SlideShare a Scribd company logo
1 of 14
Download to read offline
Life Cycle Costing
Presented by
Christine Storry – PIPEN Project Manager
South West England
Sustainable Procurement –
to recap
Social
Workers’ rights
Ethical issues
Fair pay
Economic
Local economy
Life cycle costs
Employment
Environmental
Air quality
Water use
Energy
Direct LCC
Commonest LCC includes
• (a) costs, borne by the contracting
authority or other users, such as:
 (i) costs relating to acquisition,
 (ii) costs of use, such as
consumption of energy and other
resources,
 (iii) maintenance costs,
 (iv) end of life costs, such as
collection and recycling costs
(Article 68 EU Procurement Directive 2014)
Example of costs
Examples of costs:
• Purchase price, leasing costs
• Staff to operate machinery
• Training required
• For MFDs – inclusion of toners and
disposal of old cartridges
• Maintenance costs and requirements
can increase as a product gets older
• Spare parts – cost and availability
• End of life costs can also be positive if
there is a re-sale value
LCC Direct + Externalities
Clause (a) (as before)
+
(b) costs imputed to environmental
externalities linked to the product, service or
works during its life cycle, provided their
monetary value can be determined and
verified; such costs may include the cost of
emissions of greenhouse gases and of other
pollutant emissions and other climate change
mitigation
(Article 68 EU Procurement Directive 2014)
Mandatory common
method
• Whenever a common method for the
calculation of life-cycle costs has been
made mandatory by a legislative act of
the Union, that common method shall
be applied for the assessment of life-
cycle costs.
• Clean Vehicles Directive – currently
only mandated method
(Article 68 EU Procurement
Directive 2014)
Why is LCC important?
Encouraging analysis of business requirements
Making better informed decisions
Resulting in more robust contracts
Specifically allowed for in the 2014 Directive
Good financial and procurement sense to do so
LCC in the tender process
• Assess real cost of
alternative options
• Determining the
scope of the tender
• Needs assessment
• Market engagement
– what’s on offer
• Best options for your
organisation against
priorities
Tender Planning
• Comparing life cycle
costs on bids
• Comparing like-for-
like
Tender Evaluation
LCC in tendering
Various conditions are mandatory if using LCC:
In tender documents, state the LCC
methodology being used. MUST include:
– (a) be based on objectively verifiable
and non-discriminatory criteria;
– (b) be accessible to all interested
parties;
– (c) not require more than a reasonable
effort from bidders in terms of data
submission; and
– (d) follow any common, mandatory EU
method for calculating LCC which
applies in the sector
Choosing LCC methodology
• No methodology mandated (except
Clean Vehicles Directive)
• Various ones exist and publicly
available
• Can devise own methodology but must
ensure that:
 It is transparent
 All bidders can provide the
requested information
 The public body has the ability to
assess and verify the information
requested and received
Barriers
Lack of
expertise
Lack of
awareness
Too many
tools
Don’t care
Not enough
time planned
in the process
“takes too
long to do”
Mitigation

Don’t
reinvent the
wheel
Peer
learning
Experience
Engage
other teams
Early supply
market
engagement
South West England
© 2017, UWE Bristol
www.uwe.ac.uk
Life Cycle Costing

More Related Content

What's hot

Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.Aszahari Aie
 
Project cost stimating
Project cost stimatingProject cost stimating
Project cost stimatinghatim ahmed
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftMuneesh Methwani
 
Contracts and Types (Project Management)
Contracts and Types (Project Management) Contracts and Types (Project Management)
Contracts and Types (Project Management) Habib Rahman
 
Chapter-5-Scheduling-and-Resource-Allocation.ppt
Chapter-5-Scheduling-and-Resource-Allocation.pptChapter-5-Scheduling-and-Resource-Allocation.ppt
Chapter-5-Scheduling-and-Resource-Allocation.pptTecnicoItca
 
Budget and budgetary control
Budget and budgetary controlBudget and budgetary control
Budget and budgetary controlSumitBedi57
 
Lecture 2 Cost Terminology and Classification
Lecture 2 Cost Terminology and ClassificationLecture 2 Cost Terminology and Classification
Lecture 2 Cost Terminology and ClassificationRiri Ariyanty
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementHayat Denzi
 
Construction Law - Presentation - Construction Contractual Claims
Construction Law - Presentation - Construction Contractual ClaimsConstruction Law - Presentation - Construction Contractual Claims
Construction Law - Presentation - Construction Contractual ClaimsYee Len Wan
 
Cost concepts
Cost conceptsCost concepts
Cost conceptswolfaze
 
Detailed project report
Detailed project reportDetailed project report
Detailed project reportSelva Prakash
 
METHODS OF DEPRECIATION -PPT.pptx
METHODS OF DEPRECIATION -PPT.pptxMETHODS OF DEPRECIATION -PPT.pptx
METHODS OF DEPRECIATION -PPT.pptxHeldaMaryA
 
Decarbonising Planet Earth ThroughGreen Building
Decarbonising Planet Earth ThroughGreen   Building Decarbonising Planet Earth ThroughGreen   Building
Decarbonising Planet Earth ThroughGreen Building JIT KUMAR GUPTA
 
Tender and tender document
Tender and tender documentTender and tender document
Tender and tender documentAkshataFarakate
 
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail  2017 _ lec 5Ss 5 training fidic Dr. Moustafa Ismail  2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5Moustafa Ismail Abu Dief
 

What's hot (20)

Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
 
Project cost stimating
Project cost stimatingProject cost stimating
Project cost stimating
 
What is depreciation
What is depreciationWhat is depreciation
What is depreciation
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final Draft
 
Contracts and Types (Project Management)
Contracts and Types (Project Management) Contracts and Types (Project Management)
Contracts and Types (Project Management)
 
Chapter-5-Scheduling-and-Resource-Allocation.ppt
Chapter-5-Scheduling-and-Resource-Allocation.pptChapter-5-Scheduling-and-Resource-Allocation.ppt
Chapter-5-Scheduling-and-Resource-Allocation.ppt
 
Lump Sum Contract
Lump Sum ContractLump Sum Contract
Lump Sum Contract
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
 
Budget and budgetary control
Budget and budgetary controlBudget and budgetary control
Budget and budgetary control
 
Lecture 2 Cost Terminology and Classification
Lecture 2 Cost Terminology and ClassificationLecture 2 Cost Terminology and Classification
Lecture 2 Cost Terminology and Classification
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Construction Law - Presentation - Construction Contractual Claims
Construction Law - Presentation - Construction Contractual ClaimsConstruction Law - Presentation - Construction Contractual Claims
Construction Law - Presentation - Construction Contractual Claims
 
Cost concepts
Cost conceptsCost concepts
Cost concepts
 
Construction Bidding Step-by-Step
Construction Bidding Step-by-StepConstruction Bidding Step-by-Step
Construction Bidding Step-by-Step
 
Detailed project report
Detailed project reportDetailed project report
Detailed project report
 
METHODS OF DEPRECIATION -PPT.pptx
METHODS OF DEPRECIATION -PPT.pptxMETHODS OF DEPRECIATION -PPT.pptx
METHODS OF DEPRECIATION -PPT.pptx
 
Decarbonising Planet Earth ThroughGreen Building
Decarbonising Planet Earth ThroughGreen   Building Decarbonising Planet Earth ThroughGreen   Building
Decarbonising Planet Earth ThroughGreen Building
 
Tender and tender document
Tender and tender documentTender and tender document
Tender and tender document
 
Costing
CostingCosting
Costing
 
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail  2017 _ lec 5Ss 5 training fidic Dr. Moustafa Ismail  2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
 

Similar to Life Cycle Costing

PUBLIC PROCUREMENT in East Africa pp 6.pptx
PUBLIC PROCUREMENT in East Africa pp 6.pptxPUBLIC PROCUREMENT in East Africa pp 6.pptx
PUBLIC PROCUREMENT in East Africa pp 6.pptxNathan457247
 
Life cycle costing_calculation_tool
Life cycle costing_calculation_toolLife cycle costing_calculation_tool
Life cycle costing_calculation_toolDemid Odkhuu
 
Rationalising ippc6 clean
Rationalising ippc6 cleanRationalising ippc6 clean
Rationalising ippc6 cleanDr. Paul Davis
 
Contract monitoring & evaluation
Contract monitoring & evaluationContract monitoring & evaluation
Contract monitoring & evaluationjama osman
 
OECD Workshop on Regional Trade Agreements and the Environment Session 2.1 - Lim
OECD Workshop on Regional Trade Agreements and the Environment Session 2.1 - LimOECD Workshop on Regional Trade Agreements and the Environment Session 2.1 - Lim
OECD Workshop on Regional Trade Agreements and the Environment Session 2.1 - LimOECD Environment
 
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTSTUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTSProf Handley Mpoki Mafwenga
 

Similar to Life Cycle Costing (20)

PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
 
Presentation, SIGMA workshop on tendering of PPP projects and contract signat...
Presentation, SIGMA workshop on tendering of PPP projects and contract signat...Presentation, SIGMA workshop on tendering of PPP projects and contract signat...
Presentation, SIGMA workshop on tendering of PPP projects and contract signat...
 
Presentation, Niels Schuster, 7th Regional Public Procurement Conference, Vlo...
Presentation, Niels Schuster, 7th Regional Public Procurement Conference, Vlo...Presentation, Niels Schuster, 7th Regional Public Procurement Conference, Vlo...
Presentation, Niels Schuster, 7th Regional Public Procurement Conference, Vlo...
 
PUBLIC PROCUREMENT in East Africa pp 6.pptx
PUBLIC PROCUREMENT in East Africa pp 6.pptxPUBLIC PROCUREMENT in East Africa pp 6.pptx
PUBLIC PROCUREMENT in East Africa pp 6.pptx
 
Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)
 
Life cycle costing_calculation_tool
Life cycle costing_calculation_toolLife cycle costing_calculation_tool
Life cycle costing_calculation_tool
 
2 Modernisation of EU Public Procurement Policy - Association Agreements_English
2 Modernisation of EU Public Procurement Policy - Association Agreements_English2 Modernisation of EU Public Procurement Policy - Association Agreements_English
2 Modernisation of EU Public Procurement Policy - Association Agreements_English
 
Funding opportunities in Horizon 2020
Funding opportunities in Horizon 2020Funding opportunities in Horizon 2020
Funding opportunities in Horizon 2020
 
Driving Competitiveness through Servitization
Driving Competitiveness through ServitizationDriving Competitiveness through Servitization
Driving Competitiveness through Servitization
 
Carbon Audit
Carbon AuditCarbon Audit
Carbon Audit
 
Carbon Audit
Carbon AuditCarbon Audit
Carbon Audit
 
Procurement Strategy Development
Procurement Strategy DevelopmentProcurement Strategy Development
Procurement Strategy Development
 
Rationalising ippc6 clean
Rationalising ippc6 cleanRationalising ippc6 clean
Rationalising ippc6 clean
 
Contract monitoring & evaluation
Contract monitoring & evaluationContract monitoring & evaluation
Contract monitoring & evaluation
 
Public Sector Procurement
Public Sector ProcurementPublic Sector Procurement
Public Sector Procurement
 
Dariusz Koba, Poland, third regional conference on public procurement for ENP...
Dariusz Koba, Poland, third regional conference on public procurement for ENP...Dariusz Koba, Poland, third regional conference on public procurement for ENP...
Dariusz Koba, Poland, third regional conference on public procurement for ENP...
 
OECD Workshop on Regional Trade Agreements and the Environment Session 2.1 - Lim
OECD Workshop on Regional Trade Agreements and the Environment Session 2.1 - LimOECD Workshop on Regional Trade Agreements and the Environment Session 2.1 - Lim
OECD Workshop on Regional Trade Agreements and the Environment Session 2.1 - Lim
 
3 The new European Public Procurement Directives_English
3 The new European Public Procurement Directives_English3 The new European Public Procurement Directives_English
3 The new European Public Procurement Directives_English
 
Overview of CDB's new Procurement Framework
Overview of CDB's new Procurement FrameworkOverview of CDB's new Procurement Framework
Overview of CDB's new Procurement Framework
 
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTSTUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
 

More from Giuliana Longworth

Performance/Output Based Specifications (POBS) - An introduction
Performance/Output Based Specifications (POBS) - An introductionPerformance/Output Based Specifications (POBS) - An introduction
Performance/Output Based Specifications (POBS) - An introductionGiuliana Longworth
 
Sustainable procurement - An Introduction
Sustainable procurement - An IntroductionSustainable procurement - An Introduction
Sustainable procurement - An IntroductionGiuliana Longworth
 
Use of Labels in Sustainable Procurement
Use of Labels in Sustainable Procurement  Use of Labels in Sustainable Procurement
Use of Labels in Sustainable Procurement Giuliana Longworth
 
Circular Procurement - An Introduction
Circular Procurement - An IntroductionCircular Procurement - An Introduction
Circular Procurement - An IntroductionGiuliana Longworth
 
NGOs engaging in the field of Green Public Procurement (GPP)
NGOs engaging in the field of Green Public Procurement (GPP)NGOs engaging in the field of Green Public Procurement (GPP)
NGOs engaging in the field of Green Public Procurement (GPP)Giuliana Longworth
 
How to identify tender opportunities for Green Public Procurement
How to identify tender opportunities for Green Public ProcurementHow to identify tender opportunities for Green Public Procurement
How to identify tender opportunities for Green Public ProcurementGiuliana Longworth
 
EU Green Public Procurement Policy
EU Green Public Procurement PolicyEU Green Public Procurement Policy
EU Green Public Procurement PolicyGiuliana Longworth
 
Working Group 4c ''Promoting Resource Efficient Business Models and Circular ...
Working Group 4c ''Promoting Resource Efficient Business Models and Circular ...Working Group 4c ''Promoting Resource Efficient Business Models and Circular ...
Working Group 4c ''Promoting Resource Efficient Business Models and Circular ...Giuliana Longworth
 
Creating a circular approach to fashion across Europe
Creating a circular approach to fashion across EuropeCreating a circular approach to fashion across Europe
Creating a circular approach to fashion across EuropeGiuliana Longworth
 

More from Giuliana Longworth (10)

Performance/Output Based Specifications (POBS) - An introduction
Performance/Output Based Specifications (POBS) - An introductionPerformance/Output Based Specifications (POBS) - An introduction
Performance/Output Based Specifications (POBS) - An introduction
 
Sustainable procurement - An Introduction
Sustainable procurement - An IntroductionSustainable procurement - An Introduction
Sustainable procurement - An Introduction
 
Market engagement
Market engagementMarket engagement
Market engagement
 
Use of Labels in Sustainable Procurement
Use of Labels in Sustainable Procurement  Use of Labels in Sustainable Procurement
Use of Labels in Sustainable Procurement
 
Circular Procurement - An Introduction
Circular Procurement - An IntroductionCircular Procurement - An Introduction
Circular Procurement - An Introduction
 
NGOs engaging in the field of Green Public Procurement (GPP)
NGOs engaging in the field of Green Public Procurement (GPP)NGOs engaging in the field of Green Public Procurement (GPP)
NGOs engaging in the field of Green Public Procurement (GPP)
 
How to identify tender opportunities for Green Public Procurement
How to identify tender opportunities for Green Public ProcurementHow to identify tender opportunities for Green Public Procurement
How to identify tender opportunities for Green Public Procurement
 
EU Green Public Procurement Policy
EU Green Public Procurement PolicyEU Green Public Procurement Policy
EU Green Public Procurement Policy
 
Working Group 4c ''Promoting Resource Efficient Business Models and Circular ...
Working Group 4c ''Promoting Resource Efficient Business Models and Circular ...Working Group 4c ''Promoting Resource Efficient Business Models and Circular ...
Working Group 4c ''Promoting Resource Efficient Business Models and Circular ...
 
Creating a circular approach to fashion across Europe
Creating a circular approach to fashion across EuropeCreating a circular approach to fashion across Europe
Creating a circular approach to fashion across Europe
 

Recently uploaded

Build Tomorrow’s India Today By Making Charity For Poor Students
Build Tomorrow’s India Today By Making Charity For Poor StudentsBuild Tomorrow’s India Today By Making Charity For Poor Students
Build Tomorrow’s India Today By Making Charity For Poor StudentsSERUDS INDIA
 
Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Christina Parmionova
 
Digital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsDigital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsBeat Estermann
 
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.Christina Parmionova
 
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdfCristal Montañéz
 
ISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaTrinity Care Foundation
 
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...Christina Parmionova
 
Professional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxProfessional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxjennysansano2
 
23rd Infopoverty World Conference - Agenda programme
23rd Infopoverty World Conference - Agenda programme23rd Infopoverty World Conference - Agenda programme
23rd Infopoverty World Conference - Agenda programmeChristina Parmionova
 
Item # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design ServicesItem # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design Servicesahcitycouncil
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpointahcitycouncil
 
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdfPPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdfahcitycouncil
 
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Christina Parmionova
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfahcitycouncil
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processesahcitycouncil
 
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfIf there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfKatrina Sriranpong
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.Christina Parmionova
 
Item # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM MinutesItem # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM Minutesahcitycouncil
 
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.Cristal Montañéz
 

Recently uploaded (20)

Build Tomorrow’s India Today By Making Charity For Poor Students
Build Tomorrow’s India Today By Making Charity For Poor StudentsBuild Tomorrow’s India Today By Making Charity For Poor Students
Build Tomorrow’s India Today By Making Charity For Poor Students
 
Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.
 
Digital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsDigital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical Implications
 
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
 
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
 
ISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, India
 
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
 
Professional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxProfessional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptx
 
23rd Infopoverty World Conference - Agenda programme
23rd Infopoverty World Conference - Agenda programme23rd Infopoverty World Conference - Agenda programme
23rd Infopoverty World Conference - Agenda programme
 
Housing For All - Fair Housing Choice Report
Housing For All - Fair Housing Choice ReportHousing For All - Fair Housing Choice Report
Housing For All - Fair Housing Choice Report
 
Item # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design ServicesItem # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design Services
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdfPPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
 
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processes
 
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfIf there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
 
Item # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM MinutesItem # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM Minutes
 
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
Phase 8 Hope For Venezuelan Refugees Soup Meal Program-Periods 4-6.
 

Life Cycle Costing

  • 1. Life Cycle Costing Presented by Christine Storry – PIPEN Project Manager South West England
  • 2. Sustainable Procurement – to recap Social Workers’ rights Ethical issues Fair pay Economic Local economy Life cycle costs Employment Environmental Air quality Water use Energy
  • 3. Direct LCC Commonest LCC includes • (a) costs, borne by the contracting authority or other users, such as:  (i) costs relating to acquisition,  (ii) costs of use, such as consumption of energy and other resources,  (iii) maintenance costs,  (iv) end of life costs, such as collection and recycling costs (Article 68 EU Procurement Directive 2014)
  • 4. Example of costs Examples of costs: • Purchase price, leasing costs • Staff to operate machinery • Training required • For MFDs – inclusion of toners and disposal of old cartridges • Maintenance costs and requirements can increase as a product gets older • Spare parts – cost and availability • End of life costs can also be positive if there is a re-sale value
  • 5. LCC Direct + Externalities Clause (a) (as before) + (b) costs imputed to environmental externalities linked to the product, service or works during its life cycle, provided their monetary value can be determined and verified; such costs may include the cost of emissions of greenhouse gases and of other pollutant emissions and other climate change mitigation (Article 68 EU Procurement Directive 2014)
  • 6. Mandatory common method • Whenever a common method for the calculation of life-cycle costs has been made mandatory by a legislative act of the Union, that common method shall be applied for the assessment of life- cycle costs. • Clean Vehicles Directive – currently only mandated method (Article 68 EU Procurement Directive 2014)
  • 7. Why is LCC important? Encouraging analysis of business requirements Making better informed decisions Resulting in more robust contracts Specifically allowed for in the 2014 Directive Good financial and procurement sense to do so
  • 8. LCC in the tender process • Assess real cost of alternative options • Determining the scope of the tender • Needs assessment • Market engagement – what’s on offer • Best options for your organisation against priorities Tender Planning • Comparing life cycle costs on bids • Comparing like-for- like Tender Evaluation
  • 9. LCC in tendering Various conditions are mandatory if using LCC: In tender documents, state the LCC methodology being used. MUST include: – (a) be based on objectively verifiable and non-discriminatory criteria; – (b) be accessible to all interested parties; – (c) not require more than a reasonable effort from bidders in terms of data submission; and – (d) follow any common, mandatory EU method for calculating LCC which applies in the sector
  • 10. Choosing LCC methodology • No methodology mandated (except Clean Vehicles Directive) • Various ones exist and publicly available • Can devise own methodology but must ensure that:  It is transparent  All bidders can provide the requested information  The public body has the ability to assess and verify the information requested and received
  • 11. Barriers Lack of expertise Lack of awareness Too many tools Don’t care Not enough time planned in the process “takes too long to do”
  • 13. South West England © 2017, UWE Bristol www.uwe.ac.uk