Ce diaporama a bien été signalé.
Le téléchargement de votre SlideShare est en cours. ×

Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon

Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité

Consultez-les par la suite

1 sur 13 Publicité

Plus De Contenu Connexe

Diaporamas pour vous (20)

Similaire à Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon (20)

Publicité

Plus par IPPAI (20)

Publicité

Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon

  1. 1. Ken Dragoon k.dragoon@flinkenergy.com June 2015 Can the dream of 100% renewable energy be a reality? Power System Flexibility Strategic Roadmap www.flinkenergy.com
  2. 2. Not Just a Dream! 2
  3. 3. Flexibility Strategic Roadmap 3 Report on transforming power systems of today to power systems deriving most or all of their energy from variable renewable energy sources (VRES). • Draft being revised per Advisory Panel comments. • Funding from European Copper Institute. Available from: http://www.leonardo- energy.org/white-paper/power-system- flexibility-strategic-roadmap Power System Flexibility Strategic Roadmap Preparing power systems to supply reliable power from variable energy resources !!
  4. 4. Three Main Challenges 4 • Depending primarily on renewable resources requires the ability to: 1. Adjust demand and supply rapidly enough to maintain stable and reliable service. 2. Fill in during times of low renewable output 3. Absorb energy in a useful way in the more frequent and intensive times of abundance • Flexibility is the ability of a power system to maintain reliable service under potentially rapidly changing supply and demand conditions. Wind in BPA’s system Wind Thermal
  5. 5. Why a 100% VRES power system scenario? • VRES become competitive, and are gaining a central role in future scenarios • Relying on energy from VRES will require transforming the way power systems are planned and operated. • The “end game” scenario serves as a basis for understanding the challenges • Flexibility is key to enabling this transition-- First step is making more efficient use of what we already have. 29/07/2015 5
  6. 6. Seven Keys to Power System Flexibility 1. Exploit flexibility and energy storage inherent in demand (prosumers) 2. Enable liquid, expanded and close-to- real-time power markets 3. Control VRES generators to provide grid support services 4. Institute price incentives or mechanisms that reflect the value of both flexibility and the diversity-related benefits in the development variable resources. 5. Deploy bulk energy storage to cover longer periods (weeks to months) of low renewable energy supply. 6. Develop smart grids for coordination of flexible resources across voltage levels 7. Establish new electric energy uses to capitalize on the surplus energy events 29/07/2015 6 100% VRES Power System 1. DSM 2. Power Markets 3. VRES control 4. Resource Diversity 5. Energy Storage 6. Smart Grid 7. Surplus Energy
  7. 7. Primary Energy Storage Electric Energy Storage Broader View of Grid Energy Storage 7
  8. 8. Three Part Transformation 29/07/2015 8 Near Term Long TermNear Term 10% 50% 100% - Enhance markets - Review grid codes - DSM demos - Establish RE development Zones (REZs) - Plan phase out of inflexible resources. - Market reform: shorter trading periods, ancillary services markets, market consolidation, DSM and DER participation, reflect incidents of low wholesale prices at retail level. - Greater coordination and optimization at distribution level. - Renewables provide ancillary services - Transmission and distribution system coordination, dynamic transmission path ratings, strategic transmission expansion to REZs - Strategic energy storage investments and improved valuation techniques - Begin phase out of inflexible units - Implement large scale use of surplus electric generation - Grid support transition from conventional generation to VRES, demand resources and storage - Implement non-fossil fuels to conventional resources or long-term storage options to bridge period of low VRES energy supply - Implement solutions for stable system operation with reduced share of synchronous generators Penetrationlevel
  9. 9. Roadmap summary • Depending primarily on variable resources is technically feasible, and actions need to be taken to minimize costs. • Transformation in three parts: 1. Near Term, lower penetration levels in which integration costs can be minimized with relatively modest changes to existing practices. 2. Mid Term, higher penetration levels, characterized by exploiting the system's available flexibility and storage on both the production and consumption sides-- making more efficient use of surplus energy. 3. Long Term, highest penetration levels, characterized by a system where markets are dominated by storage and flexibility services and where bulk energy storage and efficient use of surplus energy become primary focuses. 29/07/2015 9
  10. 10. Next Steps • Finalizing paper, addressing issues raised by advisory panel. • Publicize the report to planners and policy makers interested in increasing role of variable renewable resources in their power systems. • Research market for flexibility tracker to rate power system’s progress toward achieving the needed flexibility. 10
  11. 11. Thank You! 29/07/2015 11 Audi Methane Production Plant
  12. 12. Key flexibility challenges Near-term Regime Integrating low VRES levels Reserve requirements Distribution networks start hosting DER Integrate DG Mid-term Regime Penetration in the 50% range Market incentives and harnessing flexibility Demand side flexibility Managing distribution networks Transmission network changes Market and system operation changes Energy storage Long-term Regime Very high penetrations Supplying Power During Low-Availability Periods Efficient Use of High- Availability Period Energy Stable Operation with Non-synchronous Generation 29/07/2015 12
  13. 13. Flexibility Roadmap 29/07/2015 13 WHY? Introduction and Purpose VISION Power System Flexibility Vision CHALLENGES Key Flexibility Challenges ACTIONS Policy and Institutional Frameworks ROADMAP SUMMARY

Notes de l'éditeur

  • Diversity helps, but there will always be gaps.
    The $2 billion pumped storage project with 6 hours storage will make a very small dent in the chart on this slide.
  • Info
  • Decarbonizing the grid is part of the “Power to Fuels” track on the chart.
  • Issues raised: Blackstart capability, difficulty of expanding transmission both physically and in connecting markets.
    Interesting overlap between interest in power system resiliency and providing flexibility.
  • Info on the project: started last year, in first round we made a ‘beta’ version which we posted online and the the AG and received feedback.
    In parallel we also made a survey in the AG members

×