ABSTRACT
Several attempts have been undertaken to assess the status of integrated water
resources management readiness, planning and implementation in the Arab Region
since the last decade of the twentieth century. This paper considers four major efforts
which have been undertaken by the Centre for Environment and Development for the
Arab Region and Europe CEDARE (2000), the Global Water Partnership
GWP/CEDARE (2003), the Arab Water Council AWC (2005), and CEDARE (2006)
following the Danish Hydraulic Institute DHI/UNEP approach. The analyses of water
management situation with time show that the water-scarce, hyper-arid, Arab Region
has a chance to improve its conditions through applying integrated water management
approaches. Moreover, the whole region is committed to IWRM but with different
levels of involvement and implementation. The WSSD targets are likely to be met if
seriously and regionally coordinated. The level of awareness of IWRM among end
users, NGOs, and Water-related sectors and agencies needs to be raised. Moreover,
more efforts are required to mobilize the political will towards IWRM among non-
water professionals and decision makers.
INTRODUCTION
The Arab population, constituting more than 5% of the world population, enjoins less
than 1% of the world's freshwater resources. Moreover, the distribution of the limited
share of renewable water resources is subject to great variability in time and space.
Overall, the Arab Region renewable freshwater availability is estimated at about 335
Km3
/year. More than 55% of these amounts are originating from outside the region.
More than 80% of the limited precipitation received by the region is evaporated
indicating the highest aridity in the world, AWC (2005). This is depicted from the
land use patterns projected in Figure (1).
Due to the scarcity of water resources in the region, non-conventional water supplies
have been widely adopted in the form of desalination plants, wastewater reuse
programs, and irrigation schemes utilizing mixed agricultural drainage water. Fossil
groundwater has been extensively tapped in the desert areas. A total of about 30
Km3
/year of non renewable and non conventional water supplies are being produced.
The demand, on the other hand is estimated at about 195 Km3
/year (about 60% of the
renewable resources) and is highly escalating. The per capita share of renewable
water resources in the Arab Region is projected to decrease from about 1300 m3
/cap/y
in 1995 to 547 m3
/cap/y in year 2025! AWC (2006).
1
Assc. Prof. of Hydraulics, Irrigation and Hydraulics Department, Engineering, Cairo University
2
Regional Water Program Manager, Centre for Environment and Development for the Arab Region
and Europe (CEDARE)
Figure (1) Land Use Patterns in the Arab Region
In an effort to confront this problem, the Arab countries have initiated a process for
reviewing their water strategies and defining their long-term goals within the
framework of integrated water resources management. The development of the
vulnerable water resources on a sustainable basis should be achieved through regional
coordination and cooperation. A balanced understanding of the security problems of
food and water supply must be achieved. The history and progress of this IWRM
planning process, in the Arab Region, is the subject of the current paper. Particular
focusing is attributed to Arab countries on the Mediterranean Sea.
ASSESSMENT OF IWRM STATUS PRIOR TO WORLD WATER FORUM 2
CEDARE (2000), in preparation for the second world water forum conducted a
comprehensive assessment for the status of water resources management in Arab
Region with particular focusing on North African countries. The main results are
summarized, in an SPIR format, as:
a. State
• Hydrological management of water resources is not comprehensively coupled to
national agronomic, economic, environmental and social management strategies.
• Water supply management has been dominating national plans except recently (late
1990s) where many countries are shifting to demand management measures to
confront escalating scarcity of resources.
• Water quality and environmental concerns are lagging behind the efforts to augment
the available quantities of freshwater.
• The legal framework governing development and preservation of freshwater
resources is in place in most countries. However, enforcement of regulations is
seriously hindered.
$
$
$
$
$
$
$
$
$
$
$
$ $
$
$
$
$
$
$
$
$
$
$
$
$
Spain Turkey
Iran
Mali Niger
Chad
Nigeria Ethiopia
EgyptLibya
Algeria
Mauritania
Sudan
Zaire
Saudi Arabia
Yemen
Iraq
Morocco
Oman
Somalia
UAE
Kuwait
Syria
Jordan
Lebanon
Tunisia
#
Djibouti
#
Qatar#
Bahrain
Palestine
Land Use
Irrigated Crops
Rainfed Crops
Natural Pasture
Forests
Rocks & LavaSheets
Swamps
Desert
Political Boundaries
Rivers
Major Permanent Stream
Permanent Streams
Major Ephemeral Streams
Ephemeral Streams (Wadis)
Lakes and Swamps
$ Dams
• The institutional framework for IWRM is partially in place in many countries.
However, appropriate operationalisation of involved institutions is subject to
various constraints.
• Irrigated agriculture contributes 13% of national GDP in Morocco, 17% in Egypt.
• Employment in the agricultural sector (irrigated) accounts for 26% in Tunisia, and
about 40% in Egypt and Morocco.
• Access to safe drinking water is close to 100% for urban population of Libya, and
may drop to less than 50% for rural communities of Morocco. Sanitation services
are lagging behind especially for rural areas.
b. Pressure
• High rate of population growth, among the highest in the world, UNSPD (1997),
where population doubled in 30 years for the sub-region.
• Need to develop, or to make available, additional quantities of freshwater to fulfil
requirements of expanded agriculture, domestic and industrial supplies.
• One third of the population is living in drought-porn areas with short recurrent
periods.
• Global climate changes may pose threats to available freshwater.
• Lack of regulatory mechanisms to ensure enforcement of laws and regulations.
• Fragmentation in institutions and authorities concerned with water resources
management.
• Inadequate wastewater treatment.
• Proper capacity building for institutions is highly required.
• Lack of funds required to finance the water sector. Conditional foreign assistance
limits the anticipated benefits.
• Inter-sectoral reallocations versus social stability, foreign dependency, and
evolution into market economy.
• Maintaining the equilibrium between urban and rural (agronomy dependent)
development.
• Economic instruments to encourage IWRM are not effectively applied.
• Lack of appropriate treatment for industrial wastewater.
• Increased rates of agro-chemical applications.
• Poverty and low economic returns for farmers.
• Political instabilities in some countries, and imposed economic sanctions on others
(Libya and Sudan).
• Elevated pressures to join the globalization trend, international market economy,
GATT, …etc.
C. Impacts
• Integration needed, at basin level, hydrologic, agronomic, economic and social
relationships into a comprehensive modelling frame-work, generating policy
instruments, thus ensuring rational use and management of freshwater resources.
• Need to establish national / regional information frameworks / networks for
IWRM.
• Need to improve cooperation among centres of excellence to provide for better
processing and dissemination of information.
• Depletion and Salinization of coastal aquifers and rapid encroachment of the salt
water interface along the Mediterranean shoreline.
• Excessive extractions from fossil water reserves.
• Degradation of water quality of drains, and some irrigation channels.
• Potential for eutrofication of downstream water bodies and loss of natural
wetlands.
• Inappropriate hygienic conditions associated with lack of sanitation services,
pathogenic contamination resulting from illegal dumping of raw wastewater to
surface and groundwater.
• Social stability concerns calls for more development of land and water resources.
• Need to mobilize the political will, which usually over-rules technical decisions.
• Probable reduction of flow of the Blue Nile as a result of global warming and
regional climate variations.
• Insufficient technical and financial resources impede efforts for controlling water
hyacinth in upper Nile reaches.
• Excessive siltation and reservoir sedimentation hinders effective operation of flow
control structures in Morocco, Algeria, Tunisia and Sudan.
• Jeopardizing of development projects with promising benefits, like the Jongly
Canal Project, as a result of political instabilities and foreign interventions.
• Loss of valued biodiversity of aquatic fauna and associated impacts on rural/urban
migration.
D. Responses
• National policies for stabilizing population growth achieved partial success in
Tunisia and Egypt.
• Major demand management measures include:
- Extensive reuse of mixed agriculture drainage water for irrigation in Egypt.
- Drought management and mitigation plan for Morocco.
- Aquifer recharge in Tunisia.
- Programs for modernizing of irrigation techniques, and rationalizing of irrigation
water use in Egypt and Tunisia.
- Recycling and reuse of treated domestic wastewater (Egypt).
• Examples of cooperation for IWRM for shared resources:
- The Nile Basin Initiative (shared by all Nile riparian).
- Strategies for rational utilization of the Nubian Sandstone aquifer (Egypt, Sudan,
Libya, Chad).
• Major environmental preservation measures include:
- National program for abatement of discharge industrial wastewater to the Nile in
Egypt (1998-1999).
- Control and restriction of water use from lakes, natural bodies, … etc., in Tunisia,
for preserving the ecosystem.
- Constructed wetlands systems are tested in Egypt for WW biological treatment
- Major institutional and policy reform measures include:
- Creation of five basin authorities for IWRM in Algeria (1996).
- Revised national water resources management plans in all countries attempt to
formulate their policies within an IWRM framework. However, implementation of
these polices will judge its adherence to IWRM principles.
- A mature system of water user associations is in place in Tunisia, and Morocco.
- National water research centers are operating in Egypt, Tunisia, and Morocco.
• Conjunctive use of surface and groundwater is widely applied in Egypt, Tunisia,
and Morocco.
• Public awareness programs are widely applied in Egypt to preserve Nile water
quality, and to rationalize water use.
• Coordination for joint land and water resources management.
ASSESSMENT OF IWRM IN NORTH AFRICAN ARAB COUNTRIES FOLLOWING THE
INDICATORS PROPOSED BY THE GLOBAL WATER PARTNERSHIP (PRIOR TO WWF3)
The GWP Indicators for the status of IWRM readiness, planning and implementation
are summarized as :
• Awareness raised about IWRM and political will to support the process
• A framework for broad stakeholders participation
• Any ongoing activities that the IWRM plan can build on
• IWRM issues and challenges: identified?
• Management potential and constraints: identified?
• Adoption of IWRM plans at the highest political level: ensured?
• Capacity building: initiated?
• Portfolio of implementation projects and financial strategy of the plan: prepared?
Accordingly, CEDARE (2003) conducted a survey for these indicators for Egypt,
Libya, Tunisia, Algeria, Morocco, and Sudan. K. AbuZeid et al, 2004 elaborated on
the same survey. The main results, which are based on responses from country
officials, are summarized in the coming tables (1-7).
Steps Egypt
1. Awareness
about IWRM
High Political will. Good support to initiatives for shared visions
and regional cooperation on shared water resources.
2. Framework for
broad stakeholder
participation
The establishment of the Egyptian Water Partnership (EWP) for
dialogue between stakeholders on IWRM. Establishment of
water boards and water users associations.
3. Activities that
IWRM plan can
build on
IWRM plan is developing. Framework for implementation is
needed.
4. IWRM issues
and challenges
Identified
5. Management
potential and
constraints
Constraints are identified. Better coordination between the
irrigation, agriculture and water supply and sanitation sectors is
needed.
6. Political will Can be achieved.
7. Capacity
building
A regional training center for water resources management is
established.
8. Portfolio
implementation
projects &
financing strategy
Prepared and submitted to the North AMCOW interim Secretariat
(CEDARE). Financing strategy could be prepared.
Conclusion 2005 target of IWRM plan likely to be met.
Table (1) The GWP Indicators for the status of IWRM in Egypt
Steps Libya
1. Awareness
about IWRM
High political will. Sirt Summit for water and agriculture
organized in 2004. An environmental protection law, a water
well drilling law, and a forest protection law issued
3. Activities that
IWRM plan can
build on
Formation of a national committee on water resources.
Assessment of WRs, and identification of challenges.
Preparation of a water policy to meet challenges.
4. IWRM issues
and challenges
Identified.
5. Management
potential and
constraints
Identified.
6. Political will Adopted at the highest levels, due to the severe water scarcity
conditions.
7. Capacity
building
Organization of awareness campaigns to educate farmers on
efficient irrigation practices is ongoing.
8. Projs Portofolio,
financing strategy
Prepared and submitted to the North AMCOW interim Secretariat
(CEDARE). Financing strategy could be prepared.
Conclusion 2005 target likely to be met.
Table (2) The GWP Indicators for the status of IWRM in Libya
Steps Algeria
1. Awareness High Political will.
2. Framework for
broad stakeholder
participation
Hydrographic basin committees; “Parliaments of Water” are
created. Assure consultations within the basin, maintain the
balance of government representatives & water users associations
3. Activities that
IWRM plan can
build on
Formation of national water resources committee, 5 basin
authorities for IWRM in Algeria, 1996. Ministry of Equipment
1993, initiated a process of reform in the WSS Sector.
Consulting with main sectors; Agriculture, Industry, local
municipalities, a new Water Policy is adopted
4. IWRM issues
and challenges
Identified.
5. Management
potential and
constraints
Constraints have been comprehensively identified especially in
the water supply sector.
6. Political will Can be achieved.
7. Capacity
building
Training programmes were initiated in the early 90 ‘s, with high
level consultants, but stopped very quickly, due to some
instabilities encountered by the country.
8. Projs Portofolio,
financing strategy
Prepared and submitted to the North AMCOW interim Secretariat
(CEDARE). Financing strategy could be prepared.
Conclusion 2005 target likely to be met.
Table (3) The GWP Indicators for the status of IWRM in Algeria
Steps Tunisia
1. Awareness
about IWRM
High Political will.
2. Framework for
broad stakeholder
participation
High Involvement of the Farmers Union in the formulation of
water policies.
3. Activities that
IWRM plan can
build on
Formation of a national committee on water resources. The
strategy of water resources development for the next thirty years
is set to cover the different water requirements at a national level,
taking into account all IWRM principles.
4. IWRM issues
and challenges
Identified.
5. Management
potential and
constraints
Identified. Better coordination is required between irrigation, and
water supply and sanitation sectors. The legislative framework
needs to be reviewed.
6. Political will Adopted at the highest level.
7. Capacity
building
The education and research system has since 25 years supported
the policy of hydraulic infrastructure development. It needs some
adjustments to face the new challenges.
Conclusion 2005 target likely to be met.
Table (4) The GWP Indicators for the status of IWRM in Tunisia
Steps Morocco
1. Awareness
about IWRM
High Political will.
2. Stakeholder
participation
Progressing, PPP in process.
3. Activities that
IWRM plan can
build on
The establishment of the High national council on water is a
platform for the development of an IWRM plan. The plan for the
establishment of a public-private partnership in the drinking
water supply sector is ongoing.
4. IWRM issues
and challenges
Identified.
5. Management
potential and
constraints
Identified
6. Political will Can be achieved.
7. Capacity
building
Capacity building programmes in the water sector are existing.
8. Projs Portofolio,
financing strategy
Prepared and submitted to the North AMCOW interim Secretariat
(CEDARE). Financing strategy could be prepared.
Conclusion 2005 target likely to be met. A good scope of coordination among
sectors is shown.
Table (5) The GWP Indicators for the status of IWRM in Morocco
Steps Syria
1. Awareness Political will is high.
2. Framework for
broad stakeholder
participation
Farmers participation is among the elements of the new plan for
IWRM, however instruments for the implementation of
participation approaches needs strengthening.
3. Activities that
IWRM plan can
build on
The (1997-2000) policy focused on water resources development,
demand management, pollution control, and on the Country
Cooperation Framework.
A Plan for IWRM for 1998-2008 is developed, support by UNDP
4. IWRM issues
and challenges
Identified.
5. Management
potential and
constraints
Identified.
6. Political will Can be achieved.
7. Capacity
building
Among the strategy objectives, is the technical capacity building
of the institutions participating in the implementation of IWRM,
through a wide range of training modules in different aspects
related to water resources planning and management.
8. Projs Portofolio,
financing strategy
Prepared, and the financial strategy could be formulated.
Conclusion 2005 target likely to be met.
Table (6) The GWP Indicators for the status of IWRM in Syria
Required Assistance
to Meet the IWRM
2005 WSSD Target
Country
Plans / Strategies / Policies / Documents towards
IWRM Needs
some
support
Needs
substantial
support
Algeria X
Egypt
-Main Features for Water Policy towards Year
2017; Ministry of Water Resources & Irrigation, 2000.
-National Water Resources Plan; Ministry of Water
Resources & Irrigation, 2003.
X
Libya
-National Strategy for Water Resources
Management, 2000-2025 ;1999.
X
Morocco -Water Law. 1995 X
Sudan -Sudan National Water Policy. X
Tunisia
-L'Etat de l'Environment; 2002.
-L'Avenir de l'eau : un noveau challenge pour la
Tunisie
-The Long Term Strategy for the Water Sector in
Tunisia; Ministry of Agriculture, 2003.
X
Table (7) Status of Plans, Strategies, and Policies towards IWRM as of 2003
ASSESSMENT OF IWRM IN ARAB COUNTRIES CONDUCTED BY THE ARAB WATER
COUNCIL 2005
The Arab Water Council (AWC) is a non-governmental organization that endeavors
to promote better understanding and management of the water resources in the Arab
States in a multi-disciplinary, non-political, professional and scientific manner; to
disseminate knowledge, enhance sharing of experience and information for the
rational and comprehensive water resources development of the region for the
benefits of its inhabitants. Taking on these responsibilities, the AWC is committed to
share and present regional experiences at WWF4.
Throughout its regional consultations, a questionnaire circulated to different members
from all states resulted in the following interesting statistics:
• 94% agreed that cost of delivered water should be covered
• 72% recommend that stakeholders should partially participate in Water Resource
Management, 22% suggest that water resources management should be gradually
transferred to end users, while 6% advise that the government should be fully in
charge of all aspects of Water Resource Management
• 88% Agreed that we need to revise our water quality legislations and to
implement proper enforcement mechanisms, 6% suggest that we only need
enforcement mechanisms, and 6% recommended that water quality legislations
need to be revised/altered.
• From of a large pool of suggested actions toward better management of water, 14
actions are selected and prioritized according to the following order:
- Improving water quality
- Policy formulation and legislation enforcement
- Physical interventions
- Promoting water saving
- Capacity building
- Ensuring economic and financial sustainability
- Institutional reform/strengthening
- Enhancing applied research
- Raising awareness for IWRM
- Introducing technologies and information systems
- Developing monitoring and evaluation systems
- Inter-sectoral coordination
- Introducing water valuing mechanisms
- Boosting shared resources cooperation
THE DHI / UNEP APPROACH, 2006
The Danish Hydraulic Institute in cooperation with UNEP have designed a
questionnaire for assessment of country IWRM status through addressing the
following issues:
1. National Water Policy: existence, coverage, reference to IWRM as a base for
management, reference to the role of private sector, role of women, polluter
pays principle, user pays principle.
2. National Water Legislations: existence of specific water code or law,
ownership of water, specific obligations by law for public hearings,
stakeholder participation, river basin management, decentralization, water
duties, sanctions, separation between water management and water services
provisions, incentives for water efficiency.
3. Regulations Supporting the Water Law: effectiveness of existing regulations,
impediments to effectiveness of regulations (lack of awareness, lack of
monitoring capacity, lack of institutional capacity, contradiction of
regulations,…etc), harmonisation of water law with other laws
(environmental, health, ..etc.), harmonization with international agreements.
4. Institutional Framework: existence of cross-sectoral coordination body at the
national, local, and river-basin levels, existence of platform for public
participation
5. Institutional Capacity for undertaking IWRM: policy formulation, drafting of
legislations, cost recovery, information systems and data processing,
undertaking water-related assessments, monitoring of water-related issues,
planning of water use and water conservation.
6. Institutional Constraints: improper governance, mul-defined institutional
mandate, overlapping roles and responsibilities, inadequate equipment,
inappropriate office conditions, and inadequate budget.
7. Adequacy of human resources to handle IWRM: number of available staff,
quality of available staff, number of senior management personnel acquainted
with IWRM, staff motivation to implement IWRM, training in IWRM
8. Level of awareness of IWRM among different stakeholders: senior officials,
water management staff, water users, NGOs, consultants.
9. Implementation status of IWRM: existence of an action plan for IWRM
implementation, existence of a project portfolio and a capacity building
program within the plan, existence of a financing strategy and monitoring and
evaluation of implementation.
The situation in eight countries within the Arab Region has been assessed through
analysing the response to the previous questionnaire. These countries are: Algeria,
Egypt, Libya, Mauritania, Morocco, Palestine, and Syria. The analysis revealed the
following as per the year 2005:
A. Similar features in all countries
The following features attained the same responses from all countries:
- A water policy is existing in each country.
- The policy covers water supply and other issues in addition to water resources
management.
- The polluter pays principle is inherent to each policy
- Water is a property of state (ownership is not variant)
- A water law or code exists in each country
- Water legislations include obligations for public hearings, stakeholders
participation, and water use efficiency
- All water laws do not differentiate between society on gender basis
- A basin-level platform for public participation exists
- Available staff is motivated to a reasonably good degree to apply IWRM
principle to current water management!
- Lowest level of awareness of IWRM is experienced by NGOs and main water
users (Poor to Fair)
B. Similar features in most countries
The following features attained the same responses from most countries:
- Water policy is partially to fully harmonized with laws/regulations
- Water policy endorses IWRM principles as basis for water resources
management (6 countries), partially in the other 2
- Water legislations include obligations for basin-level management, and private
sector involvement
- National legal frameworks are harmonized with international agreements
endorsed by the respective countries
- Legislations include an elaboration for an IWRM process / plan / strategy
- A national entity exists for overall cross-sectoral coordination
- A local-level platforms for public participation exists
- A national-level platform exists in 4 countries, provincial-level platforms exist
in 3 countries
- Level of awareness of IWRM is reasonably good to high among decision
makers, professionals in water management and consultants!
C. Regulations supporting the water law and their effectiveness
Several regulations to support and enforce the water law are issued in all countries.
However the effectiveness of such regulations vary from country to country.
Generally, regulations are considered to be partially effective in 60% of the sampled
domain, fully effective in 25% of the countries and only one country considers them
to be not effective. This is depicted in Figure (2). Moreover, the impediments to
effectiveness are attributed to the following causes which are identified, as shown in
Figure (3), and ranked according to their importance:
a. Lack of awareness of regulations by end users
b. Insufficient knowledge of regulations by those who enforce them
c. Inadequacy of monitoring capacity
d. Lack of institutional capacity
e. Inappropriate enforcement of sanctions
f. Regulations themselves are complicated and in many cases too strict to be
followed
Effectiveness of Water Regulations
0
1
2
3
4
5
6
Fully Effective Partially Effective Not effective
No.ofCountries
Figure (2) Effectiveness of Regulations Supporting the Water Law
Impedements to Effectiveness
0
1
2
3
4
Lack of users
awareness
Lack of
officials
awareness
Lack of
monitoring
Lack of
institutional
capacity
Strict /
Complicated
regulations
lack of
inforcement
of sanctions
No.ofCountries
Figure (3) Factors Contributing to Impediments to Effectiveness of
Regulations Supporting the Water Law
D. Institutional capacity for water management based on IWRM principles
at the national / central level
The institutional capacity for water management based on IWRM principles, at the
national / central level, is judged in the current study according to eleven parameters
as shown in Figure (4). Generally, monitoring activities and recovery of costs of
water resources management exhibit lower scores and thus seem to be main
restraining factors for the institutional capacity. Furthermore, planning of resource
use, protection, and conservation scored average. On the other hand, activities related
to water resources assessments, environmental assessments, and legislation drafting
scored above average (functioning status). Finally, policy formulation, collection of
information on water systems and data management revealed an overall high score
(well functioning status).3
Institutional Performance
0
1
2
3
4
5
6
7
Policy
Form
ulation
Legislation
D
rafting
C
ostrecovery
Info.&
D
-B
ases
W
R
A
ssessm
ents
Env
A
ssessm
ents
Socio-econom
ic
A
ssessm
ents
M
onitoring
(w
ateravailability)
M
onitoring
(w
aterquality)
M
onitoring
(ecosystem
s)
M
onitoring
(pollution
loads)
M
onitoring
(w
ateruse)
Planning
(use/conservation)
No.ofCountries
Well
Functioning
Functioning
Poor
Functioning
Mul
Functioning
Figure (4) Factors Governing the Institutional Capacity at the National /
Central level for Applying IWRM Principles to Traditional Water
Management
Moreover, the major negative factors constraining the water resources management
institution(s) in the assessed countries have been contributed to the following factors,
ranked according to their priority (severity):
a. Inadequate equipment (laboratory, monitoring equipment, etc.)
b. Roles and responsibilities are overlapping for departments and institutes
c. Institutional mandate poorly defined
d. Lack of good governance (transparency, accountability, communication,
integrity, participation)
e. Inadequate budget
f. Inadequate office conditions
The previous outcomes are depicted in Figure (5). A remark, which is worthy of
mentioning here, is that insufficient budget has not been identified as a major
constraining factor.
3
It is the authors belief that although information on water resources may be present, it is the flow and
exchange of information that hinders the institutional capacity.
Institutional Constraints
0
1
2
3
4
5
6
7
Im
propergovernance
M
andate
m
ul-defined
R
esposibilities
unclear
Inadequate
equipm
ent
Inadequate
budget
Inadequate
offices
No.ofCountries
No Problem
Not Severe
Severe
Very Severe
Figure (5) The Major Negative Factors Constraining the Water Resources
Management Institution(s)
E. Human Resources and Staff Capabilities Regarding IWRM at National
Institutions
The staff capabilities situation in the national/central water resources management
institution(s) in relation to the IWRM functions is assessed according to five
parameters as explained in Figure (6). The analysis show that the number of staff,
and their qualifications, adequate for handling the IWRM functions at national
institutions is between fair to good, and did not reach the full command capacity in
any country. The same is valid for the training and capacity building programs
undertaken. Moreover, the staff seems to receive an above average motivation to
conduct IWRM responsibilities. Furthermore, the number of seniors with sufficient
knowledge of IWRM and capacity to implement it is fully sufficient in half of the
surveyed countries.
F. Level of Awareness of IWRM
Is IWRM and the inherent concepts known and understood by the major operators in
the water sector and sectors relating to water (e.g. agriculture/irrigation, hydropower,
health, environment, water supply and sanitation)? The answer is represented in
Figure (7).
The results of the questionnaire show that the highest level of awareness of IWRM
exist among professionals in institutes mandated for water management followed by
high level decision makers in these institutes and their consultants.
Human Resources Adequacy
0
1
2
3
4
5
6
7
Staff No. Quality Motivation Seniors No. Training
No.ofCountries
V. Good
Good
Fair
Figure (6) Human Resources and Staff Capabilities at National Water
Resources Management Institution(s)
Professionals in agencies within water use and water related sectors scored fair to
good, while end users scored fair to poor. The survey also shows that the lowest level
of awareness is encountered by NGOs (poor to fair).
Awareness of IWRM
0
1
2
3
4
5
6
Decision
makers
Professional
officials
Water-related
agencies
Water users Consultants NGOs
No.ofCountries
V. Good
Good
Fair
Poor
Figure (7) The Level of Awareness of IWRM among Different Stakeholders
G. Status of Implementation of an IWRM Framework
The survey shows that three out eight countries (about 40 %) already have an IWRM
action plan, while four countries (50%) are in the process of producing one, and only
in one country this process is not foreseen. The former three countries also produced
a portfolio of projects associated with the IWRM actions plan, and have some sort of
financing strategy. Two of these countries also produced a monitoring plan for
evaluating the implementation process. In this respect half of the countries are on
their way to produce such an M&E plan, while the remaining 25% did not initiate this
process yet.
Status of IWRM Implementation
0
1
2
3
4
5
Existence of plan Project portofolio Capacity building Financing
strategy
M&E of
implementation
No.ofCountries
Yes
No
Ongoing
Figure (7) Status of Implementation of IWRM
CONCLUSIONS
1. Limited water resources in the region is an overwhelming condition, however
there is still considerable room for sustainable management of water resources
provided IWRM is adopted and implemented
2. Arab countries are committed to IWRM. The WSSD 2005 target is met by five
countries, and is likely to be met by the rest of the region before 2007 if seriously
and regionally coordinated.
3. IWRM is however at various levels of planning and implementation in the region.
4. Technical and financial support are required for some of the countries for the
development of management plans, institutional reform, awareness raising and
capacity building.
5. Educating NGOs and end users require immediate attention
6. Coordinating assistance and efforts is highly required. After all, integrated
management requires integration of efforts in the first place
REFERENCES
1. AWC (2005) “State of the Water in the Arab region” Arab Water Council
Report.
2. AWC (2006) “Regional Document for the MENA Region” WWF4, Mexico
City, Mexico, 2006.
3. CEDARE/GWP-Med, Framework For Action for North Africa, “Water for the
21st
Century, From Vision to Action”, 2003.
4. CEDARE / AWC / UNDP (2005) “Status of Integrated Water Resources
Management Plans in the Arab Region” Arab Water Council Report
5. K. AbuZeid and A. AbdelMegeed, “Status of Integrated Water Resources
Management Planning in Arab Mediterranean Countries” WB session on
IWRM, International Water Demand Management Conference, Dead Sea,
Jordan, Jun 2004.

Contenu connexe

Tendances

National Water Policy of Ghana
National Water Policy of GhanaNational Water Policy of Ghana
National Water Policy of GhanaEnoch Ofosu
 
Geopolitics of Water In The MENA
Geopolitics of Water In The MENAGeopolitics of Water In The MENA
Geopolitics of Water In The MENAcconvery
 
Watershed management for sustainable water supply
Watershed management for sustainable water supplyWatershed management for sustainable water supply
Watershed management for sustainable water supplyLloyd Celeste
 
India's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for ImplementationIndia's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for ImplementationIWRS Society
 
Evolution of watershed management in nepal
Evolution of watershed management in nepalEvolution of watershed management in nepal
Evolution of watershed management in nepalManoj Neupane
 
Integrated Approaches to Nutrient Reduction: Protecting Soil and Water Resour...
Integrated Approaches to Nutrient Reduction: Protecting Soil and Water Resour...Integrated Approaches to Nutrient Reduction: Protecting Soil and Water Resour...
Integrated Approaches to Nutrient Reduction: Protecting Soil and Water Resour...Iwl Pcu
 
Introduction to Water Resource Management
Introduction to Water Resource ManagementIntroduction to Water Resource Management
Introduction to Water Resource ManagementKaium Chowdhury
 
watershed management-Dr.G.GADDEYYA
watershed management-Dr.G.GADDEYYAwatershed management-Dr.G.GADDEYYA
watershed management-Dr.G.GADDEYYAGADDEYYA GANDIPILLI
 
Abdulrazzak - Coordinating Action at the Regional Level
Abdulrazzak - Coordinating Action at the Regional LevelAbdulrazzak - Coordinating Action at the Regional Level
Abdulrazzak - Coordinating Action at the Regional LevelLaura Haddad
 
06 115 water resources management
06 115 water resources management06 115 water resources management
06 115 water resources managementAHMED NADIM JILANI
 
Why is water resources management critical
Why is water resources management criticalWhy is water resources management critical
Why is water resources management criticalKaium Chowdhury
 
Water resources Status in Nepal
Water resources Status in NepalWater resources Status in Nepal
Water resources Status in NepalAshok Parajuli
 

Tendances (19)

Water Policies in India
Water Policies in IndiaWater Policies in India
Water Policies in India
 
National Water Policy of Ghana
National Water Policy of GhanaNational Water Policy of Ghana
National Water Policy of Ghana
 
Geopolitics of Water In The MENA
Geopolitics of Water In The MENAGeopolitics of Water In The MENA
Geopolitics of Water In The MENA
 
Nwp 1987
Nwp 1987Nwp 1987
Nwp 1987
 
Watershed management for sustainable water supply
Watershed management for sustainable water supplyWatershed management for sustainable water supply
Watershed management for sustainable water supply
 
Iwrm sai
Iwrm saiIwrm sai
Iwrm sai
 
Introduction to IWRM
Introduction to IWRM Introduction to IWRM
Introduction to IWRM
 
India's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for ImplementationIndia's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for Implementation
 
Evolution of watershed management in nepal
Evolution of watershed management in nepalEvolution of watershed management in nepal
Evolution of watershed management in nepal
 
Integrated Approaches to Nutrient Reduction: Protecting Soil and Water Resour...
Integrated Approaches to Nutrient Reduction: Protecting Soil and Water Resour...Integrated Approaches to Nutrient Reduction: Protecting Soil and Water Resour...
Integrated Approaches to Nutrient Reduction: Protecting Soil and Water Resour...
 
National waterpolicy
National waterpolicyNational waterpolicy
National waterpolicy
 
Introduction to Water Resource Management
Introduction to Water Resource ManagementIntroduction to Water Resource Management
Introduction to Water Resource Management
 
watershed management-Dr.G.GADDEYYA
watershed management-Dr.G.GADDEYYAwatershed management-Dr.G.GADDEYYA
watershed management-Dr.G.GADDEYYA
 
Abdulrazzak - Coordinating Action at the Regional Level
Abdulrazzak - Coordinating Action at the Regional LevelAbdulrazzak - Coordinating Action at the Regional Level
Abdulrazzak - Coordinating Action at the Regional Level
 
06 115 water resources management
06 115 water resources management06 115 water resources management
06 115 water resources management
 
Why is water resources management critical
Why is water resources management criticalWhy is water resources management critical
Why is water resources management critical
 
Water Resource Management
Water Resource ManagementWater Resource Management
Water Resource Management
 
Waterscarcity
WaterscarcityWaterscarcity
Waterscarcity
 
Water resources Status in Nepal
Water resources Status in NepalWater resources Status in Nepal
Water resources Status in Nepal
 

En vedette

Responsive web design
Responsive web designResponsive web design
Responsive web designDavid Jacob
 
MBA in Shipping & Logistics with 3 years experience in Trade Compliance & Cu...
MBA in Shipping & Logistics with  3 years experience in Trade Compliance & Cu...MBA in Shipping & Logistics with  3 years experience in Trade Compliance & Cu...
MBA in Shipping & Logistics with 3 years experience in Trade Compliance & Cu...Anoop Sharma
 
2014 T1 Tax Update
2014 T1 Tax Update2014 T1 Tax Update
2014 T1 Tax UpdatePeter Wiebe
 
Cinematography
Cinematography Cinematography
Cinematography L C
 
Scan!_Brochure
Scan!_BrochureScan!_Brochure
Scan!_BrochureLaura Long
 
Random 150204104724-conversion-gate01
Random 150204104724-conversion-gate01Random 150204104724-conversion-gate01
Random 150204104724-conversion-gate01kate_ostrozka
 
BEAR GRANT 2015 PORTFOLIO PAGES_5_11_2015_SMALL
BEAR GRANT 2015 PORTFOLIO PAGES_5_11_2015_SMALLBEAR GRANT 2015 PORTFOLIO PAGES_5_11_2015_SMALL
BEAR GRANT 2015 PORTFOLIO PAGES_5_11_2015_SMALLBeresford Grant
 

En vedette (15)

RESUME
RESUMERESUME
RESUME
 
Sterktes
SterktesSterktes
Sterktes
 
CERTIFICATES
CERTIFICATESCERTIFICATES
CERTIFICATES
 
Thief Review
Thief ReviewThief Review
Thief Review
 
Responsive web design
Responsive web designResponsive web design
Responsive web design
 
MBA in Shipping & Logistics with 3 years experience in Trade Compliance & Cu...
MBA in Shipping & Logistics with  3 years experience in Trade Compliance & Cu...MBA in Shipping & Logistics with  3 years experience in Trade Compliance & Cu...
MBA in Shipping & Logistics with 3 years experience in Trade Compliance & Cu...
 
Retorik svenska 1
Retorik svenska 1Retorik svenska 1
Retorik svenska 1
 
2014 T1 Tax Update
2014 T1 Tax Update2014 T1 Tax Update
2014 T1 Tax Update
 
Cinematography
Cinematography Cinematography
Cinematography
 
American_Neo-Classicism2
American_Neo-Classicism2American_Neo-Classicism2
American_Neo-Classicism2
 
Scan!_Brochure
Scan!_BrochureScan!_Brochure
Scan!_Brochure
 
Random 150204104724-conversion-gate01
Random 150204104724-conversion-gate01Random 150204104724-conversion-gate01
Random 150204104724-conversion-gate01
 
SMC - Minisite/Landing Pages
SMC - Minisite/Landing PagesSMC - Minisite/Landing Pages
SMC - Minisite/Landing Pages
 
Saravanan rajalingam
Saravanan rajalingamSaravanan rajalingam
Saravanan rajalingam
 
BEAR GRANT 2015 PORTFOLIO PAGES_5_11_2015_SMALL
BEAR GRANT 2015 PORTFOLIO PAGES_5_11_2015_SMALLBEAR GRANT 2015 PORTFOLIO PAGES_5_11_2015_SMALL
BEAR GRANT 2015 PORTFOLIO PAGES_5_11_2015_SMALL
 

Similaire à Files15 file2289

Coping with Water Scarcity in Near East and North Africa: Shifting Gear
Coping with Water Scarcity in Near East and North Africa: Shifting GearCoping with Water Scarcity in Near East and North Africa: Shifting Gear
Coping with Water Scarcity in Near East and North Africa: Shifting GearFAO
 
Impacts of climate change on agriculture
Impacts of climate change on agricultureImpacts of climate change on agriculture
Impacts of climate change on agricultureCarmen Capriles
 
Water resources management in africa
Water resources management in africaWater resources management in africa
Water resources management in africaDogara Bashir
 
Assessment of water management efficiency in Egypt
Assessment of water management efficiency in EgyptAssessment of water management efficiency in Egypt
Assessment of water management efficiency in EgyptICARDA
 
WATER INNOVATION SUMMIT 2023 | Sessione 6-Ciarlo
WATER INNOVATION SUMMIT 2023 | Sessione 6-Ciarlo WATER INNOVATION SUMMIT 2023 | Sessione 6-Ciarlo
WATER INNOVATION SUMMIT 2023 | Sessione 6-Ciarlo Servizi a rete
 
WATER INNOVATION SUMMIT 2023 | Sessione 6-Sertoli
WATER INNOVATION SUMMIT 2023 | Sessione 6-SertoliWATER INNOVATION SUMMIT 2023 | Sessione 6-Sertoli
WATER INNOVATION SUMMIT 2023 | Sessione 6-SertoliServizi a rete
 
T5 mohammed karrou supplemental irrigation exec summary
T5 mohammed karrou supplemental irrigation  exec summaryT5 mohammed karrou supplemental irrigation  exec summary
T5 mohammed karrou supplemental irrigation exec summaryNENAwaterscarcity
 
Dr teshome increasing water accessibility - shorter (2)
Dr teshome   increasing water accessibility -  shorter (2)Dr teshome   increasing water accessibility -  shorter (2)
Dr teshome increasing water accessibility - shorter (2)Karen157
 
Coordinating land and water governance in the context of food security
Coordinating land and water governance in the context of food securityCoordinating land and water governance in the context of food security
Coordinating land and water governance in the context of food securityGlobal Water Partnership
 
Water Management in Dry land And Irrigation Scheduling in Tobacco
Water Management in Dry land And Irrigation Scheduling in TobaccoWater Management in Dry land And Irrigation Scheduling in Tobacco
Water Management in Dry land And Irrigation Scheduling in TobaccoAminul Huq
 
T5: Supplemental irrigation: Case of Tadla region in Morocco
T5: Supplemental irrigation: Case of Tadla region in MoroccoT5: Supplemental irrigation: Case of Tadla region in Morocco
T5: Supplemental irrigation: Case of Tadla region in MoroccoFAO
 
EU DG Climate Action Initiative
EU DG Climate Action InitiativeEU DG Climate Action Initiative
EU DG Climate Action Initiativeclimasouth
 
Lecture 2-CVS 445.ppt
Lecture 2-CVS 445.pptLecture 2-CVS 445.ppt
Lecture 2-CVS 445.pptLawrence Omai
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...UNESCO Venice Office
 
Turkey Anatolia Watershed Rehabilitation Project Presentation
Turkey Anatolia Watershed Rehabilitation Project PresentationTurkey Anatolia Watershed Rehabilitation Project Presentation
Turkey Anatolia Watershed Rehabilitation Project PresentationIwl Pcu
 
The Role of Science and Technology in the Dilemma of Drought and Food Securit...
The Role of Science and Technology in the Dilemma of Drought and Food Securit...The Role of Science and Technology in the Dilemma of Drought and Food Securit...
The Role of Science and Technology in the Dilemma of Drought and Food Securit...Global Risk Forum GRFDavos
 
Operational Drainage Water Reuse Guidelines
Operational Drainage Water Reuse GuidelinesOperational Drainage Water Reuse Guidelines
Operational Drainage Water Reuse GuidelinesFAO
 

Similaire à Files15 file2289 (20)

Coping with Water Scarcity in Near East and North Africa: Shifting Gear
Coping with Water Scarcity in Near East and North Africa: Shifting GearCoping with Water Scarcity in Near East and North Africa: Shifting Gear
Coping with Water Scarcity in Near East and North Africa: Shifting Gear
 
Impacts of climate change on agriculture
Impacts of climate change on agricultureImpacts of climate change on agriculture
Impacts of climate change on agriculture
 
Water resources management in africa
Water resources management in africaWater resources management in africa
Water resources management in africa
 
Assessment of water management efficiency in Egypt
Assessment of water management efficiency in EgyptAssessment of water management efficiency in Egypt
Assessment of water management efficiency in Egypt
 
WATER INNOVATION SUMMIT 2023 | Sessione 6-Ciarlo
WATER INNOVATION SUMMIT 2023 | Sessione 6-Ciarlo WATER INNOVATION SUMMIT 2023 | Sessione 6-Ciarlo
WATER INNOVATION SUMMIT 2023 | Sessione 6-Ciarlo
 
WATER INNOVATION SUMMIT 2023 | Sessione 6-Sertoli
WATER INNOVATION SUMMIT 2023 | Sessione 6-SertoliWATER INNOVATION SUMMIT 2023 | Sessione 6-Sertoli
WATER INNOVATION SUMMIT 2023 | Sessione 6-Sertoli
 
T5 mohammed karrou supplemental irrigation exec summary
T5 mohammed karrou supplemental irrigation  exec summaryT5 mohammed karrou supplemental irrigation  exec summary
T5 mohammed karrou supplemental irrigation exec summary
 
Dr teshome increasing water accessibility - shorter (2)
Dr teshome   increasing water accessibility -  shorter (2)Dr teshome   increasing water accessibility -  shorter (2)
Dr teshome increasing water accessibility - shorter (2)
 
Coordinating land and water governance in the context of food security
Coordinating land and water governance in the context of food securityCoordinating land and water governance in the context of food security
Coordinating land and water governance in the context of food security
 
Water Management in Dry land And Irrigation Scheduling in Tobacco
Water Management in Dry land And Irrigation Scheduling in TobaccoWater Management in Dry land And Irrigation Scheduling in Tobacco
Water Management in Dry land And Irrigation Scheduling in Tobacco
 
T5: Supplemental irrigation: Case of Tadla region in Morocco
T5: Supplemental irrigation: Case of Tadla region in MoroccoT5: Supplemental irrigation: Case of Tadla region in Morocco
T5: Supplemental irrigation: Case of Tadla region in Morocco
 
EU DG Climate Action Initiative
EU DG Climate Action InitiativeEU DG Climate Action Initiative
EU DG Climate Action Initiative
 
Lecture 2-CVS 445.ppt
Lecture 2-CVS 445.pptLecture 2-CVS 445.ppt
Lecture 2-CVS 445.ppt
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
 
Turkey Anatolia Watershed Rehabilitation Project Presentation
Turkey Anatolia Watershed Rehabilitation Project PresentationTurkey Anatolia Watershed Rehabilitation Project Presentation
Turkey Anatolia Watershed Rehabilitation Project Presentation
 
Waterscarcity
WaterscarcityWaterscarcity
Waterscarcity
 
The Role of Science and Technology in the Dilemma of Drought and Food Securit...
The Role of Science and Technology in the Dilemma of Drought and Food Securit...The Role of Science and Technology in the Dilemma of Drought and Food Securit...
The Role of Science and Technology in the Dilemma of Drought and Food Securit...
 
Unethical and inimical practices in large-scale land acquisitions in west africa
Unethical and inimical practices in large-scale land acquisitions in west africaUnethical and inimical practices in large-scale land acquisitions in west africa
Unethical and inimical practices in large-scale land acquisitions in west africa
 
Magdy Salah El-Dein • 2017 IFPRI Egypt Seminar in partnership with WorldFish:...
Magdy Salah El-Dein • 2017 IFPRI Egypt Seminar in partnership with WorldFish:...Magdy Salah El-Dein • 2017 IFPRI Egypt Seminar in partnership with WorldFish:...
Magdy Salah El-Dein • 2017 IFPRI Egypt Seminar in partnership with WorldFish:...
 
Operational Drainage Water Reuse Guidelines
Operational Drainage Water Reuse GuidelinesOperational Drainage Water Reuse Guidelines
Operational Drainage Water Reuse Guidelines
 

Dernier

home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 

Dernier (20)

home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 

Files15 file2289

  • 1. Challenges of Implementing IWRM in the Arab Region Ahmad Wagdy1 , Ph.D. and Khaled AbuZeid2 , Ph.D. WWF4, Mexico City, Mexico, 2006 ABSTRACT Several attempts have been undertaken to assess the status of integrated water resources management readiness, planning and implementation in the Arab Region since the last decade of the twentieth century. This paper considers four major efforts which have been undertaken by the Centre for Environment and Development for the Arab Region and Europe CEDARE (2000), the Global Water Partnership GWP/CEDARE (2003), the Arab Water Council AWC (2005), and CEDARE (2006) following the Danish Hydraulic Institute DHI/UNEP approach. The analyses of water management situation with time show that the water-scarce, hyper-arid, Arab Region has a chance to improve its conditions through applying integrated water management approaches. Moreover, the whole region is committed to IWRM but with different levels of involvement and implementation. The WSSD targets are likely to be met if seriously and regionally coordinated. The level of awareness of IWRM among end users, NGOs, and Water-related sectors and agencies needs to be raised. Moreover, more efforts are required to mobilize the political will towards IWRM among non- water professionals and decision makers. INTRODUCTION The Arab population, constituting more than 5% of the world population, enjoins less than 1% of the world's freshwater resources. Moreover, the distribution of the limited share of renewable water resources is subject to great variability in time and space. Overall, the Arab Region renewable freshwater availability is estimated at about 335 Km3 /year. More than 55% of these amounts are originating from outside the region. More than 80% of the limited precipitation received by the region is evaporated indicating the highest aridity in the world, AWC (2005). This is depicted from the land use patterns projected in Figure (1). Due to the scarcity of water resources in the region, non-conventional water supplies have been widely adopted in the form of desalination plants, wastewater reuse programs, and irrigation schemes utilizing mixed agricultural drainage water. Fossil groundwater has been extensively tapped in the desert areas. A total of about 30 Km3 /year of non renewable and non conventional water supplies are being produced. The demand, on the other hand is estimated at about 195 Km3 /year (about 60% of the renewable resources) and is highly escalating. The per capita share of renewable water resources in the Arab Region is projected to decrease from about 1300 m3 /cap/y in 1995 to 547 m3 /cap/y in year 2025! AWC (2006). 1 Assc. Prof. of Hydraulics, Irrigation and Hydraulics Department, Engineering, Cairo University 2 Regional Water Program Manager, Centre for Environment and Development for the Arab Region and Europe (CEDARE)
  • 2. Figure (1) Land Use Patterns in the Arab Region In an effort to confront this problem, the Arab countries have initiated a process for reviewing their water strategies and defining their long-term goals within the framework of integrated water resources management. The development of the vulnerable water resources on a sustainable basis should be achieved through regional coordination and cooperation. A balanced understanding of the security problems of food and water supply must be achieved. The history and progress of this IWRM planning process, in the Arab Region, is the subject of the current paper. Particular focusing is attributed to Arab countries on the Mediterranean Sea. ASSESSMENT OF IWRM STATUS PRIOR TO WORLD WATER FORUM 2 CEDARE (2000), in preparation for the second world water forum conducted a comprehensive assessment for the status of water resources management in Arab Region with particular focusing on North African countries. The main results are summarized, in an SPIR format, as: a. State • Hydrological management of water resources is not comprehensively coupled to national agronomic, economic, environmental and social management strategies. • Water supply management has been dominating national plans except recently (late 1990s) where many countries are shifting to demand management measures to confront escalating scarcity of resources. • Water quality and environmental concerns are lagging behind the efforts to augment the available quantities of freshwater. • The legal framework governing development and preservation of freshwater resources is in place in most countries. However, enforcement of regulations is seriously hindered. $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Spain Turkey Iran Mali Niger Chad Nigeria Ethiopia EgyptLibya Algeria Mauritania Sudan Zaire Saudi Arabia Yemen Iraq Morocco Oman Somalia UAE Kuwait Syria Jordan Lebanon Tunisia # Djibouti # Qatar# Bahrain Palestine Land Use Irrigated Crops Rainfed Crops Natural Pasture Forests Rocks & LavaSheets Swamps Desert Political Boundaries Rivers Major Permanent Stream Permanent Streams Major Ephemeral Streams Ephemeral Streams (Wadis) Lakes and Swamps $ Dams
  • 3. • The institutional framework for IWRM is partially in place in many countries. However, appropriate operationalisation of involved institutions is subject to various constraints. • Irrigated agriculture contributes 13% of national GDP in Morocco, 17% in Egypt. • Employment in the agricultural sector (irrigated) accounts for 26% in Tunisia, and about 40% in Egypt and Morocco. • Access to safe drinking water is close to 100% for urban population of Libya, and may drop to less than 50% for rural communities of Morocco. Sanitation services are lagging behind especially for rural areas. b. Pressure • High rate of population growth, among the highest in the world, UNSPD (1997), where population doubled in 30 years for the sub-region. • Need to develop, or to make available, additional quantities of freshwater to fulfil requirements of expanded agriculture, domestic and industrial supplies. • One third of the population is living in drought-porn areas with short recurrent periods. • Global climate changes may pose threats to available freshwater. • Lack of regulatory mechanisms to ensure enforcement of laws and regulations. • Fragmentation in institutions and authorities concerned with water resources management. • Inadequate wastewater treatment. • Proper capacity building for institutions is highly required. • Lack of funds required to finance the water sector. Conditional foreign assistance limits the anticipated benefits. • Inter-sectoral reallocations versus social stability, foreign dependency, and evolution into market economy. • Maintaining the equilibrium between urban and rural (agronomy dependent) development. • Economic instruments to encourage IWRM are not effectively applied. • Lack of appropriate treatment for industrial wastewater. • Increased rates of agro-chemical applications. • Poverty and low economic returns for farmers. • Political instabilities in some countries, and imposed economic sanctions on others (Libya and Sudan). • Elevated pressures to join the globalization trend, international market economy, GATT, …etc. C. Impacts • Integration needed, at basin level, hydrologic, agronomic, economic and social relationships into a comprehensive modelling frame-work, generating policy instruments, thus ensuring rational use and management of freshwater resources. • Need to establish national / regional information frameworks / networks for IWRM. • Need to improve cooperation among centres of excellence to provide for better processing and dissemination of information.
  • 4. • Depletion and Salinization of coastal aquifers and rapid encroachment of the salt water interface along the Mediterranean shoreline. • Excessive extractions from fossil water reserves. • Degradation of water quality of drains, and some irrigation channels. • Potential for eutrofication of downstream water bodies and loss of natural wetlands. • Inappropriate hygienic conditions associated with lack of sanitation services, pathogenic contamination resulting from illegal dumping of raw wastewater to surface and groundwater. • Social stability concerns calls for more development of land and water resources. • Need to mobilize the political will, which usually over-rules technical decisions. • Probable reduction of flow of the Blue Nile as a result of global warming and regional climate variations. • Insufficient technical and financial resources impede efforts for controlling water hyacinth in upper Nile reaches. • Excessive siltation and reservoir sedimentation hinders effective operation of flow control structures in Morocco, Algeria, Tunisia and Sudan. • Jeopardizing of development projects with promising benefits, like the Jongly Canal Project, as a result of political instabilities and foreign interventions. • Loss of valued biodiversity of aquatic fauna and associated impacts on rural/urban migration. D. Responses • National policies for stabilizing population growth achieved partial success in Tunisia and Egypt. • Major demand management measures include: - Extensive reuse of mixed agriculture drainage water for irrigation in Egypt. - Drought management and mitigation plan for Morocco. - Aquifer recharge in Tunisia. - Programs for modernizing of irrigation techniques, and rationalizing of irrigation water use in Egypt and Tunisia. - Recycling and reuse of treated domestic wastewater (Egypt). • Examples of cooperation for IWRM for shared resources: - The Nile Basin Initiative (shared by all Nile riparian). - Strategies for rational utilization of the Nubian Sandstone aquifer (Egypt, Sudan, Libya, Chad). • Major environmental preservation measures include: - National program for abatement of discharge industrial wastewater to the Nile in Egypt (1998-1999). - Control and restriction of water use from lakes, natural bodies, … etc., in Tunisia, for preserving the ecosystem. - Constructed wetlands systems are tested in Egypt for WW biological treatment - Major institutional and policy reform measures include: - Creation of five basin authorities for IWRM in Algeria (1996). - Revised national water resources management plans in all countries attempt to formulate their policies within an IWRM framework. However, implementation of these polices will judge its adherence to IWRM principles. - A mature system of water user associations is in place in Tunisia, and Morocco.
  • 5. - National water research centers are operating in Egypt, Tunisia, and Morocco. • Conjunctive use of surface and groundwater is widely applied in Egypt, Tunisia, and Morocco. • Public awareness programs are widely applied in Egypt to preserve Nile water quality, and to rationalize water use. • Coordination for joint land and water resources management. ASSESSMENT OF IWRM IN NORTH AFRICAN ARAB COUNTRIES FOLLOWING THE INDICATORS PROPOSED BY THE GLOBAL WATER PARTNERSHIP (PRIOR TO WWF3) The GWP Indicators for the status of IWRM readiness, planning and implementation are summarized as : • Awareness raised about IWRM and political will to support the process • A framework for broad stakeholders participation • Any ongoing activities that the IWRM plan can build on • IWRM issues and challenges: identified? • Management potential and constraints: identified? • Adoption of IWRM plans at the highest political level: ensured? • Capacity building: initiated? • Portfolio of implementation projects and financial strategy of the plan: prepared? Accordingly, CEDARE (2003) conducted a survey for these indicators for Egypt, Libya, Tunisia, Algeria, Morocco, and Sudan. K. AbuZeid et al, 2004 elaborated on the same survey. The main results, which are based on responses from country officials, are summarized in the coming tables (1-7). Steps Egypt 1. Awareness about IWRM High Political will. Good support to initiatives for shared visions and regional cooperation on shared water resources. 2. Framework for broad stakeholder participation The establishment of the Egyptian Water Partnership (EWP) for dialogue between stakeholders on IWRM. Establishment of water boards and water users associations. 3. Activities that IWRM plan can build on IWRM plan is developing. Framework for implementation is needed. 4. IWRM issues and challenges Identified 5. Management potential and constraints Constraints are identified. Better coordination between the irrigation, agriculture and water supply and sanitation sectors is needed. 6. Political will Can be achieved. 7. Capacity building A regional training center for water resources management is established. 8. Portfolio implementation projects & financing strategy Prepared and submitted to the North AMCOW interim Secretariat (CEDARE). Financing strategy could be prepared. Conclusion 2005 target of IWRM plan likely to be met. Table (1) The GWP Indicators for the status of IWRM in Egypt
  • 6. Steps Libya 1. Awareness about IWRM High political will. Sirt Summit for water and agriculture organized in 2004. An environmental protection law, a water well drilling law, and a forest protection law issued 3. Activities that IWRM plan can build on Formation of a national committee on water resources. Assessment of WRs, and identification of challenges. Preparation of a water policy to meet challenges. 4. IWRM issues and challenges Identified. 5. Management potential and constraints Identified. 6. Political will Adopted at the highest levels, due to the severe water scarcity conditions. 7. Capacity building Organization of awareness campaigns to educate farmers on efficient irrigation practices is ongoing. 8. Projs Portofolio, financing strategy Prepared and submitted to the North AMCOW interim Secretariat (CEDARE). Financing strategy could be prepared. Conclusion 2005 target likely to be met. Table (2) The GWP Indicators for the status of IWRM in Libya Steps Algeria 1. Awareness High Political will. 2. Framework for broad stakeholder participation Hydrographic basin committees; “Parliaments of Water” are created. Assure consultations within the basin, maintain the balance of government representatives & water users associations 3. Activities that IWRM plan can build on Formation of national water resources committee, 5 basin authorities for IWRM in Algeria, 1996. Ministry of Equipment 1993, initiated a process of reform in the WSS Sector. Consulting with main sectors; Agriculture, Industry, local municipalities, a new Water Policy is adopted 4. IWRM issues and challenges Identified. 5. Management potential and constraints Constraints have been comprehensively identified especially in the water supply sector. 6. Political will Can be achieved. 7. Capacity building Training programmes were initiated in the early 90 ‘s, with high level consultants, but stopped very quickly, due to some instabilities encountered by the country. 8. Projs Portofolio, financing strategy Prepared and submitted to the North AMCOW interim Secretariat (CEDARE). Financing strategy could be prepared. Conclusion 2005 target likely to be met. Table (3) The GWP Indicators for the status of IWRM in Algeria
  • 7. Steps Tunisia 1. Awareness about IWRM High Political will. 2. Framework for broad stakeholder participation High Involvement of the Farmers Union in the formulation of water policies. 3. Activities that IWRM plan can build on Formation of a national committee on water resources. The strategy of water resources development for the next thirty years is set to cover the different water requirements at a national level, taking into account all IWRM principles. 4. IWRM issues and challenges Identified. 5. Management potential and constraints Identified. Better coordination is required between irrigation, and water supply and sanitation sectors. The legislative framework needs to be reviewed. 6. Political will Adopted at the highest level. 7. Capacity building The education and research system has since 25 years supported the policy of hydraulic infrastructure development. It needs some adjustments to face the new challenges. Conclusion 2005 target likely to be met. Table (4) The GWP Indicators for the status of IWRM in Tunisia Steps Morocco 1. Awareness about IWRM High Political will. 2. Stakeholder participation Progressing, PPP in process. 3. Activities that IWRM plan can build on The establishment of the High national council on water is a platform for the development of an IWRM plan. The plan for the establishment of a public-private partnership in the drinking water supply sector is ongoing. 4. IWRM issues and challenges Identified. 5. Management potential and constraints Identified 6. Political will Can be achieved. 7. Capacity building Capacity building programmes in the water sector are existing. 8. Projs Portofolio, financing strategy Prepared and submitted to the North AMCOW interim Secretariat (CEDARE). Financing strategy could be prepared. Conclusion 2005 target likely to be met. A good scope of coordination among sectors is shown. Table (5) The GWP Indicators for the status of IWRM in Morocco
  • 8. Steps Syria 1. Awareness Political will is high. 2. Framework for broad stakeholder participation Farmers participation is among the elements of the new plan for IWRM, however instruments for the implementation of participation approaches needs strengthening. 3. Activities that IWRM plan can build on The (1997-2000) policy focused on water resources development, demand management, pollution control, and on the Country Cooperation Framework. A Plan for IWRM for 1998-2008 is developed, support by UNDP 4. IWRM issues and challenges Identified. 5. Management potential and constraints Identified. 6. Political will Can be achieved. 7. Capacity building Among the strategy objectives, is the technical capacity building of the institutions participating in the implementation of IWRM, through a wide range of training modules in different aspects related to water resources planning and management. 8. Projs Portofolio, financing strategy Prepared, and the financial strategy could be formulated. Conclusion 2005 target likely to be met. Table (6) The GWP Indicators for the status of IWRM in Syria Required Assistance to Meet the IWRM 2005 WSSD Target Country Plans / Strategies / Policies / Documents towards IWRM Needs some support Needs substantial support Algeria X Egypt -Main Features for Water Policy towards Year 2017; Ministry of Water Resources & Irrigation, 2000. -National Water Resources Plan; Ministry of Water Resources & Irrigation, 2003. X Libya -National Strategy for Water Resources Management, 2000-2025 ;1999. X Morocco -Water Law. 1995 X Sudan -Sudan National Water Policy. X Tunisia -L'Etat de l'Environment; 2002. -L'Avenir de l'eau : un noveau challenge pour la Tunisie -The Long Term Strategy for the Water Sector in Tunisia; Ministry of Agriculture, 2003. X Table (7) Status of Plans, Strategies, and Policies towards IWRM as of 2003
  • 9. ASSESSMENT OF IWRM IN ARAB COUNTRIES CONDUCTED BY THE ARAB WATER COUNCIL 2005 The Arab Water Council (AWC) is a non-governmental organization that endeavors to promote better understanding and management of the water resources in the Arab States in a multi-disciplinary, non-political, professional and scientific manner; to disseminate knowledge, enhance sharing of experience and information for the rational and comprehensive water resources development of the region for the benefits of its inhabitants. Taking on these responsibilities, the AWC is committed to share and present regional experiences at WWF4. Throughout its regional consultations, a questionnaire circulated to different members from all states resulted in the following interesting statistics: • 94% agreed that cost of delivered water should be covered • 72% recommend that stakeholders should partially participate in Water Resource Management, 22% suggest that water resources management should be gradually transferred to end users, while 6% advise that the government should be fully in charge of all aspects of Water Resource Management • 88% Agreed that we need to revise our water quality legislations and to implement proper enforcement mechanisms, 6% suggest that we only need enforcement mechanisms, and 6% recommended that water quality legislations need to be revised/altered. • From of a large pool of suggested actions toward better management of water, 14 actions are selected and prioritized according to the following order: - Improving water quality - Policy formulation and legislation enforcement - Physical interventions - Promoting water saving - Capacity building - Ensuring economic and financial sustainability - Institutional reform/strengthening - Enhancing applied research - Raising awareness for IWRM - Introducing technologies and information systems - Developing monitoring and evaluation systems - Inter-sectoral coordination - Introducing water valuing mechanisms - Boosting shared resources cooperation THE DHI / UNEP APPROACH, 2006 The Danish Hydraulic Institute in cooperation with UNEP have designed a questionnaire for assessment of country IWRM status through addressing the following issues:
  • 10. 1. National Water Policy: existence, coverage, reference to IWRM as a base for management, reference to the role of private sector, role of women, polluter pays principle, user pays principle. 2. National Water Legislations: existence of specific water code or law, ownership of water, specific obligations by law for public hearings, stakeholder participation, river basin management, decentralization, water duties, sanctions, separation between water management and water services provisions, incentives for water efficiency. 3. Regulations Supporting the Water Law: effectiveness of existing regulations, impediments to effectiveness of regulations (lack of awareness, lack of monitoring capacity, lack of institutional capacity, contradiction of regulations,…etc), harmonisation of water law with other laws (environmental, health, ..etc.), harmonization with international agreements. 4. Institutional Framework: existence of cross-sectoral coordination body at the national, local, and river-basin levels, existence of platform for public participation 5. Institutional Capacity for undertaking IWRM: policy formulation, drafting of legislations, cost recovery, information systems and data processing, undertaking water-related assessments, monitoring of water-related issues, planning of water use and water conservation. 6. Institutional Constraints: improper governance, mul-defined institutional mandate, overlapping roles and responsibilities, inadequate equipment, inappropriate office conditions, and inadequate budget. 7. Adequacy of human resources to handle IWRM: number of available staff, quality of available staff, number of senior management personnel acquainted with IWRM, staff motivation to implement IWRM, training in IWRM 8. Level of awareness of IWRM among different stakeholders: senior officials, water management staff, water users, NGOs, consultants. 9. Implementation status of IWRM: existence of an action plan for IWRM implementation, existence of a project portfolio and a capacity building program within the plan, existence of a financing strategy and monitoring and evaluation of implementation. The situation in eight countries within the Arab Region has been assessed through analysing the response to the previous questionnaire. These countries are: Algeria, Egypt, Libya, Mauritania, Morocco, Palestine, and Syria. The analysis revealed the following as per the year 2005: A. Similar features in all countries The following features attained the same responses from all countries: - A water policy is existing in each country. - The policy covers water supply and other issues in addition to water resources management. - The polluter pays principle is inherent to each policy - Water is a property of state (ownership is not variant) - A water law or code exists in each country
  • 11. - Water legislations include obligations for public hearings, stakeholders participation, and water use efficiency - All water laws do not differentiate between society on gender basis - A basin-level platform for public participation exists - Available staff is motivated to a reasonably good degree to apply IWRM principle to current water management! - Lowest level of awareness of IWRM is experienced by NGOs and main water users (Poor to Fair) B. Similar features in most countries The following features attained the same responses from most countries: - Water policy is partially to fully harmonized with laws/regulations - Water policy endorses IWRM principles as basis for water resources management (6 countries), partially in the other 2 - Water legislations include obligations for basin-level management, and private sector involvement - National legal frameworks are harmonized with international agreements endorsed by the respective countries - Legislations include an elaboration for an IWRM process / plan / strategy - A national entity exists for overall cross-sectoral coordination - A local-level platforms for public participation exists - A national-level platform exists in 4 countries, provincial-level platforms exist in 3 countries - Level of awareness of IWRM is reasonably good to high among decision makers, professionals in water management and consultants! C. Regulations supporting the water law and their effectiveness Several regulations to support and enforce the water law are issued in all countries. However the effectiveness of such regulations vary from country to country. Generally, regulations are considered to be partially effective in 60% of the sampled domain, fully effective in 25% of the countries and only one country considers them to be not effective. This is depicted in Figure (2). Moreover, the impediments to effectiveness are attributed to the following causes which are identified, as shown in Figure (3), and ranked according to their importance: a. Lack of awareness of regulations by end users b. Insufficient knowledge of regulations by those who enforce them c. Inadequacy of monitoring capacity d. Lack of institutional capacity e. Inappropriate enforcement of sanctions f. Regulations themselves are complicated and in many cases too strict to be followed
  • 12. Effectiveness of Water Regulations 0 1 2 3 4 5 6 Fully Effective Partially Effective Not effective No.ofCountries Figure (2) Effectiveness of Regulations Supporting the Water Law Impedements to Effectiveness 0 1 2 3 4 Lack of users awareness Lack of officials awareness Lack of monitoring Lack of institutional capacity Strict / Complicated regulations lack of inforcement of sanctions No.ofCountries Figure (3) Factors Contributing to Impediments to Effectiveness of Regulations Supporting the Water Law D. Institutional capacity for water management based on IWRM principles at the national / central level The institutional capacity for water management based on IWRM principles, at the national / central level, is judged in the current study according to eleven parameters
  • 13. as shown in Figure (4). Generally, monitoring activities and recovery of costs of water resources management exhibit lower scores and thus seem to be main restraining factors for the institutional capacity. Furthermore, planning of resource use, protection, and conservation scored average. On the other hand, activities related to water resources assessments, environmental assessments, and legislation drafting scored above average (functioning status). Finally, policy formulation, collection of information on water systems and data management revealed an overall high score (well functioning status).3 Institutional Performance 0 1 2 3 4 5 6 7 Policy Form ulation Legislation D rafting C ostrecovery Info.& D -B ases W R A ssessm ents Env A ssessm ents Socio-econom ic A ssessm ents M onitoring (w ateravailability) M onitoring (w aterquality) M onitoring (ecosystem s) M onitoring (pollution loads) M onitoring (w ateruse) Planning (use/conservation) No.ofCountries Well Functioning Functioning Poor Functioning Mul Functioning Figure (4) Factors Governing the Institutional Capacity at the National / Central level for Applying IWRM Principles to Traditional Water Management Moreover, the major negative factors constraining the water resources management institution(s) in the assessed countries have been contributed to the following factors, ranked according to their priority (severity): a. Inadequate equipment (laboratory, monitoring equipment, etc.) b. Roles and responsibilities are overlapping for departments and institutes c. Institutional mandate poorly defined d. Lack of good governance (transparency, accountability, communication, integrity, participation) e. Inadequate budget f. Inadequate office conditions The previous outcomes are depicted in Figure (5). A remark, which is worthy of mentioning here, is that insufficient budget has not been identified as a major constraining factor. 3 It is the authors belief that although information on water resources may be present, it is the flow and exchange of information that hinders the institutional capacity.
  • 14. Institutional Constraints 0 1 2 3 4 5 6 7 Im propergovernance M andate m ul-defined R esposibilities unclear Inadequate equipm ent Inadequate budget Inadequate offices No.ofCountries No Problem Not Severe Severe Very Severe Figure (5) The Major Negative Factors Constraining the Water Resources Management Institution(s) E. Human Resources and Staff Capabilities Regarding IWRM at National Institutions The staff capabilities situation in the national/central water resources management institution(s) in relation to the IWRM functions is assessed according to five parameters as explained in Figure (6). The analysis show that the number of staff, and their qualifications, adequate for handling the IWRM functions at national institutions is between fair to good, and did not reach the full command capacity in any country. The same is valid for the training and capacity building programs undertaken. Moreover, the staff seems to receive an above average motivation to conduct IWRM responsibilities. Furthermore, the number of seniors with sufficient knowledge of IWRM and capacity to implement it is fully sufficient in half of the surveyed countries. F. Level of Awareness of IWRM Is IWRM and the inherent concepts known and understood by the major operators in the water sector and sectors relating to water (e.g. agriculture/irrigation, hydropower, health, environment, water supply and sanitation)? The answer is represented in Figure (7). The results of the questionnaire show that the highest level of awareness of IWRM exist among professionals in institutes mandated for water management followed by high level decision makers in these institutes and their consultants.
  • 15. Human Resources Adequacy 0 1 2 3 4 5 6 7 Staff No. Quality Motivation Seniors No. Training No.ofCountries V. Good Good Fair Figure (6) Human Resources and Staff Capabilities at National Water Resources Management Institution(s) Professionals in agencies within water use and water related sectors scored fair to good, while end users scored fair to poor. The survey also shows that the lowest level of awareness is encountered by NGOs (poor to fair). Awareness of IWRM 0 1 2 3 4 5 6 Decision makers Professional officials Water-related agencies Water users Consultants NGOs No.ofCountries V. Good Good Fair Poor Figure (7) The Level of Awareness of IWRM among Different Stakeholders
  • 16. G. Status of Implementation of an IWRM Framework The survey shows that three out eight countries (about 40 %) already have an IWRM action plan, while four countries (50%) are in the process of producing one, and only in one country this process is not foreseen. The former three countries also produced a portfolio of projects associated with the IWRM actions plan, and have some sort of financing strategy. Two of these countries also produced a monitoring plan for evaluating the implementation process. In this respect half of the countries are on their way to produce such an M&E plan, while the remaining 25% did not initiate this process yet. Status of IWRM Implementation 0 1 2 3 4 5 Existence of plan Project portofolio Capacity building Financing strategy M&E of implementation No.ofCountries Yes No Ongoing Figure (7) Status of Implementation of IWRM CONCLUSIONS 1. Limited water resources in the region is an overwhelming condition, however there is still considerable room for sustainable management of water resources provided IWRM is adopted and implemented 2. Arab countries are committed to IWRM. The WSSD 2005 target is met by five countries, and is likely to be met by the rest of the region before 2007 if seriously and regionally coordinated. 3. IWRM is however at various levels of planning and implementation in the region. 4. Technical and financial support are required for some of the countries for the development of management plans, institutional reform, awareness raising and capacity building. 5. Educating NGOs and end users require immediate attention 6. Coordinating assistance and efforts is highly required. After all, integrated management requires integration of efforts in the first place
  • 17. REFERENCES 1. AWC (2005) “State of the Water in the Arab region” Arab Water Council Report. 2. AWC (2006) “Regional Document for the MENA Region” WWF4, Mexico City, Mexico, 2006. 3. CEDARE/GWP-Med, Framework For Action for North Africa, “Water for the 21st Century, From Vision to Action”, 2003. 4. CEDARE / AWC / UNDP (2005) “Status of Integrated Water Resources Management Plans in the Arab Region” Arab Water Council Report 5. K. AbuZeid and A. AbdelMegeed, “Status of Integrated Water Resources Management Planning in Arab Mediterranean Countries” WB session on IWRM, International Water Demand Management Conference, Dead Sea, Jordan, Jun 2004.