THE ULTIMATE SOLUTION FOR SOIL ROAD
PROBASE ROAD SYSTEM
The Past
The Common
Problem Of
Soil Road.
PROBASE GROUP OF COMPANY.
• The Inventor Of “Probase Road System”
• The Manufacturer Of Probase Product.
• Provide Technology Transfer, JV, Design &
Specification, Training, R&D.
• The Pioneer Of “Soil Road Maintenance Technology”
Probase Production Plant In Malaysia.
The Product.
1. For Stabilization.
2. For Sealing.
Tx-85 Soil Stabilize &
Strengthener For Stable Soil.
• PB-65 Soil Sealant.
SH-85 Soil Hardener
For Unstable Soil.
How Does It Works?
2 Simple Steps:
Step 1. Step 2.
• Stabilization Using TX & SH • Sealing With PB
Probase Road System
The Soil Road Solution.
The Past The Present
Mud & Slippery.
High Transport Cost
Probase Road.
All Season Road.
Dusty Soil Road
Probase Road.
Dust Free.
PB-65 did not peal off even after emergency break from a truck
Probase Road System.
The Right Technology To Up Keep Soil Road.
Types of Road and Cost of Construction
Performance
& Durability
Soil Road
Laterite Road
Asphalt Road
Concrete Road
Gravel Road
Low Cost
High Cost
Probase Road
(Using In-situ Material)
Medium & Low Cost
Patching Treated Soil Spray PB-65
For more information visit our website http://probase.com.my
© 2013 PROBASE®. All rights reserved. Slides are licensed under the PROBASE®
Completion Date: 15/6/1999
Maintenance period 2011 –
2016, next renewal will be
2016 – 2021.
With minimum maintenance cost,
the road can last longer period of time.
How Long PROBASE road will last?
14 Years Old Probase Road.
After Some Time….
PROBASE Asphalt Road
Cost Savings Between 40% - 60%
To Build An Asphalt Road
Upgrade To Asphalt Road.
By Laying 50mm ACWC.
Case study
• To Built Conventional Asphalt Road.
• 250km x 6m X USD2m/km = USD500 million
• Time 10 Years
• Budget Constraint!
Probase Proposal
• To Supply & Install 250km x 6m Probase Road.
• Contract Period 3 Years.
• Contract Value USD60 Million.
(Base On Usd40/m2).
30% or Usd18 Million By Government.
70% or Usd42 Million By Funder.
Technology Transfer.
90% Local Work Force.
Engineer, Project Manager, Supervisor, Worker.
CONCLUSION.
PROBASE ROAD SYSTEM.
PROBASE ROAD SYSTEM
Better Road, Better Life, Better Future..
17
Thank You. . .
CHANGE!
Change Will Not Come If We Wait For Some Other Person
Or Some Other Time.
We Are The Ones We’ve Been Waiting For.
We Are The Change That We Seek.
---Obama---
Q & A

More Related Content

What's hot

Gabion walls design guide
Gabion walls design guideGabion walls design guide
Gabion walls design guideScottMeredith1
 
Piawai_Rekabentuk_Pencawang.pdf
Piawai_Rekabentuk_Pencawang.pdfPiawai_Rekabentuk_Pencawang.pdf
Piawai_Rekabentuk_Pencawang.pdfkhairulsalleh10
 
Civil Engineer & Inspector
Civil Engineer & InspectorCivil Engineer & Inspector
Civil Engineer & InspectorMOHAMED RASHEED
 
Scale of fees (rev. 2004)
Scale of fees (rev. 2004)Scale of fees (rev. 2004)
Scale of fees (rev. 2004)helmie84
 
Dead load of structure
Dead load of structureDead load of structure
Dead load of structureKen Wong
 
Slide presentation assignment2,case study mrr2, group4, section5, session 201...
Slide presentation assignment2,case study mrr2, group4, section5, session 201...Slide presentation assignment2,case study mrr2, group4, section5, session 201...
Slide presentation assignment2,case study mrr2, group4, section5, session 201...Nurhasanah Shafei
 
Pvd Soil Consolidation Design
Pvd Soil Consolidation DesignPvd Soil Consolidation Design
Pvd Soil Consolidation Designgeo synthetics
 
History of soil mechanics
History of soil mechanicsHistory of soil mechanics
History of soil mechanicsNilesh Kachot
 
Various types of retaining walls
Various types of retaining wallsVarious types of retaining walls
Various types of retaining wallshcseonline
 
Code of Ethics & Code of Conduct as a Profesional Engineer
Code of Ethics & Code of Conduct as a Profesional EngineerCode of Ethics & Code of Conduct as a Profesional Engineer
Code of Ethics & Code of Conduct as a Profesional EngineerIr. Dr. R.Badlishah Ahmad
 
Lesson of highland towers
Lesson of highland towersLesson of highland towers
Lesson of highland towersMiz Belle
 
Foundation design of burj khalifa (deep foundation<piles>)
Foundation design of burj khalifa (deep foundation<piles>)Foundation design of burj khalifa (deep foundation<piles>)
Foundation design of burj khalifa (deep foundation<piles>)sumitvikram
 
Mullin Jonathan - Resume - Driller 2014 nitro
Mullin Jonathan - Resume - Driller 2014 nitroMullin Jonathan - Resume - Driller 2014 nitro
Mullin Jonathan - Resume - Driller 2014 nitroJon Mullin
 
Lec07 Analysis and Design of Doubly Reinforced Beam (Reinforced Concrete Desi...
Lec07 Analysis and Design of Doubly Reinforced Beam (Reinforced Concrete Desi...Lec07 Analysis and Design of Doubly Reinforced Beam (Reinforced Concrete Desi...
Lec07 Analysis and Design of Doubly Reinforced Beam (Reinforced Concrete Desi...Hossam Shafiq II
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesAkshey Sharma
 
analysis and design of telecommunication tower
analysis and design of telecommunication toweranalysis and design of telecommunication tower
analysis and design of telecommunication towerRohithasangaraju
 
Earthquake load as per nbc 105 and is 1893
Earthquake load as per nbc 105 and is 1893Earthquake load as per nbc 105 and is 1893
Earthquake load as per nbc 105 and is 1893Binay Shrestha
 
Lateral Earth Pressure - Rankin Theory
Lateral Earth Pressure - Rankin Theory Lateral Earth Pressure - Rankin Theory
Lateral Earth Pressure - Rankin Theory Ahmad Maher
 

What's hot (20)

Gabion walls design guide
Gabion walls design guideGabion walls design guide
Gabion walls design guide
 
Piawai_Rekabentuk_Pencawang.pdf
Piawai_Rekabentuk_Pencawang.pdfPiawai_Rekabentuk_Pencawang.pdf
Piawai_Rekabentuk_Pencawang.pdf
 
Civil Engineer & Inspector
Civil Engineer & InspectorCivil Engineer & Inspector
Civil Engineer & Inspector
 
Scale of fees (rev. 2004)
Scale of fees (rev. 2004)Scale of fees (rev. 2004)
Scale of fees (rev. 2004)
 
Dead load of structure
Dead load of structureDead load of structure
Dead load of structure
 
Slide presentation assignment2,case study mrr2, group4, section5, session 201...
Slide presentation assignment2,case study mrr2, group4, section5, session 201...Slide presentation assignment2,case study mrr2, group4, section5, session 201...
Slide presentation assignment2,case study mrr2, group4, section5, session 201...
 
Pvd Soil Consolidation Design
Pvd Soil Consolidation DesignPvd Soil Consolidation Design
Pvd Soil Consolidation Design
 
Raniah c.v sep 2018
Raniah c.v sep  2018Raniah c.v sep  2018
Raniah c.v sep 2018
 
Site possession
Site possessionSite possession
Site possession
 
History of soil mechanics
History of soil mechanicsHistory of soil mechanics
History of soil mechanics
 
Various types of retaining walls
Various types of retaining wallsVarious types of retaining walls
Various types of retaining walls
 
Code of Ethics & Code of Conduct as a Profesional Engineer
Code of Ethics & Code of Conduct as a Profesional EngineerCode of Ethics & Code of Conduct as a Profesional Engineer
Code of Ethics & Code of Conduct as a Profesional Engineer
 
Lesson of highland towers
Lesson of highland towersLesson of highland towers
Lesson of highland towers
 
Foundation design of burj khalifa (deep foundation<piles>)
Foundation design of burj khalifa (deep foundation<piles>)Foundation design of burj khalifa (deep foundation<piles>)
Foundation design of burj khalifa (deep foundation<piles>)
 
Mullin Jonathan - Resume - Driller 2014 nitro
Mullin Jonathan - Resume - Driller 2014 nitroMullin Jonathan - Resume - Driller 2014 nitro
Mullin Jonathan - Resume - Driller 2014 nitro
 
Lec07 Analysis and Design of Doubly Reinforced Beam (Reinforced Concrete Desi...
Lec07 Analysis and Design of Doubly Reinforced Beam (Reinforced Concrete Desi...Lec07 Analysis and Design of Doubly Reinforced Beam (Reinforced Concrete Desi...
Lec07 Analysis and Design of Doubly Reinforced Beam (Reinforced Concrete Desi...
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologies
 
analysis and design of telecommunication tower
analysis and design of telecommunication toweranalysis and design of telecommunication tower
analysis and design of telecommunication tower
 
Earthquake load as per nbc 105 and is 1893
Earthquake load as per nbc 105 and is 1893Earthquake load as per nbc 105 and is 1893
Earthquake load as per nbc 105 and is 1893
 
Lateral Earth Pressure - Rankin Theory
Lateral Earth Pressure - Rankin Theory Lateral Earth Pressure - Rankin Theory
Lateral Earth Pressure - Rankin Theory
 

Viewers also liked

150 acres for jv or sale in hoskote
150 acres for jv or sale in hoskote150 acres for jv or sale in hoskote
150 acres for jv or sale in hoskoterealtyplazza
 
PPt - Contribution for 7th IRF Conference in INDIA OK2 [Mode de compatibilité]
PPt - Contribution for 7th IRF Conference in INDIA OK2 [Mode de compatibilité]PPt - Contribution for 7th IRF Conference in INDIA OK2 [Mode de compatibilité]
PPt - Contribution for 7th IRF Conference in INDIA OK2 [Mode de compatibilité]Tambe John Bita
 
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]Tambe John Bita
 
Dxn product-presentation
Dxn product-presentationDxn product-presentation
Dxn product-presentationAamir Awan
 
Tongue cancer - Mrs Maria Komane- Now freed from tongue cancer
Tongue cancer - Mrs Maria Komane- Now freed from tongue cancerTongue cancer - Mrs Maria Komane- Now freed from tongue cancer
Tongue cancer - Mrs Maria Komane- Now freed from tongue cancerHarshad Master
 
Weight loose natural way by MycoVeggie (DXN)
Weight loose natural way by MycoVeggie (DXN)Weight loose natural way by MycoVeggie (DXN)
Weight loose natural way by MycoVeggie (DXN)Smart Kabir
 
Motivational Quotes
Motivational QuotesMotivational Quotes
Motivational QuotesSmart Kabir
 
Dxn presentation-pakistan
Dxn presentation-pakistanDxn presentation-pakistan
Dxn presentation-pakistanAamir Awan
 
DXN in Obtainer Magazin (English)
DXN in Obtainer Magazin (English)DXN in Obtainer Magazin (English)
DXN in Obtainer Magazin (English)DXN Ganoderma
 
Dxn products South Africa
Dxn products South AfricaDxn products South Africa
Dxn products South AfricaVicente Bonto
 
Ganotherapy : How DXN Ganoderma works
Ganotherapy  : How DXN Ganoderma worksGanotherapy  : How DXN Ganoderma works
Ganotherapy : How DXN Ganoderma worksmustafa rangoon
 
Business vs my Business (DXN) - 1 August 2015
Business vs my Business (DXN) - 1 August 2015Business vs my Business (DXN) - 1 August 2015
Business vs my Business (DXN) - 1 August 2015Faisal Ansari
 
DXN Seminar June 2010 (Presented by Jane Yau)
DXN Seminar June 2010 (Presented by Jane Yau)DXN Seminar June 2010 (Presented by Jane Yau)
DXN Seminar June 2010 (Presented by Jane Yau)theanyong
 
DXN Dr. Jane Yau Presentation 2010 EN.- презентации.
DXN Dr. Jane Yau Presentation 2010 EN.- презентации.DXN Dr. Jane Yau Presentation 2010 EN.- презентации.
DXN Dr. Jane Yau Presentation 2010 EN.- презентации.DXN Russia Ukraine Kazakhstan
 
Dxn Presentation
Dxn PresentationDxn Presentation
Dxn PresentationSmart Kabir
 
Ganoderma Lucidium Reishi Lingzhi fungi
Ganoderma Lucidium Reishi Lingzhi fungiGanoderma Lucidium Reishi Lingzhi fungi
Ganoderma Lucidium Reishi Lingzhi fungiLeona Chin
 

Viewers also liked (20)

150 acres for jv or sale in hoskote
150 acres for jv or sale in hoskote150 acres for jv or sale in hoskote
150 acres for jv or sale in hoskote
 
PPt - Contribution for 7th IRF Conference in INDIA OK2 [Mode de compatibilité]
PPt - Contribution for 7th IRF Conference in INDIA OK2 [Mode de compatibilité]PPt - Contribution for 7th IRF Conference in INDIA OK2 [Mode de compatibilité]
PPt - Contribution for 7th IRF Conference in INDIA OK2 [Mode de compatibilité]
 
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
 
Dxn product-presentation
Dxn product-presentationDxn product-presentation
Dxn product-presentation
 
4 Candles
4 Candles4 Candles
4 Candles
 
Tongue cancer - Mrs Maria Komane- Now freed from tongue cancer
Tongue cancer - Mrs Maria Komane- Now freed from tongue cancerTongue cancer - Mrs Maria Komane- Now freed from tongue cancer
Tongue cancer - Mrs Maria Komane- Now freed from tongue cancer
 
Weight loose natural way by MycoVeggie (DXN)
Weight loose natural way by MycoVeggie (DXN)Weight loose natural way by MycoVeggie (DXN)
Weight loose natural way by MycoVeggie (DXN)
 
Motivational Quotes
Motivational QuotesMotivational Quotes
Motivational Quotes
 
Dxn presentation-pakistan
Dxn presentation-pakistanDxn presentation-pakistan
Dxn presentation-pakistan
 
DXN in Obtainer Magazin (English)
DXN in Obtainer Magazin (English)DXN in Obtainer Magazin (English)
DXN in Obtainer Magazin (English)
 
Dxn products South Africa
Dxn products South AfricaDxn products South Africa
Dxn products South Africa
 
Ganotherapy
GanotherapyGanotherapy
Ganotherapy
 
Ganotherapy : How DXN Ganoderma works
Ganotherapy  : How DXN Ganoderma worksGanotherapy  : How DXN Ganoderma works
Ganotherapy : How DXN Ganoderma works
 
Business vs my Business (DXN) - 1 August 2015
Business vs my Business (DXN) - 1 August 2015Business vs my Business (DXN) - 1 August 2015
Business vs my Business (DXN) - 1 August 2015
 
DXN Seminar June 2010 (Presented by Jane Yau)
DXN Seminar June 2010 (Presented by Jane Yau)DXN Seminar June 2010 (Presented by Jane Yau)
DXN Seminar June 2010 (Presented by Jane Yau)
 
DXN Dr. Jane Yau Presentation 2010 EN.- презентации.
DXN Dr. Jane Yau Presentation 2010 EN.- презентации.DXN Dr. Jane Yau Presentation 2010 EN.- презентации.
DXN Dr. Jane Yau Presentation 2010 EN.- презентации.
 
Dxn Presentation
Dxn PresentationDxn Presentation
Dxn Presentation
 
Ganoderma Lucidium Reishi Lingzhi fungi
Ganoderma Lucidium Reishi Lingzhi fungiGanoderma Lucidium Reishi Lingzhi fungi
Ganoderma Lucidium Reishi Lingzhi fungi
 
Dxn
DxnDxn
Dxn
 
Ganoderma therapy.pptx [autosaved]
Ganoderma therapy.pptx [autosaved]Ganoderma therapy.pptx [autosaved]
Ganoderma therapy.pptx [autosaved]
 

Similar to Probase Road System (18 slides)

Developers Transflex Installation
Developers Transflex InstallationDevelopers Transflex Installation
Developers Transflex Installationguest470ea8
 
Access Engineering PLC - Training Presentation
Access Engineering PLC - Training PresentationAccess Engineering PLC - Training Presentation
Access Engineering PLC - Training PresentationGihan Anuradha Bombuwala
 
RoadstaB - Road Stabilization
RoadstaB - Road StabilizationRoadstaB - Road Stabilization
RoadstaB - Road StabilizationNikhil Sharma
 
Milestone Smart Choices
Milestone Smart ChoicesMilestone Smart Choices
Milestone Smart Choicescoreycarr
 
Industrial training abhi edited.pdf
Industrial training abhi edited.pdfIndustrial training abhi edited.pdf
Industrial training abhi edited.pdfAbhi858562
 
Road Repair Marketing
Road Repair MarketingRoad Repair Marketing
Road Repair Marketinggarry sharp
 
RoadstaB : Road Stabilization
RoadstaB : Road Stabilization RoadstaB : Road Stabilization
RoadstaB : Road Stabilization Nikhil Sharma
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_AkhtarJavad Akhtar
 
Internship report by Muhammad Kamal Ud Din Anwar
Internship report by Muhammad Kamal Ud Din AnwarInternship report by Muhammad Kamal Ud Din Anwar
Internship report by Muhammad Kamal Ud Din AnwarKamal787
 
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfDanielWisman1
 
Maintaining Access on Concrete Overlay Projects
Maintaining Access on Concrete Overlay ProjectsMaintaining Access on Concrete Overlay Projects
Maintaining Access on Concrete Overlay ProjectsJill Reeves
 
INTERLOCKING CONCRETE BLOCKS PAVEMENTS
INTERLOCKING CONCRETE BLOCKS PAVEMENTSINTERLOCKING CONCRETE BLOCKS PAVEMENTS
INTERLOCKING CONCRETE BLOCKS PAVEMENTSDileep Gowda
 
Road construction pavements flexible rigid
Road construction pavements flexible rigidRoad construction pavements flexible rigid
Road construction pavements flexible rigidKumarS250747
 

Similar to Probase Road System (18 slides) (20)

Roadstab 2017
Roadstab 2017Roadstab 2017
Roadstab 2017
 
pothole repairs
pothole repairspothole repairs
pothole repairs
 
Developers Transflex Installation
Developers Transflex InstallationDevelopers Transflex Installation
Developers Transflex Installation
 
Access Engineering PLC - Training Presentation
Access Engineering PLC - Training PresentationAccess Engineering PLC - Training Presentation
Access Engineering PLC - Training Presentation
 
final ppt.pptx
final ppt.pptxfinal ppt.pptx
final ppt.pptx
 
RoadstaB - Road Stabilization
RoadstaB - Road StabilizationRoadstaB - Road Stabilization
RoadstaB - Road Stabilization
 
Milestone Smart Choices
Milestone Smart ChoicesMilestone Smart Choices
Milestone Smart Choices
 
Industrial training abhi edited.pdf
Industrial training abhi edited.pdfIndustrial training abhi edited.pdf
Industrial training abhi edited.pdf
 
Road Repair Marketing
Road Repair MarketingRoad Repair Marketing
Road Repair Marketing
 
RoadstaB : Road Stabilization
RoadstaB : Road Stabilization RoadstaB : Road Stabilization
RoadstaB : Road Stabilization
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
 
Internship report by Muhammad Kamal Ud Din Anwar
Internship report by Muhammad Kamal Ud Din AnwarInternship report by Muhammad Kamal Ud Din Anwar
Internship report by Muhammad Kamal Ud Din Anwar
 
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
 
Maintaining Access on Concrete Overlay Projects
Maintaining Access on Concrete Overlay ProjectsMaintaining Access on Concrete Overlay Projects
Maintaining Access on Concrete Overlay Projects
 
RoadstabB-Presentation
RoadstabB-PresentationRoadstabB-Presentation
RoadstabB-Presentation
 
RoadstaB august 2013
RoadstaB august 2013RoadstaB august 2013
RoadstaB august 2013
 
Smart city
Smart citySmart city
Smart city
 
Smart city
Smart citySmart city
Smart city
 
INTERLOCKING CONCRETE BLOCKS PAVEMENTS
INTERLOCKING CONCRETE BLOCKS PAVEMENTSINTERLOCKING CONCRETE BLOCKS PAVEMENTS
INTERLOCKING CONCRETE BLOCKS PAVEMENTS
 
Road construction pavements flexible rigid
Road construction pavements flexible rigidRoad construction pavements flexible rigid
Road construction pavements flexible rigid
 

Recently uploaded

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 

Probase Road System (18 slides)

  • 1. THE ULTIMATE SOLUTION FOR SOIL ROAD PROBASE ROAD SYSTEM The Past
  • 3.
  • 4. PROBASE GROUP OF COMPANY. • The Inventor Of “Probase Road System” • The Manufacturer Of Probase Product. • Provide Technology Transfer, JV, Design & Specification, Training, R&D. • The Pioneer Of “Soil Road Maintenance Technology” Probase Production Plant In Malaysia.
  • 5. The Product. 1. For Stabilization. 2. For Sealing. Tx-85 Soil Stabilize & Strengthener For Stable Soil. • PB-65 Soil Sealant. SH-85 Soil Hardener For Unstable Soil.
  • 6. How Does It Works? 2 Simple Steps: Step 1. Step 2. • Stabilization Using TX & SH • Sealing With PB
  • 7. Probase Road System The Soil Road Solution. The Past The Present Mud & Slippery. High Transport Cost Probase Road. All Season Road. Dusty Soil Road Probase Road. Dust Free.
  • 8. PB-65 did not peal off even after emergency break from a truck Probase Road System. The Right Technology To Up Keep Soil Road.
  • 9. Types of Road and Cost of Construction Performance & Durability Soil Road Laterite Road Asphalt Road Concrete Road Gravel Road Low Cost High Cost Probase Road (Using In-situ Material) Medium & Low Cost
  • 10. Patching Treated Soil Spray PB-65
  • 11. For more information visit our website http://probase.com.my © 2013 PROBASE®. All rights reserved. Slides are licensed under the PROBASE® Completion Date: 15/6/1999 Maintenance period 2011 – 2016, next renewal will be 2016 – 2021. With minimum maintenance cost, the road can last longer period of time. How Long PROBASE road will last? 14 Years Old Probase Road.
  • 12. After Some Time…. PROBASE Asphalt Road Cost Savings Between 40% - 60% To Build An Asphalt Road Upgrade To Asphalt Road. By Laying 50mm ACWC.
  • 13. Case study • To Built Conventional Asphalt Road. • 250km x 6m X USD2m/km = USD500 million • Time 10 Years • Budget Constraint!
  • 14. Probase Proposal • To Supply & Install 250km x 6m Probase Road. • Contract Period 3 Years. • Contract Value USD60 Million. (Base On Usd40/m2). 30% or Usd18 Million By Government. 70% or Usd42 Million By Funder.
  • 15. Technology Transfer. 90% Local Work Force. Engineer, Project Manager, Supervisor, Worker.
  • 17. PROBASE ROAD SYSTEM Better Road, Better Life, Better Future.. 17 Thank You. . . CHANGE! Change Will Not Come If We Wait For Some Other Person Or Some Other Time. We Are The Ones We’ve Been Waiting For. We Are The Change That We Seek. ---Obama---
  • 18. Q & A

Editor's Notes

  1. Probase road picture
  2. Frame the small picture