Area : HONDA 2CV
BEFORE AFTER
1. Total No of ckt = 919 1. Total No of ckt = 392
Comment : 1. Shopfloor space is un necessory
occupied with such material which is not
required to produce on that particular day.
COMMENT : 1. Production of ckt in meakotei
as per given customer order.
2.Easy to use for ckt in multivarient.
58 % less ckt is going to be processed.
VIEW POINT: Enable to use in multi varient.
Model No of ckt
R CABIN 179
Instrument 500
L CABIN 236
Others 4
Model No of ckt
R CABIN 71
Instrument 233
L CABIN 84
Others 4
501/26/2017 Honda 2CV NYS PUNE
Area : HONDA 2CV
BEFORE AFTER
Comment : 1. Cost is high. Unable to use its
raw material in different requirement.
Comment : WIP Reduced by 703584.7 Rs/day.
WIP can use in any varient & production is as
per customer requirement.
VIEW POINT: Illustration How kanban reduces Invetory.
21/26/2017 Honda 2CV NYS PUNE
Customer Requirement 150/day
Model
Name
Requiremen
t
LOT SIZE
WITH WOC
L CABIN 203 50 200
R CABIN
203
50 200
Instrument
203
50 200
WIP in Rs 938112.9
Customer Requirement 150/day
Model
Name
Requirement LOT SIZE
WITH WOC
L CABIN
203
50 50
R CABIN
203
50 50
Instrumen
t 203
50 50
WIP in RS 234528.2
1/26/2017 Honda 2CV NYS PUNE 3
938112.9
234528.2
After KanbanBefore Kanban
WIP REDUCED BY
703584.7 Rs/day
WIPATSHOPFLOORinRS.
Area : HONDA 2CV
BEFORE AFTER
Comment : 1. Pipe size used for 100 qty. qty is
more than production qty.
COMMENT : If one pipe is empty than another
pipe can fill during the chorobiki cycle.
Zero stoppages due to unavailability of
material.
VIEW POINT: Line flexibility for mix production.
41/26/2017 Honda 2CV NYS PUNE
Area : HONDA 2CV
BEFORE AFTER
Comment : Opeartor has to input manually all
information. Any single mistake in manual
entry leads to wrong cutting.
COMMENT : No need to give maual input.
Updation in database required only when ECN
comes.
VIEW POINT : Prevent wrong error feeding in M/c.
51/26/2017 Honda 2CV NYS PUNE
Area : HONDA 2CV
BEFORE AFTER
Comment : Opeartor was unable to
understand where to put ckt for next process
as per coding system. Only skilled manpower
can indentify the required location for next
process.
COMMENT : Once new opeartor know only
type of M/C. He/She able to find location as
seeing in route withing 10 sec intially. Also final
junkan location defines its proper location
results easy to get ckt for Atokotei also.
VIEW POINT : Production gets easy to understand for operator.
61/26/2017 Honda 2CV NYS PUNE
Area : HONDA 2CV
BEFORE AFTER
Comment : 1. Cost is high. Unable to use its
raw material in different requirement. No drop
box arrangement.
COMMENT : Cost is low, in house fabrication,
drop box arrangement for kanban.
VIEW POINT: Cost saving and In house fabrication
71/26/2017 Honda 2CV NYS PUNE
MATERIAL
INFORMATION FLOW
& KANBAN FORMATS
WORK INSTRUCTION
of All KANBAN
OTHERS ACTIVITY
81/26/2017 Honda 2CV NYS PUNE

More Related Content

Viewers also liked

ZenOffice Print and Promotion Brochure
ZenOffice Print and Promotion BrochureZenOffice Print and Promotion Brochure
ZenOffice Print and Promotion Brochure
Sharlene Ashton
 
Retraites-Santé : Oser les vraies réformes
Retraites-Santé : Oser les vraies réformesRetraites-Santé : Oser les vraies réformes
Retraites-Santé : Oser les vraies réformes
Fondation iFRAP
 

Viewers also liked (20)

Some dos and don’ts to help you reach your export goals
Some dos and don’ts to help you reach your export goalsSome dos and don’ts to help you reach your export goals
Some dos and don’ts to help you reach your export goals
 
Pat Sellars Frith -Resume 2016
Pat Sellars Frith -Resume 2016Pat Sellars Frith -Resume 2016
Pat Sellars Frith -Resume 2016
 
Design sprint - What is it and how it works
Design sprint - What is it and how it worksDesign sprint - What is it and how it works
Design sprint - What is it and how it works
 
1º lección 18 5
1º lección 18 51º lección 18 5
1º lección 18 5
 
Стратегія розвитку черкаської області до 2020 р.
Стратегія розвитку черкаської області до 2020 р.Стратегія розвитку черкаської області до 2020 р.
Стратегія розвитку черкаської області до 2020 р.
 
ZenOffice Print and Promotion Brochure
ZenOffice Print and Promotion BrochureZenOffice Print and Promotion Brochure
ZenOffice Print and Promotion Brochure
 
PATOLOGÍA DE LA EDIFICACIÓN EN MADRID.
PATOLOGÍA DE LA EDIFICACIÓN EN MADRID.PATOLOGÍA DE LA EDIFICACIÓN EN MADRID.
PATOLOGÍA DE LA EDIFICACIÓN EN MADRID.
 
Learning to Generate Pseudo-code from Source Code using Statistical Machine T...
Learning to Generate Pseudo-code from Source Code using Statistical Machine T...Learning to Generate Pseudo-code from Source Code using Statistical Machine T...
Learning to Generate Pseudo-code from Source Code using Statistical Machine T...
 
MuleSoft London Community September 2016
MuleSoft London Community September 2016MuleSoft London Community September 2016
MuleSoft London Community September 2016
 
12 tips for Delivering Fun and Engaging Presentation
12 tips for Delivering Fun and Engaging Presentation12 tips for Delivering Fun and Engaging Presentation
12 tips for Delivering Fun and Engaging Presentation
 
GEOMETRIA
GEOMETRIAGEOMETRIA
GEOMETRIA
 
Cherkasy region development strategy 2020
Cherkasy region development strategy 2020Cherkasy region development strategy 2020
Cherkasy region development strategy 2020
 
Aplicações Digitais na Formação
Aplicações Digitais na FormaçãoAplicações Digitais na Formação
Aplicações Digitais na Formação
 
COMPOSITORES POR EPOCA
COMPOSITORES POR EPOCA COMPOSITORES POR EPOCA
COMPOSITORES POR EPOCA
 
Impact and chronology of Japanese Occupation in Singapore and Malaya
Impact and chronology of Japanese Occupation in Singapore and MalayaImpact and chronology of Japanese Occupation in Singapore and Malaya
Impact and chronology of Japanese Occupation in Singapore and Malaya
 
Rudy Bueno_CV
Rudy Bueno_CVRudy Bueno_CV
Rudy Bueno_CV
 
MuleSoft London Community - API Marketing, Culture Change and Tooling
MuleSoft London Community - API Marketing, Culture Change and ToolingMuleSoft London Community - API Marketing, Culture Change and Tooling
MuleSoft London Community - API Marketing, Culture Change and Tooling
 
Изменения в Федеральном законе ФЗ-54 и новый порядок работы с ККТ
Изменения в Федеральном законе ФЗ-54 и новый порядок работы с ККТ Изменения в Федеральном законе ФЗ-54 и новый порядок работы с ККТ
Изменения в Федеральном законе ФЗ-54 и новый порядок работы с ККТ
 
Proton NMR
Proton NMRProton NMR
Proton NMR
 
Retraites-Santé : Oser les vraies réformes
Retraites-Santé : Oser les vraies réformesRetraites-Santé : Oser les vraies réformes
Retraites-Santé : Oser les vraies réformes
 

Similar to Kaizen at 2CV

Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,
NIZAM ISMAIL
 
THE BENEFIT OF APPLY AUTOMATIC LUBRICATION
THE BENEFIT OF APPLY AUTOMATIC LUBRICATIONTHE BENEFIT OF APPLY AUTOMATIC LUBRICATION
THE BENEFIT OF APPLY AUTOMATIC LUBRICATION
Cao Hoang Le
 
Senior Project Report - Brian Breuhan - Final
Senior Project Report - Brian Breuhan - FinalSenior Project Report - Brian Breuhan - Final
Senior Project Report - Brian Breuhan - Final
Brian Breuhan
 
Des guidelines indust v601
Des guidelines indust v601Des guidelines indust v601
Des guidelines indust v601
Anitha M R
 
Project report
Project reportProject report
Project report
Dolly Roy
 
Artcool mirror su_chassis service manual
Artcool mirror su_chassis service manualArtcool mirror su_chassis service manual
Artcool mirror su_chassis service manual
Sharifah Hilma
 

Similar to Kaizen at 2CV (20)

E2.pdf
E2.pdfE2.pdf
E2.pdf
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Lean Production Capacity Report
Lean Production Capacity ReportLean Production Capacity Report
Lean Production Capacity Report
 
Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,
 
CNC Punching & Bending Machine
CNC Punching & Bending MachineCNC Punching & Bending Machine
CNC Punching & Bending Machine
 
35160 wt adapter and can v2.1 adapter for cg pro 9s12
35160 wt adapter and can v2.1 adapter for cg pro 9s1235160 wt adapter and can v2.1 adapter for cg pro 9s12
35160 wt adapter and can v2.1 adapter for cg pro 9s12
 
Case study-optimization-cbm
Case study-optimization-cbmCase study-optimization-cbm
Case study-optimization-cbm
 
Tutorials
TutorialsTutorials
Tutorials
 
THE BENEFIT OF APPLY AUTOMATIC LUBRICATION
THE BENEFIT OF APPLY AUTOMATIC LUBRICATIONTHE BENEFIT OF APPLY AUTOMATIC LUBRICATION
THE BENEFIT OF APPLY AUTOMATIC LUBRICATION
 
Senior Project Report - Brian Breuhan - Final
Senior Project Report - Brian Breuhan - FinalSenior Project Report - Brian Breuhan - Final
Senior Project Report - Brian Breuhan - Final
 
2002 Sea Doo Speedster Service Repair Manual.pdf
2002 Sea Doo Speedster Service Repair Manual.pdf2002 Sea Doo Speedster Service Repair Manual.pdf
2002 Sea Doo Speedster Service Repair Manual.pdf
 
2002 Sea Doo X-20 Service Repair Manual.pdf
2002 Sea Doo X-20 Service Repair Manual.pdf2002 Sea Doo X-20 Service Repair Manual.pdf
2002 Sea Doo X-20 Service Repair Manual.pdf
 
Des guidelines indust v601
Des guidelines indust v601Des guidelines indust v601
Des guidelines indust v601
 
Training1
Training1Training1
Training1
 
Project report
Project reportProject report
Project report
 
IRJET- Design and Implementation of Code Converters for High Speed Multiplier...
IRJET- Design and Implementation of Code Converters for High Speed Multiplier...IRJET- Design and Implementation of Code Converters for High Speed Multiplier...
IRJET- Design and Implementation of Code Converters for High Speed Multiplier...
 
Improvement in the Design of the Fixture and Pattern
Improvement in the Design of the Fixture and PatternImprovement in the Design of the Fixture and Pattern
Improvement in the Design of the Fixture and Pattern
 
DA23-01-28.pdf
DA23-01-28.pdfDA23-01-28.pdf
DA23-01-28.pdf
 
ICFD Tutorial - Two Dimensional Cylinder Flow.pdf
ICFD Tutorial - Two Dimensional Cylinder Flow.pdfICFD Tutorial - Two Dimensional Cylinder Flow.pdf
ICFD Tutorial - Two Dimensional Cylinder Flow.pdf
 
Artcool mirror su_chassis service manual
Artcool mirror su_chassis service manualArtcool mirror su_chassis service manual
Artcool mirror su_chassis service manual
 

Kaizen at 2CV

  • 1. Area : HONDA 2CV BEFORE AFTER 1. Total No of ckt = 919 1. Total No of ckt = 392 Comment : 1. Shopfloor space is un necessory occupied with such material which is not required to produce on that particular day. COMMENT : 1. Production of ckt in meakotei as per given customer order. 2.Easy to use for ckt in multivarient. 58 % less ckt is going to be processed. VIEW POINT: Enable to use in multi varient. Model No of ckt R CABIN 179 Instrument 500 L CABIN 236 Others 4 Model No of ckt R CABIN 71 Instrument 233 L CABIN 84 Others 4 501/26/2017 Honda 2CV NYS PUNE
  • 2. Area : HONDA 2CV BEFORE AFTER Comment : 1. Cost is high. Unable to use its raw material in different requirement. Comment : WIP Reduced by 703584.7 Rs/day. WIP can use in any varient & production is as per customer requirement. VIEW POINT: Illustration How kanban reduces Invetory. 21/26/2017 Honda 2CV NYS PUNE Customer Requirement 150/day Model Name Requiremen t LOT SIZE WITH WOC L CABIN 203 50 200 R CABIN 203 50 200 Instrument 203 50 200 WIP in Rs 938112.9 Customer Requirement 150/day Model Name Requirement LOT SIZE WITH WOC L CABIN 203 50 50 R CABIN 203 50 50 Instrumen t 203 50 50 WIP in RS 234528.2
  • 3. 1/26/2017 Honda 2CV NYS PUNE 3 938112.9 234528.2 After KanbanBefore Kanban WIP REDUCED BY 703584.7 Rs/day WIPATSHOPFLOORinRS.
  • 4. Area : HONDA 2CV BEFORE AFTER Comment : 1. Pipe size used for 100 qty. qty is more than production qty. COMMENT : If one pipe is empty than another pipe can fill during the chorobiki cycle. Zero stoppages due to unavailability of material. VIEW POINT: Line flexibility for mix production. 41/26/2017 Honda 2CV NYS PUNE
  • 5. Area : HONDA 2CV BEFORE AFTER Comment : Opeartor has to input manually all information. Any single mistake in manual entry leads to wrong cutting. COMMENT : No need to give maual input. Updation in database required only when ECN comes. VIEW POINT : Prevent wrong error feeding in M/c. 51/26/2017 Honda 2CV NYS PUNE
  • 6. Area : HONDA 2CV BEFORE AFTER Comment : Opeartor was unable to understand where to put ckt for next process as per coding system. Only skilled manpower can indentify the required location for next process. COMMENT : Once new opeartor know only type of M/C. He/She able to find location as seeing in route withing 10 sec intially. Also final junkan location defines its proper location results easy to get ckt for Atokotei also. VIEW POINT : Production gets easy to understand for operator. 61/26/2017 Honda 2CV NYS PUNE
  • 7. Area : HONDA 2CV BEFORE AFTER Comment : 1. Cost is high. Unable to use its raw material in different requirement. No drop box arrangement. COMMENT : Cost is low, in house fabrication, drop box arrangement for kanban. VIEW POINT: Cost saving and In house fabrication 71/26/2017 Honda 2CV NYS PUNE
  • 8. MATERIAL INFORMATION FLOW & KANBAN FORMATS WORK INSTRUCTION of All KANBAN OTHERS ACTIVITY 81/26/2017 Honda 2CV NYS PUNE