Bi-directional linkage between TIMES-Norway
and a power system model
73rd Semi-Annual ETSAP meeting
Chalmers University, 17.06.2018
Pernille Seljom & Eva Rosenberg – IFE
Linn Emelie Schäffer – SINTEF Energy Research
v
v
• Bi-directional linking between Energy system and Power system models
provide
• Consistency between models
• Improved decision support
• Literature dominated by Uni-directional linking
• No direct improvement of the energy system model
• Literature on bi-directional linking exclude parts of the energy system
• Do not utilise the strength of the energy system model!
• Novelty - Bi-directional linking of a complete energy system model
29.06.2018 2
Motivation
v
v
29.06.2018 3
TIMES-Norway
• Energy system model of Norway
• Coarse hydropower
Model characteristics
EMPS
• Power system model of Europe
• Detailed hydropower in NO & SE
Model parameter EMPS TIMES-Norway
Electricity capacity in Norway Exogenous Endogenous
Electricity demand in Norway Exogenous Endogenous
Electricity generation in Norway Endogenous Endogenous
Electricity prices in Norway Endogenous Endogenous
Electricity prices outside Norway Endogenous Exogenous
v
v
29.06.2018 4
• Detailed description of the hydropower
system
• Fine temporal and spatial resolution
• Stochastic - 58 historical weather years
• Optimization method
1. Water value calculation based on
aggregated system, stochastic
weather
2. Simulation with detailed disposal of
the hydropower system
EMPS - Multi area Power-market simulator
Historical inflow
years
v
v
29.06.2018 5
EMPS
• Consistent model input for Norway
• Electricity generation capacity
• Electricity demand
Motivation for linkage
TIMES-Norway
• Consistent electricity trade prices
• DK, SE, DE, NL, UK
• Improved hydropower
• Reservoir hydro
• Improved model results
v
v
29.06.2018 6
• Bi-directional linkage
• Complete energy system
• Convergence criteria
• Endogenous parameters in
both models
• Income rather than
production
• Novel methodology
Our linking strategy- TIMES-NO↔EMPS
Power system model
EMPS
Energy system model
TIMES-Norway
H
a
r
m
o
n
i
s
a
t
i
o
n
Convergence Results
No
Yes
A
C
C
D
B
v
v
29.06.2018 7
• A) TIMES-NO→ EMPS
• 2030 & 2050, by region
• Electricity capacity
• Transmission capacity
• Electricity demand
• B) EMPS → TIMES-NO
• 2030 & 2050, by region
• Electricity prices in Europe
• Hydropower production
• Week & spot price region
Our linking strategy- TIMES-NO↔EMPS
Power system model
EMPS
Energy system model
TIMES-Norway
H
a
r
m
o
n
i
s
a
t
i
o
n
Convergence Results
No
Yes
A
C
C
D
B
v
v
Result Comparison
• Hydropower production
• Hydropower income → Production x Price
• Hydropower sales Price → Income/ Production
29.06.2018 8
Iteration 1
Power system model
(EMPS-NO)
Energy system model
(TIMES-Norway)
Demand 1
Capacity 1
EMPS electricity
trade prices - 1
v
v
29.06.2018 9
1) Hydropower production 2050
-
500
1 000
1 500
2 000
2 500
3 000
3 500
4 000
4 500
1 11 21 31 41 51
Hydropowerproduciton,GWh/week
Week
Production TIMES L1 145.5 TWh
→ Different production profile & similar annual production
-
500
1 000
1 500
2 000
2 500
3 000
3 500
4 000
4 500
1 11 21 31 41 51
Hydropowerproduciton,GWh/week
Week
Production EMPS i1 145.1 TWh
-
500
1 000
1 500
2 000
2 500
3 000
3 500
4 000
4 500
1 11 21 31 41 51
Hydropowerproduciton,GWh/week
Week
Production TIMES L1 145.5 TWh
-
500
1 000
1 500
2 000
2 500
3 000
3 500
4 000
4 500
1 11 21 31 41 51
Hydropowerproduciton,GWh/week
Week
Production EMPS i1 145.1 TWh
v
v
29.06.2018 10
1) Hydropower income 2050
→ 10 % higher hydropower income in TIMES than EMPS
-
500
1 000
1 500
2 000
1 11 21 31 41 51
Hydropowerincome,mill.NOK
Week
TIMES L1 52 575 mill NOK
-
500
1 000
1 500
2 000
1 11 21 31 41 51
Hydropowerincome,mill.NOK
Week
EMPS i1 47 665 mill NOK
v
v
29.06.2018 11
1) Hydropower sales price 2050
→ 19 % higher hydropower average sales price in TIMES than EMPS
0
50
100
150
200
250
300
350
400
1 11 21 31 41 51
Electricityprice,NOK/kWh
Week
Price TIMES L1 361 NOK/kWh
0
50
100
150
200
250
300
350
400
1 11 21 31 41 51
Electricityprice,NOK/kWh
Week
Price EMPS i1 328 NOK/kWh
v
v
29.06.2018 12
Results- Hydropower in TIMES
• Results converge after iteration 2
• If convergence criteria is only related
to TIMES
• Linking = Successful ......
130
135
140
145
150
2030 2050
Production,TWh
1 2 3 4 5
-
20
40
60
80
2030 2050
Income,bill.NOK
1 2 3 4 5
-
100
200
300
400
500
600
2030 2050
SalespriceNOK/kWh
1 2 3 4 5
v
v
300
320
340
360
380
1 2 3 4 5
SalespriceNOK/kWh
Iteration
TIMES 2050
EMPS
29.06.2018 13
Results- Hydropower in TIMES & EMPS
• Income tend to converge !
• Differences between TIMES & EMPS
• Different model characteristics
• Lack of convergence
44 000
46 000
48 000
50 000
52 000
54 000
1 2 3 4 5
IncomemillNOK
Iteration
TIMES 2050
EMPS
v
v
29.06.2018 14
Results- TIMES electricity generation capacity 2050
• Wind capacity most
sensitive to the iteration
L1 L2 L3 L4
WIND 5.8 1.8 4.4 2.5
HYDRO 35.2 34.1 34.4 34.2
PV 8.2 8.2 8.2 8.2
CHP + GAS 0.5 0.5 0.5 0.5
0
10
20
30
40
50
60
Electricitygen.cap.,GW
CHP + GAS PV HYDRO WIND
v
v
29.06.2018 15
Results– TIMES elc. consumption and trade
120
125
130
135
140
145
150
1 2 3 4 5 1 2 3 4 5
2030 2050
Electricityconsumption,TWh
→ Export is more sensitive to the iteration than consumption
-10 -5 - 5 10 15 20 25
1
2
3
4
5
Net export from Norway in 2050, TWh
Iterationnumber
v
v
29.06.2018 16
Iteration comparison 1→ 5
Hydropower production 2050
v
v
29.06.2018 17
Iteration comparison 1→ 5 Hydro income 2050
-
500
1 000
1 500
2 000
1 11 21 31 41 51
Hydropowerincome,mill.NOK
Week
TIMES L1 52 575 mill NOK
-
500
1 000
1 500
2 000
1 11 21 31 41 51
Hydropowerincome,mill.NOK
Week
EMPS i1 47 665 mill NOK
-
500
1 000
1 500
2 000
1 11 21 31 41 51
Hydropowerincome,mill.NOK
Week
TIMES L5 48 440 mill NOK
-
500
1 000
1 500
2 000
1 11 21 31 41 51
Hydropowerincome,mill.NOK
Week
EMPS i5 47 950 mill NOK
v
v
• Bi-directional linkage between TIMES-Norway and EMPS provides
consistent and improved model results
• Electricity generation, including hydropower
• Electricity consumption and trade
• The results are highly converged after linking iteration 2
• Next steps
• How to further improve the linking?
• How to improve TIMES-Norway when operating alone?
29.06.2018 18
Concluding remarks
v
v
Thank you for your attention!
Pernille.Seljom@ife.no
19

More Related Content

What's hot

Policy Fair Poster - Molten Carbonate Fuel Cells for SAGD
Policy Fair Poster - Molten Carbonate Fuel Cells for SAGDPolicy Fair Poster - Molten Carbonate Fuel Cells for SAGD
Policy Fair Poster - Molten Carbonate Fuel Cells for SAGDJordan Robinson
 
Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE
Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE
Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE Ashish Verma
 
The Role of Storage in Smart Energy Systems | Henrik Lund
The Role of Storage in Smart Energy Systems | Henrik LundThe Role of Storage in Smart Energy Systems | Henrik Lund
The Role of Storage in Smart Energy Systems | Henrik Lundicarb
 
Why Energy Storage? | Grant Wilson
Why Energy Storage? | Grant WilsonWhy Energy Storage? | Grant Wilson
Why Energy Storage? | Grant Wilsonicarb
 
Emerging Scottish Policy to Promote Energy Storage | Chris Stark
Emerging Scottish Policy to Promote Energy Storage | Chris StarkEmerging Scottish Policy to Promote Energy Storage | Chris Stark
Emerging Scottish Policy to Promote Energy Storage | Chris Starkicarb
 
Keynote Interview: Texas as a U.S. Flagship for Energy Transition
Keynote Interview: Texas as a U.S. Flagship for Energy TransitionKeynote Interview: Texas as a U.S. Flagship for Energy Transition
Keynote Interview: Texas as a U.S. Flagship for Energy TransitionNicole Green
 
Energy-Water-Land Nexus in Germany: A case study
Energy-Water-Land Nexus in Germany: A case studyEnergy-Water-Land Nexus in Germany: A case study
Energy-Water-Land Nexus in Germany: A case studyIEA-ETSAP
 
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...IEA-ETSAP
 
Energy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsEnergy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsIEA-ETSAP
 
Presentation 2012.06.20 bce milan
Presentation 2012.06.20 bce milanPresentation 2012.06.20 bce milan
Presentation 2012.06.20 bce milanFlexigas_Site
 
Energy analysis using computer aided design
Energy analysis using computer aided designEnergy analysis using computer aided design
Energy analysis using computer aided designEric Brennan
 
Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030IEA-ETSAP
 
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...IEA-ETSAP
 
Case Study: Ensuring Security of Supply Through Flexibility
Case Study: Ensuring Security of Supply Through FlexibilityCase Study: Ensuring Security of Supply Through Flexibility
Case Study: Ensuring Security of Supply Through FlexibilityEMEX
 
Sam Chapman | Electricity Sensitivity
Sam Chapman | Electricity SensitivitySam Chapman | Electricity Sensitivity
Sam Chapman | Electricity Sensitivityicarb
 
Presentation by Benoit Ribesse, CEO of Engie Mongolia, on “Future Summit Tren...
Presentation by Benoit Ribesse, CEO of Engie Mongolia, on “Future Summit Tren...Presentation by Benoit Ribesse, CEO of Engie Mongolia, on “Future Summit Tren...
Presentation by Benoit Ribesse, CEO of Engie Mongolia, on “Future Summit Tren...The Business Council of Mongolia
 

What's hot (20)

Policy Fair Poster - Molten Carbonate Fuel Cells for SAGD
Policy Fair Poster - Molten Carbonate Fuel Cells for SAGDPolicy Fair Poster - Molten Carbonate Fuel Cells for SAGD
Policy Fair Poster - Molten Carbonate Fuel Cells for SAGD
 
Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE
Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE
Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE
 
The Role of Storage in Smart Energy Systems | Henrik Lund
The Role of Storage in Smart Energy Systems | Henrik LundThe Role of Storage in Smart Energy Systems | Henrik Lund
The Role of Storage in Smart Energy Systems | Henrik Lund
 
Why Energy Storage? | Grant Wilson
Why Energy Storage? | Grant WilsonWhy Energy Storage? | Grant Wilson
Why Energy Storage? | Grant Wilson
 
Emerging Scottish Policy to Promote Energy Storage | Chris Stark
Emerging Scottish Policy to Promote Energy Storage | Chris StarkEmerging Scottish Policy to Promote Energy Storage | Chris Stark
Emerging Scottish Policy to Promote Energy Storage | Chris Stark
 
Keynote Interview: Texas as a U.S. Flagship for Energy Transition
Keynote Interview: Texas as a U.S. Flagship for Energy TransitionKeynote Interview: Texas as a U.S. Flagship for Energy Transition
Keynote Interview: Texas as a U.S. Flagship for Energy Transition
 
Energy-Water-Land Nexus in Germany: A case study
Energy-Water-Land Nexus in Germany: A case studyEnergy-Water-Land Nexus in Germany: A case study
Energy-Water-Land Nexus in Germany: A case study
 
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
 
Energy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsEnergy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and Costs
 
CHP in Ireland 2014
CHP in Ireland 2014CHP in Ireland 2014
CHP in Ireland 2014
 
Presentation 2012.06.20 bce milan
Presentation 2012.06.20 bce milanPresentation 2012.06.20 bce milan
Presentation 2012.06.20 bce milan
 
NSW ggas scheme summary
NSW ggas scheme summaryNSW ggas scheme summary
NSW ggas scheme summary
 
Energy analysis using computer aided design
Energy analysis using computer aided designEnergy analysis using computer aided design
Energy analysis using computer aided design
 
Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030
 
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
 
Case Study: Ensuring Security of Supply Through Flexibility
Case Study: Ensuring Security of Supply Through FlexibilityCase Study: Ensuring Security of Supply Through Flexibility
Case Study: Ensuring Security of Supply Through Flexibility
 
Phillips Ch10 Ppt 1
Phillips Ch10 Ppt 1Phillips Ch10 Ppt 1
Phillips Ch10 Ppt 1
 
Sam Chapman | Electricity Sensitivity
Sam Chapman | Electricity SensitivitySam Chapman | Electricity Sensitivity
Sam Chapman | Electricity Sensitivity
 
2016 03-11 PHOTOVOLTAICS REPORT
2016 03-11 PHOTOVOLTAICS REPORT2016 03-11 PHOTOVOLTAICS REPORT
2016 03-11 PHOTOVOLTAICS REPORT
 
Presentation by Benoit Ribesse, CEO of Engie Mongolia, on “Future Summit Tren...
Presentation by Benoit Ribesse, CEO of Engie Mongolia, on “Future Summit Tren...Presentation by Benoit Ribesse, CEO of Engie Mongolia, on “Future Summit Tren...
Presentation by Benoit Ribesse, CEO of Engie Mongolia, on “Future Summit Tren...
 

Similar to Bi-directional linkage of TIMES-Norway and a power system model

Emission impacts of marginal electricity demand in France
Emission impacts of marginal electricity demand in FranceEmission impacts of marginal electricity demand in France
Emission impacts of marginal electricity demand in FranceIEA-ETSAP
 
Energy Efficiency Workshop - Powering Sydney
Energy Efficiency Workshop - Powering SydneyEnergy Efficiency Workshop - Powering Sydney
Energy Efficiency Workshop - Powering SydneyTransGrid AU
 
Hydrogen electrolyser capacity investment in the Australian context: optimiza...
Hydrogen electrolyser capacity investment in the Australian context: optimiza...Hydrogen electrolyser capacity investment in the Australian context: optimiza...
Hydrogen electrolyser capacity investment in the Australian context: optimiza...IEA-ETSAP
 
EFEU / FLEXe Antila Heli in the future it is more important when you use elec...
EFEU / FLEXe Antila Heli in the future it is more important when you use elec...EFEU / FLEXe Antila Heli in the future it is more important when you use elec...
EFEU / FLEXe Antila Heli in the future it is more important when you use elec...CLIC Innovation Ltd
 
Winners and losers of end-use flexibility in the Norwegian energy system
Winners and losers of end-use flexibility in the Norwegian energy systemWinners and losers of end-use flexibility in the Norwegian energy system
Winners and losers of end-use flexibility in the Norwegian energy systemIEA-ETSAP
 
ISO New England Slides Used During Jan 16, 2016 Webinar
ISO New England Slides Used During Jan 16, 2016 WebinarISO New England Slides Used During Jan 16, 2016 Webinar
ISO New England Slides Used During Jan 16, 2016 WebinarMarcellus Drilling News
 
Informing the debate around the role of hydrogen in net zero pathways for dif...
Informing the debate around the role of hydrogen in net zero pathways for dif...Informing the debate around the role of hydrogen in net zero pathways for dif...
Informing the debate around the role of hydrogen in net zero pathways for dif...IEA-ETSAP
 
Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...
Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...
Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...IEA-ETSAP
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Implementing Agreement (IA)
 
Linkage of TIMES with Power Dispatch Models and Network Optimization
Linkage of TIMES with Power Dispatch Models and Network OptimizationLinkage of TIMES with Power Dispatch Models and Network Optimization
Linkage of TIMES with Power Dispatch Models and Network OptimizationIEA-ETSAP
 
International approach – Is DSM the answer for intermittent renewable generat...
International approach – Is DSM the answer for intermittent renewable generat...International approach – Is DSM the answer for intermittent renewable generat...
International approach – Is DSM the answer for intermittent renewable generat...IEA DSM Implementing Agreement (IA)
 
UK Energy Review 2013
UK Energy Review 2013UK Energy Review 2013
UK Energy Review 2013Latif Faiyaz
 
Intégration des énergies renouvelables dans le réseau de Grande-Bretagne
Intégration des énergies renouvelables dans le réseau de Grande-BretagneIntégration des énergies renouvelables dans le réseau de Grande-Bretagne
Intégration des énergies renouvelables dans le réseau de Grande-BretagneThearkvalais
 
Clim2Power: Integrating climate data on highly resolved TIMES model
Clim2Power: Integrating climate data on highly resolved TIMES modelClim2Power: Integrating climate data on highly resolved TIMES model
Clim2Power: Integrating climate data on highly resolved TIMES modelIEA-ETSAP
 
Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20Stefan Larsson
 
Utilizing solar+storage to obviate natural gas peaker plants
Utilizing solar+storage to obviate natural gas peaker plants  Utilizing solar+storage to obviate natural gas peaker plants
Utilizing solar+storage to obviate natural gas peaker plants Clean Coalition
 
Energy systems & power systems modelling, Comparing Experiences in Ireland an...
Energy systems & power systems modelling, Comparing Experiences in Ireland an...Energy systems & power systems modelling, Comparing Experiences in Ireland an...
Energy systems & power systems modelling, Comparing Experiences in Ireland an...IEA-ETSAP
 

Similar to Bi-directional linkage of TIMES-Norway and a power system model (20)

RE‐INVEST project: Exploiting sector synergies and countries interconnections...
RE‐INVEST project: Exploiting sector synergies and countries interconnections...RE‐INVEST project: Exploiting sector synergies and countries interconnections...
RE‐INVEST project: Exploiting sector synergies and countries interconnections...
 
Emission impacts of marginal electricity demand in France
Emission impacts of marginal electricity demand in FranceEmission impacts of marginal electricity demand in France
Emission impacts of marginal electricity demand in France
 
Energy Efficiency Workshop - Powering Sydney
Energy Efficiency Workshop - Powering SydneyEnergy Efficiency Workshop - Powering Sydney
Energy Efficiency Workshop - Powering Sydney
 
Hydrogen electrolyser capacity investment in the Australian context: optimiza...
Hydrogen electrolyser capacity investment in the Australian context: optimiza...Hydrogen electrolyser capacity investment in the Australian context: optimiza...
Hydrogen electrolyser capacity investment in the Australian context: optimiza...
 
EFEU / FLEXe Antila Heli in the future it is more important when you use elec...
EFEU / FLEXe Antila Heli in the future it is more important when you use elec...EFEU / FLEXe Antila Heli in the future it is more important when you use elec...
EFEU / FLEXe Antila Heli in the future it is more important when you use elec...
 
Winners and losers of end-use flexibility in the Norwegian energy system
Winners and losers of end-use flexibility in the Norwegian energy systemWinners and losers of end-use flexibility in the Norwegian energy system
Winners and losers of end-use flexibility in the Norwegian energy system
 
ISO New England Slides Used During Jan 16, 2016 Webinar
ISO New England Slides Used During Jan 16, 2016 WebinarISO New England Slides Used During Jan 16, 2016 Webinar
ISO New England Slides Used During Jan 16, 2016 Webinar
 
Wind energy – challenges
Wind energy – challengesWind energy – challenges
Wind energy – challenges
 
Europe’s Future Energy System: Local, Smart & 100% Renewable
Europe’s Future Energy System: Local, Smart & 100% Renewable Europe’s Future Energy System: Local, Smart & 100% Renewable
Europe’s Future Energy System: Local, Smart & 100% Renewable
 
Informing the debate around the role of hydrogen in net zero pathways for dif...
Informing the debate around the role of hydrogen in net zero pathways for dif...Informing the debate around the role of hydrogen in net zero pathways for dif...
Informing the debate around the role of hydrogen in net zero pathways for dif...
 
Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...
Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...
Analysis of the role of energy storages in Germany with TIMES PanEU – methodo...
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
 
Linkage of TIMES with Power Dispatch Models and Network Optimization
Linkage of TIMES with Power Dispatch Models and Network OptimizationLinkage of TIMES with Power Dispatch Models and Network Optimization
Linkage of TIMES with Power Dispatch Models and Network Optimization
 
International approach – Is DSM the answer for intermittent renewable generat...
International approach – Is DSM the answer for intermittent renewable generat...International approach – Is DSM the answer for intermittent renewable generat...
International approach – Is DSM the answer for intermittent renewable generat...
 
UK Energy Review 2013
UK Energy Review 2013UK Energy Review 2013
UK Energy Review 2013
 
Intégration des énergies renouvelables dans le réseau de Grande-Bretagne
Intégration des énergies renouvelables dans le réseau de Grande-BretagneIntégration des énergies renouvelables dans le réseau de Grande-Bretagne
Intégration des énergies renouvelables dans le réseau de Grande-Bretagne
 
Clim2Power: Integrating climate data on highly resolved TIMES model
Clim2Power: Integrating climate data on highly resolved TIMES modelClim2Power: Integrating climate data on highly resolved TIMES model
Clim2Power: Integrating climate data on highly resolved TIMES model
 
Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20Future possibilities for utilization of solar energy serc 2009 05-20
Future possibilities for utilization of solar energy serc 2009 05-20
 
Utilizing solar+storage to obviate natural gas peaker plants
Utilizing solar+storage to obviate natural gas peaker plants  Utilizing solar+storage to obviate natural gas peaker plants
Utilizing solar+storage to obviate natural gas peaker plants
 
Energy systems & power systems modelling, Comparing Experiences in Ireland an...
Energy systems & power systems modelling, Comparing Experiences in Ireland an...Energy systems & power systems modelling, Comparing Experiences in Ireland an...
Energy systems & power systems modelling, Comparing Experiences in Ireland an...
 

More from IEA-ETSAP

Variable Renewable Energy in China's Transition
Variable Renewable Energy in China's TransitionVariable Renewable Energy in China's Transition
Variable Renewable Energy in China's TransitionIEA-ETSAP
 
The Nordics as a hub for green electricity and fuels
The Nordics as a hub for green electricity and fuelsThe Nordics as a hub for green electricity and fuels
The Nordics as a hub for green electricity and fuelsIEA-ETSAP
 
The role of Norwegian offshore wind in the energy system transition
The role of Norwegian offshore wind in the energy system transitionThe role of Norwegian offshore wind in the energy system transition
The role of Norwegian offshore wind in the energy system transitionIEA-ETSAP
 
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...IEA-ETSAP
 
Green hydrogen trade from North Africa to Europe: optional long-term scenario...
Green hydrogen trade from North Africa to Europe: optional long-term scenario...Green hydrogen trade from North Africa to Europe: optional long-term scenario...
Green hydrogen trade from North Africa to Europe: optional long-term scenario...IEA-ETSAP
 
Optimal development of the Canadian forest sector for both climate change mit...
Optimal development of the Canadian forest sector for both climate change mit...Optimal development of the Canadian forest sector for both climate change mit...
Optimal development of the Canadian forest sector for both climate change mit...IEA-ETSAP
 
Presentation on IEA Net Zero Pathways/Roadmap
Presentation on IEA Net Zero Pathways/RoadmapPresentation on IEA Net Zero Pathways/Roadmap
Presentation on IEA Net Zero Pathways/RoadmapIEA-ETSAP
 
Flexibility with renewable(low-carbon) hydrogen
Flexibility with renewable(low-carbon) hydrogenFlexibility with renewable(low-carbon) hydrogen
Flexibility with renewable(low-carbon) hydrogenIEA-ETSAP
 
Bioenergy in energy system models with flexibility
Bioenergy in energy system models with flexibilityBioenergy in energy system models with flexibility
Bioenergy in energy system models with flexibilityIEA-ETSAP
 
Reframing flexibility beyond power - IEA Bioenergy TCP
Reframing flexibility beyond power - IEA Bioenergy TCPReframing flexibility beyond power - IEA Bioenergy TCP
Reframing flexibility beyond power - IEA Bioenergy TCPIEA-ETSAP
 
Decarbonization of heating in the buildings sector: efficiency first vs low-c...
Decarbonization of heating in the buildings sector: efficiency first vs low-c...Decarbonization of heating in the buildings sector: efficiency first vs low-c...
Decarbonization of heating in the buildings sector: efficiency first vs low-c...IEA-ETSAP
 
The Regionalization Tool: spatial representation of TIMES-BE output data in i...
The Regionalization Tool: spatial representation of TIMES-BE output data in i...The Regionalization Tool: spatial representation of TIMES-BE output data in i...
The Regionalization Tool: spatial representation of TIMES-BE output data in i...IEA-ETSAP
 
Synthetic methane production prospective modelling up to 2050 in the European...
Synthetic methane production prospective modelling up to 2050 in the European...Synthetic methane production prospective modelling up to 2050 in the European...
Synthetic methane production prospective modelling up to 2050 in the European...IEA-ETSAP
 
Energy Transition in global Aviation - ETSAP Workshop Turin
Energy Transition in global Aviation - ETSAP Workshop TurinEnergy Transition in global Aviation - ETSAP Workshop Turin
Energy Transition in global Aviation - ETSAP Workshop TurinIEA-ETSAP
 
Integrated Energy and Climate plans: approaches, practices and experiences
Integrated Energy and Climate plans: approaches, practices and experiencesIntegrated Energy and Climate plans: approaches, practices and experiences
Integrated Energy and Climate plans: approaches, practices and experiencesIEA-ETSAP
 
Updates on Veda provided by Amit Kanudia from KanORS-EMR
Updates on Veda provided by Amit Kanudia from KanORS-EMRUpdates on Veda provided by Amit Kanudia from KanORS-EMR
Updates on Veda provided by Amit Kanudia from KanORS-EMRIEA-ETSAP
 
Energy system modeling activities in the MAHTEP Group
Energy system modeling activities in the MAHTEP GroupEnergy system modeling activities in the MAHTEP Group
Energy system modeling activities in the MAHTEP GroupIEA-ETSAP
 
Applying science fiction to approach the future
Applying science fiction to approach the futureApplying science fiction to approach the future
Applying science fiction to approach the futureIEA-ETSAP
 
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...IEA-ETSAP
 
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...IEA-ETSAP
 

More from IEA-ETSAP (20)

Variable Renewable Energy in China's Transition
Variable Renewable Energy in China's TransitionVariable Renewable Energy in China's Transition
Variable Renewable Energy in China's Transition
 
The Nordics as a hub for green electricity and fuels
The Nordics as a hub for green electricity and fuelsThe Nordics as a hub for green electricity and fuels
The Nordics as a hub for green electricity and fuels
 
The role of Norwegian offshore wind in the energy system transition
The role of Norwegian offshore wind in the energy system transitionThe role of Norwegian offshore wind in the energy system transition
The role of Norwegian offshore wind in the energy system transition
 
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
 
Green hydrogen trade from North Africa to Europe: optional long-term scenario...
Green hydrogen trade from North Africa to Europe: optional long-term scenario...Green hydrogen trade from North Africa to Europe: optional long-term scenario...
Green hydrogen trade from North Africa to Europe: optional long-term scenario...
 
Optimal development of the Canadian forest sector for both climate change mit...
Optimal development of the Canadian forest sector for both climate change mit...Optimal development of the Canadian forest sector for both climate change mit...
Optimal development of the Canadian forest sector for both climate change mit...
 
Presentation on IEA Net Zero Pathways/Roadmap
Presentation on IEA Net Zero Pathways/RoadmapPresentation on IEA Net Zero Pathways/Roadmap
Presentation on IEA Net Zero Pathways/Roadmap
 
Flexibility with renewable(low-carbon) hydrogen
Flexibility with renewable(low-carbon) hydrogenFlexibility with renewable(low-carbon) hydrogen
Flexibility with renewable(low-carbon) hydrogen
 
Bioenergy in energy system models with flexibility
Bioenergy in energy system models with flexibilityBioenergy in energy system models with flexibility
Bioenergy in energy system models with flexibility
 
Reframing flexibility beyond power - IEA Bioenergy TCP
Reframing flexibility beyond power - IEA Bioenergy TCPReframing flexibility beyond power - IEA Bioenergy TCP
Reframing flexibility beyond power - IEA Bioenergy TCP
 
Decarbonization of heating in the buildings sector: efficiency first vs low-c...
Decarbonization of heating in the buildings sector: efficiency first vs low-c...Decarbonization of heating in the buildings sector: efficiency first vs low-c...
Decarbonization of heating in the buildings sector: efficiency first vs low-c...
 
The Regionalization Tool: spatial representation of TIMES-BE output data in i...
The Regionalization Tool: spatial representation of TIMES-BE output data in i...The Regionalization Tool: spatial representation of TIMES-BE output data in i...
The Regionalization Tool: spatial representation of TIMES-BE output data in i...
 
Synthetic methane production prospective modelling up to 2050 in the European...
Synthetic methane production prospective modelling up to 2050 in the European...Synthetic methane production prospective modelling up to 2050 in the European...
Synthetic methane production prospective modelling up to 2050 in the European...
 
Energy Transition in global Aviation - ETSAP Workshop Turin
Energy Transition in global Aviation - ETSAP Workshop TurinEnergy Transition in global Aviation - ETSAP Workshop Turin
Energy Transition in global Aviation - ETSAP Workshop Turin
 
Integrated Energy and Climate plans: approaches, practices and experiences
Integrated Energy and Climate plans: approaches, practices and experiencesIntegrated Energy and Climate plans: approaches, practices and experiences
Integrated Energy and Climate plans: approaches, practices and experiences
 
Updates on Veda provided by Amit Kanudia from KanORS-EMR
Updates on Veda provided by Amit Kanudia from KanORS-EMRUpdates on Veda provided by Amit Kanudia from KanORS-EMR
Updates on Veda provided by Amit Kanudia from KanORS-EMR
 
Energy system modeling activities in the MAHTEP Group
Energy system modeling activities in the MAHTEP GroupEnergy system modeling activities in the MAHTEP Group
Energy system modeling activities in the MAHTEP Group
 
Applying science fiction to approach the future
Applying science fiction to approach the futureApplying science fiction to approach the future
Applying science fiction to approach the future
 
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
 
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
 

Recently uploaded

Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Servicesdollysharma2066
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 

Recently uploaded (20)

Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
 
Green Banking
Green Banking Green Banking
Green Banking
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 

Bi-directional linkage of TIMES-Norway and a power system model

  • 1. Bi-directional linkage between TIMES-Norway and a power system model 73rd Semi-Annual ETSAP meeting Chalmers University, 17.06.2018 Pernille Seljom & Eva Rosenberg – IFE Linn Emelie Schäffer – SINTEF Energy Research
  • 2. v v • Bi-directional linking between Energy system and Power system models provide • Consistency between models • Improved decision support • Literature dominated by Uni-directional linking • No direct improvement of the energy system model • Literature on bi-directional linking exclude parts of the energy system • Do not utilise the strength of the energy system model! • Novelty - Bi-directional linking of a complete energy system model 29.06.2018 2 Motivation
  • 3. v v 29.06.2018 3 TIMES-Norway • Energy system model of Norway • Coarse hydropower Model characteristics EMPS • Power system model of Europe • Detailed hydropower in NO & SE Model parameter EMPS TIMES-Norway Electricity capacity in Norway Exogenous Endogenous Electricity demand in Norway Exogenous Endogenous Electricity generation in Norway Endogenous Endogenous Electricity prices in Norway Endogenous Endogenous Electricity prices outside Norway Endogenous Exogenous
  • 4. v v 29.06.2018 4 • Detailed description of the hydropower system • Fine temporal and spatial resolution • Stochastic - 58 historical weather years • Optimization method 1. Water value calculation based on aggregated system, stochastic weather 2. Simulation with detailed disposal of the hydropower system EMPS - Multi area Power-market simulator Historical inflow years
  • 5. v v 29.06.2018 5 EMPS • Consistent model input for Norway • Electricity generation capacity • Electricity demand Motivation for linkage TIMES-Norway • Consistent electricity trade prices • DK, SE, DE, NL, UK • Improved hydropower • Reservoir hydro • Improved model results
  • 6. v v 29.06.2018 6 • Bi-directional linkage • Complete energy system • Convergence criteria • Endogenous parameters in both models • Income rather than production • Novel methodology Our linking strategy- TIMES-NO↔EMPS Power system model EMPS Energy system model TIMES-Norway H a r m o n i s a t i o n Convergence Results No Yes A C C D B
  • 7. v v 29.06.2018 7 • A) TIMES-NO→ EMPS • 2030 & 2050, by region • Electricity capacity • Transmission capacity • Electricity demand • B) EMPS → TIMES-NO • 2030 & 2050, by region • Electricity prices in Europe • Hydropower production • Week & spot price region Our linking strategy- TIMES-NO↔EMPS Power system model EMPS Energy system model TIMES-Norway H a r m o n i s a t i o n Convergence Results No Yes A C C D B
  • 8. v v Result Comparison • Hydropower production • Hydropower income → Production x Price • Hydropower sales Price → Income/ Production 29.06.2018 8 Iteration 1 Power system model (EMPS-NO) Energy system model (TIMES-Norway) Demand 1 Capacity 1 EMPS electricity trade prices - 1
  • 9. v v 29.06.2018 9 1) Hydropower production 2050 - 500 1 000 1 500 2 000 2 500 3 000 3 500 4 000 4 500 1 11 21 31 41 51 Hydropowerproduciton,GWh/week Week Production TIMES L1 145.5 TWh → Different production profile & similar annual production - 500 1 000 1 500 2 000 2 500 3 000 3 500 4 000 4 500 1 11 21 31 41 51 Hydropowerproduciton,GWh/week Week Production EMPS i1 145.1 TWh - 500 1 000 1 500 2 000 2 500 3 000 3 500 4 000 4 500 1 11 21 31 41 51 Hydropowerproduciton,GWh/week Week Production TIMES L1 145.5 TWh - 500 1 000 1 500 2 000 2 500 3 000 3 500 4 000 4 500 1 11 21 31 41 51 Hydropowerproduciton,GWh/week Week Production EMPS i1 145.1 TWh
  • 10. v v 29.06.2018 10 1) Hydropower income 2050 → 10 % higher hydropower income in TIMES than EMPS - 500 1 000 1 500 2 000 1 11 21 31 41 51 Hydropowerincome,mill.NOK Week TIMES L1 52 575 mill NOK - 500 1 000 1 500 2 000 1 11 21 31 41 51 Hydropowerincome,mill.NOK Week EMPS i1 47 665 mill NOK
  • 11. v v 29.06.2018 11 1) Hydropower sales price 2050 → 19 % higher hydropower average sales price in TIMES than EMPS 0 50 100 150 200 250 300 350 400 1 11 21 31 41 51 Electricityprice,NOK/kWh Week Price TIMES L1 361 NOK/kWh 0 50 100 150 200 250 300 350 400 1 11 21 31 41 51 Electricityprice,NOK/kWh Week Price EMPS i1 328 NOK/kWh
  • 12. v v 29.06.2018 12 Results- Hydropower in TIMES • Results converge after iteration 2 • If convergence criteria is only related to TIMES • Linking = Successful ...... 130 135 140 145 150 2030 2050 Production,TWh 1 2 3 4 5 - 20 40 60 80 2030 2050 Income,bill.NOK 1 2 3 4 5 - 100 200 300 400 500 600 2030 2050 SalespriceNOK/kWh 1 2 3 4 5
  • 13. v v 300 320 340 360 380 1 2 3 4 5 SalespriceNOK/kWh Iteration TIMES 2050 EMPS 29.06.2018 13 Results- Hydropower in TIMES & EMPS • Income tend to converge ! • Differences between TIMES & EMPS • Different model characteristics • Lack of convergence 44 000 46 000 48 000 50 000 52 000 54 000 1 2 3 4 5 IncomemillNOK Iteration TIMES 2050 EMPS
  • 14. v v 29.06.2018 14 Results- TIMES electricity generation capacity 2050 • Wind capacity most sensitive to the iteration L1 L2 L3 L4 WIND 5.8 1.8 4.4 2.5 HYDRO 35.2 34.1 34.4 34.2 PV 8.2 8.2 8.2 8.2 CHP + GAS 0.5 0.5 0.5 0.5 0 10 20 30 40 50 60 Electricitygen.cap.,GW CHP + GAS PV HYDRO WIND
  • 15. v v 29.06.2018 15 Results– TIMES elc. consumption and trade 120 125 130 135 140 145 150 1 2 3 4 5 1 2 3 4 5 2030 2050 Electricityconsumption,TWh → Export is more sensitive to the iteration than consumption -10 -5 - 5 10 15 20 25 1 2 3 4 5 Net export from Norway in 2050, TWh Iterationnumber
  • 16. v v 29.06.2018 16 Iteration comparison 1→ 5 Hydropower production 2050
  • 17. v v 29.06.2018 17 Iteration comparison 1→ 5 Hydro income 2050 - 500 1 000 1 500 2 000 1 11 21 31 41 51 Hydropowerincome,mill.NOK Week TIMES L1 52 575 mill NOK - 500 1 000 1 500 2 000 1 11 21 31 41 51 Hydropowerincome,mill.NOK Week EMPS i1 47 665 mill NOK - 500 1 000 1 500 2 000 1 11 21 31 41 51 Hydropowerincome,mill.NOK Week TIMES L5 48 440 mill NOK - 500 1 000 1 500 2 000 1 11 21 31 41 51 Hydropowerincome,mill.NOK Week EMPS i5 47 950 mill NOK
  • 18. v v • Bi-directional linkage between TIMES-Norway and EMPS provides consistent and improved model results • Electricity generation, including hydropower • Electricity consumption and trade • The results are highly converged after linking iteration 2 • Next steps • How to further improve the linking? • How to improve TIMES-Norway when operating alone? 29.06.2018 18 Concluding remarks