SlideShare une entreprise Scribd logo
1  sur  8
Télécharger pour lire hors ligne
Value Added Elements
 Estimations of Product-wise Demand
for Steel in Power Projects
 Exclusive Coverage on Market of
Special Steel (CRGO/CRNO);
Seamless Pipes & Tubes in India
 Market Sizing of Steel Products and
Equipment for Indian Power Sector
 Equipment Requirement Portfolio in
Power Sector Projects
 Illustrating linkages of Sustainability
and Environment Friendly Steel
Solutions in Power sector
 Detailed Profiling of Power Projects to
come up till 2017 in India
Renewable
Power
Hydro
Power
Thermal
Power
Steel Demand in Power Sector Projects 2017
Market sizing and Opportunity Assessment
May 2014
Industry First
Report
Infraline Business Series Report
Steel & Power Sector: A Correlation
With continued growth in India’s infrastructure sector, the growth in power sector shall be
palpable, with expert estimates suggesting that for every one percent increase in GDP, power
generation would need to increase by one percent. The government, in its 12th Five Year Plan, has set
a target of adding 88,537 MW of power generation capacity with an estimated total fund requirement
of more than INR 13.55 lakh crore (USD 225 Billion) for power generation; transmission and
distribution.
51%
69%
41.3
78.7
88.5
0%
50%
100%
150%
0
50
100
Tenth Plan Eleventh Plan Twelfth Plan (E)
Actual Achievement (in %)
Target Capacity Additions (in GW)
In FY17, the share of power sector (excluding renewable energy sources) in total steel
demand is expected to rise by more than 50 percent from FY12
Steel aficionados understand that steel shall be an indispensable input for green-field as well
brownfield power plant capacities, owing to high capital investments in power sector. This is
because the application of steel is widespread in the power plant; from boilers; turbines;
transformers; generators; power transmission towers and cables to a variety of components
used in renewable energy technologies such as solar and wind energy.
Power Generation Capacity Additions
92
119
129
140
149
80
110
140
FY13 FY14 FY15 FY16 FY17
Projected Crude Steel Capacity in 12th FYP
Capacity Additions
Structural Steel
Structural steel remains the default material in building power
plant equipments. Its major application in a power project is in
building turbines, generators, boilers, pumping
stations, cooling towers, control panels etc.
Reinforcement Steel
Reinforcement steels include rods and bars and are primarily
used for reinforcement of concrete structure.
Pipes & Tubes
Seamless tubes and pipes are used in boilers and heat
exchangers, areas where a significant amount of fluid transfer
is required.
Electrical Steel
Electrical Steel primarily comprises of two steel products i.e.
Cold Rolled Grain Oriented (CRGO) Steel and Cold Rolled
Non Grain Oriented (CRNO) Steel.
Steel pipes and tubes comprise of about 15%
of the total steel requirement of a thermal
power plant.
CRGO steel finds applications in
manufacturing power transformer cores, and
CRNO steel is suitable for moving parts in
generators and motors.
As per CEA norms for Steel used in hydro
power sector - 93 tons of reinforcement steel
are used in per MW of hydropower project.
Plates and sheets comprise of about 40% of
the total steel requirement of a coal Base
thermal power plant.
Assessment of power sector steel demand essentially
requires an in-depth study of the electrical equipment (EE)
market of India as EE manufacturers are the major direct
finished steel consumers with product sales largely
dependent on power sector growth plans.
The envisioned growth of power sector for 12th Plan period
is expected to entail exponential demand for electrical
equipment. Presently, the domestic electrical equipment
industry is worth INR 120,200 crores (UDS 20 Billion) with
1/4th share captured by generation equipment -
Boiler, Turbines & Generators and the remaining by T&D.
0
50
100
150
200
250
300
FY12 FY17
BTG Equipment T&D Equipment
263
120.2
As per IEEMA estimates, the production of major electrical
equipment has grown from INR 38,920 crore in 2006-07 to INR
64,235 crore in 2011-12 at a CAGR of 10.5 % while the
production of BTG equipment has increased from INR 8,933
crores in 2006-07 to INR 31,000 crores in 2011-12 at a CAGR
of 28.3%.
Source: EE Industry Mission Plan, Department of
Heavy Industries, GoI
Equipment Industry Size
(in INR ‘000 crore)
Steel Applicability in Power Sector
Growth in Equipment Industry to Drive
Steel Demand
Infraline’s Initiative
Objective 1:
Shortlisting
Power Projects
to be
commissionedin
12th FYP
Objective 2:
Estimating equipment
requirement for
proposedpower projects
Objective 3:
Estimating
Product wise steel
requirements for
the power sector
till FY17
In view of the growing capacity addition of steel
in power sector, InfralineEnergy is launching
India’s first ever Business Series Report on
“Steel Demand in Power Sector Projects
2017: Market sizing and Opportunity
Assessment”. Equipped with Infraline’s
expertise in the energy and steel domains, this
in-depth report, covering analytical models and
primary research elements, would primarily
investigate the application of various steel
products in the power generation and
transmission sector with a core objective of
estimating the future growth in product-wise
steel demand for the sector.
Recommendations have also been provided
with respect to the emerging area of
environment friendly steel solutions for the
power generation.
The aim of this
research is to
analyze steel’s
role in power
sector in 12th
FYP
 Equipment Portfolio for Power Plant Installation
(Coal, Gas, Hydro, Wind and Solar)
 Highlights of Major Steel Products Requirement by Power Plants
 Profiles of Major Equipment Manufacturers and Steel Producers
 Opportunities for Power Equipment Suppliers and Steel Players
 Estimates of Upcoming Power Capacity till 2017
 Coverage on Renewable Capacity Additions with Special Focus
on Solar and Wind Energy
Pivotal Features
of the Study
 Which products of steel would be in high demand by the Indian power sector?
 Which power projects are expected to be commissioned by FY17?
 What will be the generation and transmission equipment portfolio demanded by FY17?
 What is the level of India’s indigenous capabilities in steel production (in terms of satisfying power
sector demand)?
 Do new opportunities exist for steel players in expanding their product portfolios to satisfy specific
demands of emerging renewable energy technologies?
 What kind of opportunities exist for steel producers to attract more revenue from the envisaged
power sector growth in 12th FYP?
 What are the different product offerings by domestic players in Indian steel market?
Key Questions Answered
Research Process
Key
Sources
Market
Research
Literature
Review
Industry
Interaction
In-house
Expertise
Survey Questionnaire and
Telephonic Interviews of Players in
Power & Steel Sector
FacetoFaceMeetingsand
PersonalInterviewsofcoal
SectorStakeholders
Power&SteelSector
Reports,Journals,Magazines,
MinisterialDocuments,Infraline
Database
In-house Analysis and Focus Groups
1
2
3
4
Indian Power Project Developers
Steel Producers
Steel Traders
Equipment Manufacturers
Power Transmission Utilities
Shipping Companies
Project Management Companies
Government Agencies
Project Financers
Investment Bankers
Research & Educational Institutes
Risk Managers
Consulting and EPC companies
A Must Buy For
 Increased Import Duties on Special Steel and Resulting Impact on Equipment Manufacturers
 Continuous Rise in Threat from International Steel Supplier
 International Equipment Suppliers Preferred over Domestic Players
 Strategic collaboration for indigenous development of Special steel Technology
Business Case Studies
EXECUTIVE SUMMARY
1. Steel in Power Industry Landscape: Status Quo
1.1 Steel Intensiveness in Power Sector
1.2 The Indian Steel Industry: Indigenous Capabilities
and Trends
1.2.1 Historical Production and Trade Trends
1.2.2 Product-wise Steel Availability in India
1.3.3 Steel Capacity addition under 12th FYP
1.2.3 Player-wise offerings for Power Sector
1.3 The Indian Power Sector – Growth Story and
Future Plans
1.3.1 Historical Planned and Achieved Capacity
Additions
1.3.2 Electricity Demand-Supply Dynamics in 11th
FYP
1.3.3 Power Capacity Addition under 12th FYP
1.4 Specific Steel Requirements of Power Sector
2. Capacity Addition in Indian power sector till FY17: A
Latest Assessment
2.1. Power Sector Transition in the Past Five Years
2.1.1 Transition in Fuel Usage
2.1.2 Transition in sector-wise capacity addition
2.1.3 Transition in Power Generation Technology
2.2 Under Construction Indian Power Projects till FY17
2.2.1 Under-Construction Thermal power projects
2.2.2. Under-Construction Hydro power projects: By
state and Capacity
2.2.3 Under-Construction Renewable power projects:
SHP, Solar and Wind
2.2.3 Upcoming Power Transmission projects
2.3 Project Execution Challenges and Key Issues in
Indian Power Projects
3. Steel Applicability in Power Equipments
3.1 Equipment Portfolio and Steel Requirements for
Power Generation Projects
3.1.1 Thermal Power Plant
3.1.2 Hydro Power Plant
3.2 Equipment Portfolio and Steel Requirements for
Renewable Power Generation Projects
3.2.1 Solar Power Plant
3.2.2 Wind Power Plant
3.3 Equipment Portfolio for Power Transmission
Projects
4. Estimating Steel Potential in Indian Power Sector
till FY17: End use Demand forecasting Modelling
4.1 Power Sector Steel Demand Projections till FY17
4.1.1 Thermal Power Projects
4.1.2 Hydro Power Projects
4.1.3 Renewable Power Projects (Wind and Solar)
4.1.4 Power Transmission Projects
4.2 Summarization of Power Sector Steel Demand in the
12th FYP
4.3 Steel Product-wise Production Estimates till FY17
4.4 Infraline’s Market Sizing
4.4.1 Market sizing for steel products
4.4.2 Market sizing for power equipment
5. Electrical Steel (CRGO/ CRNO) : Influence on the
Indian Power Sector
5.1 International Scenario for Electrical Steel
5.2 Electrical Steel Technological Complexities
5.3 Demand Estimates for Electrical steel in Indian Power
Sector
5.4 Electrical Steel Import Burden on the Power Sector
5.5 Government Initiatives for Developing Indigenous
Capabilities
6. Seamless Pipes and Tubes: An Untapped Potential
6.1 Market Trends and Forecast till FY17
6.1.1 Domestic Production Trends
6.1.2 Imports Trends
6.1.3 Domestic Production Forecast
6.2 Applications in Power Sector
6.3 Major Players in Indian Market
(Maharashtra Seamless, ISMT, BHEL, Jindal Saw)
6.4 Foremost Sourcing Options
7. Steel Solutions for a Cleaner Environment
7.1 Winds of Positive Outlook for Steel Demand
7.1.1 Steel usage in Wind power plant
7.1.2 Steel demand in Indian Wind energy sector
7.2 Steel outlook for Indian Solar Sector
7.2.1 Steel Usage in Solar Power Pant
7.2.2 Steel demand in Indian solar manufacturing
market
7.3. Environment -friendly Steel Solutions for Power
Sector
7.3.1 Support for Recyclability and Reusability of Steel
7.3.2 Environmental concerns of coated steel sheets
7.3.3 Sustainable steel offering for the Power sector
Contents & Coverage
Additional Data Points:
1. Competitive Landscape: Benchmarking Steel
Manufacturers & Power Equipment Manufacturers
a) Key Business Statistics
b) Financial Profiling
2. List of under construction Thermal Power Projects in
India with their anticipated date of commissioning
Note: TDS will not be deducted.
In case of payments to be made in USD, Euro, GBP the conversion rates on the date of purchase
will be applicable.
Making the Payment
Payment in Indian Rupees (INR): We accept Cheques / Demand Draft. However, we prefer payment
through RTGS.
Account Name Infraline Technologies India Pvt. Ltd
Account Type Current Account
Account No. 503011022657
Bank Branch IFSC Code VYSA0005030
Name of Bank ING Vysya
Address ING Vysya Bank Ltd. Ground Floor Narain Manzil,
Barakhamba Road, New Delhi-110 001
Payment through Cheques / Demand Draft: Payment should be made in favour of 'Infraline Technologies
(India) Private Limited' through Cheques / DD payable at New Delhi (or 'at Par' cheques) and send it to the
below mentioned address.
For Payments in Foreign Currency
Through Wire Transfer: The wire transfer instructions are available at
http://www.infraline.com/WreTransferlnstructions.htm
Through Credit Card: We accept Visa, Master, Amex Cards and all major Net Banking cards. Additional
7% Gateway processing charge applicable along with additional shipping/courier charges.
For Sales & Support
Ravinder Nagar
ravinder.nagar@infraline.com
+91 11 46250027
For Research & Consulting
Ashima Tyagi
ashima.tyagi@infraline.com
+91 11 42425198
14th Floor, Atmaram House, 1, Tolstoy Road, Connaught Place,
New Delhi- 110001, India
Tel +91 11 46250027 (D), 46250000, Fax +91 11 46250099
Email ravinder.nagar@infraline.com, reports@infraline.com
For more details, visit
http://store.infraline.com
Pricing Options
Report Publications (Hard Bound) INR 50,000 only
Report Electronic Version (Single User License) INR 40,000 + Service Tax
Report Electronic Version (Corporate License) INR 1,50,000 + Service Tax
Payment Options
14th Floor, Atmaram House,1, Tolstoy Road, Connaught Place, New Delhi - 110001, India
Tel +91 11 46250000 (B), Fax +91 11 46250099
Email rs@infraline.com

Contenu connexe

Plus de Infraline Energy

InfralineEnergy | Solar Irrigation Pumps in India : Market Potential
InfralineEnergy | Solar Irrigation Pumps in India : Market PotentialInfralineEnergy | Solar Irrigation Pumps in India : Market Potential
InfralineEnergy | Solar Irrigation Pumps in India : Market PotentialInfraline Energy
 
4th Annual Conference on Global Domestic Coal Outlook : Need for logistics op...
4th Annual Conference on Global Domestic Coal Outlook : Need for logistics op...4th Annual Conference on Global Domestic Coal Outlook : Need for logistics op...
4th Annual Conference on Global Domestic Coal Outlook : Need for logistics op...Infraline Energy
 
Water & Waste Water Treatment Market in India - 2013
Water & Waste Water Treatment Market in India - 2013Water & Waste Water Treatment Market in India - 2013
Water & Waste Water Treatment Market in India - 2013Infraline Energy
 
Energy Infrastructure in India : A Reference Book
Energy Infrastructure in India : A Reference BookEnergy Infrastructure in India : A Reference Book
Energy Infrastructure in India : A Reference BookInfraline Energy
 
Conference on Waste to Energy in India : Opportunities and Challenges on 29th...
Conference on Waste to Energy in India : Opportunities and Challenges on 29th...Conference on Waste to Energy in India : Opportunities and Challenges on 29th...
Conference on Waste to Energy in India : Opportunities and Challenges on 29th...Infraline Energy
 
Conference on Unconventional Hydrocarbon Resources on 13th March in New Delhi.
Conference on Unconventional Hydrocarbon Resources on 13th March in New Delhi.Conference on Unconventional Hydrocarbon Resources on 13th March in New Delhi.
Conference on Unconventional Hydrocarbon Resources on 13th March in New Delhi.Infraline Energy
 
Conference on Acquisition Opportunities for Power Generation Assets in India ...
Conference on Acquisition Opportunities for Power Generation Assets in India ...Conference on Acquisition Opportunities for Power Generation Assets in India ...
Conference on Acquisition Opportunities for Power Generation Assets in India ...Infraline Energy
 
Power T&D Expo 2014 Brochure
Power T&D Expo 2014 BrochurePower T&D Expo 2014 Brochure
Power T&D Expo 2014 BrochureInfraline Energy
 

Plus de Infraline Energy (8)

InfralineEnergy | Solar Irrigation Pumps in India : Market Potential
InfralineEnergy | Solar Irrigation Pumps in India : Market PotentialInfralineEnergy | Solar Irrigation Pumps in India : Market Potential
InfralineEnergy | Solar Irrigation Pumps in India : Market Potential
 
4th Annual Conference on Global Domestic Coal Outlook : Need for logistics op...
4th Annual Conference on Global Domestic Coal Outlook : Need for logistics op...4th Annual Conference on Global Domestic Coal Outlook : Need for logistics op...
4th Annual Conference on Global Domestic Coal Outlook : Need for logistics op...
 
Water & Waste Water Treatment Market in India - 2013
Water & Waste Water Treatment Market in India - 2013Water & Waste Water Treatment Market in India - 2013
Water & Waste Water Treatment Market in India - 2013
 
Energy Infrastructure in India : A Reference Book
Energy Infrastructure in India : A Reference BookEnergy Infrastructure in India : A Reference Book
Energy Infrastructure in India : A Reference Book
 
Conference on Waste to Energy in India : Opportunities and Challenges on 29th...
Conference on Waste to Energy in India : Opportunities and Challenges on 29th...Conference on Waste to Energy in India : Opportunities and Challenges on 29th...
Conference on Waste to Energy in India : Opportunities and Challenges on 29th...
 
Conference on Unconventional Hydrocarbon Resources on 13th March in New Delhi.
Conference on Unconventional Hydrocarbon Resources on 13th March in New Delhi.Conference on Unconventional Hydrocarbon Resources on 13th March in New Delhi.
Conference on Unconventional Hydrocarbon Resources on 13th March in New Delhi.
 
Conference on Acquisition Opportunities for Power Generation Assets in India ...
Conference on Acquisition Opportunities for Power Generation Assets in India ...Conference on Acquisition Opportunities for Power Generation Assets in India ...
Conference on Acquisition Opportunities for Power Generation Assets in India ...
 
Power T&D Expo 2014 Brochure
Power T&D Expo 2014 BrochurePower T&D Expo 2014 Brochure
Power T&D Expo 2014 Brochure
 

Dernier

Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxran17april2001
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 

Dernier (20)

Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptx
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 

Steel Demand in Power Sector Projects 2017

  • 1. Value Added Elements  Estimations of Product-wise Demand for Steel in Power Projects  Exclusive Coverage on Market of Special Steel (CRGO/CRNO); Seamless Pipes & Tubes in India  Market Sizing of Steel Products and Equipment for Indian Power Sector  Equipment Requirement Portfolio in Power Sector Projects  Illustrating linkages of Sustainability and Environment Friendly Steel Solutions in Power sector  Detailed Profiling of Power Projects to come up till 2017 in India Renewable Power Hydro Power Thermal Power Steel Demand in Power Sector Projects 2017 Market sizing and Opportunity Assessment May 2014 Industry First Report Infraline Business Series Report
  • 2. Steel & Power Sector: A Correlation With continued growth in India’s infrastructure sector, the growth in power sector shall be palpable, with expert estimates suggesting that for every one percent increase in GDP, power generation would need to increase by one percent. The government, in its 12th Five Year Plan, has set a target of adding 88,537 MW of power generation capacity with an estimated total fund requirement of more than INR 13.55 lakh crore (USD 225 Billion) for power generation; transmission and distribution. 51% 69% 41.3 78.7 88.5 0% 50% 100% 150% 0 50 100 Tenth Plan Eleventh Plan Twelfth Plan (E) Actual Achievement (in %) Target Capacity Additions (in GW) In FY17, the share of power sector (excluding renewable energy sources) in total steel demand is expected to rise by more than 50 percent from FY12 Steel aficionados understand that steel shall be an indispensable input for green-field as well brownfield power plant capacities, owing to high capital investments in power sector. This is because the application of steel is widespread in the power plant; from boilers; turbines; transformers; generators; power transmission towers and cables to a variety of components used in renewable energy technologies such as solar and wind energy. Power Generation Capacity Additions 92 119 129 140 149 80 110 140 FY13 FY14 FY15 FY16 FY17 Projected Crude Steel Capacity in 12th FYP Capacity Additions
  • 3. Structural Steel Structural steel remains the default material in building power plant equipments. Its major application in a power project is in building turbines, generators, boilers, pumping stations, cooling towers, control panels etc. Reinforcement Steel Reinforcement steels include rods and bars and are primarily used for reinforcement of concrete structure. Pipes & Tubes Seamless tubes and pipes are used in boilers and heat exchangers, areas where a significant amount of fluid transfer is required. Electrical Steel Electrical Steel primarily comprises of two steel products i.e. Cold Rolled Grain Oriented (CRGO) Steel and Cold Rolled Non Grain Oriented (CRNO) Steel. Steel pipes and tubes comprise of about 15% of the total steel requirement of a thermal power plant. CRGO steel finds applications in manufacturing power transformer cores, and CRNO steel is suitable for moving parts in generators and motors. As per CEA norms for Steel used in hydro power sector - 93 tons of reinforcement steel are used in per MW of hydropower project. Plates and sheets comprise of about 40% of the total steel requirement of a coal Base thermal power plant. Assessment of power sector steel demand essentially requires an in-depth study of the electrical equipment (EE) market of India as EE manufacturers are the major direct finished steel consumers with product sales largely dependent on power sector growth plans. The envisioned growth of power sector for 12th Plan period is expected to entail exponential demand for electrical equipment. Presently, the domestic electrical equipment industry is worth INR 120,200 crores (UDS 20 Billion) with 1/4th share captured by generation equipment - Boiler, Turbines & Generators and the remaining by T&D. 0 50 100 150 200 250 300 FY12 FY17 BTG Equipment T&D Equipment 263 120.2 As per IEEMA estimates, the production of major electrical equipment has grown from INR 38,920 crore in 2006-07 to INR 64,235 crore in 2011-12 at a CAGR of 10.5 % while the production of BTG equipment has increased from INR 8,933 crores in 2006-07 to INR 31,000 crores in 2011-12 at a CAGR of 28.3%. Source: EE Industry Mission Plan, Department of Heavy Industries, GoI Equipment Industry Size (in INR ‘000 crore) Steel Applicability in Power Sector Growth in Equipment Industry to Drive Steel Demand
  • 4. Infraline’s Initiative Objective 1: Shortlisting Power Projects to be commissionedin 12th FYP Objective 2: Estimating equipment requirement for proposedpower projects Objective 3: Estimating Product wise steel requirements for the power sector till FY17 In view of the growing capacity addition of steel in power sector, InfralineEnergy is launching India’s first ever Business Series Report on “Steel Demand in Power Sector Projects 2017: Market sizing and Opportunity Assessment”. Equipped with Infraline’s expertise in the energy and steel domains, this in-depth report, covering analytical models and primary research elements, would primarily investigate the application of various steel products in the power generation and transmission sector with a core objective of estimating the future growth in product-wise steel demand for the sector. Recommendations have also been provided with respect to the emerging area of environment friendly steel solutions for the power generation. The aim of this research is to analyze steel’s role in power sector in 12th FYP  Equipment Portfolio for Power Plant Installation (Coal, Gas, Hydro, Wind and Solar)  Highlights of Major Steel Products Requirement by Power Plants  Profiles of Major Equipment Manufacturers and Steel Producers  Opportunities for Power Equipment Suppliers and Steel Players  Estimates of Upcoming Power Capacity till 2017  Coverage on Renewable Capacity Additions with Special Focus on Solar and Wind Energy Pivotal Features of the Study
  • 5.  Which products of steel would be in high demand by the Indian power sector?  Which power projects are expected to be commissioned by FY17?  What will be the generation and transmission equipment portfolio demanded by FY17?  What is the level of India’s indigenous capabilities in steel production (in terms of satisfying power sector demand)?  Do new opportunities exist for steel players in expanding their product portfolios to satisfy specific demands of emerging renewable energy technologies?  What kind of opportunities exist for steel producers to attract more revenue from the envisaged power sector growth in 12th FYP?  What are the different product offerings by domestic players in Indian steel market? Key Questions Answered Research Process Key Sources Market Research Literature Review Industry Interaction In-house Expertise Survey Questionnaire and Telephonic Interviews of Players in Power & Steel Sector FacetoFaceMeetingsand PersonalInterviewsofcoal SectorStakeholders Power&SteelSector Reports,Journals,Magazines, MinisterialDocuments,Infraline Database In-house Analysis and Focus Groups 1 2 3 4 Indian Power Project Developers Steel Producers Steel Traders Equipment Manufacturers Power Transmission Utilities Shipping Companies Project Management Companies Government Agencies Project Financers Investment Bankers Research & Educational Institutes Risk Managers Consulting and EPC companies A Must Buy For  Increased Import Duties on Special Steel and Resulting Impact on Equipment Manufacturers  Continuous Rise in Threat from International Steel Supplier  International Equipment Suppliers Preferred over Domestic Players  Strategic collaboration for indigenous development of Special steel Technology Business Case Studies
  • 6. EXECUTIVE SUMMARY 1. Steel in Power Industry Landscape: Status Quo 1.1 Steel Intensiveness in Power Sector 1.2 The Indian Steel Industry: Indigenous Capabilities and Trends 1.2.1 Historical Production and Trade Trends 1.2.2 Product-wise Steel Availability in India 1.3.3 Steel Capacity addition under 12th FYP 1.2.3 Player-wise offerings for Power Sector 1.3 The Indian Power Sector – Growth Story and Future Plans 1.3.1 Historical Planned and Achieved Capacity Additions 1.3.2 Electricity Demand-Supply Dynamics in 11th FYP 1.3.3 Power Capacity Addition under 12th FYP 1.4 Specific Steel Requirements of Power Sector 2. Capacity Addition in Indian power sector till FY17: A Latest Assessment 2.1. Power Sector Transition in the Past Five Years 2.1.1 Transition in Fuel Usage 2.1.2 Transition in sector-wise capacity addition 2.1.3 Transition in Power Generation Technology 2.2 Under Construction Indian Power Projects till FY17 2.2.1 Under-Construction Thermal power projects 2.2.2. Under-Construction Hydro power projects: By state and Capacity 2.2.3 Under-Construction Renewable power projects: SHP, Solar and Wind 2.2.3 Upcoming Power Transmission projects 2.3 Project Execution Challenges and Key Issues in Indian Power Projects 3. Steel Applicability in Power Equipments 3.1 Equipment Portfolio and Steel Requirements for Power Generation Projects 3.1.1 Thermal Power Plant 3.1.2 Hydro Power Plant 3.2 Equipment Portfolio and Steel Requirements for Renewable Power Generation Projects 3.2.1 Solar Power Plant 3.2.2 Wind Power Plant 3.3 Equipment Portfolio for Power Transmission Projects 4. Estimating Steel Potential in Indian Power Sector till FY17: End use Demand forecasting Modelling 4.1 Power Sector Steel Demand Projections till FY17 4.1.1 Thermal Power Projects 4.1.2 Hydro Power Projects 4.1.3 Renewable Power Projects (Wind and Solar) 4.1.4 Power Transmission Projects 4.2 Summarization of Power Sector Steel Demand in the 12th FYP 4.3 Steel Product-wise Production Estimates till FY17 4.4 Infraline’s Market Sizing 4.4.1 Market sizing for steel products 4.4.2 Market sizing for power equipment 5. Electrical Steel (CRGO/ CRNO) : Influence on the Indian Power Sector 5.1 International Scenario for Electrical Steel 5.2 Electrical Steel Technological Complexities 5.3 Demand Estimates for Electrical steel in Indian Power Sector 5.4 Electrical Steel Import Burden on the Power Sector 5.5 Government Initiatives for Developing Indigenous Capabilities 6. Seamless Pipes and Tubes: An Untapped Potential 6.1 Market Trends and Forecast till FY17 6.1.1 Domestic Production Trends 6.1.2 Imports Trends 6.1.3 Domestic Production Forecast 6.2 Applications in Power Sector 6.3 Major Players in Indian Market (Maharashtra Seamless, ISMT, BHEL, Jindal Saw) 6.4 Foremost Sourcing Options 7. Steel Solutions for a Cleaner Environment 7.1 Winds of Positive Outlook for Steel Demand 7.1.1 Steel usage in Wind power plant 7.1.2 Steel demand in Indian Wind energy sector 7.2 Steel outlook for Indian Solar Sector 7.2.1 Steel Usage in Solar Power Pant 7.2.2 Steel demand in Indian solar manufacturing market 7.3. Environment -friendly Steel Solutions for Power Sector 7.3.1 Support for Recyclability and Reusability of Steel 7.3.2 Environmental concerns of coated steel sheets 7.3.3 Sustainable steel offering for the Power sector Contents & Coverage Additional Data Points: 1. Competitive Landscape: Benchmarking Steel Manufacturers & Power Equipment Manufacturers a) Key Business Statistics b) Financial Profiling 2. List of under construction Thermal Power Projects in India with their anticipated date of commissioning
  • 7. Note: TDS will not be deducted. In case of payments to be made in USD, Euro, GBP the conversion rates on the date of purchase will be applicable. Making the Payment Payment in Indian Rupees (INR): We accept Cheques / Demand Draft. However, we prefer payment through RTGS. Account Name Infraline Technologies India Pvt. Ltd Account Type Current Account Account No. 503011022657 Bank Branch IFSC Code VYSA0005030 Name of Bank ING Vysya Address ING Vysya Bank Ltd. Ground Floor Narain Manzil, Barakhamba Road, New Delhi-110 001 Payment through Cheques / Demand Draft: Payment should be made in favour of 'Infraline Technologies (India) Private Limited' through Cheques / DD payable at New Delhi (or 'at Par' cheques) and send it to the below mentioned address. For Payments in Foreign Currency Through Wire Transfer: The wire transfer instructions are available at http://www.infraline.com/WreTransferlnstructions.htm Through Credit Card: We accept Visa, Master, Amex Cards and all major Net Banking cards. Additional 7% Gateway processing charge applicable along with additional shipping/courier charges. For Sales & Support Ravinder Nagar ravinder.nagar@infraline.com +91 11 46250027 For Research & Consulting Ashima Tyagi ashima.tyagi@infraline.com +91 11 42425198 14th Floor, Atmaram House, 1, Tolstoy Road, Connaught Place, New Delhi- 110001, India Tel +91 11 46250027 (D), 46250000, Fax +91 11 46250099 Email ravinder.nagar@infraline.com, reports@infraline.com For more details, visit http://store.infraline.com Pricing Options Report Publications (Hard Bound) INR 50,000 only Report Electronic Version (Single User License) INR 40,000 + Service Tax Report Electronic Version (Corporate License) INR 1,50,000 + Service Tax Payment Options
  • 8. 14th Floor, Atmaram House,1, Tolstoy Road, Connaught Place, New Delhi - 110001, India Tel +91 11 46250000 (B), Fax +91 11 46250099 Email rs@infraline.com