SlideShare une entreprise Scribd logo
1  sur  65
PRESENTATION TO
                             THE
            INTERNATIONAL ASSOCIATION OF SCHOOL
                        LIBRARIANSHIP
                  PRE-
                  PRE-CONFERENCE MEETING
                           Hosted by
                              THE
             LIBRARY AND INFORMATION ASSOCIATION
                          OF JAMAICA

                        AUGUST 5 2011



13 October 2011                                    1
Purpose of
                      Presentation



    Overview of Project
    Project Achievements to Date, Challenges, Mitigation
                             Date,
    Strategies
    Plans to Project Completion
    Impact of the Project on the Education System, the
    Community and National Development




13 October 2011                                            2
Project Overview -
                   Genesis of Project


    In early 2004, in considering its goal for universal access,
    the Ministry with responsibility for telecommunications
    determined that an educated knowledge-based society
                                   knowledge-
    would spur demand for Internet Services
    ITU fully endorsed and sponsored the design of an e-  e-
    learning project, utilizing the technology to impact the
    education levels of Jamaica’s citizenry
    Preliminary Feasibility Study developed by Joint
    Committee chaired by MOE Junior Minister
    Consulting firm hired to finalize study in late 2004
    Cabinet approved 1st e-Learning Jamaica project in March
    2005

13 October 2011                                                    3
Project Overview -
                   Genesis of Project


 In 2005, Govn. established two Agencies
          Govn.
   The Universal Access Fund Company Limited
        to collect and manage a cess on calls terminating in Ja,
        establish a broad band network to facilitate universal
        access, and fund ICT projects that will stimulate internet
        connectivity
    The e-Learning Jamaica Company Limited
        e-
        to develop and implement projects that will contribute
        to Universal Access


13 October 2011                                                  4
Project Overview -
                   Genesis of Project


    Board of e-Ljam appointed July 2005
    CEO hired Nov 2005
    Project launched in February 2006
    Period to September 2006 used to staff and equip
    company and establish systems and procedures
    Project started in September 2006
    3 phased implementation planned




13 October 2011                                        5
Project Overview -
                          Genesis of Project


              Phase 1 - pilot project
              in 30 schools Sept 2006
              to Aug 2007
                  Phase 2 - roll-out to 75
                            roll-
                  schools Sept 2007 to
                  Aug 2008
                     Phase 3 – roll-out to 75
                               roll-
                     schools Sept 2008 to
                     Aug 2009

13 October 2011                                 6
Project Overview-
                          Overview-
                  Purpose of Project




 MOE asked that the first project be in the high schools,
  grade 7 to 11

    To utilize current state-of-the-art ICTs to
                       state-of-the-
      Improve the quality of education
      Enhance the learning experience
      Improve the level of passes in the CXC CSEC
      exam


13 October 2011                                             7
Project Overview-
                            Overview-
                    Scope of Project at
                    Sept 2006

                           180 institutions
                                              166 Public High
                                              Scchools

                                              6 Public Special
                                              Scools

                                              8 Colleges that
                                              train teachers for
                                              the High Schools


           Over 11,000 teachers and
           lecturers
           Over 260,000 students
           11 subjects
13 October 2011                                                    8
Project Overview-
                            Overview-
                    Current Scope of
                    Project




           Over 11,400 teachers and
           lecturers
           Over 260,000 students
           11 subjects
13 October 2011                         9
Project Overview-
                          Overview-
                  Current Scope of
                  Project

    11 subjects – 1st 5 in pilot
        English
        Mathematics
        Biology
        Chemistry
        Information Technology
        Physics
        Geography
        Building technology
        Integrated Science
        Spanish
        Social Studies

13 October 2011                       10
PROJECT OVERVIEW-PROJECT COMPONENTS
                                OVERVIEW-




                           Instructional Materials


                                                     Technology Infrastructure


Continuous Assessment




      Remedial                                         Teacher Training


 13 October 2011                                                          11
Project Overview: Component 1 –
                   Instructional Materials

                                 Teachers
                               Instructional
                              Materials (TIMs)

            Video-
            Video-taped
                                 Acquisition /            Student’s
               Lecture
                              Development of a          Instructiona
              Series ( for
                              comprehensive set          l Materials
            ‘challenging’
                               of standard ICT-
                                           ICT-            (SIMs)
                topics)
                topics)
                                     based
                                 instructional
                                 materials for
                                 teachers and
                                 students in 11
                                 subject areas     Interactive
                  Item Bank                       Educational
                                                    Software



13 October 2011                                                        12
Project Overview: Component 2–
                                              2–
                  Technology Infrastructure
                  for Storage/Access/Dissemination

                                            Establishment of a Central
                      Provision of ICT      Repository for Educational
                  equipment and related     Materials (CREM) at MOE
                  software to Schools and      to store, reproduce,
                          Colleges          continuously update, and
                                               distribute materials


                   Upgrade of the EMIS at
                    the MOE to enhance          Broad Band Internet
                      management and           Access (to be provided
                       administrative                 by UAF)
                                                         UAF)
                         capability




13 October 2011                                                          13
Project Overview: Component 3 –
                  Teacher Training

                     ICT skills
                                                                      Training of 2
                  (NCTVET NVQJ                     Training of 2      Trainers from
                    standards)                        Systems        each institution
                                                  Administrators       for both ICT
                                                     from each           skills and
                   Training of                      institution         Technology
                    all school                                          Integration
 Integration      teachers and
   into the       College tutors   Utilization
  teaching                                        Training of 2 Lecturers from each
                                    of the new    College to Masters degree level in
  /learning                        instruction
   process                                            Technology in Education
                                   al materials
    (ISTE
 standards)




13 October 2011                                                                  14
Project Overview: Component 4 –
                  Remedial


                        Collaborating with existing
                          remedial interventions
                      providing ICT-based materials
                                ICT-
                      and equipment and training of
                       tutors and support personnel


                         Special equipment and
                          software for Special
                                 Schools


13 October 2011                                       15
Project Overview: Component 5 –
                  Continuous Assessment




                    Introduction of standard
                     examinations across the
                    system at grades 7, 8 & 9
                     (Grade 11 CSEC and Grade 10 CCSC
                             already in place)




13 October 2011                                         16
The Pilot

Time frame
   1-year pilot September 2006 – August 2007
Purpose
  To test procedures and methodologies, identify bet
  practices and support systems
  Inform roll-out
Scope (decided by MOE)
  5 subjects (English, Maths, Biology, Chemistry, IT)
  Grades 10 & 11
   28 high schools
  3 teachers colleges (that train 80% of the teachers in the high
   schools)

                                                                17
Technology Deployment Strategy

Impact Required                      Deployment Strategy
 Teacher Planning and                 Remedial type lab (approx 25
 Organization                         computers
 Capability/Research Capability       Group type lab (10 desktops or
 Subject Matter Delivery to           laptops)
 include student interaction,         Computers for library, resource
 group work, individual work          room
 Student Assessment /                 Computers for staff room (desk
 Immediate feedback                   tops/laptops)
 Student Self-help                    Network connectivity and
 School Administration                presentation bundles for grades
 Individual interactive learning -    10 & 11
 Remedial                             Interactive white boards in
                                      group lab and AV room
Project Implementation
             Strategies




  Promoting Buy-in/Ownership
  Ensuring adequate management and control of
  implementation processes
  Handholding / Reinforcement
  Ensuring Sustainability
  Smooth/effective Handover


October 11                                      19
Project Implementation Strategies




                                                                Alternate
             Instruction Improvement
                                                                learning


                                                                Learning
  Quality Instructional
                                Remedial           Skills         Mgt
       Materials
                                                                 Tools


                   Tech              Tech            ICT &
     CREM     Infrastructure/   Infrastructure/   Integration   CREM/Portal
                   Tools             Tools         Training



October 11                                                                20
Project Implementation Strategies




                    Sustainability
                    Implementation                          Longer term support
      Buy-in
                     Management




                                                                                        Equip.
                                                                                   Maintenance and
                    Quality Assurance,   Sys Adm training
   Promotion &                                                Teachers College       replacement
                     reinforcement,
 Planning support                           & CREM              intervention      Strategy as well as
                        help dsek
                                                                                       Funding
                                                                                  Recommendations



October 11                                                                                          21
Major challenges
                       experienced

        Pilot phase delayed by 1 year to August 2008

           RFP for network and equipment published June 2006,
           protest from unsuccessful bidder delayed the signing
           of the contracts to May and July 2007, resp.
           No Board between September 2007 to January 2008
           Rollout affected by unavailability of funds in MOE
           2007-
           2007-8 budget to fund building infrastructure in
           remaining 150 schools




13 October 2011                                                   22
Mitigating strategies




     Early 2008, fast track strategies implemented
     including:
         Provision of Audiovisuals to all schools ASAP (not only pilot,
         since do not require infrastructure)
         Sourced off-the-shelf materials since development timeline
                  off-the-
         would be protracted
         Encouraged schools to self-finance building infrastructure
                                 self-
         Negotiated with Contractors to increase rate of deployment
         MOE assigned 2 Building Officers directly to project

     Project extended to March 2011, new timeline
     developed for all components
13 October 2011                                                       23
Other Happenings/Challenges 2009-2010
                                              2009-



    In mid 2009, MOE requested inclusion of 16
    independent high schools whom assist in
    placement of students from GSAT and GNA

    In April 2010, budget halved by MOFP, project had
    to be extended to March 2012

    Decision taken to defer all items for which the
    supplier was not yet contracted to 2011-12, affecting
                                       2011-
        mobile white boards
        equipment and networks for 4 remaining high schools
        and 16 additional independent high schools,
        content development for next 6 subjects
13 October 2011                                               24
Achievements to date

                  Re Instructional Materials

    TIMs and SIMs sourced for English, Maths,
                                          Maths,
    Biology, Information technology, Building
    Technology and Physics, licenses purchased and
    materials delivered to all relevant schools,
    Spanish delivered to pilot schools only - to be
    evaluated for roll-out,
                  roll-
    Geography and Integrated Science to be trialed
    in selected schools, nothing found for Social
    Studies
13 October 2011                                       25
Additional Achievements to date


    Govt.-
    Govt.-owned materials developed, delivered to
    schools and available on e-Ljam website
                             e-

        TIMS and SIMs for English, Biology and Chemistry
        developed by UWI (JBTE) and Maths developed by
        UTECH/U. of Plymouth

        Video lectures for 1st 5 subjects developed by ZED
        and CPTC, broadcast on PBCJ, Contracts signed and
        production in progress for remaining 6 subjects

        Over 11500 Items written and reviewed by teachers,
        placed in a Moodle database on e-Ljam website,
                                        e-
        used by students to study for exams (since 2009)
13 October 2011                                              26
Additional Achievements to date


                  Re Technology Infrastructure

    Audiovisuals delivered to 185 institutions ,
    including the 5 Community Colleges

    Computer networks in 180 institutions
        Grade 10&11 Classrooms
        Library
        Resource Room
        Staff rooms
        Computer Laboratories

13 October 2011                                      27
Additional Achievements to date


                      Re CREM

    Decision re CREM hosting taken by MOE Nov
    2009, equipment and network delivered since July
    2010, and training of technical staff completed
    (Supplier – Dell World Trade)


     CREM Coordinator identified early 2011, and
    discussions commenced re establishment of unit
    for managing the materials development, update
    and dissemination/access, and providing 24/7
    support

13 October 2011                                        28
Additional Achievements to Date
                             Re Training
    Basic ICT skills
        Over 11,000 teachers, lecturers and Education Field Officers
        nearly 8,000 certified
        454 systems administrators
        Nearly 200 Trainer of trainers
        Online application developed
    Re Technology Integration
       3,988 teachers, lecturers and education officers
       Online Application developed
    Re Masters degrees in Technology in Education
        15 lecturers granted scholarships British Columbia University,
        J$1mil each
        8 graduated in November 2010
        now the Instructional Technology Lecturer at the College,
        bonded for 3 years

13 October 2011                                                        29
Additional Achievements to Date

                   Re Continuous Assessment
    Grade 9 Diagnostic test
        Pilot in 28 schools in 2009 in English, Maths
        rolled out to 150 schools in June 2010, adding Integrated Science,
        marked centrally at e-Ljam using Multiple Choice Marking Software
                             e-
        (Exam View), uses scanners provided by the project - results
        compiled by July 2010
        administered in 173 schools in June 2011, adding Social Studies,
        being marked by schools who have been trained in Exam view

    Grade 7 tests administered in June 2011
    Results started coming in 1 week after test administered
    Analysis and reporting done at e-Ljam under the supervision of
                                   e-
    the CXC Consultant



13 October 2011                                                          30
Additional Achievements to Date


                  Re Remedial Component

    Technology Enrichment programme designed for
    30 low-performing schools,
       low-
        Selection based on poor performance in English and
        Maths,
        Maths, by students entering from GSAT as well as in the
        CXC and the Grade 9 diagnostic tests
        Institution of a Volunteer Programme to assist the
        teachers of these subjects at the grade 7 & 8 levels
        Provision of Integrated Learning Software in English
        and Maths, as well as other resources
             Maths,


13 October 2011                                                   31
Additional Achievements to Date

            Re Remedial Component Continued

        Grade 7 diagnostic tests in English and Maths,
                                                Maths,
        pre and post tests
        Technology Planning Workshops
        Closer monitoring and support – increased visits
        and cluster meetings
        Reinforcement teacher training
        More frequent reporting


13 October 2011                                        32
Additional Achievements to Date

            Re Remedial Component Continued

        Involvement of Parents, Community, School
        Board
        Ensuring that the intervention interfaces
        seamlessly with the school’s remedial
        programme and the MOE’s Grade Seven
        Intervention Programme (GPIS)
    Volunteer Operation and Training Manuals
    developed, and volunteers identified, and
    training commenced
13 October 2011                                     33
13 October 2011   34
Content Resources




      Exciting Text
                                 Video-
                                 Video-taped lectures
      CD-ROMs
      CD-                        Database resources
      DVDs                       Interactive Software
      Power Point                Item Bank
      Presentations               Web-
                                  Web-based resources




13 October 2011                                         35
EXAMPLE OF CONTENT RESOURCE
PROVIDED




October 11                    36
Equipment Resources




    Desk tops                  Digital Video Cameras
    Lap-
    Lap-tops                   DVD/CD Players
    Multimedia Projectors &    Scanners
    Screens
                               Televisions
    Interactive White Boards
                               Network connectivity
    Document Cameras




13 October 2011                                        37
ICT’s in use in project schools
Trained Human Resources


     Teachers and lecturers trained
        to levels 1 and 2 in ICT skills (NVTVET)
        in Technology Integration (ISTE) – how to use the
        technology in instructional delivery
        General Characteristics of Technology Tools and their Uses
        Digital Devices
        Using the Internet for Research and Teaching
        Creating 2D and 3D Animations
        Using Internet Communication Tools
        Digital Stories
        Web Quests and Treasure Hunts
        Wikis
        Blogs
        Podcasts
        RSS Feeds
13 October 2011                                                      39
Trained Human Resources

     Trainer of trainers for both aspects

    System Administrators trained to manage and maintain
   the integrity of the network, at least 2 per school
      System Administration introduction
      Dell Equipment Orientation
      Network and Server Administration including
      Microsoft Server and Active directory
      School Network build out and Virus Management
      Advanced Microsoft System utilities
      Advanced Systems Problem Solving
      Web resources and Forum

    Masters level trained Instructional Technology Lecturers
   in the Colleges
13 October 2011                                                40
Trained Human Resources




13 October 2011                             41
Intellectual Property




    Virtual Assets that have IP value
        Ideas
        Designs
        Images
        Instructional Materials
        Lessons
        Vignettes
        Stories
        Theses
        Power-
        Power-points

13 October 2011                              42
Intellectual Property
Cost of Investment




 Average investment per high school/teachers
  college
  Equipment and Networks and related training
  US$142,000
  Materials and related training US$9000
  Training (HEART and Mico) US$25,000

 Additional US$11,635 per person for Masters training
  (15 lecturers)
13 October 2011                                     44
Strategic Focus to March 2012



    To provide equipment to remaining 4 high schools and
    additional 16 independent high schools and special
    equipment to special schools,

    To provide whiteboards and mobile labs to all schools

    To complete establishment of the CREM (MOU for
    Broadband signed in May 2011)




13 October 2011                                             45
Strategic Focus to March 2012




    To complete training and certification of teachers and
    lecturers, using the online application developed for the
    project

    To implement the technology enrichment programme to
    assist the selected schools in improving literacy and
    numeracy




13 October 2011                                                 46
Strategic Focus to March 2012


    To roll-out Chemistry materials to remaining 150 schools
       roll-

    To complete sourcing and development of materials for
    additional 6 subjects

    To acquire/develop materials for grade 7-9
                                           7-

    To increase the Item bank for grades 10&11 to 22,000, 2000
    for each subject, and for grades 7-9 to 5,000, 1000 for each
                                     7-     5,000,
    subject

    To trial various educational software in selected schools
    (literacy, numeracy, CAD)
13 October 2011                                                    47
Strategic Focus to March 2012



    To handover elements of the project to MOE for
    institutionalization

    To develop Project #2 for Primary Schools

    To work with the schools to ensure proper Implementation
    and Resource Management strategies that seek to direct
    and control the use of resources to produce the best value
    from the investment and to ensure sustainability of the
    project interventions




13 October 2011                                              48
IMPLEMENTATION/SUSTAINABILITY
                  STRATEGIES




    School Inventory and Knowledge database being
    maintained, periodic audits conducted

    Support provided through website, telephone, e-
                                                 e-
    mail, Chat, Blogs, field visits

    Service level agreement in place for all equipment

    Technical and operational guidelines / standards
    /best practices provided
13 October 2011                                          49
SOME RESOURCE MANAGEMENT STRATEGIES




13 October 2011                                         50
IMPLEMENTATION/SUSTAINABILITY
               STRATEGIES




  Infrastructure Project Manager to assist schools in
  identifying contractors and liaise between e-Ljam and the
                                              e-
  MOE Building Officers
  Framework contract with suppliers to supply goods over
  period of time and give latest technology
  Electrical Consultant to sign-off on building works and
                            sign-
  electrical circuitry (paid for by MOE)
  Distinctive marking on equipment – logo on BIOS
  Training of System Administrators to ensure integrity of the
  school network

October 11                                                       51
IMPLEMENTATION/SUSTAINABILITY
                  STRATEGIES


    Subject Specialists hired to manage the acquisition
    and development of content

    Subject Advisory Groups, led by MOE Officer,
    established to sign off on standards and ensure
    quality of materials developed/acquired

    Cluster workshops on materials provided to ensure
    appropriate and effective usage

    Teachers Colleges being equipped to ensure on-
                                               on-
    going professional development of teachers, both
    pre-service and in-service
    pre-            in-
13 October 2011                                        52
IMPLEMENTATION/SUSTAINABILITY
                  STRATEGIES



    School e-Learning Implementation Committee
            e-
    (SEIMC), comprising heads of departments ,
    established to be responsible for the Steering/
    Monitoring of the implementation of the project
    in the school

    Officers hired to monitor the implementation of
    the projects in the schools, includes regular visits
    and SEIMC cluster meetings for reinforcement
    /sharing / problem solving /monitoring, regular
    reporting

    MOE Officers part of the monitoring process
13 October 2011                                            53
IMPLEMENTATION/SUSTAINABILITY
                  STRATEGIES




    Brokering adequate insurance coverage for the schools to
    participate if desired

    Lobbying for posts of Systems Administrator and
    Instructional Technology Lecturer to be added to
    school/college establishment

    Locks being installed to safeguard computers at the schools
    (incidence of theft reported thirty (30) schools, valued at
    US $115,289.40)


13 October 2011                                                54
IMPLEMENTATION/SUSTAINABILITY
                  STRATEGIES



    Looking at a workable maintenance strategy, eg use of the
    HEART Trust and Community College network to provide
    maintenance services as indicated in MOE draft ICT
    Strategic Plan

    Support in planning for technology sustainability

    Fully automated help desk system




13 October 2011                                                 55
THE e-LEARNING PROJECT
                  A Joint MITEC/MOEY Project



 The Network




13 October 2011                                56
Impact on Education System




Will revolutionize every aspect of the school system
      teaching,

      learning,

      administration




October 11                                             57
Impact on Education System


  Teachers
    Greater proficiency in the use of ICTs by lecturers in the
    teachers colleges and high school teachers
             lesson planning,
             lesson delivery,
             student evaluation,
             marking,
             reporting,
             video presentations,
             communication,
             research,
             networking,
             accessing web-resources, etc
                       web-

      Inexperienced teachers will have a pool of standard high-
                                                          high-
      quality materials to draw from


October 11                                                        58
Impact on Education System


  Teachers
      Better alignment between teacher communication
      methods and student interactive trends, eg
        Use of Webquest to stimulate inquiry-based learning
                                      inquiry-
        Use of interactive whiteboards to stimulate interactivity
        Use of video-cameras to stimulate creativity and
                video-
        innovation

      Difficult concepts can be dealt with more easily and more
      excitingly

      Content can be accessed to specifically deal with
      weaknesses identified from the Diagnostic tests


October 11                                                      59
Impact on Education System



  Learners
      Quest for knowledge encouraged
      Increased interest in education
      Teaching/learning process more exciting, especially for
      students who learn ‘differently’ or are disabled
      Improved attendance at school
      Increased participation of parents thru Cable TV,
      broadcasts, Internet
      Contribution to improvement in passes at the school-
                                                      school-
      leaving CXC CSEC examinations
      School-leavers more equipped for the 21st century work –
      School-
      ICT skills, research skills, problem-solving/decision-
                                   problem-solving/decision-
      making skills

October 11                                                       60
USING THE INTERACTIVE WHITEBOARD
Impact on Education System




  Administration
      Modernisation of school development planning

      Greater efficiency in school operation

      Improved decision-making since now data-driven
               decision-                 data-

      Increased and more efficient communication with
      stakeholders

October 11                                              62
Impact on
           Community/National
           Development

 Improvement in the quality of education between Grades 7-11
                                                        7-
 (Forms 1-5) in 188 high schools island-wide
        1-                       island-

 School-
 School-leavers better suited to the 21st century world of work

 Creation of local expertise in development of digital material and
 other technology-driven industries, with the possibility of
       technology-
 exporting these services

 Greater appetite for internet and data-driven services
                                   data-

 Increased demand for affordable computers for teachers and
 students

  Project can be used as case study for project implementation
  nationally and regionally
October 11                                                            63
DISCUSSION




13 October 2011                64
THANK YOU

            Avrill Crawford
            CEO/Project Manager
            e-Learning Jamaica Company Limited
            36 Trafalgar Road, Kingston 10, Jamaica
            Tel: 876-929-4044, Fax: 876-929-8676
            E-mail: info@e-ljam.net
            Website: www.e-ljam.net.jm
13 October 2011                                       65

Contenu connexe

Tendances

Course management system
Course management systemCourse management system
Course management systemNighat Shaheen
 
Learning Management System | ATUM-LMS
Learning Management System | ATUM-LMSLearning Management System | ATUM-LMS
Learning Management System | ATUM-LMSStratbeans
 
E learning project definition
E learning project definitionE learning project definition
E learning project definitionEric Kluijfhout
 
Online examination system project ppt
Online examination system project pptOnline examination system project ppt
Online examination system project pptMohit Gupta
 
Importance of e learning
Importance of e learningImportance of e learning
Importance of e learningAtif Chauhdary
 
Online examination system
Online examination systemOnline examination system
Online examination systemPRANJAL SAIKIA
 
Online Attendance Management System
Online Attendance Management SystemOnline Attendance Management System
Online Attendance Management SystemRIDDHICHOUHAN2
 
What is an LMS (Definition and Uses)
What is an LMS (Definition and Uses) What is an LMS (Definition and Uses)
What is an LMS (Definition and Uses) TalentLMS
 
Attendance Management Report 2016
Attendance Management Report 2016Attendance Management Report 2016
Attendance Management Report 2016Pooja Maan
 
Online examination system
Online examination systemOnline examination system
Online examination systemAj Maurya
 
Online school website
Online school websiteOnline school website
Online school websiteDiksha Suman
 
online Examination System (project report)
online Examination System (project report)online Examination System (project report)
online Examination System (project report)vivek anand
 
e-Learning Management System : a Critical Study
e-Learning Management System : a Critical Studye-Learning Management System : a Critical Study
e-Learning Management System : a Critical StudyKaustav Saha
 
Online examination
Online examinationOnline examination
Online examinationLikithaGR
 
online E-voting system
online E-voting systemonline E-voting system
online E-voting systemshubham patil
 
Online Hostel Management System Proposal
Online Hostel Management System Proposal Online Hostel Management System Proposal
Online Hostel Management System Proposal farhanamusthafa
 
Online education system project presentation
Online education system project presentationOnline education system project presentation
Online education system project presentationUmme Kulsum Lucky
 
Online examination ppt
Online examination pptOnline examination ppt
Online examination pptAmit Kumar
 

Tendances (20)

Course management system
Course management systemCourse management system
Course management system
 
Learning Management System | ATUM-LMS
Learning Management System | ATUM-LMSLearning Management System | ATUM-LMS
Learning Management System | ATUM-LMS
 
E learning project definition
E learning project definitionE learning project definition
E learning project definition
 
Online examination system project ppt
Online examination system project pptOnline examination system project ppt
Online examination system project ppt
 
Online examination system
Online examination systemOnline examination system
Online examination system
 
Importance of e learning
Importance of e learningImportance of e learning
Importance of e learning
 
Online examination system
Online examination systemOnline examination system
Online examination system
 
Online Attendance Management System
Online Attendance Management SystemOnline Attendance Management System
Online Attendance Management System
 
Exam system
Exam systemExam system
Exam system
 
What is an LMS (Definition and Uses)
What is an LMS (Definition and Uses) What is an LMS (Definition and Uses)
What is an LMS (Definition and Uses)
 
Attendance Management Report 2016
Attendance Management Report 2016Attendance Management Report 2016
Attendance Management Report 2016
 
Online examination system
Online examination systemOnline examination system
Online examination system
 
Online school website
Online school websiteOnline school website
Online school website
 
online Examination System (project report)
online Examination System (project report)online Examination System (project report)
online Examination System (project report)
 
e-Learning Management System : a Critical Study
e-Learning Management System : a Critical Studye-Learning Management System : a Critical Study
e-Learning Management System : a Critical Study
 
Online examination
Online examinationOnline examination
Online examination
 
online E-voting system
online E-voting systemonline E-voting system
online E-voting system
 
Online Hostel Management System Proposal
Online Hostel Management System Proposal Online Hostel Management System Proposal
Online Hostel Management System Proposal
 
Online education system project presentation
Online education system project presentationOnline education system project presentation
Online education system project presentation
 
Online examination ppt
Online examination pptOnline examination ppt
Online examination ppt
 

En vedette

eLearning Proposal
eLearning ProposaleLearning Proposal
eLearning Proposalayounce
 
E learning business plan development
E learning business plan developmentE learning business plan development
E learning business plan developmentEric Kluijfhout
 
Proposal elearning content developement
Proposal elearning content developementProposal elearning content developement
Proposal elearning content developementAzmawati Lazim
 
E-Learning Business Proposal
E-Learning Business ProposalE-Learning Business Proposal
E-Learning Business Proposalhaussmannmatthew
 
Hospital Management System
Hospital Management SystemHospital Management System
Hospital Management Systemidowume
 
"Hospital Management"
"Hospital Management""Hospital Management"
"Hospital Management"vivek kct
 
09.project hospital management system
09.project hospital management system09.project hospital management system
09.project hospital management systemshahidahmad527
 
Processing Patterns for PredictiveBusiness
Processing Patterns for PredictiveBusinessProcessing Patterns for PredictiveBusiness
Processing Patterns for PredictiveBusinessTim Bass
 
Survey Findings - Scope of E-learning industry in India
Survey Findings - Scope of E-learning industry in IndiaSurvey Findings - Scope of E-learning industry in India
Survey Findings - Scope of E-learning industry in IndiaNet2user
 
Resturant stakeholders
Resturant stakeholdersResturant stakeholders
Resturant stakeholdersmazin mohamed
 
Online Hotel Room Booking System
Online Hotel Room Booking SystemOnline Hotel Room Booking System
Online Hotel Room Booking SystemAbhishek Kumar
 
Hospital management system
Hospital management systemHospital management system
Hospital management systemsubu
 
Hospital management system project
Hospital management system projectHospital management system project
Hospital management system projectHimani Chopra
 
Hospital management system(database)
Hospital management system(database)Hospital management system(database)
Hospital management system(database)Iftikhar Ahmad
 
Major stakeholders of health care system pwrpnt
Major stakeholders of health care system pwrpntMajor stakeholders of health care system pwrpnt
Major stakeholders of health care system pwrpntDeepthy Philip Thomas
 
[PPT] Hospital management system - Quanta-his
[PPT] Hospital management system - Quanta-his[PPT] Hospital management system - Quanta-his
[PPT] Hospital management system - Quanta-hisBirlamedisoft Pvt. Ltd
 
Library Management System
Library Management SystemLibrary Management System
Library Management SystemPankaj Kumar
 

En vedette (20)

eLearning Proposal
eLearning ProposaleLearning Proposal
eLearning Proposal
 
Proposal E Learning
Proposal E LearningProposal E Learning
Proposal E Learning
 
E learning business plan development
E learning business plan developmentE learning business plan development
E learning business plan development
 
Proposal elearning content developement
Proposal elearning content developementProposal elearning content developement
Proposal elearning content developement
 
E-Learning Business Proposal
E-Learning Business ProposalE-Learning Business Proposal
E-Learning Business Proposal
 
Hospital Management System
Hospital Management SystemHospital Management System
Hospital Management System
 
"Hospital Management"
"Hospital Management""Hospital Management"
"Hospital Management"
 
09.project hospital management system
09.project hospital management system09.project hospital management system
09.project hospital management system
 
Processing Patterns for PredictiveBusiness
Processing Patterns for PredictiveBusinessProcessing Patterns for PredictiveBusiness
Processing Patterns for PredictiveBusiness
 
Survey Findings - Scope of E-learning industry in India
Survey Findings - Scope of E-learning industry in IndiaSurvey Findings - Scope of E-learning industry in India
Survey Findings - Scope of E-learning industry in India
 
E Learning Objectives
E Learning ObjectivesE Learning Objectives
E Learning Objectives
 
Resturant stakeholders
Resturant stakeholdersResturant stakeholders
Resturant stakeholders
 
Hospital Management System
Hospital Management SystemHospital Management System
Hospital Management System
 
Online Hotel Room Booking System
Online Hotel Room Booking SystemOnline Hotel Room Booking System
Online Hotel Room Booking System
 
Hospital management system
Hospital management systemHospital management system
Hospital management system
 
Hospital management system project
Hospital management system projectHospital management system project
Hospital management system project
 
Hospital management system(database)
Hospital management system(database)Hospital management system(database)
Hospital management system(database)
 
Major stakeholders of health care system pwrpnt
Major stakeholders of health care system pwrpntMajor stakeholders of health care system pwrpnt
Major stakeholders of health care system pwrpnt
 
[PPT] Hospital management system - Quanta-his
[PPT] Hospital management system - Quanta-his[PPT] Hospital management system - Quanta-his
[PPT] Hospital management system - Quanta-his
 
Library Management System
Library Management SystemLibrary Management System
Library Management System
 

Similaire à e-learning project

OER fact sheet CSAPOER2 cascade project
OER fact sheet CSAPOER2 cascade projectOER fact sheet CSAPOER2 cascade project
OER fact sheet CSAPOER2 cascade projectCSAPSubjectCentre
 
Adopting an e-portfolio as an assessment tool: investigating options, issues ...
Adopting an e-portfolio as an assessment tool: investigating options, issues ...Adopting an e-portfolio as an assessment tool: investigating options, issues ...
Adopting an e-portfolio as an assessment tool: investigating options, issues ...ePortfolios Australia
 
Adopting an e-portfolio as an assessment tool: investigating options, issues ...
Adopting an e-portfolio as an assessment tool: investigating options, issues ...Adopting an e-portfolio as an assessment tool: investigating options, issues ...
Adopting an e-portfolio as an assessment tool: investigating options, issues ...ePortfolios Australia
 
Presentazione move me coonference
Presentazione move me coonferencePresentazione move me coonference
Presentazione move me coonferenceEmma Abbate
 
Bringing e-assessment to a higher maturity on a national scale
Bringing e-assessment to a higher maturity on a national scaleBringing e-assessment to a higher maturity on a national scale
Bringing e-assessment to a higher maturity on a national scaleAlfred Hartoog
 
Where do you see ICT?
Where do you see ICT?Where do you see ICT?
Where do you see ICT?mackas
 
Pal gov.tutorial4.session11.lab zinnarontologybasedwebservices
Pal gov.tutorial4.session11.lab zinnarontologybasedwebservicesPal gov.tutorial4.session11.lab zinnarontologybasedwebservices
Pal gov.tutorial4.session11.lab zinnarontologybasedwebservicesMustafa Jarrar
 
Ideas for Internationalisation@Home in Higher Education
Ideas for Internationalisation@Home in Higher EducationIdeas for Internationalisation@Home in Higher Education
Ideas for Internationalisation@Home in Higher EducationTon Koenraad
 
DELILA project overview
DELILA project overviewDELILA project overview
DELILA project overviewJane Secker
 
Assessing the impact of access to and availability of OER on the emergence an...
Assessing the impact of access to and availability of OER on the emergence an...Assessing the impact of access to and availability of OER on the emergence an...
Assessing the impact of access to and availability of OER on the emergence an...Open Education Consortium
 
Lisa simmons' technology action plan
Lisa simmons' technology action planLisa simmons' technology action plan
Lisa simmons' technology action planLisagsimmons
 
Ntu share project final report
Ntu share project final reportNtu share project final report
Ntu share project final reportVicki McGarvey
 
February 2009
February 2009February 2009
February 2009linioti
 
Pal gov.tutorial4.session1 1.needforsharedsemantics
Pal gov.tutorial4.session1 1.needforsharedsemanticsPal gov.tutorial4.session1 1.needforsharedsemantics
Pal gov.tutorial4.session1 1.needforsharedsemanticsMustafa Jarrar
 
Pal gov.tutorial4.session1 1.needforsharedsemantics
Pal gov.tutorial4.session1 1.needforsharedsemanticsPal gov.tutorial4.session1 1.needforsharedsemantics
Pal gov.tutorial4.session1 1.needforsharedsemanticsMustafa Jarrar
 
Kisp status report and work plan (revised)
Kisp status report and work plan (revised)Kisp status report and work plan (revised)
Kisp status report and work plan (revised)Ave Mejia
 
Lisa simmons' technology action plan
Lisa simmons' technology action planLisa simmons' technology action plan
Lisa simmons' technology action planLisagsimmons
 
Lisa Simmons' Technology Action Plan
Lisa Simmons' Technology Action PlanLisa Simmons' Technology Action Plan
Lisa Simmons' Technology Action PlanLisagsimmons
 

Similaire à e-learning project (20)

OER fact sheet CSAPOER2 cascade project
OER fact sheet CSAPOER2 cascade projectOER fact sheet CSAPOER2 cascade project
OER fact sheet CSAPOER2 cascade project
 
Adopting an e-portfolio as an assessment tool: investigating options, issues ...
Adopting an e-portfolio as an assessment tool: investigating options, issues ...Adopting an e-portfolio as an assessment tool: investigating options, issues ...
Adopting an e-portfolio as an assessment tool: investigating options, issues ...
 
Adopting an e-portfolio as an assessment tool: investigating options, issues ...
Adopting an e-portfolio as an assessment tool: investigating options, issues ...Adopting an e-portfolio as an assessment tool: investigating options, issues ...
Adopting an e-portfolio as an assessment tool: investigating options, issues ...
 
Presentazione move me coonference
Presentazione move me coonferencePresentazione move me coonference
Presentazione move me coonference
 
Bringing e-assessment to a higher maturity on a national scale
Bringing e-assessment to a higher maturity on a national scaleBringing e-assessment to a higher maturity on a national scale
Bringing e-assessment to a higher maturity on a national scale
 
Where do you see ICT?
Where do you see ICT?Where do you see ICT?
Where do you see ICT?
 
Pal gov.tutorial4.session11.lab zinnarontologybasedwebservices
Pal gov.tutorial4.session11.lab zinnarontologybasedwebservicesPal gov.tutorial4.session11.lab zinnarontologybasedwebservices
Pal gov.tutorial4.session11.lab zinnarontologybasedwebservices
 
Ideas for Internationalisation@Home in Higher Education
Ideas for Internationalisation@Home in Higher EducationIdeas for Internationalisation@Home in Higher Education
Ideas for Internationalisation@Home in Higher Education
 
M Macario I-CLEEN
M Macario I-CLEENM Macario I-CLEEN
M Macario I-CLEEN
 
DELILA project overview
DELILA project overviewDELILA project overview
DELILA project overview
 
Assessing the impact of access to and availability of OER on the emergence an...
Assessing the impact of access to and availability of OER on the emergence an...Assessing the impact of access to and availability of OER on the emergence an...
Assessing the impact of access to and availability of OER on the emergence an...
 
Lisa simmons' technology action plan
Lisa simmons' technology action planLisa simmons' technology action plan
Lisa simmons' technology action plan
 
Ntu share project final report
Ntu share project final reportNtu share project final report
Ntu share project final report
 
February 2009
February 2009February 2009
February 2009
 
MacICT Local Eco Study Project 2010
MacICT Local Eco Study Project 2010MacICT Local Eco Study Project 2010
MacICT Local Eco Study Project 2010
 
Pal gov.tutorial4.session1 1.needforsharedsemantics
Pal gov.tutorial4.session1 1.needforsharedsemanticsPal gov.tutorial4.session1 1.needforsharedsemantics
Pal gov.tutorial4.session1 1.needforsharedsemantics
 
Pal gov.tutorial4.session1 1.needforsharedsemantics
Pal gov.tutorial4.session1 1.needforsharedsemanticsPal gov.tutorial4.session1 1.needforsharedsemantics
Pal gov.tutorial4.session1 1.needforsharedsemantics
 
Kisp status report and work plan (revised)
Kisp status report and work plan (revised)Kisp status report and work plan (revised)
Kisp status report and work plan (revised)
 
Lisa simmons' technology action plan
Lisa simmons' technology action planLisa simmons' technology action plan
Lisa simmons' technology action plan
 
Lisa Simmons' Technology Action Plan
Lisa Simmons' Technology Action PlanLisa Simmons' Technology Action Plan
Lisa Simmons' Technology Action Plan
 

Plus de International Association of School Librarianship

Plus de International Association of School Librarianship (20)

Collaboration and support: Perspective of a secondary school principal
Collaboration and support: Perspective of a secondary school principalCollaboration and support: Perspective of a secondary school principal
Collaboration and support: Perspective of a secondary school principal
 
Collaboration and support: The role of the principal
Collaboration and support: The role of the principalCollaboration and support: The role of the principal
Collaboration and support: The role of the principal
 
Home broadband adoption and student achievement: Scenes from an initial exami...
Home broadband adoption and student achievement: Scenes from an initial exami...Home broadband adoption and student achievement: Scenes from an initial exami...
Home broadband adoption and student achievement: Scenes from an initial exami...
 
Researching data sets to develop state library standards
Researching data sets to develop state library standardsResearching data sets to develop state library standards
Researching data sets to develop state library standards
 
The role of the teacher librarian in the bookless library: information litera...
The role of the teacher librarian in the bookless library: information litera...The role of the teacher librarian in the bookless library: information litera...
The role of the teacher librarian in the bookless library: information litera...
 
Utilization of a school library in a black rural South African town
Utilization of a school library in a black rural South African townUtilization of a school library in a black rural South African town
Utilization of a school library in a black rural South African town
 
Re-thinking the role of the teacher-librarian in a post literate society
Re-thinking the role of the teacher-librarian in a post literate societyRe-thinking the role of the teacher-librarian in a post literate society
Re-thinking the role of the teacher-librarian in a post literate society
 
Multicultural books in the social studies classroom: Which Caribbean?
Multicultural books in the social studies classroom: Which Caribbean?Multicultural books in the social studies classroom: Which Caribbean?
Multicultural books in the social studies classroom: Which Caribbean?
 
standards
standardsstandards
standards
 
one-to-one-computing
one-to-one-computingone-to-one-computing
one-to-one-computing
 
reading
readingreading
reading
 
school_libraries_brazil
school_libraries_brazilschool_libraries_brazil
school_libraries_brazil
 
learning_environments
learning_environmentslearning_environments
learning_environments
 
collaboration
collaborationcollaboration
collaboration
 
The Information Search Process (ISP) and the research essay
The Information Search Process (ISP) and the research essayThe Information Search Process (ISP) and the research essay
The Information Search Process (ISP) and the research essay
 
Building collaborative communities online: a CSU initiative
Building collaborative communities online: a CSU initiativeBuilding collaborative communities online: a CSU initiative
Building collaborative communities online: a CSU initiative
 
Culturally sensitive learning practices
Culturally sensitive learning practicesCulturally sensitive learning practices
Culturally sensitive learning practices
 
Future of the book - challenge of the digital world
Future of the book - challenge of the digital worldFuture of the book - challenge of the digital world
Future of the book - challenge of the digital world
 
Resilience is as resilience does
Resilience is as resilience doesResilience is as resilience does
Resilience is as resilience does
 
Measuring Malaysia school resource centers' standards through iQ-PSS
Measuring Malaysia school resource centers' standards through iQ-PSSMeasuring Malaysia school resource centers' standards through iQ-PSS
Measuring Malaysia school resource centers' standards through iQ-PSS
 

Dernier

Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxPoojaSen20
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 

Dernier (20)

Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 

e-learning project

  • 1. PRESENTATION TO THE INTERNATIONAL ASSOCIATION OF SCHOOL LIBRARIANSHIP PRE- PRE-CONFERENCE MEETING Hosted by THE LIBRARY AND INFORMATION ASSOCIATION OF JAMAICA AUGUST 5 2011 13 October 2011 1
  • 2. Purpose of Presentation Overview of Project Project Achievements to Date, Challenges, Mitigation Date, Strategies Plans to Project Completion Impact of the Project on the Education System, the Community and National Development 13 October 2011 2
  • 3. Project Overview - Genesis of Project In early 2004, in considering its goal for universal access, the Ministry with responsibility for telecommunications determined that an educated knowledge-based society knowledge- would spur demand for Internet Services ITU fully endorsed and sponsored the design of an e- e- learning project, utilizing the technology to impact the education levels of Jamaica’s citizenry Preliminary Feasibility Study developed by Joint Committee chaired by MOE Junior Minister Consulting firm hired to finalize study in late 2004 Cabinet approved 1st e-Learning Jamaica project in March 2005 13 October 2011 3
  • 4. Project Overview - Genesis of Project In 2005, Govn. established two Agencies Govn. The Universal Access Fund Company Limited to collect and manage a cess on calls terminating in Ja, establish a broad band network to facilitate universal access, and fund ICT projects that will stimulate internet connectivity The e-Learning Jamaica Company Limited e- to develop and implement projects that will contribute to Universal Access 13 October 2011 4
  • 5. Project Overview - Genesis of Project Board of e-Ljam appointed July 2005 CEO hired Nov 2005 Project launched in February 2006 Period to September 2006 used to staff and equip company and establish systems and procedures Project started in September 2006 3 phased implementation planned 13 October 2011 5
  • 6. Project Overview - Genesis of Project Phase 1 - pilot project in 30 schools Sept 2006 to Aug 2007 Phase 2 - roll-out to 75 roll- schools Sept 2007 to Aug 2008 Phase 3 – roll-out to 75 roll- schools Sept 2008 to Aug 2009 13 October 2011 6
  • 7. Project Overview- Overview- Purpose of Project MOE asked that the first project be in the high schools, grade 7 to 11 To utilize current state-of-the-art ICTs to state-of-the- Improve the quality of education Enhance the learning experience Improve the level of passes in the CXC CSEC exam 13 October 2011 7
  • 8. Project Overview- Overview- Scope of Project at Sept 2006 180 institutions 166 Public High Scchools 6 Public Special Scools 8 Colleges that train teachers for the High Schools Over 11,000 teachers and lecturers Over 260,000 students 11 subjects 13 October 2011 8
  • 9. Project Overview- Overview- Current Scope of Project Over 11,400 teachers and lecturers Over 260,000 students 11 subjects 13 October 2011 9
  • 10. Project Overview- Overview- Current Scope of Project 11 subjects – 1st 5 in pilot English Mathematics Biology Chemistry Information Technology Physics Geography Building technology Integrated Science Spanish Social Studies 13 October 2011 10
  • 11. PROJECT OVERVIEW-PROJECT COMPONENTS OVERVIEW- Instructional Materials Technology Infrastructure Continuous Assessment Remedial Teacher Training 13 October 2011 11
  • 12. Project Overview: Component 1 – Instructional Materials Teachers Instructional Materials (TIMs) Video- Video-taped Acquisition / Student’s Lecture Development of a Instructiona Series ( for comprehensive set l Materials ‘challenging’ of standard ICT- ICT- (SIMs) topics) topics) based instructional materials for teachers and students in 11 subject areas Interactive Item Bank Educational Software 13 October 2011 12
  • 13. Project Overview: Component 2– 2– Technology Infrastructure for Storage/Access/Dissemination Establishment of a Central Provision of ICT Repository for Educational equipment and related Materials (CREM) at MOE software to Schools and to store, reproduce, Colleges continuously update, and distribute materials Upgrade of the EMIS at the MOE to enhance Broad Band Internet management and Access (to be provided administrative by UAF) UAF) capability 13 October 2011 13
  • 14. Project Overview: Component 3 – Teacher Training ICT skills Training of 2 (NCTVET NVQJ Training of 2 Trainers from standards) Systems each institution Administrators for both ICT from each skills and Training of institution Technology all school Integration Integration teachers and into the College tutors Utilization teaching Training of 2 Lecturers from each of the new College to Masters degree level in /learning instruction process Technology in Education al materials (ISTE standards) 13 October 2011 14
  • 15. Project Overview: Component 4 – Remedial Collaborating with existing remedial interventions providing ICT-based materials ICT- and equipment and training of tutors and support personnel Special equipment and software for Special Schools 13 October 2011 15
  • 16. Project Overview: Component 5 – Continuous Assessment Introduction of standard examinations across the system at grades 7, 8 & 9 (Grade 11 CSEC and Grade 10 CCSC already in place) 13 October 2011 16
  • 17. The Pilot Time frame 1-year pilot September 2006 – August 2007 Purpose To test procedures and methodologies, identify bet practices and support systems Inform roll-out Scope (decided by MOE) 5 subjects (English, Maths, Biology, Chemistry, IT) Grades 10 & 11 28 high schools 3 teachers colleges (that train 80% of the teachers in the high schools) 17
  • 18. Technology Deployment Strategy Impact Required Deployment Strategy Teacher Planning and Remedial type lab (approx 25 Organization computers Capability/Research Capability Group type lab (10 desktops or Subject Matter Delivery to laptops) include student interaction, Computers for library, resource group work, individual work room Student Assessment / Computers for staff room (desk Immediate feedback tops/laptops) Student Self-help Network connectivity and School Administration presentation bundles for grades Individual interactive learning - 10 & 11 Remedial Interactive white boards in group lab and AV room
  • 19. Project Implementation Strategies Promoting Buy-in/Ownership Ensuring adequate management and control of implementation processes Handholding / Reinforcement Ensuring Sustainability Smooth/effective Handover October 11 19
  • 20. Project Implementation Strategies Alternate Instruction Improvement learning Learning Quality Instructional Remedial Skills Mgt Materials Tools Tech Tech ICT & CREM Infrastructure/ Infrastructure/ Integration CREM/Portal Tools Tools Training October 11 20
  • 21. Project Implementation Strategies Sustainability Implementation Longer term support Buy-in Management Equip. Maintenance and Quality Assurance, Sys Adm training Promotion & Teachers College replacement reinforcement, Planning support & CREM intervention Strategy as well as help dsek Funding Recommendations October 11 21
  • 22. Major challenges experienced Pilot phase delayed by 1 year to August 2008 RFP for network and equipment published June 2006, protest from unsuccessful bidder delayed the signing of the contracts to May and July 2007, resp. No Board between September 2007 to January 2008 Rollout affected by unavailability of funds in MOE 2007- 2007-8 budget to fund building infrastructure in remaining 150 schools 13 October 2011 22
  • 23. Mitigating strategies Early 2008, fast track strategies implemented including: Provision of Audiovisuals to all schools ASAP (not only pilot, since do not require infrastructure) Sourced off-the-shelf materials since development timeline off-the- would be protracted Encouraged schools to self-finance building infrastructure self- Negotiated with Contractors to increase rate of deployment MOE assigned 2 Building Officers directly to project Project extended to March 2011, new timeline developed for all components 13 October 2011 23
  • 24. Other Happenings/Challenges 2009-2010 2009- In mid 2009, MOE requested inclusion of 16 independent high schools whom assist in placement of students from GSAT and GNA In April 2010, budget halved by MOFP, project had to be extended to March 2012 Decision taken to defer all items for which the supplier was not yet contracted to 2011-12, affecting 2011- mobile white boards equipment and networks for 4 remaining high schools and 16 additional independent high schools, content development for next 6 subjects 13 October 2011 24
  • 25. Achievements to date Re Instructional Materials TIMs and SIMs sourced for English, Maths, Maths, Biology, Information technology, Building Technology and Physics, licenses purchased and materials delivered to all relevant schools, Spanish delivered to pilot schools only - to be evaluated for roll-out, roll- Geography and Integrated Science to be trialed in selected schools, nothing found for Social Studies 13 October 2011 25
  • 26. Additional Achievements to date Govt.- Govt.-owned materials developed, delivered to schools and available on e-Ljam website e- TIMS and SIMs for English, Biology and Chemistry developed by UWI (JBTE) and Maths developed by UTECH/U. of Plymouth Video lectures for 1st 5 subjects developed by ZED and CPTC, broadcast on PBCJ, Contracts signed and production in progress for remaining 6 subjects Over 11500 Items written and reviewed by teachers, placed in a Moodle database on e-Ljam website, e- used by students to study for exams (since 2009) 13 October 2011 26
  • 27. Additional Achievements to date Re Technology Infrastructure Audiovisuals delivered to 185 institutions , including the 5 Community Colleges Computer networks in 180 institutions Grade 10&11 Classrooms Library Resource Room Staff rooms Computer Laboratories 13 October 2011 27
  • 28. Additional Achievements to date Re CREM Decision re CREM hosting taken by MOE Nov 2009, equipment and network delivered since July 2010, and training of technical staff completed (Supplier – Dell World Trade) CREM Coordinator identified early 2011, and discussions commenced re establishment of unit for managing the materials development, update and dissemination/access, and providing 24/7 support 13 October 2011 28
  • 29. Additional Achievements to Date Re Training Basic ICT skills Over 11,000 teachers, lecturers and Education Field Officers nearly 8,000 certified 454 systems administrators Nearly 200 Trainer of trainers Online application developed Re Technology Integration 3,988 teachers, lecturers and education officers Online Application developed Re Masters degrees in Technology in Education 15 lecturers granted scholarships British Columbia University, J$1mil each 8 graduated in November 2010 now the Instructional Technology Lecturer at the College, bonded for 3 years 13 October 2011 29
  • 30. Additional Achievements to Date Re Continuous Assessment Grade 9 Diagnostic test Pilot in 28 schools in 2009 in English, Maths rolled out to 150 schools in June 2010, adding Integrated Science, marked centrally at e-Ljam using Multiple Choice Marking Software e- (Exam View), uses scanners provided by the project - results compiled by July 2010 administered in 173 schools in June 2011, adding Social Studies, being marked by schools who have been trained in Exam view Grade 7 tests administered in June 2011 Results started coming in 1 week after test administered Analysis and reporting done at e-Ljam under the supervision of e- the CXC Consultant 13 October 2011 30
  • 31. Additional Achievements to Date Re Remedial Component Technology Enrichment programme designed for 30 low-performing schools, low- Selection based on poor performance in English and Maths, Maths, by students entering from GSAT as well as in the CXC and the Grade 9 diagnostic tests Institution of a Volunteer Programme to assist the teachers of these subjects at the grade 7 & 8 levels Provision of Integrated Learning Software in English and Maths, as well as other resources Maths, 13 October 2011 31
  • 32. Additional Achievements to Date Re Remedial Component Continued Grade 7 diagnostic tests in English and Maths, Maths, pre and post tests Technology Planning Workshops Closer monitoring and support – increased visits and cluster meetings Reinforcement teacher training More frequent reporting 13 October 2011 32
  • 33. Additional Achievements to Date Re Remedial Component Continued Involvement of Parents, Community, School Board Ensuring that the intervention interfaces seamlessly with the school’s remedial programme and the MOE’s Grade Seven Intervention Programme (GPIS) Volunteer Operation and Training Manuals developed, and volunteers identified, and training commenced 13 October 2011 33
  • 35. Content Resources Exciting Text Video- Video-taped lectures CD-ROMs CD- Database resources DVDs Interactive Software Power Point Item Bank Presentations Web- Web-based resources 13 October 2011 35
  • 36. EXAMPLE OF CONTENT RESOURCE PROVIDED October 11 36
  • 37. Equipment Resources Desk tops Digital Video Cameras Lap- Lap-tops DVD/CD Players Multimedia Projectors & Scanners Screens Televisions Interactive White Boards Network connectivity Document Cameras 13 October 2011 37
  • 38. ICT’s in use in project schools
  • 39. Trained Human Resources Teachers and lecturers trained to levels 1 and 2 in ICT skills (NVTVET) in Technology Integration (ISTE) – how to use the technology in instructional delivery General Characteristics of Technology Tools and their Uses Digital Devices Using the Internet for Research and Teaching Creating 2D and 3D Animations Using Internet Communication Tools Digital Stories Web Quests and Treasure Hunts Wikis Blogs Podcasts RSS Feeds 13 October 2011 39
  • 40. Trained Human Resources Trainer of trainers for both aspects System Administrators trained to manage and maintain the integrity of the network, at least 2 per school System Administration introduction Dell Equipment Orientation Network and Server Administration including Microsoft Server and Active directory School Network build out and Virus Management Advanced Microsoft System utilities Advanced Systems Problem Solving Web resources and Forum Masters level trained Instructional Technology Lecturers in the Colleges 13 October 2011 40
  • 41. Trained Human Resources 13 October 2011 41
  • 42. Intellectual Property Virtual Assets that have IP value Ideas Designs Images Instructional Materials Lessons Vignettes Stories Theses Power- Power-points 13 October 2011 42
  • 44. Cost of Investment Average investment per high school/teachers college Equipment and Networks and related training US$142,000 Materials and related training US$9000 Training (HEART and Mico) US$25,000 Additional US$11,635 per person for Masters training (15 lecturers) 13 October 2011 44
  • 45. Strategic Focus to March 2012 To provide equipment to remaining 4 high schools and additional 16 independent high schools and special equipment to special schools, To provide whiteboards and mobile labs to all schools To complete establishment of the CREM (MOU for Broadband signed in May 2011) 13 October 2011 45
  • 46. Strategic Focus to March 2012 To complete training and certification of teachers and lecturers, using the online application developed for the project To implement the technology enrichment programme to assist the selected schools in improving literacy and numeracy 13 October 2011 46
  • 47. Strategic Focus to March 2012 To roll-out Chemistry materials to remaining 150 schools roll- To complete sourcing and development of materials for additional 6 subjects To acquire/develop materials for grade 7-9 7- To increase the Item bank for grades 10&11 to 22,000, 2000 for each subject, and for grades 7-9 to 5,000, 1000 for each 7- 5,000, subject To trial various educational software in selected schools (literacy, numeracy, CAD) 13 October 2011 47
  • 48. Strategic Focus to March 2012 To handover elements of the project to MOE for institutionalization To develop Project #2 for Primary Schools To work with the schools to ensure proper Implementation and Resource Management strategies that seek to direct and control the use of resources to produce the best value from the investment and to ensure sustainability of the project interventions 13 October 2011 48
  • 49. IMPLEMENTATION/SUSTAINABILITY STRATEGIES School Inventory and Knowledge database being maintained, periodic audits conducted Support provided through website, telephone, e- e- mail, Chat, Blogs, field visits Service level agreement in place for all equipment Technical and operational guidelines / standards /best practices provided 13 October 2011 49
  • 50. SOME RESOURCE MANAGEMENT STRATEGIES 13 October 2011 50
  • 51. IMPLEMENTATION/SUSTAINABILITY STRATEGIES Infrastructure Project Manager to assist schools in identifying contractors and liaise between e-Ljam and the e- MOE Building Officers Framework contract with suppliers to supply goods over period of time and give latest technology Electrical Consultant to sign-off on building works and sign- electrical circuitry (paid for by MOE) Distinctive marking on equipment – logo on BIOS Training of System Administrators to ensure integrity of the school network October 11 51
  • 52. IMPLEMENTATION/SUSTAINABILITY STRATEGIES Subject Specialists hired to manage the acquisition and development of content Subject Advisory Groups, led by MOE Officer, established to sign off on standards and ensure quality of materials developed/acquired Cluster workshops on materials provided to ensure appropriate and effective usage Teachers Colleges being equipped to ensure on- on- going professional development of teachers, both pre-service and in-service pre- in- 13 October 2011 52
  • 53. IMPLEMENTATION/SUSTAINABILITY STRATEGIES School e-Learning Implementation Committee e- (SEIMC), comprising heads of departments , established to be responsible for the Steering/ Monitoring of the implementation of the project in the school Officers hired to monitor the implementation of the projects in the schools, includes regular visits and SEIMC cluster meetings for reinforcement /sharing / problem solving /monitoring, regular reporting MOE Officers part of the monitoring process 13 October 2011 53
  • 54. IMPLEMENTATION/SUSTAINABILITY STRATEGIES Brokering adequate insurance coverage for the schools to participate if desired Lobbying for posts of Systems Administrator and Instructional Technology Lecturer to be added to school/college establishment Locks being installed to safeguard computers at the schools (incidence of theft reported thirty (30) schools, valued at US $115,289.40) 13 October 2011 54
  • 55. IMPLEMENTATION/SUSTAINABILITY STRATEGIES Looking at a workable maintenance strategy, eg use of the HEART Trust and Community College network to provide maintenance services as indicated in MOE draft ICT Strategic Plan Support in planning for technology sustainability Fully automated help desk system 13 October 2011 55
  • 56. THE e-LEARNING PROJECT A Joint MITEC/MOEY Project The Network 13 October 2011 56
  • 57. Impact on Education System Will revolutionize every aspect of the school system teaching, learning, administration October 11 57
  • 58. Impact on Education System Teachers Greater proficiency in the use of ICTs by lecturers in the teachers colleges and high school teachers lesson planning, lesson delivery, student evaluation, marking, reporting, video presentations, communication, research, networking, accessing web-resources, etc web- Inexperienced teachers will have a pool of standard high- high- quality materials to draw from October 11 58
  • 59. Impact on Education System Teachers Better alignment between teacher communication methods and student interactive trends, eg Use of Webquest to stimulate inquiry-based learning inquiry- Use of interactive whiteboards to stimulate interactivity Use of video-cameras to stimulate creativity and video- innovation Difficult concepts can be dealt with more easily and more excitingly Content can be accessed to specifically deal with weaknesses identified from the Diagnostic tests October 11 59
  • 60. Impact on Education System Learners Quest for knowledge encouraged Increased interest in education Teaching/learning process more exciting, especially for students who learn ‘differently’ or are disabled Improved attendance at school Increased participation of parents thru Cable TV, broadcasts, Internet Contribution to improvement in passes at the school- school- leaving CXC CSEC examinations School-leavers more equipped for the 21st century work – School- ICT skills, research skills, problem-solving/decision- problem-solving/decision- making skills October 11 60
  • 61. USING THE INTERACTIVE WHITEBOARD
  • 62. Impact on Education System Administration Modernisation of school development planning Greater efficiency in school operation Improved decision-making since now data-driven decision- data- Increased and more efficient communication with stakeholders October 11 62
  • 63. Impact on Community/National Development Improvement in the quality of education between Grades 7-11 7- (Forms 1-5) in 188 high schools island-wide 1- island- School- School-leavers better suited to the 21st century world of work Creation of local expertise in development of digital material and other technology-driven industries, with the possibility of technology- exporting these services Greater appetite for internet and data-driven services data- Increased demand for affordable computers for teachers and students Project can be used as case study for project implementation nationally and regionally October 11 63
  • 65. THANK YOU Avrill Crawford CEO/Project Manager e-Learning Jamaica Company Limited 36 Trafalgar Road, Kingston 10, Jamaica Tel: 876-929-4044, Fax: 876-929-8676 E-mail: info@e-ljam.net Website: www.e-ljam.net.jm 13 October 2011 65