Progetto
“GREEN COMMUNITIES NELLE REGIONI OBIETTIVO
            CONVERGENZA”

                            Linea di attività 1
  Diagnosi energetica sulle diverse tipologie di edifici e strutture pubbliche,
comprese quelle che costituiscono il patrimonio immobiliare dei propri associati
                            a cura di Carlo Battisti


                          Roma, 24 febbraio 2012
1
                        PREPARAZIONE DELLE
                        ATTIVITA’




                                    2
                                   REALIZZAZIONE




                 3
  DISSEMINAZIONE DEI
          RISULTATI E
    DIFFUSIONE DELLE
            PRATICHE



Project Chart
Project Plan
Green Communities Line 1 Presentation by Battisti Carlo
54                        Pollino
edifici candidati




                                  6
                     Comuni visitati

                       Castrovillari
                             Civita
                    Morano Calabro
                        Mormanno
                        San Basile
                         Saracena
18                            Madonie
edifici candidati



                                         7
                            Comuni visitati

                             Castelbuono
                         Castellana Sicula
                                Collesano
                                    Isnello
                          Petralia Sottana
                                    Pollina
                    San Mauro Castelverde
17                     Alto Tammaro
edifici candidati             Titerno


                                         7
                            Comuni visitati

                             Campolattaro
                           Cerreto Sannita
                                  Faicchio
                      Guardia Sanframondi
                    Santa Croce del Sannio
                                Sassinoro
                                 Pietraroja
77                          Cilento
edifici candidati                  15
                    Comuni visitati
                    Castelnuovo Cilento
                      Castel S. Lorenzo
                        Cuccaro Vetere
                                  Futani
                                 Laurino
                       Magliano Vetere
                              Morigerati
                              Novi Velia
                              Omignano
                                   Perito
                          Roccagloriosa
                          Sessa Cilento
                           Stella Cilento
                            Torre Orsaia
                     Vallo della Lucania
Riunione iniziale                                Scelta
  con gli stakeholders                              edifici




                               LA 02                                            LA 03
  Raccolta dati edifici    Sintesi dati        Audit di tipo                 Checklista
   pubblici Comunali      edifici pubblici      qualitativo                audit qualitativo



                                                                           1. descrizione delle caratteristiche costruttive e
                             LA 01                                            impiantistiche dell’edificio
    Raccolta dati         Dati consumi        Raccolta dati                2. descrizione dei consumi (energia termica ed
   consumi energia           edifici         singolo edificio                 elettrica)
                                                                           3. modellazione termodinamica dell’edificio
                                                                              finalizzata a individuare le criticità,
                                                                              individuare gli interventi più efficaci e
                                                                              stimarne i risparmi derivanti
                              LA 04                                        4. risultati della modellazione
                              Audit             AUDIT                      5. individuazione delle criticità
   Modellazione dati
                            energetico       ENERGETICO                    6. proposte di interventi migliorativi
                                                                           7. modellazione degli interventi proposti per la
                                                                              riduzione dei consumi termici
                                                                           8. analisi economica degli interventi proposti
                                                                              per la riduzione dei consumi termici
    Applicazione          Report attività    Certificazione
                                                                           9. analisi tecnico-economica degli interventi
                                                                              proposti per la riduzione dei consumi elettrici
  metodologia scelta          LA1             energetica
       edifici                                                  Report
                                                              proposta
                                                              interventi


Metodologia Linea attività 1
LA Mod. 02
                       Sintesi dati edifici pubblici Comuni

LA Mod. 01
Dati consumi edifici




 Template
LA Mod. 03
           Checklist audit qualitativo




                LA Mod. 04
Template   Audit energetico
Avanzamento raccolta dati edifici pubblici dai Comuni




                                                         report




 35 Comuni 166 edifici
 Disponibilità dati e risorse per raccolta dati
 Tempi di risposta
 Riscontro dagli amministratori
 Tracciabilità dei consumi per singolo edificio
 Correttezza delle informazioni

Risultati provvisori e criticità
Municipio di Civita




Risultati provvisori e criticità
Schema crediti Green Mountain (edifici)
Costruzione e
gestione
“sostenibile” del
patrimonio edilizio e
delle infrastrutture

Intento
Aumentare
l’insediamento di green
buildings e componenti
di bio-edilizia che
sfruttano risorse locali.

Requisito
Piano di uso del
territorio (combinazione
di piano urbanistico e
piano paesaggistico in
evoluzione)

Credito 1
Green building +
malghe e baite o altro
di specifico (LEED,
Casaclima)

Credito 2
Integrazione di LEED
ND (Neighborhood
Develoment)
prerequisito
                     PIANO STRUTTURALE COMUNALE ASSOCIATO
      prerequisito
   PIANO D’USO DEL   Obbligatorio
      TERRITORIO
                     Finalità

                     Incoraggiare una pianificazione sostenibile del territorio, per quanto riguarda nuove
      credito e.1    edificazioni, recupero del patrimonio edilizio esistente e miglioramento delle infrastrutture.
   GREEN BUILDINGS   Il Piano Strutturale Comunale (PSC) é l'insieme delle attività volte all'individuazione delle
                     risorse del territorio, e alla contestuale definizione degli obiettivi di conservazione,
                     trasformazione o di riqualificazione da perseguire, nel periodo di vigenza del piano.

                     Requisiti
       credito e.2
    INTEGRAZIONE
                     Attuare un pianificazione sostenibile integrata intercomunale, basata sugli strumenti del
       LEED ND
                     Piano Strutturale Comunale Associato, ovvero il PSC Piano Strutturale Comunale (di
                     natura programmatica), che delinea le scelte strategiche di assetto e sviluppo del proprio
                     territorio, tutelando l’integrità fisica e ambientale e l’identità culturale dello stesso) e due
                     strumenti operativi (di natura operativa) il RUE (Regolamento Urbanistico Edilizio, che
                     disciplina il territorio urbanizzato e rurale oltre che comprendere il regolamento edilizio) e il
                     POC (Piano Operativo Comunale, che disciplina per ogni quinquennio le grandi aree
                     oggetto di trasformazione del territorio).




Schema crediti Green Mountain (edifici)
credito e.1
                     GREEN BUILDINGS
      prerequisito
   PIANO D’USO DEL   1 punto
     TERRITORIO
                     Finalità

                     Incoraggiare la progettazione, la costruzione, e il recupero degli edifici che utilizzano
      credito e.1    pratiche sostenibili.
   GREEN BUILDINGS
                     Requisiti

                     Progettare, costruire o recuperare un intero edificio all'interno dell'area di progetto, in
                     aggiunta alla richiesta del prerequisito, per essere certificato LEED secondo uno dei
       credito e.2
                     protocolli disponibili nella versione italiana (LEED Italia Nuove Costruzioni e
    INTEGRAZIONE
                     Ristrutturazioni, GBC Home) o americana (LEED for New Construction, LEED for Existing
       LEED ND
                     Buildings: Operations & Maintenance, LEED for Schools, LEED for Retail: New
                     Construction, LEED for Core&Shell, con almeno il 75% della superficie di pavimento
                     certificata LEED for Commercial Interiors, o LEED for Retail: Commercial Interiors),
                     oppure certificato secondo un qualsiasi altro sistema per la valutazione degli edifici verdi
                     rilasciato da un ente terzo, indipendente, imparziale che sia stato accreditato o dimostri di
                     possedere i requisiti richiesti dalla norma ISO/IEC 17021 e, quando disponibile, dalla
                     norma ISO/IEC 17065.
                     (nota: il riferimento è alla versione interna in bozza di GBC Ecoquartieri in corso di
                     elaborazione)




Schema crediti Green Mountain (edifici)
credito e.2
                     INTEGRAZIONE DI LEED ND
      prerequisito
   PIANO D’USO DEL   1÷5 punti
     TERRITORIO
                     Finalità
                     Incoraggiare la progettazione, la costruzione, e il recupero degli edifici che utilizzano pratiche sostenibili.

                     Requisiti
                     Opzione 1. Progetti con meno di 10 edifici
      credito e.1    Progettare, costruire o recuperare un intero edificio all'interno dell'area di progetto, in aggiunta alla richiesta del
   GREEN BUILDINGS   credito 1, per essere certificato LEED secondo uno dei protocolli disponibili nella versione italiana (LEED Italia
                     Nuove Costruzioni e Ristrutturazioni, GBC Home) o americana (LEED for New Construction, LEED for Existing
                     Buildings: Operations & Maintenance, LEED for Schools, LEED for Retail: New Construction, LEED for
                     Core&Shell, con almeno il 75% della superficie di pavimento certificata LEED for Commercial Interiors, o LEED
                     for Retail: Commercial Interiors), oppure certificato secondo un qualsiasi altro sistema per la valutazione degli
      credito e.2    edifici verdi rilasciato da un ente terzo, indipendente, imparziale che sia stato accreditato o dimostri di possedere i
    INTEGRAZIONE     requisiti richiesti dalla norma ISO/IEC 17021 e, quando disponibile, dalla norma ISO/IEC 17065.
       LEED ND       oppure

                     Opzione 2. Progetti di qualsiasi dimensione
                     Progettare, costruire o recuperare una percentuale dell’intera superficie lorda costruita nell'area di progetto, in
                     aggiunta alla richiesta del credito 1, per essere certificata LEED secondo uno dei protocolli disponibili elencati
                     sopra, oppure certificato secondo un qualsiasi altro sistema per la valutazione di edifici verdi rilasciato da un ente
                     terzo, indipendente, imparziale che sia stato accreditato o dimostri di possedere i requisiti richiesti dalla norma
                     ISO/IEC 17021 e, quando disponibile, dalla norma ISO/IEC 17065.
                     ≥10% e < 20% 1 punto
                     ≥20% e < 30% 2 punti
                     ≥30% e < 40% 3 punti
                     ≥40% e < 50% 4 punti
                     ≥50%             5 punti

                     e per tutti i progetti

                     Le dependance di un edificio residenziale devono essere conteggiate come edifici separati se sono fisicamente
                     indipendenti dall’edificio principale. Nel caso in cui siano adiacenti all’edificio principale non sono conteggiate
                     separatamente. (nota: il riferimento è alla versione interna in bozza di GBC Ecoquartieri in corso di elaborazione)


Schema crediti Green Mountain (edifici)
Grazie per l’attenzione
                         Carlo Battisti
                           Consulente UNCEM
                  Progetto Green Communities

                           battistic@alice.it




domande




                       Roma, 24-25/02/2012

Contenu connexe

En vedette

Kesenian Mengikut Perspektif Islam
Kesenian Mengikut Perspektif IslamKesenian Mengikut Perspektif Islam
Kesenian Mengikut Perspektif IslamChaerry Cha
 
Kepentingan piawaian
Kepentingan piawaianKepentingan piawaian
Kepentingan piawaianChaerry Cha
 
Methods of conservative and operational treatment of the facial skull fractures
Methods of conservative and operational treatment of  the facial skull fracturesMethods of conservative and operational treatment of  the facial skull fractures
Methods of conservative and operational treatment of the facial skull fracturesLinda Jenhani
 
Textiles online reservation(jakel)
Textiles online reservation(jakel)Textiles online reservation(jakel)
Textiles online reservation(jakel)Chaerry Cha
 
Dental implants. surgical stages
Dental  implants. surgical stagesDental  implants. surgical stages
Dental implants. surgical stagesLinda Jenhani
 
Bab 1 Pengaturcaraan Antaramuka Pengguna
Bab 1 Pengaturcaraan Antaramuka PenggunaBab 1 Pengaturcaraan Antaramuka Pengguna
Bab 1 Pengaturcaraan Antaramuka PenggunaChaerry Cha
 
SISTEM MAKLUMAT PENGURUSAN(PROJEK AKHIR)
SISTEM MAKLUMAT PENGURUSAN(PROJEK AKHIR)SISTEM MAKLUMAT PENGURUSAN(PROJEK AKHIR)
SISTEM MAKLUMAT PENGURUSAN(PROJEK AKHIR)Chaerry Cha
 
Marriot Hotel Case
Marriot Hotel CaseMarriot Hotel Case
Marriot Hotel Casekruegervehm
 
Penyuluhan Ibu Hamil Resiko Tinggi
Penyuluhan Ibu Hamil Resiko TinggiPenyuluhan Ibu Hamil Resiko Tinggi
Penyuluhan Ibu Hamil Resiko Tinggidpalupiw
 

En vedette (9)

Kesenian Mengikut Perspektif Islam
Kesenian Mengikut Perspektif IslamKesenian Mengikut Perspektif Islam
Kesenian Mengikut Perspektif Islam
 
Kepentingan piawaian
Kepentingan piawaianKepentingan piawaian
Kepentingan piawaian
 
Methods of conservative and operational treatment of the facial skull fractures
Methods of conservative and operational treatment of  the facial skull fracturesMethods of conservative and operational treatment of  the facial skull fractures
Methods of conservative and operational treatment of the facial skull fractures
 
Textiles online reservation(jakel)
Textiles online reservation(jakel)Textiles online reservation(jakel)
Textiles online reservation(jakel)
 
Dental implants. surgical stages
Dental  implants. surgical stagesDental  implants. surgical stages
Dental implants. surgical stages
 
Bab 1 Pengaturcaraan Antaramuka Pengguna
Bab 1 Pengaturcaraan Antaramuka PenggunaBab 1 Pengaturcaraan Antaramuka Pengguna
Bab 1 Pengaturcaraan Antaramuka Pengguna
 
SISTEM MAKLUMAT PENGURUSAN(PROJEK AKHIR)
SISTEM MAKLUMAT PENGURUSAN(PROJEK AKHIR)SISTEM MAKLUMAT PENGURUSAN(PROJEK AKHIR)
SISTEM MAKLUMAT PENGURUSAN(PROJEK AKHIR)
 
Marriot Hotel Case
Marriot Hotel CaseMarriot Hotel Case
Marriot Hotel Case
 
Penyuluhan Ibu Hamil Resiko Tinggi
Penyuluhan Ibu Hamil Resiko TinggiPenyuluhan Ibu Hamil Resiko Tinggi
Penyuluhan Ibu Hamil Resiko Tinggi
 

Plus de green communities

1. “Sistemi di rating: il quadro internazionale e nazionale”
1. “Sistemi di rating: il quadro internazionale e nazionale” 1. “Sistemi di rating: il quadro internazionale e nazionale”
1. “Sistemi di rating: il quadro internazionale e nazionale” green communities
 
“Il Green Building Council Italia”
“Il Green Building Council Italia”“Il Green Building Council Italia”
“Il Green Building Council Italia”green communities
 
1. “Sistemi di rating: il quadro internazionale e nazionale”
1. “Sistemi di rating: il quadro internazionale e nazionale” 1. “Sistemi di rating: il quadro internazionale e nazionale”
1. “Sistemi di rating: il quadro internazionale e nazionale” green communities
 
Presentazione parco delle madonie al seminario green communities part2
Presentazione parco delle madonie al seminario green communities part2Presentazione parco delle madonie al seminario green communities part2
Presentazione parco delle madonie al seminario green communities part2green communities
 
Presentazione parco delle madonie al seminario green communities part1
Presentazione parco delle madonie al seminario green communities part1Presentazione parco delle madonie al seminario green communities part1
Presentazione parco delle madonie al seminario green communities part1green communities
 
Green Communities: "Short&slow"
Green Communities: "Short&slow"Green Communities: "Short&slow"
Green Communities: "Short&slow"green communities
 
Green communities by Lorenzoni
Green communities by Lorenzoni Green communities by Lorenzoni
Green communities by Lorenzoni green communities
 

Plus de green communities (7)

1. “Sistemi di rating: il quadro internazionale e nazionale”
1. “Sistemi di rating: il quadro internazionale e nazionale” 1. “Sistemi di rating: il quadro internazionale e nazionale”
1. “Sistemi di rating: il quadro internazionale e nazionale”
 
“Il Green Building Council Italia”
“Il Green Building Council Italia”“Il Green Building Council Italia”
“Il Green Building Council Italia”
 
1. “Sistemi di rating: il quadro internazionale e nazionale”
1. “Sistemi di rating: il quadro internazionale e nazionale” 1. “Sistemi di rating: il quadro internazionale e nazionale”
1. “Sistemi di rating: il quadro internazionale e nazionale”
 
Presentazione parco delle madonie al seminario green communities part2
Presentazione parco delle madonie al seminario green communities part2Presentazione parco delle madonie al seminario green communities part2
Presentazione parco delle madonie al seminario green communities part2
 
Presentazione parco delle madonie al seminario green communities part1
Presentazione parco delle madonie al seminario green communities part1Presentazione parco delle madonie al seminario green communities part1
Presentazione parco delle madonie al seminario green communities part1
 
Green Communities: "Short&slow"
Green Communities: "Short&slow"Green Communities: "Short&slow"
Green Communities: "Short&slow"
 
Green communities by Lorenzoni
Green communities by Lorenzoni Green communities by Lorenzoni
Green communities by Lorenzoni
 

Green Communities Line 1 Presentation by Battisti Carlo

  • 1. Progetto “GREEN COMMUNITIES NELLE REGIONI OBIETTIVO CONVERGENZA” Linea di attività 1 Diagnosi energetica sulle diverse tipologie di edifici e strutture pubbliche, comprese quelle che costituiscono il patrimonio immobiliare dei propri associati a cura di Carlo Battisti Roma, 24 febbraio 2012
  • 2. 1 PREPARAZIONE DELLE ATTIVITA’ 2 REALIZZAZIONE 3 DISSEMINAZIONE DEI RISULTATI E DIFFUSIONE DELLE PRATICHE Project Chart
  • 5. 54 Pollino edifici candidati 6 Comuni visitati Castrovillari Civita Morano Calabro Mormanno San Basile Saracena
  • 6. 18 Madonie edifici candidati 7 Comuni visitati Castelbuono Castellana Sicula Collesano Isnello Petralia Sottana Pollina San Mauro Castelverde
  • 7. 17 Alto Tammaro edifici candidati Titerno 7 Comuni visitati Campolattaro Cerreto Sannita Faicchio Guardia Sanframondi Santa Croce del Sannio Sassinoro Pietraroja
  • 8. 77 Cilento edifici candidati 15 Comuni visitati Castelnuovo Cilento Castel S. Lorenzo Cuccaro Vetere Futani Laurino Magliano Vetere Morigerati Novi Velia Omignano Perito Roccagloriosa Sessa Cilento Stella Cilento Torre Orsaia Vallo della Lucania
  • 9. Riunione iniziale Scelta con gli stakeholders edifici LA 02 LA 03 Raccolta dati edifici Sintesi dati Audit di tipo Checklista pubblici Comunali edifici pubblici qualitativo audit qualitativo 1. descrizione delle caratteristiche costruttive e LA 01 impiantistiche dell’edificio Raccolta dati Dati consumi Raccolta dati 2. descrizione dei consumi (energia termica ed consumi energia edifici singolo edificio elettrica) 3. modellazione termodinamica dell’edificio finalizzata a individuare le criticità, individuare gli interventi più efficaci e stimarne i risparmi derivanti LA 04 4. risultati della modellazione Audit AUDIT 5. individuazione delle criticità Modellazione dati energetico ENERGETICO 6. proposte di interventi migliorativi 7. modellazione degli interventi proposti per la riduzione dei consumi termici 8. analisi economica degli interventi proposti per la riduzione dei consumi termici Applicazione Report attività Certificazione 9. analisi tecnico-economica degli interventi proposti per la riduzione dei consumi elettrici metodologia scelta LA1 energetica edifici Report proposta interventi Metodologia Linea attività 1
  • 10. LA Mod. 02 Sintesi dati edifici pubblici Comuni LA Mod. 01 Dati consumi edifici Template
  • 11. LA Mod. 03 Checklist audit qualitativo LA Mod. 04 Template Audit energetico
  • 12. Avanzamento raccolta dati edifici pubblici dai Comuni report 35 Comuni 166 edifici Disponibilità dati e risorse per raccolta dati Tempi di risposta Riscontro dagli amministratori Tracciabilità dei consumi per singolo edificio Correttezza delle informazioni Risultati provvisori e criticità
  • 13. Municipio di Civita Risultati provvisori e criticità
  • 14. Schema crediti Green Mountain (edifici) Costruzione e gestione “sostenibile” del patrimonio edilizio e delle infrastrutture Intento Aumentare l’insediamento di green buildings e componenti di bio-edilizia che sfruttano risorse locali. Requisito Piano di uso del territorio (combinazione di piano urbanistico e piano paesaggistico in evoluzione) Credito 1 Green building + malghe e baite o altro di specifico (LEED, Casaclima) Credito 2 Integrazione di LEED ND (Neighborhood Develoment)
  • 15. prerequisito PIANO STRUTTURALE COMUNALE ASSOCIATO prerequisito PIANO D’USO DEL Obbligatorio TERRITORIO Finalità Incoraggiare una pianificazione sostenibile del territorio, per quanto riguarda nuove credito e.1 edificazioni, recupero del patrimonio edilizio esistente e miglioramento delle infrastrutture. GREEN BUILDINGS Il Piano Strutturale Comunale (PSC) é l'insieme delle attività volte all'individuazione delle risorse del territorio, e alla contestuale definizione degli obiettivi di conservazione, trasformazione o di riqualificazione da perseguire, nel periodo di vigenza del piano. Requisiti credito e.2 INTEGRAZIONE Attuare un pianificazione sostenibile integrata intercomunale, basata sugli strumenti del LEED ND Piano Strutturale Comunale Associato, ovvero il PSC Piano Strutturale Comunale (di natura programmatica), che delinea le scelte strategiche di assetto e sviluppo del proprio territorio, tutelando l’integrità fisica e ambientale e l’identità culturale dello stesso) e due strumenti operativi (di natura operativa) il RUE (Regolamento Urbanistico Edilizio, che disciplina il territorio urbanizzato e rurale oltre che comprendere il regolamento edilizio) e il POC (Piano Operativo Comunale, che disciplina per ogni quinquennio le grandi aree oggetto di trasformazione del territorio). Schema crediti Green Mountain (edifici)
  • 16. credito e.1 GREEN BUILDINGS prerequisito PIANO D’USO DEL 1 punto TERRITORIO Finalità Incoraggiare la progettazione, la costruzione, e il recupero degli edifici che utilizzano credito e.1 pratiche sostenibili. GREEN BUILDINGS Requisiti Progettare, costruire o recuperare un intero edificio all'interno dell'area di progetto, in aggiunta alla richiesta del prerequisito, per essere certificato LEED secondo uno dei credito e.2 protocolli disponibili nella versione italiana (LEED Italia Nuove Costruzioni e INTEGRAZIONE Ristrutturazioni, GBC Home) o americana (LEED for New Construction, LEED for Existing LEED ND Buildings: Operations & Maintenance, LEED for Schools, LEED for Retail: New Construction, LEED for Core&Shell, con almeno il 75% della superficie di pavimento certificata LEED for Commercial Interiors, o LEED for Retail: Commercial Interiors), oppure certificato secondo un qualsiasi altro sistema per la valutazione degli edifici verdi rilasciato da un ente terzo, indipendente, imparziale che sia stato accreditato o dimostri di possedere i requisiti richiesti dalla norma ISO/IEC 17021 e, quando disponibile, dalla norma ISO/IEC 17065. (nota: il riferimento è alla versione interna in bozza di GBC Ecoquartieri in corso di elaborazione) Schema crediti Green Mountain (edifici)
  • 17. credito e.2 INTEGRAZIONE DI LEED ND prerequisito PIANO D’USO DEL 1÷5 punti TERRITORIO Finalità Incoraggiare la progettazione, la costruzione, e il recupero degli edifici che utilizzano pratiche sostenibili. Requisiti Opzione 1. Progetti con meno di 10 edifici credito e.1 Progettare, costruire o recuperare un intero edificio all'interno dell'area di progetto, in aggiunta alla richiesta del GREEN BUILDINGS credito 1, per essere certificato LEED secondo uno dei protocolli disponibili nella versione italiana (LEED Italia Nuove Costruzioni e Ristrutturazioni, GBC Home) o americana (LEED for New Construction, LEED for Existing Buildings: Operations & Maintenance, LEED for Schools, LEED for Retail: New Construction, LEED for Core&Shell, con almeno il 75% della superficie di pavimento certificata LEED for Commercial Interiors, o LEED for Retail: Commercial Interiors), oppure certificato secondo un qualsiasi altro sistema per la valutazione degli credito e.2 edifici verdi rilasciato da un ente terzo, indipendente, imparziale che sia stato accreditato o dimostri di possedere i INTEGRAZIONE requisiti richiesti dalla norma ISO/IEC 17021 e, quando disponibile, dalla norma ISO/IEC 17065. LEED ND oppure Opzione 2. Progetti di qualsiasi dimensione Progettare, costruire o recuperare una percentuale dell’intera superficie lorda costruita nell'area di progetto, in aggiunta alla richiesta del credito 1, per essere certificata LEED secondo uno dei protocolli disponibili elencati sopra, oppure certificato secondo un qualsiasi altro sistema per la valutazione di edifici verdi rilasciato da un ente terzo, indipendente, imparziale che sia stato accreditato o dimostri di possedere i requisiti richiesti dalla norma ISO/IEC 17021 e, quando disponibile, dalla norma ISO/IEC 17065. ≥10% e < 20% 1 punto ≥20% e < 30% 2 punti ≥30% e < 40% 3 punti ≥40% e < 50% 4 punti ≥50% 5 punti e per tutti i progetti Le dependance di un edificio residenziale devono essere conteggiate come edifici separati se sono fisicamente indipendenti dall’edificio principale. Nel caso in cui siano adiacenti all’edificio principale non sono conteggiate separatamente. (nota: il riferimento è alla versione interna in bozza di GBC Ecoquartieri in corso di elaborazione) Schema crediti Green Mountain (edifici)