Omer Syed
 

What's hot (20)

what is BIM
what is BIMwhat is BIM
what is BIM
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in Construction
 
Introduction to Building Information Modeling
Introduction to Building Information Modeling Introduction to Building Information Modeling
Introduction to Building Information Modeling
 
BIM & Sustainability
BIM & SustainabilityBIM & Sustainability
BIM & Sustainability
 
Building information modelling
Building information modellingBuilding information modelling
Building information modelling
 
BIM Presentation
BIM PresentationBIM Presentation
BIM Presentation
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction
 
bim+ Presentation BIM Manager
bim+ Presentation BIM Managerbim+ Presentation BIM Manager
bim+ Presentation BIM Manager
 
Bim
BimBim
Bim
 
Synergis University 2014-BIM for Construction
Synergis University 2014-BIM for ConstructionSynergis University 2014-BIM for Construction
Synergis University 2014-BIM for Construction
 
BIM for Project Managers
BIM for Project ManagersBIM for Project Managers
BIM for Project Managers
 
Bim overview
Bim overviewBim overview
Bim overview
 
BIM new.pptx
BIM new.pptxBIM new.pptx
BIM new.pptx
 
Building information modeling
Building information modelingBuilding information modeling
Building information modeling
 
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
BIM in Project Management: Keynote Speech by Mr. Kevin POOLEBIM in Project Management: Keynote Speech by Mr. Kevin POOLE
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation
 
Bim level-2 information-management
Bim level-2 information-managementBim level-2 information-management
Bim level-2 information-management
 
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
 

Similar to Building information modeling BIM

NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfNZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
le canh
 

Similar to Building information modeling BIM (20)

Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15
 
5 Benefits of BIM Implementation
5 Benefits of BIM Implementation5 Benefits of BIM Implementation
5 Benefits of BIM Implementation
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
BIM Dominating The Future of Architectural Design.pptx
BIM Dominating The Future of Architectural Design.pptxBIM Dominating The Future of Architectural Design.pptx
BIM Dominating The Future of Architectural Design.pptx
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
 
Bim its applications
Bim   its applicationsBim   its applications
Bim its applications
 
Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212
 
CH-1 (2).pptx
CH-1 (2).pptxCH-1 (2).pptx
CH-1 (2).pptx
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
Bim
BimBim
Bim
 
SCAN to BIM services, documenting existing building for digital planning
SCAN to BIM services, documenting existing building for digital planningSCAN to BIM services, documenting existing building for digital planning
SCAN to BIM services, documenting existing building for digital planning
 
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsBIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
 
International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5
 
How building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projectsHow building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projects
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction Projects
 
4 mark mc kane, uu
4   mark mc kane, uu4   mark mc kane, uu
4 mark mc kane, uu
 
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdfNZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
NZ-BIM-Handbook-Appendix+D-BIM-uses-definitions-April-19.pdf
 

Recently uploaded

Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Recently uploaded (20)

GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 

Building information modeling BIM

  • 1. Building information modeling (BIM) Fitsum Yonas BIM Manager Zias Design
  • 2. WHAT IS BIM ? • A digital model, created at the start of the project and used by project stakeholders • Linked to a database • On a collaborative platform which allows each user access to BIM data with his own tools / software
  • 3. WHAT IS BIM ? Building Information Modelling is Digital representation of physical and functional characteristics of a facility. A BIM is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle; defined as existing from earliest conception to demolition.
  • 4. WHAT IS BIM ? Use of BIM goes beyond the planning and design phase of the project, extending throughout the building life cycle, supporting processes including cost management, construction management, project management and facility operation BIM Life-cycle
  • 5. WHY IS BIM IMPORTANT NOW ? • PRODUCTIVITY • INTEROPERABILITY • BUILDING ENERGY EFFICIENCY
  • 6. WHY IS BIM IMPORTANT NOW ? • PRODUCTIVITY
  • 7. WHY IS BIM IMPORTANT NOW ? • INTEROPERABILITY – The cost of not addressing interoperability in US is $15bn p.a. – Probably more – Perhaps equivalent to £10/m2 in the UK • 2/3 on Owners, • 1/3 on Design and Construction
  • 8. WHY IS BIM IMPORTANT NOW ? • BUILDING ENERGY EFFICIENCY – In certain regions highly dependent on traditional biomass, energy use in buildings represents as much as 80% of total final energy use. – 64% in US – 55% in EU – 48% world wide – If no action is taken to improve energy efficiency in the buildings sector, energy demand is expected to rise by 50% by 2050.
  • 9. THE BIM EXECUTION PLAN (BIMXP) • To effectively integrate BIM into the project delivery process, it is important for the team to develop a detailed execution plan for BIM implementation.
  • 10. THE BIM EXECUTION PLAN (BIMXP) • By developing a BIM Plan, the project and project team members can achieve the following value 1. All parties will clearly understand and communicate the strategic goals for implementing BIM on the project 2. Organizations will understand their roles and responsibilities 3. The team will be able to design an execution process which is well suited for each team member’s business practices and typical organizational workflows 4. The plan will outline additional resources, 5. The plan will provide a benchmark for describing the process to future participants who join the project 6. The purchasing divisions will be able to define contract language to ensure that all project participants fulfill their obligations 7. The baseline plan will provide a goal for measuring progress throughout the project
  • 11. THE BIM EXECUTION PLAN (BIMXP) Outline DEFINE MODEL PROGRESSION DETERMINE BIM USE IDENTIFY BIM CONDITION of SATISFACTIONS COLLABORATION PROCEDURES PROJECT INFORMATION
  • 12. PROJECT INFORMATION • THE PROJECT INFORMATION INCLUDES – PROJECT NAME, ADDRESS – CONTRACT TYPE AND DURATION – PROJECT DESCRIPTIONS – PROJECT TEAM AND CONTACT ETC.
  • 13. COLLABORATION PROCEDURES • Will define relevant • collaboration strategies • Meetings • Model sharing and exchange schedule • Technology and infrastructure • Model submission schedule (Milestones)
  • 14. BIM CONDITIONS of SATISFACTION (CoS) • Project scope and Conditions of Satisfaction (CoS) dictate the BIM Uses executed on a project • CoS address the desired process, decision, and project outcomes
  • 15. BIM Uses Matrix • The goal of BIM Use is to align the Conditions of Satisfaction, with corresponding BIM uses to support the project • According to the CoS priority number the project team select the final uses for the project
  • 16. BIM Uses 1. EXISTING CONDITIONS MODELING 1.1 BIM Project Site Modeling 1.2 Surrounding Site Modeling 1.3 Existing Conditions – Laser Scanning 1.4 Geo-technical Modeling 1.5 Site Modeling – Horizontal Construction 2. DESIGN AND BUILDING SYSTEM AUTHORING 2.1 Architectural Model 2.2 Space, Accessibility, and Circulation Requirements Modeling 2.3 Structural Model 2.4 HVAC Mechanical Systems 2.5 Plumbing and Fire Protection 2.6 Electrical 2.7 Interiors 2.8 Tenant Build-Out
  • 17. BIM Uses 3. ANALYSIS AND REPORTING 3.1 Area and Space Program Validation 3.2 Design Options 3.3 Model Checking – Program Compliance 3.4 Clash Avoidance and Detection 3.5 Structural Analysis 3.6 Equipment and Maintenance Clear Space 3.7 Budgetary Costing 3.8 Quantity Take-Off 4. SUSTAINABILITY, LEED, ENERGY 4.1 Energy Modeling, Sun Studies, Day Lighting 4.2 Existing Building – Rapid Energy Modeling 4.3 Mechanical Analysis 4.4 LEED Credit and Certification Reporting 4.5 Lighting Analysis 4.6 Systems Analysis
  • 18. BIM Uses 5. DESIGN, CONSTRUCTABILITY REVIEWS AND COORDINATION 5.1 BIM Based Progress Meetings, Reviews – “Big Room” 5.2 Digital Details, Mock-ups 5.3 Scheduling – 4D Modeling and Logistics 5.4 Site Safety Review 5.5 In Field – Construction Layout 5.6 Laser Scanning – Construction Phase 5.7 Pre-Fabrication Building Components 6. DOCUMENTATION, DRAWINGS, AND SPECS 6.1 Construction Drawing Production 6.2 Shop Drawing Coordination 6.3 As-Built Models 6.4 Data Normalization 6.5 Lighting Analysis 6.6 Systems Analysis
  • 19. BIM Uses 7. COMMISSIONING AND HANDOVER 7.1 BIM Based Progress Meetings, Reviews – “Big Room” 7.2 Digital Details, Mock-ups 7.3 Scheduling – 4D Modeling and Logistics 7.4 Site Safety Review 7.5 In Field – Construction Layout 8. FACILITIES AND DATA INTEGRATION 8.1 Assessment Models 8.2 Space Planning – Move Management 8.3 Security 8.4 CMMS and CAFM Data Model Integration 8.5 Resiliency Modeling 8.6 Building Automation Systems BAS Integration
  • 20. Model progression matrix • The Model Progression Worksheet documents the roles and responsibilities, model development, BIM Use execution, and the LOD of model elements. • The LOD is a tracking mechanism . The LOD for elements will be defined at the beginning of each phase and support the highest requirements of the BIM uses to be executed during that phase
  • 21. Model progression matrix • The Clash Detection Matrix and the Results Report are to be used to document clash detection and resolution activities
  • 23. BIM PLATFORM • Three key factors for Good BIM Platform – Process – Technology – Behavior
  • 24. BIM PLATFORM PROCESS – New technology in old process
  • 25. TECHNOLOGY • Best tool that work and improve our organization • Align with firm vision
  • 26. BIM PLATFORM BEHAVIOR “BIM is10 percent technology and 90 percent sociology.” Collaboration vs Closed-minded “In times of change, learners inherit the Earth, while the learned find themselves beautifully equipped to deal with a world that no longer exists.” Eric Hoffer
  • 27. What can we deliver with BIM? • “... reducing capital cost and the carbon burden from the construction and operation of the built environment by 20% ... • the adoption of … technologies, process and collaborative behaviors that will unlock new more efficient ways of working at all stages of the project life- cycle
  • 28. What can we deliver with BIM? • Higher quality, more reliable design information • greater client certainty/predictability (time, cost, quality) earlier • better visualization • better multi-disciplinary collaboration • quicker, more consistent and easier coordination of design documentation • earlier, accurate, complete procurement data ('smart' BoQs); elimination of waste and rework • better construction and project management ('build it once virtually, then build it for real') • better 'as-built', whole-life information for O&M
  • 29. What can we deliver with BIM? Fully computable, reliable information – no checking or re-keying of data – automated compliance checking “The end-to-end stream of BIM data will help unify the industry's supply chains, freeing construction from its craft origins, transforming it into a modern, sophisticated branch of the manufacturing industry.”
  • 30. BEWARE BIM WASH • BIM Wash is a term describing the inflated, and/or deceptive, claim of using or delivering Building Information Modeling services or products
  • 31. The four levels of “BIM-wash” The four levels of “BIM-wash” confusion – inexperience – exaggeration – illusion
  • 32. BIM Wash • Level 1: CONFUSION or Unintentional BIMwash This is when BIM processes and protocols are not understood or are perceived to be similar to CAD. It is when basic model exchanges are confused with model-based collaboration. It is when a Model Server is confused with a File Server or a Document Management System. • Level 2: INEXPERIENCE or Low-Level BIMwash BIMwash caused by inexperience manifests itself when the link between a BIM deliverable and its requirements is not acknowledged or when only some BIM deliverables (the low-hanging fruit) and their requirements are understood
  • 33. BIM Wash • Level 2: INEXPERIENCE or Low-Level BIMwash BIMwash caused by inexperience manifests itself when the link between a BIM deliverable and its requirements is not acknowledged or when only some BIM deliverables (the low-hanging fruit) and their requirements are understood
  • 34. BIM Wash • Level 3: EXAGGERATION or Mid-Level BIMwash This is when actual BIM Competencies exist but are intentionally promoted far beyond their actual level. This is similar to telling a true story yet adding several Hollywood special effects on top
  • 35. • Level 4: ILLUSION or Severe BIMwash This is when the BIM Competency story amounts to pure fiction. This is similar to a Bollywood movie plot - all song and dance, colourful, and possibly amusing - but the actual story was never, and may never be, true!
  • 36. BIM is not • CAD “CAD helps people to draw. BIM helps people to construct.” (Richard Saxon, Ecobuild, February 2009) “BIM is not CAD. BIM was never meant to be CAD. CAD is a replacement for pen and paper, a documentation tool. By comparison, BIM programs are design applications in which the documentation flows from and is a derivative of the process, from schematic design to construction to facility management.” (Pete Zyskowski, Cadalyst)
  • 37. BIM is not • ------Software • ------new • ------just an IT issue... or just software • ------3D modeling • ------something designers do • ------just about project delivery • ------a short-lived fad • ------irrelevant to small projects • ------“the silver bullet” or “Holy Grail” • ------optional?