Who’s protecting
your blindside?
Corporate Research
December 2013

Construction
Management:
Protecting your
business from
project risk
Is your blindside exposed?
Risk management continues to top business agendas, being
regarded as critical to succeed in today’s competitive and
volatile corporate environment. The major risks and pressures
that many companies are grappling with include:

Top Ten Business Risks

Aon’s Global Risk Management Survey, 2013
1.	 Economic slowdown/slow recovery

•	

Uncertain economic and political environments

2.	 Regulatory/legislative changes

•	

I
	ncreasing pace and intensity of competition

3.	 Increasing competition

•	

W
	 ar on talent, speed to market, innovation and reputation

4.	 Damage to reputation/brand

•	

H
	 igher levels of regulatory compliance

5.	 Failure to attract or retain top talent

•	

C
	 ontinued pressure to reduce costs

6.	 Failure to innovate/meet customer needs

Real estate is increasingly seen as a tool for businesses to
leverage in addressing these risks. This includes workspace
continuity planning to minimize business interruption, improving
portfolio flexibility to adapt to changing space needs over time
and implementing workplace strategies to provide the most
attractive environment for ‘best-in-class’ talent.
However, many companies leave themselves open to significant
risks in the delivery of real estate projects. Despite good project
management and planning at the outset, many things can
go wrong during the life cycle of a construction project. The
potential impact on the core business and bottom line of the
organization is often underestimated.

2 | Who’s protecting your blindside?

7.	 Business interruption
8.	 Commodity price risk
9.	 Cash flow/liquidity risk
10.	 Political risk/uncertainty
Construction management is often
neglected
While strong project management is well understood and
usually considered critical to the success of real estate projects,
the importance of construction management is often overlooked
or undervalued.
Appointing a professional construction manager can significantly
reduce business risks arising from the project delivery process.
A construction manager is always responsible for managing the
on-site works and associated tasks such as logistics, security,
safety and communications during the construction of a real
estate project, working solely in the best interest of the client.
Too often, this role is performed by someone who lacks the
expertise, accountability or incentive to effectively look after your
interests during the construction phase.

The relationship between the project manager and the
construction manager can, to some extent, be compared with
the producer-director relationship during the creation of a movie.
While the responsibilities of the two roles during the project
are different, they share the goal of successfully completing a
movie. Both roles must be performed to reach this goal, even
though they could both be performed by the same person.
Similarly, the project manager and the construction manager
share the goal of successfully completing a project, each with a
specific area of responsibility (Fig.1).

Fig. 1: Who is Looking After the Production and Direction of Your Project?

Project Manager (producer)

Construction Manager (director)

• Obtain and interpret the brief

• Provide schedule, cost, logistics and feasibility of construction
input during design stage

• Provide independent advice and reporting
• Manage and coordinate the design
• Manage and coordinate authority approvals
• Interface with your internal team
• Administer your contractual obligations with all parties
• Link between the construction manager and the design team

• Interface with stakeholders
• Trade contractor identification, procurement and management
• Site establishment, management and coordination
• Administer trade contracts including claims and payments
• Manage the handover to owner

Source: Jones Lang LaSalle

Who’s protecting your blindside? | 3
Risks are hidden throughout the
construction journey

Case Study

Strong planning and project management at the outset is critical
to the success of any building project. Still, it is in managing
the delivery for the duration of the project—from initial briefing
to final project delivery—where much of the hidden risk can be
found.

Leaving room for flexibility

Why do things go wrong? The following scenarios may sound
familiar:

1. Confrontational relationships
When contractors compete on price for a specific scope of work
and are open to being penalized when they don’t deliver, it is in
their interest to do everything they can to protect and maximize
their own position. In this situation the person responsible for the
delivery is more concerned with protecting their position (often
through a significant amount of paperwork) and minimizing
cost by cutting corners in terms of time, quality and material
substitutions. In addition, managing these types of relationships
can be a significant administrative and time-consuming burden.
›› A more collaborative and transparent approach, where
shared goals are the starting point, will link rewards and
liabilities to the project outcome. This ensures that all
parties work to maximize the final result, because that is
the best way for them to both protect and maximize their
own position. Articulating what a successful project outcome
will look like and keeping all parties working toward the
common goal are key to reducing conflict along the way.

2. Lack of flexibility
Inflexibility often leads to significant problems later in the
process when changes need to be made. The potential impact
will vary depending on the relationships you have with your
suppliers. In a confrontational relationship, contractors will look
to benefit from the changes made along the way by adding
time and charging additional fees. With a more collaborative
approach, shared goals include establishing the most
appropriate delivery/contracting model that can accommodate
potential scope changes along the way.
›› Incorporating specialist consultancy from the start will help
identify potential issues that might arise so that you can
best plan for required flexibility in the project scope.

4 | Who’s protecting your blindside?

During the relocation of a large international bank
in Singapore, new layout plans were shared with
the senior employees that would occupy the space.
However, they did not really understand the implications.
When, close to completion, members of staff were
invited to view their new workspace, some were
unhappy with the layout. This resulted in a redesign of
the floor plates, which could have significantly increased
the project costs and delayed the move by months.
By having a collaborative approach, enabling the
changes to be accommodated within the existing
program and costs restricted to a minimum (net cost of
trades), these impacts were mitigated.
3. Miscommunication

4. Breakdown between project phases

Communication issues between the project team can often be
the root of many major issues. This applies particularly for any
potential scope change along the way, because even fairly small
amendments (such as the addition of partitioning walls) can
impact on costs and timing if not handled correctly. Without clear
and effective communication among all participants, a project
can easily disintegrate, particularly in more complex situations
where changes are made throughout the construction phase.

The importance of solid and continuous management of all
participants across the full length of the project delivery chain is
often underestimated. There is a broad range of stakeholders
involved across the project life cycle (sample in Fig. 2), and
managing them all effectively can prove difficult. Inability to
manage these stakeholders often results in a breakdown in the
transfer between different phases, in particular toward the latter
stages of a project when in-depth, technical knowledge of the
construction process becomes critical.

›› A single point of contact for project delivery and onsite works throughout the project can help simplify
communication and clarify accountability, ultimately avoiding
delivery errors.

›› Integrating professional management across the full
duration of a project ensures a seamless link between all
phases of the project.

Fig. 2: Ability to Effectively Manage Stakeholders Crucial to Project Success
Initiate

Plan

Design

Close/Handover

•	 Main and trade
contractors

•	 Landlord

•	 End users

•	 Developer

•	 Facility manager

•	 Green authorities/
council

•	 Security

•	 Internal project team

•	 Finance

•	 Designer

•	 Project sponsors
(C-suite)

•	 Internal IT

•	 Vendors

•	 Local authorities
•	 Change management
•	 Legal

Construct

•	 Shipping agents

•	 Leasing team
•	 Movers

•	 Unions

Note: Stakeholders are often involved across multiple phases
Source: Jones Lang LaSalle

Who’s protecting your blindside? | 5
Case Study
5. Unfamiliar local market dynamics

Unfamiliar local nuances

Arguably, the most obvious example of differing local market
conditions is the quality of the available workforce. The skills
and availability of trade contractors can vary significantly by
country and sometimes even from project to project, which
directly impacts the level of expertise and control required. Local
nuances also include legislation such as health, safety and
environment (HSE), availability of logistics and infrastructure,
cost of trade contractors and materials, taxes, authority
approvals and regulations.

A project owner in China engaged a main contractor
to fit-out a 50,000-sq ft office space. A significant part
of the main contractor’s responsibility was to manage
the works through to completion and handover the
premises ready for occupation. However, the project
owner was unable to move in once the project had been
completed as the main contractor had not obtained
the necessary authority approvals and argued this was
the responsibility of the owner. When the space was
eventually occupied, additional issues surfaced. Sick
leave was found to be exceptionally high and constant
staff complaints were received around the smell and
atmosphere of the building, as the main contractor had
not allowed time to purge the air before occupation.

If not properly understood, all of this can easily translate into
issues such as delays, unexpected costs, on-site accidents or
poor-quality workmanship.
›› In situations where your market knowledge proves
insufficient, integrating local expertise and best practice
management is required.

Building a platform in emerging markets
Jones Lang LaSalle’s Global Corporate Real Estate
Trends 2013 report shows that portfolio growth will be
highest in the world’s emerging economies over the next
three years. These are also the world’s least transparent
real estate markets, and operating in such opaque
environments represents significant risks.
At 19%, real estate market transparency was seen as
the single most important challenge when expanding into
emerging market.

6 | Who’s protecting your blindside?
Case Study
6. Lack of accountability on site

Lack of accountability

It is important to have a line of sight and understand the ongoing
construction activities, risks and issues. When there is no onsite representative acting on your behalf, accidents, mistakes or
delays are likely to occur without your knowledge. You are then
burdened with addressing these issues as well as explaining the
consequences to stakeholders. This is particularly risky if you
are inexperienced with construction projects and/or unfamiliar
with local market practices.

An on-site flood during a fit-out construction project in
India damaged not only the site, but the works under
construction as well as significant elements of the
tenant space occupied below. The project owner did
not engage a construction manager to take overall
responsibility for the site and consequently suffered
significant delays while damages were rectified. As
no single company was responsible for the site, major
costs were incurred and insurances were limited to
individuals. The lack of accountability caused financial
loss and also greatly impacted the reputation of
the construction company, which was seen as the
irresponsible employer.

›› A professional, accountable representative on site looking
after your interests will keep you fully informed. Appointing
a specialist with full responsibility to identify and mitigate
risks provides quality assurance while safeguarding time
schedules and overseeing performance in areas including
safety, security and logistics.

While legally responsible, some contractors may have
conflicting demands when it comes to best practice in HSE
compliance. Reinforcing HSE efforts on site can ensure
that HSE-conscious behavior (as well as processes and
procedures) are aligned with the project owners’ standards
and significantly improve a positive project outcome.

7. Transparency and governance issues
With the strong global focus on compliance and corporate
social responsibility, it is now imperative for project sponsors
to have full transparency of cost, as well as supply and labor
resources. When main contractors are engaged, often there
is an expectation that they will take responsibility for these
requirements. While they are technically responsible, too often
you will not find out that they have not fulfilled their commitments
until it is too late, leaving your business exposed to regulatory,
legal or financial risk.
›› Appointing a professional representative to oversee all
procurement and labor management at the trade level—
including identification of material sources, control of labor
before and during construction, and competitive tendering—
will eliminate the opportunity for poor practices and provide
auditable results to satisfy the most stringent governance
requirements.

Who’s protecting your blindside? | 7
Your core business could take an
unexpected hit
There is a wide range of potential complications in the delivery
of a real estate project, whether it is a complex, from the ground
up construction development or a basic interior fit-out. The
potential impact on the core business of a company is often
underestimated and may threaten the position of an organization
in areas such as reputation, brand, compliance, talent attraction,
customer satisfaction, business continuity and profitability
(Fig. 3).
The success of delivering real estate construction projects
is primarily measured by the key variables of time, cost and
quality—often referred to as the ‘iron triangle’—as well as HSE.
However, the actual impact on the business goes beyond the
delivery of the finished product. For example, time issues can
delay speed to market and erode competitive advantage, cost
issues can impact cash flow and profitability and quality mishaps
can negatively impact customer experience or harm talent
attraction and retention.

In addition, a wide range of HSE issues arising during
construction can significantly impact the core business. For
example, environmental damage or health and safety incidents
can harm a company’s brand and reputation, while the financial
impact of litigation or lost productivity can substantially hit the
bottom line.
There is a real risk of your project running over time,
and beyond budget:
25% of projects overrun the initial bid margin1
40-50% of projects in the US overrun on timing and/or
costs2
92% of projects in Malaysia overrun on time or budget3
1. KMPG Global Construction Survey, 2012
2. Construction Management Association of America, 2009
3. International Journal of Advances in Applied Sciences, 2012

Figure 3: Failure to Successfully Manage Construction Projects Directly Impacts Your Core Business

CHECK

Loss of competitive advantage

LIST

FVH

FK HISO

SO

CVN

DJSK

HG

Delays in getting your
product or service to market

SGH

OOO

OSI

Failure to meet compliance
requirements

Exposure to legal action

Inability to meet customer
expectations

Reduced corporate
profitability

Damage to reputation
and brand

Disruption of business
operations
ZKDJVHS SKFGJH AKFJ SKGJHFGKJDFGH ZCV DS
DLKDFJ SLFKGJDFLKJ DFLHKGJ LDHKGD DVKJSD
DJFJFHHB O DND IDHVDDFK KSFKK HHDHDK KDKF
DFJSDJKHFDS HLSGBFJKBCXB DFGJ SGDHJ FHJ

;LGK ZSDH;LHLG

Inability to attract and
retain talent

SPOIGHSFJHSADFLIU

DJKV SDFKJALS;GKJS ALFKJF
FLKSJHD SLGKJ SDLK SDLGK
FKJH SDLGKJ SDLGJK SLDLS
KJDGSH SL SLGK SLGK GJK
SSLDKGJ SLDKGFDGJ SLD
FJFJ DJL SDJGFKHSKJ D
SKLGH KJHFG SKGJSF

DV KSDJFH
DSHJGF SIUE
AKDSYIO EIYGS DSF

DKDFLHSD

3-9589 49870 B

SKFLHSD ASFHA AWOFI
DKLFGJL SET ESTOPJT F

WANTED

STAFF

Long Term

VNBCK X,M

GSBKJ

39025 LKSRGJ

ETHEW LSGKHJFKLG DFLGJ
DFSHLK

42450 SHJK SGJFGD

AESFUITY DZZV JELKR EQWT8

CBJKH EPOURT SDGHLJF SLKG

DHKLF EIYOEG KSFLGHL SD.GKJ

JDGHFKLSDLK SELHG E;SGFJ
GSDJ SDGHLI AEFBJ AEFHL ED

320 23598- 2350- 245
DVLHJ SPEOFU AE;FKLJ

DJKVHC

FJKCVXG EWPTU F
SDKDSG

2309534905 590458 ZKDJDF

SLDHGK SED
FGKUI E EWPT
SGF SDG

DSKLHG ERPTUI RWGPO FGJHK FG SRGOIU LSRGHK
GBJ, S WEITU EKRJGH S,G W ELTIY SEFLKH NNN

Source: Jones Lang LaSalle

8 | Who’s protecting your blindside?

Impact on cash flow
and liquidity
Professional construction
management covers your blindside
Incorporating detailed, professional construction expertise in the
project as early as possible can greatly improve the success of
your project and reduce potential business risks (Fig. 4). This
enables you to benefit from advice on potential construction
issues during the design stage while ensuring smooth transition
between all phases of the project. For example, fully considering
up front the impact that proposed methods and materials will
have on the actual construction process will avoid unexpected
changes, claims, disputes, delays and cost increases later on in
the project life cycle. When combined with on-site coordination,
a construction manager engaged early in the project will
minimize the risk of time, cost, quality and HSE-related issues
and insulate you from the subsequent business impacts.

Fig. 4: Risk Mitigation through Construction Management

Where do things go wrong?

How can a construction
manager help?

1. Consultancy: Critical advice during
design and planning
2. Coordination: Seamless connection
across all phases
3. Control: Greater control over delivery
on site
4. Communication: Reduced conflict
between parties
5. Clarity: Continuous knowledge of
the project

• Unclear scope
• Not enough time or money
• Bad planning and scheduling
• Unexpected changes
• Local market nuances
• Poor trade procurement
• Contractors cutting corners
• No accountability on site
• Insufficient technical knowledge
• Stakeholder confrontation
• Accidents on site

What are the benefits?

• Avoid delays
• Prevent cost hikes
• Increase certainty of outcome
• Save time and costs
• Minimize claims and disputes
• Reduce HSE incidents
• Quality finished product
• Continuous knowledge of the project

Source: Jones Lang LaSalle

Who’s protecting your blindside? | 9
An integrated approach protects
your business
Typically, a professional project manager is engaged during the
early stages of the project, then hands over the responsibility to
the main contractor who is responsible for the project through
construction to completion. Even if a professional construction
manager is engaged, the gaps inherent in this hands-off
approach create many opportunities for risks to creep in. The
delivery of a construction project works best when both roles
work seamlessly together, and even more so, when they are
performed by the same provider (Fig. 5).

This ensures a seamless transition from project initiation all the
way through to completion and handover to operator, minimizing
the opportunity for gaps to occur that might expose your
business to risk.

Fig. 5: Seamless Delivery Through Integrated Project and Construction Management
Initiate

Plan

•	 Initiate project
•	 Assign project team
•	 Set up project on tool

Design

Construct

Close/Handover

•	 Conduct visioning
session

•	 Conduct design
review with client

•	 Landlord coordination

•	 O&M’s

•	 Execute A/E vendor
contracts

•	 Update project
budget and schedule
milestones

•	 Monitor site activity

•	 Punch list

•	 FF&E coordination

•	 Close-out checklist

Project Management

•	 Move coordination

Construction Management
•	 Prepare preliminary
project budget &
schedule

•	 Construction feasibility
advice
•	 Procure permits
•	 Invite subcontractors
to bid

•	 Trade contractor
procurement,
management and
administration

•	 Manage handover to
operator

•	 Site coordination/
execution
•	 Responsible for quality,
security and safety

Risk Management | Accountability | Best Practices | Common Tools | Shared Goals & Objectives
Source: Jones Lang LaSalle

10 | Who’s protecting your blindside?
Jones Lang LaSalle Project and Development Services
We provide project and construction management services
for real estate owners, occupiers and investors. With over 840
professionals in Asia Pacific, supported by a truly transparent
global platform, we provide the most consistent client
experience across more than USD 18 billion in capital works
annually. As your construction manager, we oversee all aspects
of procurement and construction—from technical engineering
and estimating, to site management, commissioning and
handover. We add value by providing construction input to the
design team at the most critical stages of the process. Through
seamless integration of project and construction management,
we reduce confrontation and improve communication throughout
all stages of your project. This helps you to achieve consistency,
increase speed to market, minimize risk and maximize
transparency.

For more information, please contact one of our
experts:
Dave Colverson
Regional Director
Construction Management, Asia Pacific
+65 6494 3786
dave.coverson@ap.jll.com
Kevin Hastings
Regional Director
Construction Management, Australasia
+61 2 9220 8655
kevin.hastings@ap.jll.com
Jipu Jose James
National Director
Construction Management, India
+91 9884 032 233
jipujose.james@ap.jll.com

About Jones Lang LaSalle
Jones Lang LaSalle (NYSE:JLL) is a professional services
and investment management firm offering specialized real
estate services to clients seeking increased value by owning,
occupying and investing in real estate. With annual revenue of
USD 3.9 billion, Jones Lang LaSalle operates in 70 countries
from more than 1,000 locations worldwide. On behalf of
its clients, the firm provides management and real estate
outsourcing services to a property portfolio of 2.6 billion square
feet. Its investment management business, LaSalle Investment
Management, has USD 46.7 billion of real estate assets under
management.

About Jones Lang LaSalle Corporate Solutions
A leader in the real estate outsourcing field, Jones Lang
LaSalle’s Corporate Solutions business helps corporations
improve productivity in the cost, efficiency and performance of
their national, regional or global real estate portfolios by creating
outsourcing partnerships to manage and execute a range of
corporate real estate services. This service delivery capability
helps corporations improve business performance, particularly
as companies turn to the outsourcing of their real estate activity
as a way to manage expenses and enhance profitability.

Darren Wee
Local Director
Construction Management, Singapore
+65 64943966
darren.Wee@ap.jll.com

Author

Alexander Colpaert
Senior Manager
Corporate Research, Asia Pacific
+65 6494 7084
alex.colpaert@ap.jll.com

Who’s protecting your blindside? | 11
Jones Lang LaSalle Global
Argentina
latinamerica.am.joneslanglasalle.com

Germany
www.joneslanglasalle.de

Maghreb
www.joneslanglasalle.ma

Slovakia
www.joneslanglasalle-slovakia.com

Asia Pacific
www.joneslanglasalle.com/asiapacific

Hong Kong
www.joneslanglasalle.com.hk

Mexico
www.joneslanglasalle.com.mx

South Africa
www.joneslanglasalle.co.za

Australia
www.joneslanglasalle.com.au

Hotels
www.jll.com/hospitality

Middle East
www.joneslanglasalle-mena.com

Spain
www.joneslanglasalle.es

Belgium
www.joneslanglasalle.be

Hungary
www.joneslanglasalle.hu

Morocco
www.joneslanglasalle.ma

Sri Lanka
www.joneslanglasalle.com.lk

Brazil
www.joneslanglasalle.com.br

India
www.joneslanglasalle.co.in

Netherlands
www.joneslanglasalle.nl

Sweden
www.joneslanglasalle.se

Canada
www.joneslanglasalle.ca

Indonesia
www.joneslanglasalle.co.id

New Zealand
www.joneslanglasalle.co.nz

Switzerland
www.joneslanglasalle.ch

Chile
latinamerica.am.joneslanglasalle.com

Ireland
www.joneslanglasalle.ie

Panama/ Peru
latinamerica.am.joneslanglasalle.com

Taiwan
www.joneslanglasalle.com.tw

China
www.joneslanglasalle.com.cn

Israel
www.joneslanglasalle.co.il

Philippines
www.joneslanglasalle.com.ph

Thailand
www.joneslanglasalle.co.th

Colombia
latinamerica.am.joneslanglasalle.com

Italy
www.joneslanglasalle.it

Poland
www.joneslanglasalle.pl

Turkey
www.joneslanglasalle.com.tr

Croatia
www.joneslanglasalle-croatia.com

Japan
www.joneslanglasalle.co.jp

Portugal
www.joneslanglasalle.pt

Ukraine
www.joneslanglasalle.ua

Czech-Republic
www.cz.joneslanglasalle.com

Kazakhstan
www.joneslanglasalle.kz

Romania
www.joneslanglasalle-romania.com

United Arab Emirates
www.joneslanglasalle-mena.com

Egypt

Korea
www.joneslanglasallekorea.co.kr

Russia
www.joneslanglasalle.ru

United Kingdom
www.joneslanglasalle.co.uk

Latin America
latinamerica.am.joneslanglasalle.com

Saudi Arabia
www.joneslanglasalle-mena.com

United States
www.us.am.joneslanglasalle.com

Luxembourg
www.joneslanglasalle.lu

Serbia
www.joneslanglasalle.rs

Vietnam
www.joneslanglasalle.com.vn

Macau
www.joneslanglasalle.com.mo

Singapore
www.joneslanglasalle.com.sg

www.joneslanglasalle-mena.com
EMEA
www.joneslanglasalle.eu
Finland
www.joneslanglasalle.fi
France
www.joneslanglasalle.fr

COPYRIGHT © JONES LANG LASALLE 2013 All rights reserved. No part of this publication may be published without prior written permission from Jones Lang LaSalle. The information in this publication should
be regarded solely as a general guide. Whilst care has been taken in its preparation no representation is made or responsibility accepted for the accuracy of the whole or any part. We stress that forecasting is a
problematical exercise which at best should be regarded as an indicative assessment of possibilities rather than absolute certainties. The process of making forward projections involves assumptions regarding
numerous variables which are acutely sensitive to changing conditions, variations in any one of which may significantly affect the outcome, and we draw your attention to this factor.

Contenu connexe

Tendances

Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014SHKLaw
 
ConstructionFlow
ConstructionFlowConstructionFlow
ConstructionFlowJeff Dixon
 
Ipd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation FinalIpd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation FinalAndrew Huseman
 
Residential Design Build Whitepaper
Residential Design Build WhitepaperResidential Design Build Whitepaper
Residential Design Build WhitepaperBethany Jenkins
 
Dealing With Troubled Projects in 8 Simple Steps
Dealing With Troubled Projects in 8 Simple StepsDealing With Troubled Projects in 8 Simple Steps
Dealing With Troubled Projects in 8 Simple StepsDoug Ziemke
 
Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Michael Audu
 
design bid build or Traditional contract shortcomings and alternative method,...
design bid build or Traditional contract shortcomings and alternative method,...design bid build or Traditional contract shortcomings and alternative method,...
design bid build or Traditional contract shortcomings and alternative method,...Tehmas Saeed
 
Risk and uncertainty in construction projects
Risk and uncertainty in construction projectsRisk and uncertainty in construction projects
Risk and uncertainty in construction projectsSameer Nawab
 
RISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIO
RISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIORISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIO
RISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIOIAEME Publication
 
5 immutable principles of project success (v2)(notes)
5 immutable principles of project success (v2)(notes)5 immutable principles of project success (v2)(notes)
5 immutable principles of project success (v2)(notes)Glen Alleman
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 Pang Khai Shuen
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentationTimun Loh
 
PP1 presentation slide.
PP1 presentation slide.PP1 presentation slide.
PP1 presentation slide.lucaschinsheng
 
Delivering urgent projects - management and system engineering challenges
Delivering urgent projects - management and system engineering challengesDelivering urgent projects - management and system engineering challenges
Delivering urgent projects - management and system engineering challengesAssociation for Project Management
 
The third way running effective projects
The third way   running effective projectsThe third way   running effective projects
The third way running effective projectsRune Aresvik
 

Tendances (20)

Akinjiyan_Olufemi_DRP14-15 Submitted
Akinjiyan_Olufemi_DRP14-15 SubmittedAkinjiyan_Olufemi_DRP14-15 Submitted
Akinjiyan_Olufemi_DRP14-15 Submitted
 
Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014
 
ConstructionFlow
ConstructionFlowConstructionFlow
ConstructionFlow
 
Ipd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation FinalIpd Convention 2009 Lessons Learned Presentation Final
Ipd Convention 2009 Lessons Learned Presentation Final
 
Project Delivery Method Selection Tool
Project Delivery Method Selection ToolProject Delivery Method Selection Tool
Project Delivery Method Selection Tool
 
Residential Design Build Whitepaper
Residential Design Build WhitepaperResidential Design Build Whitepaper
Residential Design Build Whitepaper
 
Dealing With Troubled Projects in 8 Simple Steps
Dealing With Troubled Projects in 8 Simple StepsDealing With Troubled Projects in 8 Simple Steps
Dealing With Troubled Projects in 8 Simple Steps
 
Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)
 
design bid build or Traditional contract shortcomings and alternative method,...
design bid build or Traditional contract shortcomings and alternative method,...design bid build or Traditional contract shortcomings and alternative method,...
design bid build or Traditional contract shortcomings and alternative method,...
 
Risk and uncertainty in construction projects
Risk and uncertainty in construction projectsRisk and uncertainty in construction projects
Risk and uncertainty in construction projects
 
RISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIO
RISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIORISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIO
RISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIO
 
5 immutable principles of project success (v2)(notes)
5 immutable principles of project success (v2)(notes)5 immutable principles of project success (v2)(notes)
5 immutable principles of project success (v2)(notes)
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
 
PP1 presentation slide.
PP1 presentation slide.PP1 presentation slide.
PP1 presentation slide.
 
Delivering urgent projects - management and system engineering challenges
Delivering urgent projects - management and system engineering challengesDelivering urgent projects - management and system engineering challenges
Delivering urgent projects - management and system engineering challenges
 
KF Recommendation (1)
KF Recommendation (1)KF Recommendation (1)
KF Recommendation (1)
 
ACH 231 Lecture 06 (Project Delivery)
ACH 231 Lecture 06 (Project Delivery)ACH 231 Lecture 06 (Project Delivery)
ACH 231 Lecture 06 (Project Delivery)
 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement Methods
 
The third way running effective projects
The third way   running effective projectsThe third way   running effective projects
The third way running effective projects
 

En vedette

Construction management practices in canada and europe
Construction management practices in canada and europeConstruction management practices in canada and europe
Construction management practices in canada and europegalaletsang
 
Brand science by printpower
Brand science by printpowerBrand science by printpower
Brand science by printpowermagazinemediaBE
 
Creative Email Strategy for the Mobile Age
Creative Email Strategy for the Mobile AgeCreative Email Strategy for the Mobile Age
Creative Email Strategy for the Mobile AgeAudienceView
 
Fotomuntatge cultura audiovisual
Fotomuntatge cultura audiovisualFotomuntatge cultura audiovisual
Fotomuntatge cultura audiovisualcarlesgariaragon
 
Emerasoft Day 2012 - TRS "Uso del metodo Cosmic e di Polarion per la gestione...
Emerasoft Day 2012 - TRS "Uso del metodo Cosmic e di Polarion per la gestione...Emerasoft Day 2012 - TRS "Uso del metodo Cosmic e di Polarion per la gestione...
Emerasoft Day 2012 - TRS "Uso del metodo Cosmic e di Polarion per la gestione...Emerasoft, solutions to collaborate
 
Improving the performance of CODO networks for major oil companies and dealer...
Improving the performance of CODO networks for major oil companies and dealer...Improving the performance of CODO networks for major oil companies and dealer...
Improving the performance of CODO networks for major oil companies and dealer...Alex King
 
R proposal 8
R proposal 8R proposal 8
R proposal 8Magdy Aly
 
2009_Marquess_JMedChem_5HT4_Agonists
2009_Marquess_JMedChem_5HT4_Agonists2009_Marquess_JMedChem_5HT4_Agonists
2009_Marquess_JMedChem_5HT4_AgonistsDan Marquess
 
El fax por internet de Axiatel
El fax por internet de AxiatelEl fax por internet de Axiatel
El fax por internet de AxiatelAXIATEL
 
La oruga hambrienta, Match up words Spanish
La oruga hambrienta, Match up words SpanishLa oruga hambrienta, Match up words Spanish
La oruga hambrienta, Match up words Spanishjaviera1974
 
Riit broucher 2014
Riit broucher 2014Riit broucher 2014
Riit broucher 2014RIT Goa
 
Ict4 d sep 23
Ict4 d sep 23Ict4 d sep 23
Ict4 d sep 23bobjay
 
UKOUG06 - An Introduction To Process Neutral Data Modelling - Presentation
UKOUG06 - An Introduction To Process Neutral Data Modelling - PresentationUKOUG06 - An Introduction To Process Neutral Data Modelling - Presentation
UKOUG06 - An Introduction To Process Neutral Data Modelling - PresentationDavid Walker
 
Digital turism - hur påverkar digitalisering turism- och besöksnäring?
Digital turism - hur påverkar digitalisering turism- och besöksnäring?Digital turism - hur påverkar digitalisering turism- och besöksnäring?
Digital turism - hur påverkar digitalisering turism- och besöksnäring?IKT-studion
 

En vedette (20)

Construction management practices in canada and europe
Construction management practices in canada and europeConstruction management practices in canada and europe
Construction management practices in canada and europe
 
br_semanadobebe
br_semanadobebebr_semanadobebe
br_semanadobebe
 
Brand science by printpower
Brand science by printpowerBrand science by printpower
Brand science by printpower
 
Creative Email Strategy for the Mobile Age
Creative Email Strategy for the Mobile AgeCreative Email Strategy for the Mobile Age
Creative Email Strategy for the Mobile Age
 
Final Management Thesis
Final Management ThesisFinal Management Thesis
Final Management Thesis
 
Fotomuntatge cultura audiovisual
Fotomuntatge cultura audiovisualFotomuntatge cultura audiovisual
Fotomuntatge cultura audiovisual
 
Necesidad y utilidad de las estimaciones de poblacion para la gestion cinegética
Necesidad y utilidad de las estimaciones de poblacion para la gestion cinegéticaNecesidad y utilidad de las estimaciones de poblacion para la gestion cinegética
Necesidad y utilidad de las estimaciones de poblacion para la gestion cinegética
 
Energia Fotovoltaica (Solar)
Energia Fotovoltaica (Solar)Energia Fotovoltaica (Solar)
Energia Fotovoltaica (Solar)
 
Emerasoft Day 2012 - TRS "Uso del metodo Cosmic e di Polarion per la gestione...
Emerasoft Day 2012 - TRS "Uso del metodo Cosmic e di Polarion per la gestione...Emerasoft Day 2012 - TRS "Uso del metodo Cosmic e di Polarion per la gestione...
Emerasoft Day 2012 - TRS "Uso del metodo Cosmic e di Polarion per la gestione...
 
Improving the performance of CODO networks for major oil companies and dealer...
Improving the performance of CODO networks for major oil companies and dealer...Improving the performance of CODO networks for major oil companies and dealer...
Improving the performance of CODO networks for major oil companies and dealer...
 
Fascismo
FascismoFascismo
Fascismo
 
R proposal 8
R proposal 8R proposal 8
R proposal 8
 
2009_Marquess_JMedChem_5HT4_Agonists
2009_Marquess_JMedChem_5HT4_Agonists2009_Marquess_JMedChem_5HT4_Agonists
2009_Marquess_JMedChem_5HT4_Agonists
 
El fax por internet de Axiatel
El fax por internet de AxiatelEl fax por internet de Axiatel
El fax por internet de Axiatel
 
La oruga hambrienta, Match up words Spanish
La oruga hambrienta, Match up words SpanishLa oruga hambrienta, Match up words Spanish
La oruga hambrienta, Match up words Spanish
 
Riit broucher 2014
Riit broucher 2014Riit broucher 2014
Riit broucher 2014
 
Ict4 d sep 23
Ict4 d sep 23Ict4 d sep 23
Ict4 d sep 23
 
S08 p1
S08 p1S08 p1
S08 p1
 
UKOUG06 - An Introduction To Process Neutral Data Modelling - Presentation
UKOUG06 - An Introduction To Process Neutral Data Modelling - PresentationUKOUG06 - An Introduction To Process Neutral Data Modelling - Presentation
UKOUG06 - An Introduction To Process Neutral Data Modelling - Presentation
 
Digital turism - hur påverkar digitalisering turism- och besöksnäring?
Digital turism - hur påverkar digitalisering turism- och besöksnäring?Digital turism - hur påverkar digitalisering turism- och besöksnäring?
Digital turism - hur påverkar digitalisering turism- och besöksnäring?
 

Similaire à [Report] Who's protecting your blindside? Construction Management: Protecting your business from project risk

CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementChris Gorga
 
Project Execution in Changing Times - Focus on the Essentials
Project Execution in Changing Times - Focus on the EssentialsProject Execution in Changing Times - Focus on the Essentials
Project Execution in Changing Times - Focus on the EssentialsEndeavor Management
 
Why projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfallsWhy projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfallsTa Ngoc
 
Critical thinking Project Management.docx
Critical thinking Project Management.docxCritical thinking Project Management.docx
Critical thinking Project Management.docxwrite22
 
Critical thinking Project Management.docx
Critical thinking Project Management.docxCritical thinking Project Management.docx
Critical thinking Project Management.docxwrite31
 
How to Avoid Project Train Wrecks
How to Avoid Project Train WrecksHow to Avoid Project Train Wrecks
How to Avoid Project Train WrecksPete Luan
 
Capital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_GasCapital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_GasMircea Tomescu
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016Chris Nash
 
Project management
Project managementProject management
Project managementsatya pal
 
M6 Toll Road Construction
M6 Toll Road ConstructionM6 Toll Road Construction
M6 Toll Road ConstructionHeidi Owens
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxMBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxAASTHA76
 
12 Terms You Should Know Project Management Fundamentals
12 Terms You Should Know Project Management Fundamentals12 Terms You Should Know Project Management Fundamentals
12 Terms You Should Know Project Management FundamentalsInsaf Ali Soomro PMP
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)FahadHasan36
 
Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxStanleyChabata1
 
CRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management BenefitsCRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management BenefitsChris Gorga
 
CPMGT_300 Week_5__Project Life Cycle Paper.docx
CPMGT_300 Week_5__Project Life Cycle Paper.docxCPMGT_300 Week_5__Project Life Cycle Paper.docx
CPMGT_300 Week_5__Project Life Cycle Paper.docxRebeccaEdwards88
 
Construction economic
Construction economicConstruction economic
Construction economicfauziani
 
Pitfalls of Managing International Contract Administration
Pitfalls of Managing International Contract AdministrationPitfalls of Managing International Contract Administration
Pitfalls of Managing International Contract AdministrationAvanti Hiremath
 

Similaire à [Report] Who's protecting your blindside? Construction Management: Protecting your business from project risk (20)

CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project Management
 
Project Execution in Changing Times - Focus on the Essentials
Project Execution in Changing Times - Focus on the EssentialsProject Execution in Changing Times - Focus on the Essentials
Project Execution in Changing Times - Focus on the Essentials
 
Why projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfallsWhy projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfalls
 
Critical thinking Project Management.docx
Critical thinking Project Management.docxCritical thinking Project Management.docx
Critical thinking Project Management.docx
 
Critical thinking Project Management.docx
Critical thinking Project Management.docxCritical thinking Project Management.docx
Critical thinking Project Management.docx
 
How to Avoid Project Train Wrecks
How to Avoid Project Train WrecksHow to Avoid Project Train Wrecks
How to Avoid Project Train Wrecks
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
Capital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_GasCapital_projects_life_cycle_managemant_Oil_and_Gas
Capital_projects_life_cycle_managemant_Oil_and_Gas
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016
 
IPD-Whitepaper_2018-2.pdf
IPD-Whitepaper_2018-2.pdfIPD-Whitepaper_2018-2.pdf
IPD-Whitepaper_2018-2.pdf
 
Project management
Project managementProject management
Project management
 
M6 Toll Road Construction
M6 Toll Road ConstructionM6 Toll Road Construction
M6 Toll Road Construction
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxMBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docx
 
12 Terms You Should Know Project Management Fundamentals
12 Terms You Should Know Project Management Fundamentals12 Terms You Should Know Project Management Fundamentals
12 Terms You Should Know Project Management Fundamentals
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)
 
Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptx
 
CRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management BenefitsCRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management Benefits
 
CPMGT_300 Week_5__Project Life Cycle Paper.docx
CPMGT_300 Week_5__Project Life Cycle Paper.docxCPMGT_300 Week_5__Project Life Cycle Paper.docx
CPMGT_300 Week_5__Project Life Cycle Paper.docx
 
Construction economic
Construction economicConstruction economic
Construction economic
 
Pitfalls of Managing International Contract Administration
Pitfalls of Managing International Contract AdministrationPitfalls of Managing International Contract Administration
Pitfalls of Managing International Contract Administration
 

Plus de JLL

September 2018 U.S. employment update and outlook
September 2018 U.S. employment update and outlookSeptember 2018 U.S. employment update and outlook
September 2018 U.S. employment update and outlookJLL
 
August 2018 U.S. employment update and outlook
August 2018 U.S. employment update and outlookAugust 2018 U.S. employment update and outlook
August 2018 U.S. employment update and outlookJLL
 
July 2018 U.S. employment update and outlook
July 2018 U.S. employment update and outlookJuly 2018 U.S. employment update and outlook
July 2018 U.S. employment update and outlookJLL
 
June 2018 U.S. employment update and outlook
June 2018 U.S. employment update and outlookJune 2018 U.S. employment update and outlook
June 2018 U.S. employment update and outlookJLL
 
May 2018 U.S. employment update and outlook
May 2018 U.S. employment update and outlookMay 2018 U.S. employment update and outlook
May 2018 U.S. employment update and outlookJLL
 
Capital Markets: Slicing the debt pie
Capital Markets: Slicing the debt pieCapital Markets: Slicing the debt pie
Capital Markets: Slicing the debt pieJLL
 
JLL Retail: Store closure summary, March 2018
JLL Retail: Store closure summary, March 2018JLL Retail: Store closure summary, March 2018
JLL Retail: Store closure summary, March 2018JLL
 
March 2018 U.S. employment update and outlook
March 2018 U.S. employment update and outlookMarch 2018 U.S. employment update and outlook
March 2018 U.S. employment update and outlookJLL
 
February 2018 U.S. employment update and outlook
February 2018 U.S. employment update and outlookFebruary 2018 U.S. employment update and outlook
February 2018 U.S. employment update and outlookJLL
 
January 2018 U.S. employment update and outlook
January 2018 U.S. employment update and outlookJanuary 2018 U.S. employment update and outlook
January 2018 U.S. employment update and outlookJLL
 
December 2017 U.S. employment update and outlook
December 2017 U.S. employment update and outlookDecember 2017 U.S. employment update and outlook
December 2017 U.S. employment update and outlookJLL
 
JLL London Office Market Seminar
JLL London Office Market SeminarJLL London Office Market Seminar
JLL London Office Market SeminarJLL
 
November 2017 U.S. employment update and outlook
November 2017 U.S. employment update and outlookNovember 2017 U.S. employment update and outlook
November 2017 U.S. employment update and outlookJLL
 
Central London Office Market Report Q3 2017
Central London Office Market Report Q3 2017Central London Office Market Report Q3 2017
Central London Office Market Report Q3 2017JLL
 
2017 JLL Energy Outlook
2017 JLL Energy Outlook2017 JLL Energy Outlook
2017 JLL Energy OutlookJLL
 
JLL Retail: Store closure summary, October 2017
JLL Retail: Store closure summary, October 2017 JLL Retail: Store closure summary, October 2017
JLL Retail: Store closure summary, October 2017 JLL
 
2017 Law Firm office market overview
2017 Law Firm office market overview2017 Law Firm office market overview
2017 Law Firm office market overviewJLL
 
October 2017 U.S. employment update and outlook
October 2017 U.S. employment update and outlookOctober 2017 U.S. employment update and outlook
October 2017 U.S. employment update and outlookJLL
 
JLL Retail: Store closure summary, September 2017
JLL Retail: Store closure summary, September 2017 JLL Retail: Store closure summary, September 2017
JLL Retail: Store closure summary, September 2017 JLL
 
September 2017 U.S. employment update and outlook
September 2017 U.S. employment update and outlookSeptember 2017 U.S. employment update and outlook
September 2017 U.S. employment update and outlookJLL
 

Plus de JLL (20)

September 2018 U.S. employment update and outlook
September 2018 U.S. employment update and outlookSeptember 2018 U.S. employment update and outlook
September 2018 U.S. employment update and outlook
 
August 2018 U.S. employment update and outlook
August 2018 U.S. employment update and outlookAugust 2018 U.S. employment update and outlook
August 2018 U.S. employment update and outlook
 
July 2018 U.S. employment update and outlook
July 2018 U.S. employment update and outlookJuly 2018 U.S. employment update and outlook
July 2018 U.S. employment update and outlook
 
June 2018 U.S. employment update and outlook
June 2018 U.S. employment update and outlookJune 2018 U.S. employment update and outlook
June 2018 U.S. employment update and outlook
 
May 2018 U.S. employment update and outlook
May 2018 U.S. employment update and outlookMay 2018 U.S. employment update and outlook
May 2018 U.S. employment update and outlook
 
Capital Markets: Slicing the debt pie
Capital Markets: Slicing the debt pieCapital Markets: Slicing the debt pie
Capital Markets: Slicing the debt pie
 
JLL Retail: Store closure summary, March 2018
JLL Retail: Store closure summary, March 2018JLL Retail: Store closure summary, March 2018
JLL Retail: Store closure summary, March 2018
 
March 2018 U.S. employment update and outlook
March 2018 U.S. employment update and outlookMarch 2018 U.S. employment update and outlook
March 2018 U.S. employment update and outlook
 
February 2018 U.S. employment update and outlook
February 2018 U.S. employment update and outlookFebruary 2018 U.S. employment update and outlook
February 2018 U.S. employment update and outlook
 
January 2018 U.S. employment update and outlook
January 2018 U.S. employment update and outlookJanuary 2018 U.S. employment update and outlook
January 2018 U.S. employment update and outlook
 
December 2017 U.S. employment update and outlook
December 2017 U.S. employment update and outlookDecember 2017 U.S. employment update and outlook
December 2017 U.S. employment update and outlook
 
JLL London Office Market Seminar
JLL London Office Market SeminarJLL London Office Market Seminar
JLL London Office Market Seminar
 
November 2017 U.S. employment update and outlook
November 2017 U.S. employment update and outlookNovember 2017 U.S. employment update and outlook
November 2017 U.S. employment update and outlook
 
Central London Office Market Report Q3 2017
Central London Office Market Report Q3 2017Central London Office Market Report Q3 2017
Central London Office Market Report Q3 2017
 
2017 JLL Energy Outlook
2017 JLL Energy Outlook2017 JLL Energy Outlook
2017 JLL Energy Outlook
 
JLL Retail: Store closure summary, October 2017
JLL Retail: Store closure summary, October 2017 JLL Retail: Store closure summary, October 2017
JLL Retail: Store closure summary, October 2017
 
2017 Law Firm office market overview
2017 Law Firm office market overview2017 Law Firm office market overview
2017 Law Firm office market overview
 
October 2017 U.S. employment update and outlook
October 2017 U.S. employment update and outlookOctober 2017 U.S. employment update and outlook
October 2017 U.S. employment update and outlook
 
JLL Retail: Store closure summary, September 2017
JLL Retail: Store closure summary, September 2017 JLL Retail: Store closure summary, September 2017
JLL Retail: Store closure summary, September 2017
 
September 2017 U.S. employment update and outlook
September 2017 U.S. employment update and outlookSeptember 2017 U.S. employment update and outlook
September 2017 U.S. employment update and outlook
 

Dernier

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...Amil Baba Dawood bangali
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 

Dernier (20)

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 

[Report] Who's protecting your blindside? Construction Management: Protecting your business from project risk

  • 1. Who’s protecting your blindside? Corporate Research December 2013 Construction Management: Protecting your business from project risk
  • 2. Is your blindside exposed? Risk management continues to top business agendas, being regarded as critical to succeed in today’s competitive and volatile corporate environment. The major risks and pressures that many companies are grappling with include: Top Ten Business Risks Aon’s Global Risk Management Survey, 2013 1. Economic slowdown/slow recovery • Uncertain economic and political environments 2. Regulatory/legislative changes • I ncreasing pace and intensity of competition 3. Increasing competition • W ar on talent, speed to market, innovation and reputation 4. Damage to reputation/brand • H igher levels of regulatory compliance 5. Failure to attract or retain top talent • C ontinued pressure to reduce costs 6. Failure to innovate/meet customer needs Real estate is increasingly seen as a tool for businesses to leverage in addressing these risks. This includes workspace continuity planning to minimize business interruption, improving portfolio flexibility to adapt to changing space needs over time and implementing workplace strategies to provide the most attractive environment for ‘best-in-class’ talent. However, many companies leave themselves open to significant risks in the delivery of real estate projects. Despite good project management and planning at the outset, many things can go wrong during the life cycle of a construction project. The potential impact on the core business and bottom line of the organization is often underestimated. 2 | Who’s protecting your blindside? 7. Business interruption 8. Commodity price risk 9. Cash flow/liquidity risk 10. Political risk/uncertainty
  • 3. Construction management is often neglected While strong project management is well understood and usually considered critical to the success of real estate projects, the importance of construction management is often overlooked or undervalued. Appointing a professional construction manager can significantly reduce business risks arising from the project delivery process. A construction manager is always responsible for managing the on-site works and associated tasks such as logistics, security, safety and communications during the construction of a real estate project, working solely in the best interest of the client. Too often, this role is performed by someone who lacks the expertise, accountability or incentive to effectively look after your interests during the construction phase. The relationship between the project manager and the construction manager can, to some extent, be compared with the producer-director relationship during the creation of a movie. While the responsibilities of the two roles during the project are different, they share the goal of successfully completing a movie. Both roles must be performed to reach this goal, even though they could both be performed by the same person. Similarly, the project manager and the construction manager share the goal of successfully completing a project, each with a specific area of responsibility (Fig.1). Fig. 1: Who is Looking After the Production and Direction of Your Project? Project Manager (producer) Construction Manager (director) • Obtain and interpret the brief • Provide schedule, cost, logistics and feasibility of construction input during design stage • Provide independent advice and reporting • Manage and coordinate the design • Manage and coordinate authority approvals • Interface with your internal team • Administer your contractual obligations with all parties • Link between the construction manager and the design team • Interface with stakeholders • Trade contractor identification, procurement and management • Site establishment, management and coordination • Administer trade contracts including claims and payments • Manage the handover to owner Source: Jones Lang LaSalle Who’s protecting your blindside? | 3
  • 4. Risks are hidden throughout the construction journey Case Study Strong planning and project management at the outset is critical to the success of any building project. Still, it is in managing the delivery for the duration of the project—from initial briefing to final project delivery—where much of the hidden risk can be found. Leaving room for flexibility Why do things go wrong? The following scenarios may sound familiar: 1. Confrontational relationships When contractors compete on price for a specific scope of work and are open to being penalized when they don’t deliver, it is in their interest to do everything they can to protect and maximize their own position. In this situation the person responsible for the delivery is more concerned with protecting their position (often through a significant amount of paperwork) and minimizing cost by cutting corners in terms of time, quality and material substitutions. In addition, managing these types of relationships can be a significant administrative and time-consuming burden. ›› A more collaborative and transparent approach, where shared goals are the starting point, will link rewards and liabilities to the project outcome. This ensures that all parties work to maximize the final result, because that is the best way for them to both protect and maximize their own position. Articulating what a successful project outcome will look like and keeping all parties working toward the common goal are key to reducing conflict along the way. 2. Lack of flexibility Inflexibility often leads to significant problems later in the process when changes need to be made. The potential impact will vary depending on the relationships you have with your suppliers. In a confrontational relationship, contractors will look to benefit from the changes made along the way by adding time and charging additional fees. With a more collaborative approach, shared goals include establishing the most appropriate delivery/contracting model that can accommodate potential scope changes along the way. ›› Incorporating specialist consultancy from the start will help identify potential issues that might arise so that you can best plan for required flexibility in the project scope. 4 | Who’s protecting your blindside? During the relocation of a large international bank in Singapore, new layout plans were shared with the senior employees that would occupy the space. However, they did not really understand the implications. When, close to completion, members of staff were invited to view their new workspace, some were unhappy with the layout. This resulted in a redesign of the floor plates, which could have significantly increased the project costs and delayed the move by months. By having a collaborative approach, enabling the changes to be accommodated within the existing program and costs restricted to a minimum (net cost of trades), these impacts were mitigated.
  • 5. 3. Miscommunication 4. Breakdown between project phases Communication issues between the project team can often be the root of many major issues. This applies particularly for any potential scope change along the way, because even fairly small amendments (such as the addition of partitioning walls) can impact on costs and timing if not handled correctly. Without clear and effective communication among all participants, a project can easily disintegrate, particularly in more complex situations where changes are made throughout the construction phase. The importance of solid and continuous management of all participants across the full length of the project delivery chain is often underestimated. There is a broad range of stakeholders involved across the project life cycle (sample in Fig. 2), and managing them all effectively can prove difficult. Inability to manage these stakeholders often results in a breakdown in the transfer between different phases, in particular toward the latter stages of a project when in-depth, technical knowledge of the construction process becomes critical. ›› A single point of contact for project delivery and onsite works throughout the project can help simplify communication and clarify accountability, ultimately avoiding delivery errors. ›› Integrating professional management across the full duration of a project ensures a seamless link between all phases of the project. Fig. 2: Ability to Effectively Manage Stakeholders Crucial to Project Success Initiate Plan Design Close/Handover • Main and trade contractors • Landlord • End users • Developer • Facility manager • Green authorities/ council • Security • Internal project team • Finance • Designer • Project sponsors (C-suite) • Internal IT • Vendors • Local authorities • Change management • Legal Construct • Shipping agents • Leasing team • Movers • Unions Note: Stakeholders are often involved across multiple phases Source: Jones Lang LaSalle Who’s protecting your blindside? | 5
  • 6. Case Study 5. Unfamiliar local market dynamics Unfamiliar local nuances Arguably, the most obvious example of differing local market conditions is the quality of the available workforce. The skills and availability of trade contractors can vary significantly by country and sometimes even from project to project, which directly impacts the level of expertise and control required. Local nuances also include legislation such as health, safety and environment (HSE), availability of logistics and infrastructure, cost of trade contractors and materials, taxes, authority approvals and regulations. A project owner in China engaged a main contractor to fit-out a 50,000-sq ft office space. A significant part of the main contractor’s responsibility was to manage the works through to completion and handover the premises ready for occupation. However, the project owner was unable to move in once the project had been completed as the main contractor had not obtained the necessary authority approvals and argued this was the responsibility of the owner. When the space was eventually occupied, additional issues surfaced. Sick leave was found to be exceptionally high and constant staff complaints were received around the smell and atmosphere of the building, as the main contractor had not allowed time to purge the air before occupation. If not properly understood, all of this can easily translate into issues such as delays, unexpected costs, on-site accidents or poor-quality workmanship. ›› In situations where your market knowledge proves insufficient, integrating local expertise and best practice management is required. Building a platform in emerging markets Jones Lang LaSalle’s Global Corporate Real Estate Trends 2013 report shows that portfolio growth will be highest in the world’s emerging economies over the next three years. These are also the world’s least transparent real estate markets, and operating in such opaque environments represents significant risks. At 19%, real estate market transparency was seen as the single most important challenge when expanding into emerging market. 6 | Who’s protecting your blindside?
  • 7. Case Study 6. Lack of accountability on site Lack of accountability It is important to have a line of sight and understand the ongoing construction activities, risks and issues. When there is no onsite representative acting on your behalf, accidents, mistakes or delays are likely to occur without your knowledge. You are then burdened with addressing these issues as well as explaining the consequences to stakeholders. This is particularly risky if you are inexperienced with construction projects and/or unfamiliar with local market practices. An on-site flood during a fit-out construction project in India damaged not only the site, but the works under construction as well as significant elements of the tenant space occupied below. The project owner did not engage a construction manager to take overall responsibility for the site and consequently suffered significant delays while damages were rectified. As no single company was responsible for the site, major costs were incurred and insurances were limited to individuals. The lack of accountability caused financial loss and also greatly impacted the reputation of the construction company, which was seen as the irresponsible employer. ›› A professional, accountable representative on site looking after your interests will keep you fully informed. Appointing a specialist with full responsibility to identify and mitigate risks provides quality assurance while safeguarding time schedules and overseeing performance in areas including safety, security and logistics. While legally responsible, some contractors may have conflicting demands when it comes to best practice in HSE compliance. Reinforcing HSE efforts on site can ensure that HSE-conscious behavior (as well as processes and procedures) are aligned with the project owners’ standards and significantly improve a positive project outcome. 7. Transparency and governance issues With the strong global focus on compliance and corporate social responsibility, it is now imperative for project sponsors to have full transparency of cost, as well as supply and labor resources. When main contractors are engaged, often there is an expectation that they will take responsibility for these requirements. While they are technically responsible, too often you will not find out that they have not fulfilled their commitments until it is too late, leaving your business exposed to regulatory, legal or financial risk. ›› Appointing a professional representative to oversee all procurement and labor management at the trade level— including identification of material sources, control of labor before and during construction, and competitive tendering— will eliminate the opportunity for poor practices and provide auditable results to satisfy the most stringent governance requirements. Who’s protecting your blindside? | 7
  • 8. Your core business could take an unexpected hit There is a wide range of potential complications in the delivery of a real estate project, whether it is a complex, from the ground up construction development or a basic interior fit-out. The potential impact on the core business of a company is often underestimated and may threaten the position of an organization in areas such as reputation, brand, compliance, talent attraction, customer satisfaction, business continuity and profitability (Fig. 3). The success of delivering real estate construction projects is primarily measured by the key variables of time, cost and quality—often referred to as the ‘iron triangle’—as well as HSE. However, the actual impact on the business goes beyond the delivery of the finished product. For example, time issues can delay speed to market and erode competitive advantage, cost issues can impact cash flow and profitability and quality mishaps can negatively impact customer experience or harm talent attraction and retention. In addition, a wide range of HSE issues arising during construction can significantly impact the core business. For example, environmental damage or health and safety incidents can harm a company’s brand and reputation, while the financial impact of litigation or lost productivity can substantially hit the bottom line. There is a real risk of your project running over time, and beyond budget: 25% of projects overrun the initial bid margin1 40-50% of projects in the US overrun on timing and/or costs2 92% of projects in Malaysia overrun on time or budget3 1. KMPG Global Construction Survey, 2012 2. Construction Management Association of America, 2009 3. International Journal of Advances in Applied Sciences, 2012 Figure 3: Failure to Successfully Manage Construction Projects Directly Impacts Your Core Business CHECK Loss of competitive advantage LIST FVH FK HISO SO CVN DJSK HG Delays in getting your product or service to market SGH OOO OSI Failure to meet compliance requirements Exposure to legal action Inability to meet customer expectations Reduced corporate profitability Damage to reputation and brand Disruption of business operations ZKDJVHS SKFGJH AKFJ SKGJHFGKJDFGH ZCV DS DLKDFJ SLFKGJDFLKJ DFLHKGJ LDHKGD DVKJSD DJFJFHHB O DND IDHVDDFK KSFKK HHDHDK KDKF DFJSDJKHFDS HLSGBFJKBCXB DFGJ SGDHJ FHJ ;LGK ZSDH;LHLG Inability to attract and retain talent SPOIGHSFJHSADFLIU DJKV SDFKJALS;GKJS ALFKJF FLKSJHD SLGKJ SDLK SDLGK FKJH SDLGKJ SDLGJK SLDLS KJDGSH SL SLGK SLGK GJK SSLDKGJ SLDKGFDGJ SLD FJFJ DJL SDJGFKHSKJ D SKLGH KJHFG SKGJSF DV KSDJFH DSHJGF SIUE AKDSYIO EIYGS DSF DKDFLHSD 3-9589 49870 B SKFLHSD ASFHA AWOFI DKLFGJL SET ESTOPJT F WANTED STAFF Long Term VNBCK X,M GSBKJ 39025 LKSRGJ ETHEW LSGKHJFKLG DFLGJ DFSHLK 42450 SHJK SGJFGD AESFUITY DZZV JELKR EQWT8 CBJKH EPOURT SDGHLJF SLKG DHKLF EIYOEG KSFLGHL SD.GKJ JDGHFKLSDLK SELHG E;SGFJ GSDJ SDGHLI AEFBJ AEFHL ED 320 23598- 2350- 245 DVLHJ SPEOFU AE;FKLJ DJKVHC FJKCVXG EWPTU F SDKDSG 2309534905 590458 ZKDJDF SLDHGK SED FGKUI E EWPT SGF SDG DSKLHG ERPTUI RWGPO FGJHK FG SRGOIU LSRGHK GBJ, S WEITU EKRJGH S,G W ELTIY SEFLKH NNN Source: Jones Lang LaSalle 8 | Who’s protecting your blindside? Impact on cash flow and liquidity
  • 9. Professional construction management covers your blindside Incorporating detailed, professional construction expertise in the project as early as possible can greatly improve the success of your project and reduce potential business risks (Fig. 4). This enables you to benefit from advice on potential construction issues during the design stage while ensuring smooth transition between all phases of the project. For example, fully considering up front the impact that proposed methods and materials will have on the actual construction process will avoid unexpected changes, claims, disputes, delays and cost increases later on in the project life cycle. When combined with on-site coordination, a construction manager engaged early in the project will minimize the risk of time, cost, quality and HSE-related issues and insulate you from the subsequent business impacts. Fig. 4: Risk Mitigation through Construction Management Where do things go wrong? How can a construction manager help? 1. Consultancy: Critical advice during design and planning 2. Coordination: Seamless connection across all phases 3. Control: Greater control over delivery on site 4. Communication: Reduced conflict between parties 5. Clarity: Continuous knowledge of the project • Unclear scope • Not enough time or money • Bad planning and scheduling • Unexpected changes • Local market nuances • Poor trade procurement • Contractors cutting corners • No accountability on site • Insufficient technical knowledge • Stakeholder confrontation • Accidents on site What are the benefits? • Avoid delays • Prevent cost hikes • Increase certainty of outcome • Save time and costs • Minimize claims and disputes • Reduce HSE incidents • Quality finished product • Continuous knowledge of the project Source: Jones Lang LaSalle Who’s protecting your blindside? | 9
  • 10. An integrated approach protects your business Typically, a professional project manager is engaged during the early stages of the project, then hands over the responsibility to the main contractor who is responsible for the project through construction to completion. Even if a professional construction manager is engaged, the gaps inherent in this hands-off approach create many opportunities for risks to creep in. The delivery of a construction project works best when both roles work seamlessly together, and even more so, when they are performed by the same provider (Fig. 5). This ensures a seamless transition from project initiation all the way through to completion and handover to operator, minimizing the opportunity for gaps to occur that might expose your business to risk. Fig. 5: Seamless Delivery Through Integrated Project and Construction Management Initiate Plan • Initiate project • Assign project team • Set up project on tool Design Construct Close/Handover • Conduct visioning session • Conduct design review with client • Landlord coordination • O&M’s • Execute A/E vendor contracts • Update project budget and schedule milestones • Monitor site activity • Punch list • FF&E coordination • Close-out checklist Project Management • Move coordination Construction Management • Prepare preliminary project budget & schedule • Construction feasibility advice • Procure permits • Invite subcontractors to bid • Trade contractor procurement, management and administration • Manage handover to operator • Site coordination/ execution • Responsible for quality, security and safety Risk Management | Accountability | Best Practices | Common Tools | Shared Goals & Objectives Source: Jones Lang LaSalle 10 | Who’s protecting your blindside?
  • 11. Jones Lang LaSalle Project and Development Services We provide project and construction management services for real estate owners, occupiers and investors. With over 840 professionals in Asia Pacific, supported by a truly transparent global platform, we provide the most consistent client experience across more than USD 18 billion in capital works annually. As your construction manager, we oversee all aspects of procurement and construction—from technical engineering and estimating, to site management, commissioning and handover. We add value by providing construction input to the design team at the most critical stages of the process. Through seamless integration of project and construction management, we reduce confrontation and improve communication throughout all stages of your project. This helps you to achieve consistency, increase speed to market, minimize risk and maximize transparency. For more information, please contact one of our experts: Dave Colverson Regional Director Construction Management, Asia Pacific +65 6494 3786 dave.coverson@ap.jll.com Kevin Hastings Regional Director Construction Management, Australasia +61 2 9220 8655 kevin.hastings@ap.jll.com Jipu Jose James National Director Construction Management, India +91 9884 032 233 jipujose.james@ap.jll.com About Jones Lang LaSalle Jones Lang LaSalle (NYSE:JLL) is a professional services and investment management firm offering specialized real estate services to clients seeking increased value by owning, occupying and investing in real estate. With annual revenue of USD 3.9 billion, Jones Lang LaSalle operates in 70 countries from more than 1,000 locations worldwide. On behalf of its clients, the firm provides management and real estate outsourcing services to a property portfolio of 2.6 billion square feet. Its investment management business, LaSalle Investment Management, has USD 46.7 billion of real estate assets under management. About Jones Lang LaSalle Corporate Solutions A leader in the real estate outsourcing field, Jones Lang LaSalle’s Corporate Solutions business helps corporations improve productivity in the cost, efficiency and performance of their national, regional or global real estate portfolios by creating outsourcing partnerships to manage and execute a range of corporate real estate services. This service delivery capability helps corporations improve business performance, particularly as companies turn to the outsourcing of their real estate activity as a way to manage expenses and enhance profitability. Darren Wee Local Director Construction Management, Singapore +65 64943966 darren.Wee@ap.jll.com Author Alexander Colpaert Senior Manager Corporate Research, Asia Pacific +65 6494 7084 alex.colpaert@ap.jll.com Who’s protecting your blindside? | 11
  • 12. Jones Lang LaSalle Global Argentina latinamerica.am.joneslanglasalle.com Germany www.joneslanglasalle.de Maghreb www.joneslanglasalle.ma Slovakia www.joneslanglasalle-slovakia.com Asia Pacific www.joneslanglasalle.com/asiapacific Hong Kong www.joneslanglasalle.com.hk Mexico www.joneslanglasalle.com.mx South Africa www.joneslanglasalle.co.za Australia www.joneslanglasalle.com.au Hotels www.jll.com/hospitality Middle East www.joneslanglasalle-mena.com Spain www.joneslanglasalle.es Belgium www.joneslanglasalle.be Hungary www.joneslanglasalle.hu Morocco www.joneslanglasalle.ma Sri Lanka www.joneslanglasalle.com.lk Brazil www.joneslanglasalle.com.br India www.joneslanglasalle.co.in Netherlands www.joneslanglasalle.nl Sweden www.joneslanglasalle.se Canada www.joneslanglasalle.ca Indonesia www.joneslanglasalle.co.id New Zealand www.joneslanglasalle.co.nz Switzerland www.joneslanglasalle.ch Chile latinamerica.am.joneslanglasalle.com Ireland www.joneslanglasalle.ie Panama/ Peru latinamerica.am.joneslanglasalle.com Taiwan www.joneslanglasalle.com.tw China www.joneslanglasalle.com.cn Israel www.joneslanglasalle.co.il Philippines www.joneslanglasalle.com.ph Thailand www.joneslanglasalle.co.th Colombia latinamerica.am.joneslanglasalle.com Italy www.joneslanglasalle.it Poland www.joneslanglasalle.pl Turkey www.joneslanglasalle.com.tr Croatia www.joneslanglasalle-croatia.com Japan www.joneslanglasalle.co.jp Portugal www.joneslanglasalle.pt Ukraine www.joneslanglasalle.ua Czech-Republic www.cz.joneslanglasalle.com Kazakhstan www.joneslanglasalle.kz Romania www.joneslanglasalle-romania.com United Arab Emirates www.joneslanglasalle-mena.com Egypt Korea www.joneslanglasallekorea.co.kr Russia www.joneslanglasalle.ru United Kingdom www.joneslanglasalle.co.uk Latin America latinamerica.am.joneslanglasalle.com Saudi Arabia www.joneslanglasalle-mena.com United States www.us.am.joneslanglasalle.com Luxembourg www.joneslanglasalle.lu Serbia www.joneslanglasalle.rs Vietnam www.joneslanglasalle.com.vn Macau www.joneslanglasalle.com.mo Singapore www.joneslanglasalle.com.sg www.joneslanglasalle-mena.com EMEA www.joneslanglasalle.eu Finland www.joneslanglasalle.fi France www.joneslanglasalle.fr COPYRIGHT © JONES LANG LASALLE 2013 All rights reserved. No part of this publication may be published without prior written permission from Jones Lang LaSalle. The information in this publication should be regarded solely as a general guide. Whilst care has been taken in its preparation no representation is made or responsibility accepted for the accuracy of the whole or any part. We stress that forecasting is a problematical exercise which at best should be regarded as an indicative assessment of possibilities rather than absolute certainties. The process of making forward projections involves assumptions regarding numerous variables which are acutely sensitive to changing conditions, variations in any one of which may significantly affect the outcome, and we draw your attention to this factor.