7 Wastes
TOTAL QUALITY MANAGEMENT
7 Wastes
PRESENTED BY:
MD.FURKAN UDDIN JEWEL
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited
How often have you used the
expressions:
“That was a waste of time!”
or
“That was a waste of money!”
or
“That was a waste of effort!”
Waste
© STM Quality Limited
STM Quality
LimitedWasted Time
Just imagine if
we could collect
all the time
together that we
have wasted in
the past -
How much time
would that be?
© STM Quality Limited
STM Quality
LimitedWasted Money
Just imagine if
we could collect
all the money
together that we
have wasted in
the past -
How much
money would
that be?
© STM Quality Limited
STM Quality
LimitedWasted Effort
Just imagine if
we could collect
all the effort
together that we
have wasted in
the past -
How much effort
would that be?
© STM Quality Limited
STM Quality
LimitedThe Problem With Waste
The problem with wasted time, money &
effort is:
When it’s gone…
- it’s gone!
© STM Quality Limited
STM Quality
LimitedEliminating Waste
So what can we do to eliminate
waste?
We first need to identify what is &
is not waste, then we can look at
ways of eliminating or at least
reducing waste.
© STM Quality Limited
STM Quality
Limited
Identifying Waste in the
Workplace
Operational Activity
Value added Operations
Any process that changes the nature,
shape or characteristic of the product in
line with customer requirements
e.g. Pressing, welding, heat treatment.
This is where we make a profit!
© STM Quality Limited
STM Quality
Limited
Identifying Waste in the
Workplace
Operational Activity
Non-Value added Operations
Work carried out which is necessary under
current conditions, but does not increase
product value.
e.g. Inspection, tool change, maintenance.
This is where we make a loss!
© STM Quality Limited
STM Quality
Limited
Value Added and
Non-Value Added operations
The objective is to raise the ratio of Value
added operations to non-value added
operations and eliminate waste.
WASTE NON-VALUE ADDED
VALUE
ADDED
OPERATOR TIME
VALUE
ADDED
NON-VALUE
ADDED
MORE TIME FOR
OTHER ACTIVITIES
ELIMINATE
© STM Quality Limited
STM Quality
Limited7W – The Elimination of Waste
So, now we understand the difference in
value added & non-value added
operations, what are the benefits in
eliminating all waste?
• Reduced costs
• Greater Capacity
• Bottlenecks are identified
© STM Quality Limited
STM Quality
Limited7W – 7 Types of Waste
1 Over-production
2 Inventory
3 Transportation
4 Process
5 Idle Time
6 Operator Motion
7 Bad Quality
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited
The seven wastes or Muda can be
remembered through the use of either of
the two mnemonics; TIMWOOD
1) Transport
2) Inventory
3) Motion (Operator )
4) Waiting
5) Over-production
6) Over-Processing
7) Defects or Bad Quality
© STM Quality Limited
STM Quality
Limited7W – 1. Over-production
Over-production
Producing more than is needed hides a
multitude of problems. Excessive set-up times,
machine faults, risk of producing obsolete
stock.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited7W – 2. Inventory
Inventory
Carrying stock attracts cost & storage problems.
Storage leads to stacking, racking,
sophisticated computers, bar coding &
automation, all for an activity that adds no value
to the product.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited7W – 3. Transportation
Transportation
This may appear unnecessary but does add
value. Large transport is easily identified but
small transport such as manual labour may not
be so noticeable. These can be improved by
changes to the work environment.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited
7W – 4.
Process
Process
Adds cost but no value - e.g.trimming &
moulding to a level that is beyond the required
standard adds extra time that customers do
not want to pay for.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited
7W – 5. Idle
Time
Idle Time
Typically, waiting for products & services from
preceding operations, waiting for work from
their previous set-up or waiting for cycles to
finish, or meetings to start.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited7W – 6. Operator Motion
Operator Motion
Typically, single handed operations where
both should be used, stretching unnecessarily
or awkwardly and walking between things. All
of these take time or use time poorly, none
add value.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited7W – 7. Bad Quality
Bad Quality
Rejects are always produced by systems and
procedures created by management. If
operators fail it is because the process allowed
them to fail through inadequate training or
because the process was not capable in the
first place.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited
7W – The Elimination of
Waste
So, now we understand the 7 wastes, we can:
• Produce only what is needed;
• Carry only essential stock;
• Use transportation more wisely;
• Produce work to the standard required;
• Plan our production processes;
• Put our efforts to the best possible use;
• Train to make quality work every time!

Contenu connexe

Tendances

Kaizen presentation for garments
Kaizen presentation for garmentsKaizen presentation for garments
Kaizen presentation for garmentsKhalid Mehmood
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Mahibur Rahman
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementRajeev Sharan
 
SOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSSOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSRabiul Hasan
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Khairul Bashar
 
Industrial engineering for apparel production
Industrial engineering for apparel productionIndustrial engineering for apparel production
Industrial engineering for apparel productionNiloy Rahman
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and qualityMd. Mazadul Hasan Shishir
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Khairul Bashar
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshAriful Islam
 
Fabric Inspection System (TTQC)
Fabric Inspection System (TTQC)Fabric Inspection System (TTQC)
Fabric Inspection System (TTQC)Md Mamun Mia
 
Clockwise inspection
Clockwise inspectionClockwise inspection
Clockwise inspectionlatifaslam
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)Mizan Rahman
 
Quality costing and reporting of garments and textile industry of Bangladesh
Quality costing and reporting of garments and textile industry of BangladeshQuality costing and reporting of garments and textile industry of Bangladesh
Quality costing and reporting of garments and textile industry of BangladeshTAREK MAHMUD
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industryAzmir Latif Beg
 

Tendances (20)

Kaizen presentation for garments
Kaizen presentation for garmentsKaizen presentation for garments
Kaizen presentation for garments
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
SOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSSOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLS
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
Training
TrainingTraining
Training
 
Industrial engineering for apparel production
Industrial engineering for apparel productionIndustrial engineering for apparel production
Industrial engineering for apparel production
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and quality
 
QCO presentation
QCO presentationQCO presentation
QCO presentation
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
 
Fabric Inspection System (TTQC)
Fabric Inspection System (TTQC)Fabric Inspection System (TTQC)
Fabric Inspection System (TTQC)
 
Clockwise inspection
Clockwise inspectionClockwise inspection
Clockwise inspection
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)
 
Quality costing and reporting of garments and textile industry of Bangladesh
Quality costing and reporting of garments and textile industry of BangladeshQuality costing and reporting of garments and textile industry of Bangladesh
Quality costing and reporting of garments and textile industry of Bangladesh
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industry
 
Work measurement
Work measurementWork measurement
Work measurement
 

En vedette (20)

Coping with GSD: What's the Secret
Coping with GSD: What's the SecretCoping with GSD: What's the Secret
Coping with GSD: What's the Secret
 
Time study ratings&&allowances
Time  study ratings&&allowancesTime  study ratings&&allowances
Time study ratings&&allowances
 
GSD cords
GSD cordsGSD cords
GSD cords
 
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsStandardization & digitalization of sewing operations
Standardization & digitalization of sewing operations
 
GSD Manual For Students
GSD Manual For StudentsGSD Manual For Students
GSD Manual For Students
 
total quality management
total quality managementtotal quality management
total quality management
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
7 Deadly Wastes
7 Deadly Wastes7 Deadly Wastes
7 Deadly Wastes
 
Seven Supply Chain Wastes
Seven Supply Chain WastesSeven Supply Chain Wastes
Seven Supply Chain Wastes
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
BIS and ISO
BIS and ISOBIS and ISO
BIS and ISO
 
JIT for manufacturing ppt
JIT for manufacturing pptJIT for manufacturing ppt
JIT for manufacturing ppt
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 Wastes
 
Tqm and six sigma
Tqm and six sigmaTqm and six sigma
Tqm and six sigma
 
Kaizen final ppt
Kaizen final pptKaizen final ppt
Kaizen final ppt
 
Quality management system
Quality management system Quality management system
Quality management system
 
Introduction to iso 9001
Introduction to iso 9001 Introduction to iso 9001
Introduction to iso 9001
 
8 Wastes
8 Wastes8 Wastes
8 Wastes
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 

Similaire à 7 wastages

Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Akhil Yelisetti
 
Operations_Excellence_Presentation_Promotional
Operations_Excellence_Presentation_PromotionalOperations_Excellence_Presentation_Promotional
Operations_Excellence_Presentation_PromotionalMarc Hoppenbrouwers
 
Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management BasicsUpendra K
 
Productivity related Vital Measures through simulations
Productivity related Vital Measures through simulationsProductivity related Vital Measures through simulations
Productivity related Vital Measures through simulationsSameer Kumar
 
TPM- total productive maintenance
TPM- total productive maintenanceTPM- total productive maintenance
TPM- total productive maintenanceASIF IQBAL
 
PQT - Total Productive Maintenance
PQT - Total Productive MaintenancePQT - Total Productive Maintenance
PQT - Total Productive MaintenanceDr. John V. Padua
 
Introduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfIntroduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfssuser8d9a25
 
Introduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfIntroduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfmohamedibrahim219956
 
Making Lean Work in Your Company
Making Lean Work in Your CompanyMaking Lean Work in Your Company
Making Lean Work in Your CompanyUBMCanon
 
reliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdfreliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdfEdgar V Macapili
 

Similaire à 7 wastages (20)

Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Operations_Excellence_Presentation_Promotional
Operations_Excellence_Presentation_PromotionalOperations_Excellence_Presentation_Promotional
Operations_Excellence_Presentation_Promotional
 
Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management Basics
 
Office_Lean_sample
Office_Lean_sampleOffice_Lean_sample
Office_Lean_sample
 
Office Lean Sample
Office Lean SampleOffice Lean Sample
Office Lean Sample
 
Productivity related Vital Measures through simulations
Productivity related Vital Measures through simulationsProductivity related Vital Measures through simulations
Productivity related Vital Measures through simulations
 
TPM
TPMTPM
TPM
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
Neil Potter Presentation
Neil Potter Presentation Neil Potter Presentation
Neil Potter Presentation
 
TPM- total productive maintenance
TPM- total productive maintenanceTPM- total productive maintenance
TPM- total productive maintenance
 
Just In Time
Just In Time Just In Time
Just In Time
 
PQT - Total Productive Maintenance
PQT - Total Productive MaintenancePQT - Total Productive Maintenance
PQT - Total Productive Maintenance
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Introduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfIntroduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdf
 
Introduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdfIntroduction to Lean Web Presentation.pdf
Introduction to Lean Web Presentation.pdf
 
Making Lean Work in Your Company
Making Lean Work in Your CompanyMaking Lean Work in Your Company
Making Lean Work in Your Company
 
TPM: Planned Maintenance
TPM: Planned MaintenanceTPM: Planned Maintenance
TPM: Planned Maintenance
 
reliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdfreliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdf
 
Identifying Waste
Identifying WasteIdentifying Waste
Identifying Waste
 

Plus de মোঃ ফুরকান উদ্দিন জুয়েল

Plus de মোঃ ফুরকান উদ্দিন জুয়েল (19)

Paradigm shift
Paradigm shiftParadigm shift
Paradigm shift
 
Journey begins
Journey beginsJourney begins
Journey begins
 
Teamwork
TeamworkTeamwork
Teamwork
 
Attitude
AttitudeAttitude
Attitude
 
Why why analysis
Why why analysisWhy why analysis
Why why analysis
 
Line balancing & EOQ
Line balancing & EOQLine balancing & EOQ
Line balancing & EOQ
 
Kaizen
KaizenKaizen
Kaizen
 
Bangladesh labor law'2006
Bangladesh labor law'2006Bangladesh labor law'2006
Bangladesh labor law'2006
 
VSM
VSMVSM
VSM
 
New gazzettee 10
New gazzettee   10New gazzettee   10
New gazzettee 10
 
Basic concepts on lean manufacturing
Basic concepts on lean manufacturingBasic concepts on lean manufacturing
Basic concepts on lean manufacturing
 
Work measurement
Work measurementWork measurement
Work measurement
 
Motion Economy
Motion EconomyMotion Economy
Motion Economy
 
Kanban
KanbanKanban
Kanban
 
Industrial engineer
Industrial engineerIndustrial engineer
Industrial engineer
 
Work study Training Manual
Work study Training ManualWork study Training Manual
Work study Training Manual
 
Different types of Production Layout
Different types of Production LayoutDifferent types of Production Layout
Different types of Production Layout
 
pre- determined time standard of work measurement
pre- determined time standard of work measurement pre- determined time standard of work measurement
pre- determined time standard of work measurement
 
Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...
 

Dernier

Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectErbil Polytechnic University
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 

Dernier (20)

Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction Project
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 

7 wastages

  • 1. © ABSL Power Solutions 2007© STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes PRESENTED BY: MD.FURKAN UDDIN JEWEL
  • 2. © STM Quality Limited STM Quality Limited
  • 3. © STM Quality Limited STM Quality Limited How often have you used the expressions: “That was a waste of time!” or “That was a waste of money!” or “That was a waste of effort!” Waste
  • 4. © STM Quality Limited STM Quality LimitedWasted Time Just imagine if we could collect all the time together that we have wasted in the past - How much time would that be?
  • 5. © STM Quality Limited STM Quality LimitedWasted Money Just imagine if we could collect all the money together that we have wasted in the past - How much money would that be?
  • 6. © STM Quality Limited STM Quality LimitedWasted Effort Just imagine if we could collect all the effort together that we have wasted in the past - How much effort would that be?
  • 7. © STM Quality Limited STM Quality LimitedThe Problem With Waste The problem with wasted time, money & effort is: When it’s gone… - it’s gone!
  • 8. © STM Quality Limited STM Quality LimitedEliminating Waste So what can we do to eliminate waste? We first need to identify what is & is not waste, then we can look at ways of eliminating or at least reducing waste.
  • 9. © STM Quality Limited STM Quality Limited Identifying Waste in the Workplace Operational Activity Value added Operations Any process that changes the nature, shape or characteristic of the product in line with customer requirements e.g. Pressing, welding, heat treatment. This is where we make a profit!
  • 10. © STM Quality Limited STM Quality Limited Identifying Waste in the Workplace Operational Activity Non-Value added Operations Work carried out which is necessary under current conditions, but does not increase product value. e.g. Inspection, tool change, maintenance. This is where we make a loss!
  • 11. © STM Quality Limited STM Quality Limited Value Added and Non-Value Added operations The objective is to raise the ratio of Value added operations to non-value added operations and eliminate waste. WASTE NON-VALUE ADDED VALUE ADDED OPERATOR TIME VALUE ADDED NON-VALUE ADDED MORE TIME FOR OTHER ACTIVITIES ELIMINATE
  • 12. © STM Quality Limited STM Quality Limited7W – The Elimination of Waste So, now we understand the difference in value added & non-value added operations, what are the benefits in eliminating all waste? • Reduced costs • Greater Capacity • Bottlenecks are identified
  • 13. © STM Quality Limited STM Quality Limited7W – 7 Types of Waste 1 Over-production 2 Inventory 3 Transportation 4 Process 5 Idle Time 6 Operator Motion 7 Bad Quality
  • 14. © STM Quality Limited STM Quality Limited
  • 15. © STM Quality Limited STM Quality Limited The seven wastes or Muda can be remembered through the use of either of the two mnemonics; TIMWOOD 1) Transport 2) Inventory 3) Motion (Operator ) 4) Waiting 5) Over-production 6) Over-Processing 7) Defects or Bad Quality
  • 16. © STM Quality Limited STM Quality Limited7W – 1. Over-production Over-production Producing more than is needed hides a multitude of problems. Excessive set-up times, machine faults, risk of producing obsolete stock.
  • 17. © STM Quality Limited STM Quality Limited
  • 18. © STM Quality Limited STM Quality Limited7W – 2. Inventory Inventory Carrying stock attracts cost & storage problems. Storage leads to stacking, racking, sophisticated computers, bar coding & automation, all for an activity that adds no value to the product.
  • 19. © STM Quality Limited STM Quality Limited
  • 20. © STM Quality Limited STM Quality Limited7W – 3. Transportation Transportation This may appear unnecessary but does add value. Large transport is easily identified but small transport such as manual labour may not be so noticeable. These can be improved by changes to the work environment.
  • 21. © STM Quality Limited STM Quality Limited
  • 22. © STM Quality Limited STM Quality Limited 7W – 4. Process Process Adds cost but no value - e.g.trimming & moulding to a level that is beyond the required standard adds extra time that customers do not want to pay for.
  • 23. © STM Quality Limited STM Quality Limited
  • 24. © STM Quality Limited STM Quality Limited 7W – 5. Idle Time Idle Time Typically, waiting for products & services from preceding operations, waiting for work from their previous set-up or waiting for cycles to finish, or meetings to start.
  • 25. © STM Quality Limited STM Quality Limited
  • 26. © STM Quality Limited STM Quality Limited7W – 6. Operator Motion Operator Motion Typically, single handed operations where both should be used, stretching unnecessarily or awkwardly and walking between things. All of these take time or use time poorly, none add value.
  • 27. © STM Quality Limited STM Quality Limited
  • 28. © STM Quality Limited STM Quality Limited7W – 7. Bad Quality Bad Quality Rejects are always produced by systems and procedures created by management. If operators fail it is because the process allowed them to fail through inadequate training or because the process was not capable in the first place.
  • 29. © STM Quality Limited STM Quality Limited
  • 30. © STM Quality Limited STM Quality Limited 7W – The Elimination of Waste So, now we understand the 7 wastes, we can: • Produce only what is needed; • Carry only essential stock; • Use transportation more wisely; • Produce work to the standard required; • Plan our production processes; • Put our efforts to the best possible use; • Train to make quality work every time!