Name : Herman Gerber
I. D. Number : 6507245100084
Address : 57 Melle’s Drive
Eldoraigne Ext 28
Centurion
0157
Gauteng
South Africa
Cell phone numbers: (1 st) +27 83 412 3315
(2 nd) +27 82 255 8325
(3 rd) +8618682863790 (China)
E – mail : gerberherman@yahoo.com
Nationality: South African
Country of Birth: South Africa
Health : Excellent
- 1 -
Herman Gerber
Objective To obtain position as an MEI Construction Area Coordinator/Manager, E&I
Completions Coordinator/Lead, E&I Construction Superintendent, HSE
Superintendent, Instrument Commissioning Engineer.
Experience November 2014 to Present Chevron China
E&I Completions Lead
I started in China on a Joint Venture between PetroChina and Chevron on
Chuandongbei Gas Project in Nanba City in Sichuan Province as E&I
Completions Lead. We are a team of 7 people working for Completions
Department. Our responsibilities are to do final walk downs and verifications
of punch items. Verifications of custody transfer dossiers. Assisting with
commissioning of the plant. We also do the final Custody Transfer walk
downs with the client on all disciplines.
Reference: To be supplied on request.
November 2008 to October 2014 Worley Parsons Saudi Arabia
E&I Completions Coordinator
Still with SAMREF, my responsibility was to coordinate the loop checks on
the CFP project. I was the link between the sub-contractor and the client and
had to coordinate the flow of loop checks. This included the coordination
between all parties, the report back to my head of department and to the
client. Ensure the right route was followed on the punching of problem loops
and transmitting the loop folders back to get the problem loops rectified. I
also did the transmittals back to the sub-contractor to ensure the signed off
loop folders was transferred back.
Area Coordinator
Still working on the SAMREF clean fuels project I was transferred to the
YANPET site where I had the responsibility for my own assigned facility
working directly for the Area Construction Manager. I participate in
contractibility reviews, development and progressing of construction
schedule, development and implementation of construction procedures and/
or JSA’s, and other construction activities. I was responsible for overseeing
the activities in their assigned area and/or unit to insure the construction
subcontractor’s work was executed with timely completion, safe execution
and the required quality.
- 2 -
E&I Construction Specialist
After completion of the Ma’aden project I was transferred to the SAMREF
Clean Fuels Project in Yanbu, Saudi Arabia. I was part of the team that was
responsible to do the changeover of the DCS system. I was responsible for
the day to day surveillance and inspections of construction activities. Duties
included daily review of all inspection reports, review of daily force reports,
verification of quantities installed, approved for the release Worley Parsons
furnished materials to the sub-contractor, initial review of subcontractor
request for information and facilitating coordination meetings. I reported
directly to my Area Construction Manager, John Vanweerd.
E&I Superintendent
After completion of PAP project I was transferred to Material handling in
Ma’aden where I was responsible for the control room and marshaling
cabinets. Cable pulling and terminations. After construction I did all pre
commissioning (loop checks) of conveyor belt instrumentation.
E&I Superintendent
I was transferred back to E&I Superintendent on the Ma’aden project after
completion of the HSE contract and we did the construction at the
Phosphoric Acid Plant (PAP) acting as the client representative. Our team
was also responsible for all pre commissioning (loop checks) on the project.
HSE Superintendent
After completion of SASREF Project I moved over to Ma’aden site as HSE
Superintendent. My main responsibility was to coordinate the main contractor
as we were the client’s representative and assist them on their HSE issues.
Occasionally I did lock out tag out training because of my back ground in E&I.
I reported directly to the HSE Manager.
Construction Superintendent
At SASREF I was responsible for progress of construction and to see that all
work gets done to client’s specification and approval. All work needed to be
carried out on live plant as it was a hot cut over from traditional 4 to 20 mA
Instrumentation to Foundation Field bus.
Ref: Bob Smith: bob.smith@worleyparsons.com (SAMREF Completions)
Ref: John Vanweerd: john.vanweerd@worleyparsons.com (SAMREF)
Ref: Guy Maloney: guy.malony@worleyparsons.com (PAP, Ma’aden)
Ref: Jason Matthew: jssmtt@yahoo.co.uk;
jaysen.matthew@worleyparsons.com (SASREF, Jubail)
Ref: Paul Millington: paul.millington@worleyparsons.com (HSE, Ma’aden)
- 3 -
September 2008 to October 2008 Lumwana Copper Mine Zambia
E&I Commissioning Specialist,
We were 4 experts that was hired by B&W Electrical & Instrumentation to go
to Lumwana copper mine in the north of Zambia to assist with their
commissioning. It was difficult as there were problems with lack of knowledge
of the local people, documentation, vendor assistance (no vendor assistance)
and language barriers. We mostly worked on valves, changing action of
valves, setting up of level transmitters and commissioning of the plant. We
completed the commissioning in 3 weeks.
Ref: Craig Vercuiel: vercuielcraig@yahoo.co.uk
August 2008 to September 2008 PPC Cement South Africa
E&I Commissioning Specialist
We did the commissioning on Electrical & Instrumentation on the conveyors
and tanks. Checking each loop from the field right through to the DCS in the
control room and checking each electrical circuit. We were hired by the
contractor Kentz South Africa but worked directly with the client.
Ref: Org Steyn: info@otconstruction.co.za
June 2008 to July 2008 Kentz Kazakhstan
Lead Instrument Commissioning Specialist (Supervisor)
We were responsible for the commissioning of Refinery in Tengiz,
Kazakhstan. We also manage the construction teams to clear last punch
items that was left over as the majority of the construction team leaders
already left for other projects.
Ref: Walt Swisher: waltswisher@hotmail.com
March. 2007 to May 2008 T.E.S.T. Kazakhstan
Cause and Effect Supervisor (Commissioning Engineer)
This was the same project as above. T.E.S.T. was demobilized from the
project and we where taken over by Kentz to complete our responsibilities on
the commissioning of this refinery at Tengiz, Kazakhstan.
Ref: Rod Quinlan: rkq@comcast.net
Dec 2006 to Feb 2007 Senet Guinea
Commissioning Engineer We
where responsible for commissioning of a second hand gold mine in Lero,
Guinea. I was one of ten Instrument personnel that were sent from South
Africa to help with the commissioning of a gold mine. The Machinery was
bought from a plant that closed down and brought over to Guinea. All cables
where laid and we had to ring out the cables to see witch was witch. This job
was done with minimum drawings. We did out own drawings and redline
existing drawings and as built drawings as we carried on with the wiring. We
had to plan all panel layouts cross patching and PLC addresses. Twelve
weeks after we arrived the plant was commissioned successfully with no LTI.
- 4 -
June 2005 to Nov 2006 FA Platform, PetroSA Mossel Bay
Instrument Technician (Maintenance)
Responsible for maintenance and construction work as well as shutdown
supervision on the offshore FA Platform south of Mossel Bay.
July 2004 to May 2005 Skorpion Zinc Namibia
Instrument Technician (Maintenance) Maintenance,
shutdowns and construction work. I mostly worked on night shift on a back to
back basis to perform breakdowns on the Cell house and Cast house. I was
also responsible for small construction jobs in the evening.
February 2004 to June 2004 Consol Glass Bellville
Site Supervisor
I was responsible for E&I installation on conveyor belts and lighting on the
new Cullet plant in Bellville, Cape Town.
April 2003 to November 2003 PetroSA Mossel Bay
Site Supervisor
I was the site supervisor for construction of the of the GTL Project in
Mossel Bay. I worked for B&W Electrical and Instrumentation. The main
Contractor was SA Five Engineering and I worked hand in hand with them
and the client Technip. The project was completed in one year.
February 2003 to March 2003 PetroSA Mossel Bay
Instrument Technician
I worked on the shutdown and had to replace some barriers with
Isolators and do there panel wiring in different satellite buildings. My job was
a great priority and I did it perfectly to PetroSA standards and PetroSA where
very happy about my standard of work. They asked if I could contact B&W
E&I to ask for position to run there GTL project and the job was given to me.
July 2002 to December 2002 FPSO Glass Dowr Cape Town
Fire & Gas Supervisor
I was employed by Brand Engineering to do the installation of fire and gas
detectors on the new compressor area, LPG skid aboard the Glass Dowr
FPSO while it was docked in the Cape Town Harbour. This involved the
cable tray installation, cable pulling and installation of detectors. PetroSA did
the commissioning but I was very much involved in it as well because of my
knowledge about commissioning.
January 1993 to June 2002 Caltex Refinery Cape Town
Instrument Technician (Maintenance contract)
I was part of a maintenance team that was responsible for the maintenance
and up keeping of the Caltex Refinery in Cape Town on the instrumentation
side. This included shutdowns, breakdowns, training, standby and
supervision. I was at the refinery for a long period of time and worked on the
Crude unit, vacuum unit, utilities, and Truck loading racks and specialized in
the boilers unit. I was also involved in new projects but it was for the client
(Caltex).
- 5 -
June 1992 to December 1992 SA Nylon Spinners Bellville
Instrument Technician
I was on the construction team that was responsible for the building of three
new Auto Claves and the Instrumentation involved. The contractor that I
worked for was Argus electrical and instrumentation. I moved to Caltex
refinery with them as well and started on maintenance contract there.
January 1992 to May 1992 Petronet Tarlton
Site Supervisor
I was the site supervisor for a firm called Mod Instrument Management and I
was responsible for the construction (E&I) of storage tanks in Tarlton and
Rustenburg. This mostly involve the Trenching, cable trays, cable pulling.
The installation of level gauges, flow switches, temperature monitoring,
construction of E&I on the truck and train loading racks.
June 1991 to November 1991 Engen Durban
Area Superintendent
I was in charge of a group of people responsible for a new section to be
erected on E&I during the shutdown. This was when Mobil became Engen.
We did construction, loop checks and the commissioning with the client.
October 1990 to April 1991 Mossgas Mossel Bay
Senior Instrument Technician
I had a team of people working on loop checks and I was responsible to do
the hand over of all loops passed to the client and loops that failed had to be
handed back to construction. I also had my own Quick fix team that would
tackle smaller problems like changing out temp probes that did not work etc
etc.
October 1989 to September 1990 Mondi Board Mill Springs
Instrument Technician (Maintenance)
I was on a maintenance team that was responsible for up keeping up and
maintaining instrumentation. We managed different shutdowns on the
machines. We worked 24 hour shifts.
October 1987 to October 1989 Impala Platinum Springs
Acting Instrument Technician (Maintenance)
This firm I did my apprenticeship with. I started my apprenticeship in 1984
and qualified in 1987. I stayed with them until 1990. I was in a team
responsible for doing maintenance and small projects. I also did standby,
mini shutdowns and house keeping.
.
- 6 -
Summary
Skills and
Abilities.
Education
I am Qualified in Instrumentation with International Trade Papers obtained at
Olifantsfontein, South Africa. I have 30 years of experience in Maintenance as
well as Construction, Commissioning, Completions and HSSE. I also have 18
months of offshore experience on maintenance.
I have strong leadership skills and I am a devoted team member. I have a proven
ability to work with and motivate people from other cultures.
* Construction package review,
* Coordination with construction team, loop check testing, and function check
testing, Completions
* As build of drawings.
* Work and communicate well with team members and colleagues.
* Quality Control & Quality Assurance.
* Testing of systems (cause and effect).
* Review and updating of procedures.
* Understanding loop drawings and P&ID’s.
* Can prioritize tasks and make decisions.
Preliminary Qualifications
High School - Highest Grade - Grade 12
College - N4 Instrumentation
Secondary Qualifications
Technical College - Light Current Instrumentation
Red seal Diploma as Instrument Technician (Jan 1984 to
Oct 1987)
Additional training
Courses attended Piping, Offshore survival cert. to be renewed,
Scaffolding, Lifting and rigging, Confined space entry,
Working at heights, Use of man baskets and man lifts,
Intrinsic safe systems, Fall protection, Fire fighting,
Hazard identification. Lock out Tag out, Risk
Assessment and control, Safety task analysis, PTW,
Safe Work Practices, H2S training, BBS training,
Hot Work training, SAWS,
Please do not hesitate to contact me if you need more
information or if something in this CV is not clear.
Best Regards
Herman Gerber
- 7 -
- 8 -

More Related Content

What's hot (20)

Certificate Format Samples
Certificate Format Samples Certificate Format Samples
Certificate Format Samples
 
cv march 2014
cv march 2014cv march 2014
cv march 2014
 
MURUGU SUNDARAN - CV
MURUGU SUNDARAN - CVMURUGU SUNDARAN - CV
MURUGU SUNDARAN - CV
 
Dave's resume
Dave's resumeDave's resume
Dave's resume
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
EAE Newsletter - Nov - Issue #6
EAE Newsletter - Nov - Issue #6EAE Newsletter - Nov - Issue #6
EAE Newsletter - Nov - Issue #6
 
Azhar iqbal qc_inspector
Azhar iqbal qc_inspectorAzhar iqbal qc_inspector
Azhar iqbal qc_inspector
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUME
 
CV 2016
CV 2016CV 2016
CV 2016
 
CVPLAING
CVPLAINGCVPLAING
CVPLAING
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)
 
JWBRESUME
JWBRESUMEJWBRESUME
JWBRESUME
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
KNETCO EXPERIENCE CERTIFICATE
KNETCO EXPERIENCE CERTIFICATEKNETCO EXPERIENCE CERTIFICATE
KNETCO EXPERIENCE CERTIFICATE
 
Experience Certificate
Experience CertificateExperience Certificate
Experience Certificate
 
CV -TRV-Civil Engg. Credentials
CV -TRV-Civil Engg. CredentialsCV -TRV-Civil Engg. Credentials
CV -TRV-Civil Engg. Credentials
 
Amer Zubair - QS
Amer Zubair - QSAmer Zubair - QS
Amer Zubair - QS
 
Eccles_David_Resume 2-15-2016
Eccles_David_Resume 2-15-2016Eccles_David_Resume 2-15-2016
Eccles_David_Resume 2-15-2016
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 

Viewers also liked

Viewers also liked (19)

Ali Abbas CV
Ali Abbas  CVAli Abbas  CV
Ali Abbas CV
 
C V _of_Mahmoud_Yousef updated 2017
C V _of_Mahmoud_Yousef updated 2017C V _of_Mahmoud_Yousef updated 2017
C V _of_Mahmoud_Yousef updated 2017
 
Bernhard hoff cv english l
Bernhard hoff cv english lBernhard hoff cv english l
Bernhard hoff cv english l
 
Gary Frecknall Resume 240615
Gary Frecknall Resume  240615Gary Frecknall Resume  240615
Gary Frecknall Resume 240615
 
CURRICULUMN VITAE oliver mott bw
CURRICULUMN VITAE oliver mott bwCURRICULUMN VITAE oliver mott bw
CURRICULUMN VITAE oliver mott bw
 
Marlette CV
Marlette CVMarlette CV
Marlette CV
 
CV_TAEHOON LIM
CV_TAEHOON LIMCV_TAEHOON LIM
CV_TAEHOON LIM
 
Scott Resume' copy
Scott Resume' copyScott Resume' copy
Scott Resume' copy
 
Ejike's CV
Ejike's CVEjike's CV
Ejike's CV
 
2015 Cv
2015 Cv2015 Cv
2015 Cv
 
CV March 2015- Lister Tom
CV March 2015- Lister TomCV March 2015- Lister Tom
CV March 2015- Lister Tom
 
Morowsky, K - CV2016-1a
Morowsky, K - CV2016-1aMorowsky, K - CV2016-1a
Morowsky, K - CV2016-1a
 
CARL PERRIGUE Resume
CARL PERRIGUE ResumeCARL PERRIGUE Resume
CARL PERRIGUE Resume
 
Completed covering letter
Completed covering letterCompleted covering letter
Completed covering letter
 
CV Li Li
CV Li LiCV Li Li
CV Li Li
 
RESUME updated (ARS)
RESUME updated (ARS)RESUME updated (ARS)
RESUME updated (ARS)
 
Rabia Boulanouar CV & Recommandation
Rabia Boulanouar CV & RecommandationRabia Boulanouar CV & Recommandation
Rabia Boulanouar CV & Recommandation
 
Mohsen CV
Mohsen CVMohsen CV
Mohsen CV
 
CV 2016
CV 2016CV 2016
CV 2016
 

Similar to Herman CV Newest 1 (2) (1)

Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1Kenny Hagan
 
Curriculum vitae 2016
Curriculum vitae 2016Curriculum vitae 2016
Curriculum vitae 2016Burger Rust
 
CV - Martin Bennie- commissioning manager
CV - Martin Bennie-  commissioning managerCV - Martin Bennie-  commissioning manager
CV - Martin Bennie- commissioning managerMartin Bennie
 
Work Experience Report - Ganamotse
Work Experience Report - GanamotseWork Experience Report - Ganamotse
Work Experience Report - GanamotseGaenamele Ganamotse
 
Cv for brian cole including punj lloyd
Cv for brian cole including punj lloydCv for brian cole including punj lloyd
Cv for brian cole including punj lloydBrian Cole
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.Garry Doiron
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea
 
Resume for andy mitchell current
Resume for andy mitchell   currentResume for andy mitchell   current
Resume for andy mitchell currentAndrew Mitchell
 
AlbertiResume Updated
AlbertiResume UpdatedAlbertiResume Updated
AlbertiResume UpdatedJason Alberti
 
Professional Profile, Stephen Baldwin
Professional Profile, Stephen BaldwinProfessional Profile, Stephen Baldwin
Professional Profile, Stephen BaldwinStephen Baldwin
 
Tony Fox CV latest 06 May 2016
Tony Fox CV latest 06 May 2016Tony Fox CV latest 06 May 2016
Tony Fox CV latest 06 May 2016Tony Fox
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015Jim Reaves
 

Similar to Herman CV Newest 1 (2) (1) (20)

Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1
 
Curriculum vitae 2016
Curriculum vitae 2016Curriculum vitae 2016
Curriculum vitae 2016
 
CV - Martin Bennie- commissioning manager
CV - Martin Bennie-  commissioning managerCV - Martin Bennie-  commissioning manager
CV - Martin Bennie- commissioning manager
 
Work Experience Report - Ganamotse
Work Experience Report - GanamotseWork Experience Report - Ganamotse
Work Experience Report - Ganamotse
 
Cv for brian cole including punj lloyd
Cv for brian cole including punj lloydCv for brian cole including punj lloyd
Cv for brian cole including punj lloyd
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.
 
SBCV2016
SBCV2016SBCV2016
SBCV2016
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016
 
Matthew Sutherley CV
Matthew Sutherley CVMatthew Sutherley CV
Matthew Sutherley CV
 
LATEST SHORT CV 2015
LATEST SHORT CV 2015LATEST SHORT CV 2015
LATEST SHORT CV 2015
 
LATEST SHORT CV 2015
LATEST SHORT CV 2015LATEST SHORT CV 2015
LATEST SHORT CV 2015
 
Jai Townsend - CV
Jai Townsend - CVJai Townsend - CV
Jai Townsend - CV
 
Resume for andy mitchell current
Resume for andy mitchell   currentResume for andy mitchell   current
Resume for andy mitchell current
 
AlbertiResume Updated
AlbertiResume UpdatedAlbertiResume Updated
AlbertiResume Updated
 
Orville Shaw
Orville ShawOrville Shaw
Orville Shaw
 
Professional Profile, Stephen Baldwin
Professional Profile, Stephen BaldwinProfessional Profile, Stephen Baldwin
Professional Profile, Stephen Baldwin
 
Tony Fox CV latest 06 May 2016
Tony Fox CV latest 06 May 2016Tony Fox CV latest 06 May 2016
Tony Fox CV latest 06 May 2016
 
CV for J. Moloney
CV for J. MoloneyCV for J. Moloney
CV for J. Moloney
 
aravind ..
aravind ..aravind ..
aravind ..
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015
 

Herman CV Newest 1 (2) (1)

  • 1. CURRICULUM VITAE Name : Herman Gerber I. D. Number : 6507245100084 Address : 57 Melle’s Drive Eldoraigne Ext 28 Centurion 0157 Gauteng South Africa Cell phone numbers: (1 st) +27 83 412 3315 (2 nd) +27 82 255 8325 (3 rd) +8618682863790 (China) E – mail : gerberherman@yahoo.com Nationality: South African Country of Birth: South Africa Health : Excellent - 1 -
  • 2. Herman Gerber Objective To obtain position as an MEI Construction Area Coordinator/Manager, E&I Completions Coordinator/Lead, E&I Construction Superintendent, HSE Superintendent, Instrument Commissioning Engineer. Experience November 2014 to Present Chevron China E&I Completions Lead I started in China on a Joint Venture between PetroChina and Chevron on Chuandongbei Gas Project in Nanba City in Sichuan Province as E&I Completions Lead. We are a team of 7 people working for Completions Department. Our responsibilities are to do final walk downs and verifications of punch items. Verifications of custody transfer dossiers. Assisting with commissioning of the plant. We also do the final Custody Transfer walk downs with the client on all disciplines. Reference: To be supplied on request. November 2008 to October 2014 Worley Parsons Saudi Arabia E&I Completions Coordinator Still with SAMREF, my responsibility was to coordinate the loop checks on the CFP project. I was the link between the sub-contractor and the client and had to coordinate the flow of loop checks. This included the coordination between all parties, the report back to my head of department and to the client. Ensure the right route was followed on the punching of problem loops and transmitting the loop folders back to get the problem loops rectified. I also did the transmittals back to the sub-contractor to ensure the signed off loop folders was transferred back. Area Coordinator Still working on the SAMREF clean fuels project I was transferred to the YANPET site where I had the responsibility for my own assigned facility working directly for the Area Construction Manager. I participate in contractibility reviews, development and progressing of construction schedule, development and implementation of construction procedures and/ or JSA’s, and other construction activities. I was responsible for overseeing the activities in their assigned area and/or unit to insure the construction subcontractor’s work was executed with timely completion, safe execution and the required quality. - 2 -
  • 3. E&I Construction Specialist After completion of the Ma’aden project I was transferred to the SAMREF Clean Fuels Project in Yanbu, Saudi Arabia. I was part of the team that was responsible to do the changeover of the DCS system. I was responsible for the day to day surveillance and inspections of construction activities. Duties included daily review of all inspection reports, review of daily force reports, verification of quantities installed, approved for the release Worley Parsons furnished materials to the sub-contractor, initial review of subcontractor request for information and facilitating coordination meetings. I reported directly to my Area Construction Manager, John Vanweerd. E&I Superintendent After completion of PAP project I was transferred to Material handling in Ma’aden where I was responsible for the control room and marshaling cabinets. Cable pulling and terminations. After construction I did all pre commissioning (loop checks) of conveyor belt instrumentation. E&I Superintendent I was transferred back to E&I Superintendent on the Ma’aden project after completion of the HSE contract and we did the construction at the Phosphoric Acid Plant (PAP) acting as the client representative. Our team was also responsible for all pre commissioning (loop checks) on the project. HSE Superintendent After completion of SASREF Project I moved over to Ma’aden site as HSE Superintendent. My main responsibility was to coordinate the main contractor as we were the client’s representative and assist them on their HSE issues. Occasionally I did lock out tag out training because of my back ground in E&I. I reported directly to the HSE Manager. Construction Superintendent At SASREF I was responsible for progress of construction and to see that all work gets done to client’s specification and approval. All work needed to be carried out on live plant as it was a hot cut over from traditional 4 to 20 mA Instrumentation to Foundation Field bus. Ref: Bob Smith: bob.smith@worleyparsons.com (SAMREF Completions) Ref: John Vanweerd: john.vanweerd@worleyparsons.com (SAMREF) Ref: Guy Maloney: guy.malony@worleyparsons.com (PAP, Ma’aden) Ref: Jason Matthew: jssmtt@yahoo.co.uk; jaysen.matthew@worleyparsons.com (SASREF, Jubail) Ref: Paul Millington: paul.millington@worleyparsons.com (HSE, Ma’aden) - 3 -
  • 4. September 2008 to October 2008 Lumwana Copper Mine Zambia E&I Commissioning Specialist, We were 4 experts that was hired by B&W Electrical & Instrumentation to go to Lumwana copper mine in the north of Zambia to assist with their commissioning. It was difficult as there were problems with lack of knowledge of the local people, documentation, vendor assistance (no vendor assistance) and language barriers. We mostly worked on valves, changing action of valves, setting up of level transmitters and commissioning of the plant. We completed the commissioning in 3 weeks. Ref: Craig Vercuiel: vercuielcraig@yahoo.co.uk August 2008 to September 2008 PPC Cement South Africa E&I Commissioning Specialist We did the commissioning on Electrical & Instrumentation on the conveyors and tanks. Checking each loop from the field right through to the DCS in the control room and checking each electrical circuit. We were hired by the contractor Kentz South Africa but worked directly with the client. Ref: Org Steyn: info@otconstruction.co.za June 2008 to July 2008 Kentz Kazakhstan Lead Instrument Commissioning Specialist (Supervisor) We were responsible for the commissioning of Refinery in Tengiz, Kazakhstan. We also manage the construction teams to clear last punch items that was left over as the majority of the construction team leaders already left for other projects. Ref: Walt Swisher: waltswisher@hotmail.com March. 2007 to May 2008 T.E.S.T. Kazakhstan Cause and Effect Supervisor (Commissioning Engineer) This was the same project as above. T.E.S.T. was demobilized from the project and we where taken over by Kentz to complete our responsibilities on the commissioning of this refinery at Tengiz, Kazakhstan. Ref: Rod Quinlan: rkq@comcast.net Dec 2006 to Feb 2007 Senet Guinea Commissioning Engineer We where responsible for commissioning of a second hand gold mine in Lero, Guinea. I was one of ten Instrument personnel that were sent from South Africa to help with the commissioning of a gold mine. The Machinery was bought from a plant that closed down and brought over to Guinea. All cables where laid and we had to ring out the cables to see witch was witch. This job was done with minimum drawings. We did out own drawings and redline existing drawings and as built drawings as we carried on with the wiring. We had to plan all panel layouts cross patching and PLC addresses. Twelve weeks after we arrived the plant was commissioned successfully with no LTI. - 4 -
  • 5. June 2005 to Nov 2006 FA Platform, PetroSA Mossel Bay Instrument Technician (Maintenance) Responsible for maintenance and construction work as well as shutdown supervision on the offshore FA Platform south of Mossel Bay. July 2004 to May 2005 Skorpion Zinc Namibia Instrument Technician (Maintenance) Maintenance, shutdowns and construction work. I mostly worked on night shift on a back to back basis to perform breakdowns on the Cell house and Cast house. I was also responsible for small construction jobs in the evening. February 2004 to June 2004 Consol Glass Bellville Site Supervisor I was responsible for E&I installation on conveyor belts and lighting on the new Cullet plant in Bellville, Cape Town. April 2003 to November 2003 PetroSA Mossel Bay Site Supervisor I was the site supervisor for construction of the of the GTL Project in Mossel Bay. I worked for B&W Electrical and Instrumentation. The main Contractor was SA Five Engineering and I worked hand in hand with them and the client Technip. The project was completed in one year. February 2003 to March 2003 PetroSA Mossel Bay Instrument Technician I worked on the shutdown and had to replace some barriers with Isolators and do there panel wiring in different satellite buildings. My job was a great priority and I did it perfectly to PetroSA standards and PetroSA where very happy about my standard of work. They asked if I could contact B&W E&I to ask for position to run there GTL project and the job was given to me. July 2002 to December 2002 FPSO Glass Dowr Cape Town Fire & Gas Supervisor I was employed by Brand Engineering to do the installation of fire and gas detectors on the new compressor area, LPG skid aboard the Glass Dowr FPSO while it was docked in the Cape Town Harbour. This involved the cable tray installation, cable pulling and installation of detectors. PetroSA did the commissioning but I was very much involved in it as well because of my knowledge about commissioning. January 1993 to June 2002 Caltex Refinery Cape Town Instrument Technician (Maintenance contract) I was part of a maintenance team that was responsible for the maintenance and up keeping of the Caltex Refinery in Cape Town on the instrumentation side. This included shutdowns, breakdowns, training, standby and supervision. I was at the refinery for a long period of time and worked on the Crude unit, vacuum unit, utilities, and Truck loading racks and specialized in the boilers unit. I was also involved in new projects but it was for the client (Caltex). - 5 -
  • 6. June 1992 to December 1992 SA Nylon Spinners Bellville Instrument Technician I was on the construction team that was responsible for the building of three new Auto Claves and the Instrumentation involved. The contractor that I worked for was Argus electrical and instrumentation. I moved to Caltex refinery with them as well and started on maintenance contract there. January 1992 to May 1992 Petronet Tarlton Site Supervisor I was the site supervisor for a firm called Mod Instrument Management and I was responsible for the construction (E&I) of storage tanks in Tarlton and Rustenburg. This mostly involve the Trenching, cable trays, cable pulling. The installation of level gauges, flow switches, temperature monitoring, construction of E&I on the truck and train loading racks. June 1991 to November 1991 Engen Durban Area Superintendent I was in charge of a group of people responsible for a new section to be erected on E&I during the shutdown. This was when Mobil became Engen. We did construction, loop checks and the commissioning with the client. October 1990 to April 1991 Mossgas Mossel Bay Senior Instrument Technician I had a team of people working on loop checks and I was responsible to do the hand over of all loops passed to the client and loops that failed had to be handed back to construction. I also had my own Quick fix team that would tackle smaller problems like changing out temp probes that did not work etc etc. October 1989 to September 1990 Mondi Board Mill Springs Instrument Technician (Maintenance) I was on a maintenance team that was responsible for up keeping up and maintaining instrumentation. We managed different shutdowns on the machines. We worked 24 hour shifts. October 1987 to October 1989 Impala Platinum Springs Acting Instrument Technician (Maintenance) This firm I did my apprenticeship with. I started my apprenticeship in 1984 and qualified in 1987. I stayed with them until 1990. I was in a team responsible for doing maintenance and small projects. I also did standby, mini shutdowns and house keeping. . - 6 -
  • 7. Summary Skills and Abilities. Education I am Qualified in Instrumentation with International Trade Papers obtained at Olifantsfontein, South Africa. I have 30 years of experience in Maintenance as well as Construction, Commissioning, Completions and HSSE. I also have 18 months of offshore experience on maintenance. I have strong leadership skills and I am a devoted team member. I have a proven ability to work with and motivate people from other cultures. * Construction package review, * Coordination with construction team, loop check testing, and function check testing, Completions * As build of drawings. * Work and communicate well with team members and colleagues. * Quality Control & Quality Assurance. * Testing of systems (cause and effect). * Review and updating of procedures. * Understanding loop drawings and P&ID’s. * Can prioritize tasks and make decisions. Preliminary Qualifications High School - Highest Grade - Grade 12 College - N4 Instrumentation Secondary Qualifications Technical College - Light Current Instrumentation Red seal Diploma as Instrument Technician (Jan 1984 to Oct 1987) Additional training Courses attended Piping, Offshore survival cert. to be renewed, Scaffolding, Lifting and rigging, Confined space entry, Working at heights, Use of man baskets and man lifts, Intrinsic safe systems, Fall protection, Fire fighting, Hazard identification. Lock out Tag out, Risk Assessment and control, Safety task analysis, PTW, Safe Work Practices, H2S training, BBS training, Hot Work training, SAWS, Please do not hesitate to contact me if you need more information or if something in this CV is not clear. Best Regards Herman Gerber - 7 -