SlideShare a Scribd company logo
1 of 6
Download to read offline
>	CAPTION TITLE
Caption:
Main copy:
Page title (continued...)
Arup Concept Elevating (ACE) Platforms
award-winning platforms 	Maari Wellhead Platform
Installed in May 2008 in 100m water
depth in the Taranaki Basin, a highly
seismic region, offshore New Zealand.
The platform allows jack-up drilling
with oil processing on a nearby FPSO.
Yolla DrillACE PlaTform
ACE platforms can be towed in sea-states
up to 4m Hs and installed in 2m Hs.

We shape a better world
Arup has a well deserved reputation for innovation
and the successful transfer of technology from
industry to industry. Our aim is to deliver cost
effective solutions by encouraging a clear
understanding of our client’s objectives, holistic
thinking and challenging the norm.
We provide a range of design and project
management services to the oil and gas industry
for major onshore and offshore projects. In
particular we have been a pioneer and innovator
within the offshore construction industry and our
desire to improve marginal field development with
a sustainable, environmental and cost-effective
solution, led to us developing specialist skills in
the design and project execution of Arup Concept
Elevating (ACE) self-installing platforms.
ACE platforms are Arup’s award-winning range of
fixed platform solutions for varying environmental and
functional criteria. They are self-installing and
re-locatable platforms that operate as moveable
offshore production units for water-depths up to 110m.
The platforms have been specifically developed to
combine the advantages of traditional fixed platforms
with the flexibility offered by a mobile unit. They are
particularly economical where several reserves are to
be exploited or in less mature oil and gas provinces.
The ACE platforms differ from conventional designs
by offering a lower risk solution to clients who
require rapid installation, without mobilisation of
large offshore construction vessels.
ACE platforms comprise four main components –
barge deck, gravity steel base, tubular or lattice
legs and jacking system.
Barge Deck
The barge deck provides a large uninterrupted
square or rectangular area for supporting the
topsides facilities. Supporting legs do not protrude
into the usable deck space. This sets the concept
apart from previous jack-up platforms.
Lattice or tubular legs
The legs are based on jacket rather than jack-up
technology. Jacking facilities are separated from
the legs, so the high local jacking loads that
necessitate special leg detailing on jack-ups are
avoided. Conventional grades of steel are used and
forged or cast items are unnecessary. These features
keep the market open to the widest number of
potential fabricators.
Steel gravity base
The steel gravity base foundation design incorporates
the flexibility to operate in a range of water depths,
supported by soils of different types and strengths
through adoption of a skirted base.
Jacking system
The jacking system selected is a centre-hole strand-
jacking system commonly used on land for heavy
lift operations and platform load-outs. It is similar to
that used for stressing tendons in post-tensioned
concrete and has been used extensively for civil
engineering heavy lift operations such as installing
bridge decks.
	Yolla DrillACE Platform
The platform was fabricated in the Nippon
Steel yard in Batam and transported 8000km
on a sea going heavy lift transport barge
before being installed in approximately 80m
water depth in the Bass Strait off the coast
of Victoria, Australia.
HANG TUAH FINAL ELEVATION
The world’s first ACE platform was installed
in the West Natuna Sea in April 2001. The
platform was shipped from South Korea, then
released a short tow distance from site. The
deck was raised to its final in-service elevation
within 48 hours of arrival.

ACE platforms can be fabricated at local yards
almost anywhere in the world, without the need
for extensive equipment or specialist expertise.
They are able to deliver economy and speed of
construction through simple, repetitive fabrication
details based on shipbuilding technology. Topsides
can be readily expanded or modified as field
requirements change. ACE platforms require only
tugs and strand jacks for installation and relocation.
The base can be lowered to the seabed and the
deck can be raised to final elevation within 48 hours.
The same system allows the platform to be moved to
other locations during its lifetime, making incremental
field development or re-use attractive.
At the end of a platform’s operational life,
decommissioning is rapid and economical. ACE
platforms are completely removable and can be
recycled with minimal environmental impact.
ACE platforms are individually tailored to meet a
client’s needs and Arup has an established network
of fabricators and installers who can deliver the
platforms on time and to budget.
Our in-house team can provide all the skills
necessary for the design of ACE platforms
including geotechnics, naval architecture,
structural engineering, seismic design and
offshore installation engineering.
Build  Pre-commission
Load out  dry tow to offshore
field (can be wet towed if more
economical)
Offload
Position at field
using tugs
Lower base to seabed
Penetrate skirts into
seabed (where needed)
Raise deck
Weld deck to legs
Remove strands
Commission
Arup is a global firm of planners,
designers, engineers and business
consultants. We provide a diverse
range of professional services to
clients around the world, exerting
a significant influence on the built
environment. The firm is a creative
force behind many of the world’s
most innovative buildings, transport
and civil engineering projects and
design technologies.
Established in 1946, Arup has over
10,000 employees based in more
than 90 offices across 37 countries,
working on up to 10,000 projects at
any one time. Its unique structure,
with the firm held in trust on behalf
of its employees gives us complete
independence. Our multidisciplinary
approach means that any given
project may involve people from
any or all parts of Arup. Our aim
is to achieve excellence in all we
do by bringing together the best
professionals in the world to meet
our clients needs.
	 ACE PLATFORM IN OPERATION
Hang Tuah ACE compresses associated
gas from Belida and processes gas from
subsea wells for export to Singapore. It
was designed for several re-locations in
its 25 year operational life.
For further information contact:
Europe and Africa
Gordon Jackson
T +44 20 7755 2289
E Gordon.Jackson@arup.com
Americas
Brian Raine
T	 +1 713 783 2787
E	 Brian.Raine@arup.com
Australasia
Glynn Thomas
T	 +61 8 9322 1400
E	Glynn.Thomas@arup.com
www.arup.com
FrontCOVER:HangTuahACEplatformITEM:PLPEurope09.0871265-01

More Related Content

What's hot

Rider type electric stacker cddk15 s
Rider type electric stacker cddk15 sRider type electric stacker cddk15 s
Rider type electric stacker cddk15 s
Amber Dai
 
LOAD HAUL DUMP(LHD)
LOAD HAUL DUMP(LHD)LOAD HAUL DUMP(LHD)
LOAD HAUL DUMP(LHD)
Anil Kilania
 
Part 1 T-Track - Introduction
Part 1 T-Track - IntroductionPart 1 T-Track - Introduction
Part 1 T-Track - Introduction
Sean Wilson
 
Amit crane ppt
Amit crane pptAmit crane ppt
Amit crane ppt
amits2280
 

What's hot (19)

Rider type electric stacker cddk15 s
Rider type electric stacker cddk15 sRider type electric stacker cddk15 s
Rider type electric stacker cddk15 s
 
LOAD HAUL DUMP(LHD)
LOAD HAUL DUMP(LHD)LOAD HAUL DUMP(LHD)
LOAD HAUL DUMP(LHD)
 
Part 1 T-Track - Introduction
Part 1 T-Track - IntroductionPart 1 T-Track - Introduction
Part 1 T-Track - Introduction
 
Basics Of Theory Of Machine
Basics Of Theory Of MachineBasics Of Theory Of Machine
Basics Of Theory Of Machine
 
Overhead bridge crane manufacturer & industrial cranes worldwide
Overhead bridge crane manufacturer & industrial cranes worldwideOverhead bridge crane manufacturer & industrial cranes worldwide
Overhead bridge crane manufacturer & industrial cranes worldwide
 
Crane
CraneCrane
Crane
 
Amit crane ppt
Amit crane pptAmit crane ppt
Amit crane ppt
 
Crane 123
Crane 123Crane 123
Crane 123
 
Raleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural ModificationsRaleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural Modifications
 
Wärtsilä New Generation Rectractable Thrusters
Wärtsilä New Generation Rectractable ThrustersWärtsilä New Generation Rectractable Thrusters
Wärtsilä New Generation Rectractable Thrusters
 
Hand-pallet-truck
Hand-pallet-truckHand-pallet-truck
Hand-pallet-truck
 
Helical piles for gas and oil industry
Helical piles for gas and oil industry Helical piles for gas and oil industry
Helical piles for gas and oil industry
 
Different Trucks ....
Different Trucks ....  Different Trucks ....
Different Trucks ....
 
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
 
Advancement Of Drilled Shaft Construction
Advancement Of Drilled Shaft ConstructionAdvancement Of Drilled Shaft Construction
Advancement Of Drilled Shaft Construction
 
basic of Hydraulic crane
basic of Hydraulic cranebasic of Hydraulic crane
basic of Hydraulic crane
 
Oil and Gas Applications & Innovations
Oil and Gas Applications & InnovationsOil and Gas Applications & Innovations
Oil and Gas Applications & Innovations
 
K11019(samant singh) ic engine
K11019(samant singh) ic engineK11019(samant singh) ic engine
K11019(samant singh) ic engine
 
McKinney Place Garage
McKinney Place GarageMcKinney Place Garage
McKinney Place Garage
 

Viewers also liked (8)

Portfolio project 13 a
Portfolio project 13 aPortfolio project 13 a
Portfolio project 13 a
 
Podcast
PodcastPodcast
Podcast
 
Capstone Thesis
Capstone ThesisCapstone Thesis
Capstone Thesis
 
Bedrijfsgegevens
BedrijfsgegevensBedrijfsgegevens
Bedrijfsgegevens
 
João pedro
João pedroJoão pedro
João pedro
 
Portfolio project 13 a
Portfolio project 13 aPortfolio project 13 a
Portfolio project 13 a
 
Modelos económicos
Modelos económicosModelos económicos
Modelos económicos
 
Materiales y energías en la informática
Materiales y energías en la informática Materiales y energías en la informática
Materiales y energías en la informática
 

Similar to ArupConceptElevatingACEPlatformsbrochurecopyrightArup

SeaTech-Solutions-Corporate-Brochure
SeaTech-Solutions-Corporate-BrochureSeaTech-Solutions-Corporate-Brochure
SeaTech-Solutions-Corporate-Brochure
surajith kanakam
 
ORWELL OFFSHORE Brochure 2015 v13
ORWELL OFFSHORE Brochure 2015 v13ORWELL OFFSHORE Brochure 2015 v13
ORWELL OFFSHORE Brochure 2015 v13
Stephen Adams
 
000-GENERAL presentation_rev06
000-GENERAL presentation_rev06000-GENERAL presentation_rev06
000-GENERAL presentation_rev06
Stefan Erents
 
AHK marine crane sales-2014
AHK marine crane sales-2014AHK marine crane sales-2014
AHK marine crane sales-2014
Rainer Schmied
 
NauticAWT Brochure
NauticAWT BrochureNauticAWT Brochure
NauticAWT Brochure
Aga Manhao
 

Similar to ArupConceptElevatingACEPlatformsbrochurecopyrightArup (20)

SOFEC Brochure
SOFEC BrochureSOFEC Brochure
SOFEC Brochure
 
SeaTech-Solutions-Corporate-Brochure
SeaTech-Solutions-Corporate-BrochureSeaTech-Solutions-Corporate-Brochure
SeaTech-Solutions-Corporate-Brochure
 
HSB Marine | Floating Solutions and Building On Water
HSB Marine | Floating Solutions and Building On WaterHSB Marine | Floating Solutions and Building On Water
HSB Marine | Floating Solutions and Building On Water
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Offshore Riser Design
Offshore Riser DesignOffshore Riser Design
Offshore Riser Design
 
apl-brochure
apl-brochureapl-brochure
apl-brochure
 
ORWELL OFFSHORE Brochure 2015 v13
ORWELL OFFSHORE Brochure 2015 v13ORWELL OFFSHORE Brochure 2015 v13
ORWELL OFFSHORE Brochure 2015 v13
 
000-GENERAL presentation_rev06
000-GENERAL presentation_rev06000-GENERAL presentation_rev06
000-GENERAL presentation_rev06
 
Hsb Marine Presentation 2019
Hsb Marine Presentation 2019Hsb Marine Presentation 2019
Hsb Marine Presentation 2019
 
Hsb broshure 2019_spreads_web
Hsb broshure 2019_spreads_webHsb broshure 2019_spreads_web
Hsb broshure 2019_spreads_web
 
AHK marine crane sales-2014
AHK marine crane sales-2014AHK marine crane sales-2014
AHK marine crane sales-2014
 
AMECO_Brochure_Spread_081321.pdf
AMECO_Brochure_Spread_081321.pdfAMECO_Brochure_Spread_081321.pdf
AMECO_Brochure_Spread_081321.pdf
 
ship launching airbags
ship launching airbagsship launching airbags
ship launching airbags
 
Axis TLB Ltd
Axis TLB LtdAxis TLB Ltd
Axis TLB Ltd
 
SubseaServices
SubseaServicesSubseaServices
SubseaServices
 
NauticAWT Brochure
NauticAWT BrochureNauticAWT Brochure
NauticAWT Brochure
 
Ezy Stack Structural Chamber Solutions
Ezy Stack Structural Chamber SolutionsEzy Stack Structural Chamber Solutions
Ezy Stack Structural Chamber Solutions
 
Abfad Ltd General Services Presentation
Abfad Ltd General Services PresentationAbfad Ltd General Services Presentation
Abfad Ltd General Services Presentation
 

ArupConceptElevatingACEPlatformsbrochurecopyrightArup

  • 1. > CAPTION TITLE Caption: Main copy: Page title (continued...) Arup Concept Elevating (ACE) Platforms
  • 2. award-winning platforms Maari Wellhead Platform Installed in May 2008 in 100m water depth in the Taranaki Basin, a highly seismic region, offshore New Zealand. The platform allows jack-up drilling with oil processing on a nearby FPSO.
  • 3. Yolla DrillACE PlaTform ACE platforms can be towed in sea-states up to 4m Hs and installed in 2m Hs. We shape a better world Arup has a well deserved reputation for innovation and the successful transfer of technology from industry to industry. Our aim is to deliver cost effective solutions by encouraging a clear understanding of our client’s objectives, holistic thinking and challenging the norm. We provide a range of design and project management services to the oil and gas industry for major onshore and offshore projects. In particular we have been a pioneer and innovator within the offshore construction industry and our desire to improve marginal field development with a sustainable, environmental and cost-effective solution, led to us developing specialist skills in the design and project execution of Arup Concept Elevating (ACE) self-installing platforms. ACE platforms are Arup’s award-winning range of fixed platform solutions for varying environmental and functional criteria. They are self-installing and re-locatable platforms that operate as moveable offshore production units for water-depths up to 110m. The platforms have been specifically developed to combine the advantages of traditional fixed platforms with the flexibility offered by a mobile unit. They are particularly economical where several reserves are to be exploited or in less mature oil and gas provinces. The ACE platforms differ from conventional designs by offering a lower risk solution to clients who require rapid installation, without mobilisation of large offshore construction vessels. ACE platforms comprise four main components – barge deck, gravity steel base, tubular or lattice legs and jacking system. Barge Deck The barge deck provides a large uninterrupted square or rectangular area for supporting the topsides facilities. Supporting legs do not protrude into the usable deck space. This sets the concept apart from previous jack-up platforms. Lattice or tubular legs The legs are based on jacket rather than jack-up technology. Jacking facilities are separated from the legs, so the high local jacking loads that necessitate special leg detailing on jack-ups are avoided. Conventional grades of steel are used and forged or cast items are unnecessary. These features keep the market open to the widest number of potential fabricators. Steel gravity base The steel gravity base foundation design incorporates the flexibility to operate in a range of water depths, supported by soils of different types and strengths through adoption of a skirted base. Jacking system The jacking system selected is a centre-hole strand- jacking system commonly used on land for heavy lift operations and platform load-outs. It is similar to that used for stressing tendons in post-tensioned concrete and has been used extensively for civil engineering heavy lift operations such as installing bridge decks. Yolla DrillACE Platform The platform was fabricated in the Nippon Steel yard in Batam and transported 8000km on a sea going heavy lift transport barge before being installed in approximately 80m water depth in the Bass Strait off the coast of Victoria, Australia.
  • 4. HANG TUAH FINAL ELEVATION The world’s first ACE platform was installed in the West Natuna Sea in April 2001. The platform was shipped from South Korea, then released a short tow distance from site. The deck was raised to its final in-service elevation within 48 hours of arrival. ACE platforms can be fabricated at local yards almost anywhere in the world, without the need for extensive equipment or specialist expertise. They are able to deliver economy and speed of construction through simple, repetitive fabrication details based on shipbuilding technology. Topsides can be readily expanded or modified as field requirements change. ACE platforms require only tugs and strand jacks for installation and relocation. The base can be lowered to the seabed and the deck can be raised to final elevation within 48 hours. The same system allows the platform to be moved to other locations during its lifetime, making incremental field development or re-use attractive. At the end of a platform’s operational life, decommissioning is rapid and economical. ACE platforms are completely removable and can be recycled with minimal environmental impact. ACE platforms are individually tailored to meet a client’s needs and Arup has an established network of fabricators and installers who can deliver the platforms on time and to budget. Our in-house team can provide all the skills necessary for the design of ACE platforms including geotechnics, naval architecture, structural engineering, seismic design and offshore installation engineering. Build Pre-commission Load out dry tow to offshore field (can be wet towed if more economical) Offload Position at field using tugs Lower base to seabed Penetrate skirts into seabed (where needed) Raise deck Weld deck to legs Remove strands Commission
  • 5. Arup is a global firm of planners, designers, engineers and business consultants. We provide a diverse range of professional services to clients around the world, exerting a significant influence on the built environment. The firm is a creative force behind many of the world’s most innovative buildings, transport and civil engineering projects and design technologies. Established in 1946, Arup has over 10,000 employees based in more than 90 offices across 37 countries, working on up to 10,000 projects at any one time. Its unique structure, with the firm held in trust on behalf of its employees gives us complete independence. Our multidisciplinary approach means that any given project may involve people from any or all parts of Arup. Our aim is to achieve excellence in all we do by bringing together the best professionals in the world to meet our clients needs. ACE PLATFORM IN OPERATION Hang Tuah ACE compresses associated gas from Belida and processes gas from subsea wells for export to Singapore. It was designed for several re-locations in its 25 year operational life.
  • 6. For further information contact: Europe and Africa Gordon Jackson T +44 20 7755 2289 E Gordon.Jackson@arup.com Americas Brian Raine T +1 713 783 2787 E Brian.Raine@arup.com Australasia Glynn Thomas T +61 8 9322 1400 E Glynn.Thomas@arup.com www.arup.com FrontCOVER:HangTuahACEplatformITEM:PLPEurope09.0871265-01