SlideShare une entreprise Scribd logo
1  sur  10
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],SELECTED TECHNOLOGY PROJECTS PORTFOLIO ‘ Balancing Art and Science’
Currently based in Alexandria, Virginia. I started my Architectural career in 1988 and over the last 19 years has held a number of senior project positions within IDC/Jacobs, LTD-Ireland, IDC-Israel, ADP Marshall-Taipei, Fluor Daniel, Inc.-Philippines and the United States. My project management skills have enabled me to lead successful projects in six different countries.  I have worked in all Architectural/Engineering phases of project management from programming, design development, construction documentation and administration, Equipment Fit-up/Hook-up too Client Move-in. Prior to my current role as Senior Project Manager for USCIS Headquarters in Washington, D.C., I held the position of Architectural program lead for Fluor Daniel, Inc.-Philippines, responsible for the crossover training of Fluor Daniel’s Oil, Gas & Petroleum A/E staff into the Semiconductor business portfolio of large scale mixed use Micro-Electronics Parks within the Pacific Rim. Bachelor of Arts: Architecture from Portland State University. American Institute of Architects- Associate Accredited Professional- The U.S. Green Building Council, LEED 2.0 RE License- Virginia Real Estate Board 2
3 Location: Tainan, Taiwan  | Year: 2000
4 Location: Gaithersburg, MD  | Year: 2001
5 Location: Chandler, AZ  | Year: 1997
6 Location: Hillsbourgh, OR  | Year: 1996 Location: Santa Clara, CA  | Year: 1992
7 Websites:   Work Experience: http://www.linkedin.com/in/jaingle  Art and Architecture:   http://www.slideshare.net/JamesIngle  
8 Project: National Institute of Standards and Technology (N.I.S.T.)- Y2001 http://cnst.nist.gov / General Scope:  47,480 square meters, or 511,070 square feet total. Cost: $235.2 million. 2 single-floor metrology laboratory sections completely below grade with 151 lab modules and 2 single-floor instrument laboratory sections above ground with 187 lab modules. Labs have a baseline temperature control to within ±0.25 degree Celsius and temperature control to within ±0.1 or ±0.01 degree Celsius for 48 precision temperature control laboratories in metrology sections. Included several types of vibration isolation foundations in metrology laboratory sections, for velocity amplitude of 3 micrometers per second or less. In special metrology laboratories, hold humidity control is to within 1 percent and 5 percent in the rest of the facility. Building-wide conditioned power supply system that will meet IEEE Std. 1100-1992 for critical electronic loads. Ceiling heights in laboratory modules adaptable to 7 meters (22 feet). Natural day lighting, energy conservation, and recycling incorporated into the AML’s design and planned operation. The AML facility includes an above ground Class 100 clean room wing, 80,000 square feet (3.5 or fewer particles per liter), upgradeable to Class 10.   Project: WINBOND (Fab 6)- Y2000 http://www.winbond.com/hq/enu/AboutWinbond/WinbondWorldwide/Locations/ General Scope:  Greenfield design of semiconductor manufacturing facility. Main fabrication building included 180,000 S.F. ballroom, Class 1000, mini-environment cleanroom, utilizing over-sized and multi-level automation systems. The facility was designed for DRAM products on 300-mm wafers, utilizing copper application technologies. Phase 1 total building space was 2.3M S.F.   Project: SAP Labs- Y1999 http://www.devconconstruction.com/sap.html General Scope:  140,000 S.F. ($21M), Greenfield corporate office building, with below grade parking garage adjacent to an environmentally protected site (Coyote Hill open space). The Design and Construction was committed not only to the mitigation of physical impacts from development against the Coyote Hill open space, but to do so by the creation of an exemplary project, which delivered sustainable ideologies inherent in the project's design, construction and lifecycle.   Project: GUIDANT, Santa Clara, CA.- Y1998 http://www.ir2.com/index.php/flash/ General Scope:  400,000 S.F. ($23M) Master Space Plan, Tenant Improvements to Santa Clara campus. Projects include major infrastructure upgrades to HVAC (cooling tower addition), UPS and Telecom. A 10,000 S.F. fully automated one-touch assembly/training rooms with video/satellite links, integrated with the Temecula facility. Designs included major cafeteria expansions. Also, major signature lobby remodel.   PROJECT LIST
9 Project: GUIDANT, Temecula, CA.- Y1998 General Scope:  350,000 S.F. ($21M) Master Space Plan, Tenant Improvements to Temecula campus. Projects include major infrastructure upgrades to HVAC, UPS and Telecom. A 10,000 S.F. fully automated one-touch assembly/training rooms with video/satellite links, integrated with the Santa Clara facility. Designs included major cafeteria addition. Life Safety/Security upgrades, which included CCTV, digital fire alarm station, and card readers. Full ADA/T24 upgrade, to all bathrooms, building entrances, and required exits and public spaces. Remodel of open office floor plates to include break rooms, conference rooms, teaming space, coffee bars and private offices.   Project: MAXIM Technologies (Fab X3)- Y1997 General Scope:  Design/Build for 80,000 S.F.  Bay and chase, Class 1 Cleanroom conversion of an existing open office space. Major service yard addition included elevated platforms for generators and cooling towers. Existing building was partially demolished and major structural modifications where made, including new interior steel frame structural systems and foundations. Tenant Improvement to existing open office, bathrooms, cafeteria and new signature lobby. Temporary detached gowning and bathroom facilities were deployed to keep on going operations fully functional. Building height restrictions required the design to incorporate a suspended make-up air deck.   Project: Motorola (MOS 12)- Y1997 General Scope:  Greenfield Design/Build for 80,000 S.F. C4 Process Class 1 bay and chase, cleanroom. Utilized a utility tunnel and six-foot high, 4x4-raised access flooring understructure to eliminate sub-fab level. Locate support office functions above the "cleanbox" area. Design to existing campus exterior materials, finish and color palette.   Project: National Semiconductor- Y1997 General Scope:  20,000 S.F. Class 1 bay and chase, Cleanroom Addition. Utilized four foot high, 4x4 raised access-flooring understructure with deep process trenches and central utility tunnel to eliminate sub-fab level.   Project: Intel (Fab D1B)- Y1996 General Scope:  Greenfield Design/Build for 707,000 S.F. facility, including an 75,000 S.F. Class 1 Cleanroom, 75,000 S.F. central utility building, 307,000 S.F. three story office building and 80,000 S.F. office/warehouse.   Project: Intel (Fab 18)- 1995 General Scope:   Greenfield Design/Build for 707,000 S.F. facility including an 85,000 S.F. bay and chase, Class 1 Cleanroom and 75,000 S.F. central utility building, 400,000 S.F. four story office building, 80,000 S.F. office/warehouse and 30,000 S.F. hazardous material storage building.
10 Project: Intel (Fab 14)- Y1994 General Scope:  Greenfield Design/Build for 660,000 S.F. facilities, including a 76,000 S.F. Class 1 Cleanroom, 40,000 S.F. Fab support building, an energy center and process support building.   Project: Intel (Fab 12)- Y1994 General Scope:  Greenfield Design/Build for 40,000 S.F. Class 1 Cleanroom   Project: Intel (Fab 11.2)- Y1993 General Scope:  Design/Build expansion for 233,000 S.F. facilities including 43,000 S.F. Class 1 Cleanroom. Project: Intel (Fab 11) General Scope:  Design/Build fit-up for 35,000 S.F. Class 1 Cleanroom   Project: Intel (Fab 9.2)- Y1993 General Scope:  Design/Build fit-up for 25,000 S.F. Class 10 Cleanroom   Project: Intel (Fab D2 Automation)- Y1992 General Scope:  Implement class 1 overhead transport, automated wafer material handling to ongoing production Fab, both D2-P1 and D2-P2.   Project: Intel (D2P2)- Y1991 General Scope:  Fit-up shell space of D2 Fab, for 20,000 S.F. Class 1 Cleanroom .   Project: Intel (SC9)- Y1991 General Scope:  Retrofit/expand existing class 10,000 Cleanroom.   Project: National Semiconductor- Y1990 General Scope:  10,000 S.F. C4 Class 1 Cleanroom addition.   Project: Millar Library Addition- Y1989 General Scope:  Fit up interior finishes for new five stories, inverted circular shell.

Contenu connexe

Tendances

Pepsi Project Phasing
Pepsi Project PhasingPepsi Project Phasing
Pepsi Project PhasingAlexiaLevite
 
Rick Russell Resume 150406
Rick Russell Resume 150406Rick Russell Resume 150406
Rick Russell Resume 150406Rick Russell
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalChris Humphries
 
Adrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist PortfolioAdrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist PortfolioAdrian Navarro
 
Project portfolio mark rannel gamayo
Project portfolio mark rannel gamayoProject portfolio mark rannel gamayo
Project portfolio mark rannel gamayoMark Rannel Gamayo
 

Tendances (6)

INDIAZI CV
INDIAZI CVINDIAZI CV
INDIAZI CV
 
Pepsi Project Phasing
Pepsi Project PhasingPepsi Project Phasing
Pepsi Project Phasing
 
Rick Russell Resume 150406
Rick Russell Resume 150406Rick Russell Resume 150406
Rick Russell Resume 150406
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - Final
 
Adrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist PortfolioAdrian Navarro Architectural Technologist Portfolio
Adrian Navarro Architectural Technologist Portfolio
 
Project portfolio mark rannel gamayo
Project portfolio mark rannel gamayoProject portfolio mark rannel gamayo
Project portfolio mark rannel gamayo
 

Similaire à James Ingle's Technology Portfolio

Keith Holt Personal Portfolio2
Keith Holt Personal Portfolio2Keith Holt Personal Portfolio2
Keith Holt Personal Portfolio2Keith Holt
 
0908 Olofson Hi Lighted Project List With Brief Scopes
0908 Olofson Hi Lighted Project List With Brief Scopes0908 Olofson Hi Lighted Project List With Brief Scopes
0908 Olofson Hi Lighted Project List With Brief ScopesScott Olofson
 
3. Project Profiiles
3. Project Profiiles3. Project Profiiles
3. Project ProfiilesBrett Locke
 
PDeJesus-List of projects-2014
PDeJesus-List of projects-2014PDeJesus-List of projects-2014
PDeJesus-List of projects-2014Pedro De Jesus
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1Dan Caouette
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramCordoba Corp
 
Sample Design Portfolio
Sample Design PortfolioSample Design Portfolio
Sample Design Portfoliotonytso
 
Rick Stinnett Projects
Rick Stinnett ProjectsRick Stinnett Projects
Rick Stinnett Projectsrstinnett
 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Centeraiahouston
 
End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module Jonathan Flanagan
 
Ross Harper 11-18-2015
Ross Harper  11-18-2015 Ross Harper  11-18-2015
Ross Harper 11-18-2015 Ross D Harper
 
Brian_Ash_Resume
Brian_Ash_ResumeBrian_Ash_Resume
Brian_Ash_ResumeBrian Ash
 
Utilipath Company Overview
Utilipath Company OverviewUtilipath Company Overview
Utilipath Company Overviewminerlawrence
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14Jim Benge
 

Similaire à James Ingle's Technology Portfolio (20)

Keith Holt Personal Portfolio2
Keith Holt Personal Portfolio2Keith Holt Personal Portfolio2
Keith Holt Personal Portfolio2
 
0908 Olofson Hi Lighted Project List With Brief Scopes
0908 Olofson Hi Lighted Project List With Brief Scopes0908 Olofson Hi Lighted Project List With Brief Scopes
0908 Olofson Hi Lighted Project List With Brief Scopes
 
3. Project Profiiles
3. Project Profiiles3. Project Profiiles
3. Project Profiiles
 
PDeJesus-List of projects-2014
PDeJesus-List of projects-2014PDeJesus-List of projects-2014
PDeJesus-List of projects-2014
 
Erwin Mendoza CV
Erwin Mendoza CVErwin Mendoza CV
Erwin Mendoza CV
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
International
InternationalInternational
International
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction Program
 
Sample Design Portfolio
Sample Design PortfolioSample Design Portfolio
Sample Design Portfolio
 
Article_Proof
Article_ProofArticle_Proof
Article_Proof
 
Rick Stinnett Projects
Rick Stinnett ProjectsRick Stinnett Projects
Rick Stinnett Projects
 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Center
 
Green leed projects
Green leed projectsGreen leed projects
Green leed projects
 
0609_PenRen
0609_PenRen0609_PenRen
0609_PenRen
 
End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module End of Year Exhibition Poster for Design & Detail Module
End of Year Exhibition Poster for Design & Detail Module
 
Ross Harper 11-18-2015
Ross Harper  11-18-2015 Ross Harper  11-18-2015
Ross Harper 11-18-2015
 
Rn resume 2017
Rn resume 2017Rn resume 2017
Rn resume 2017
 
Brian_Ash_Resume
Brian_Ash_ResumeBrian_Ash_Resume
Brian_Ash_Resume
 
Utilipath Company Overview
Utilipath Company OverviewUtilipath Company Overview
Utilipath Company Overview
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14
 

Plus de James Ingle

GW Clinical Learning and Simulation Skills Center
GW Clinical Learning and Simulation Skills CenterGW Clinical Learning and Simulation Skills Center
GW Clinical Learning and Simulation Skills CenterJames Ingle
 
GW Research Center for the Neglected Diseases of Poverty
GW Research Center for the Neglected Diseases of PovertyGW Research Center for the Neglected Diseases of Poverty
GW Research Center for the Neglected Diseases of PovertyJames Ingle
 
College Projects
College ProjectsCollege Projects
College ProjectsJames Ingle
 
Commercial Portfolio
Commercial PortfolioCommercial Portfolio
Commercial PortfolioJames Ingle
 
arch system components review
arch system components reviewarch system components review
arch system components reviewJames Ingle
 
From 200 to 300 MM Fabs
From 200 to 300 MM FabsFrom 200 to 300 MM Fabs
From 200 to 300 MM FabsJames Ingle
 

Plus de James Ingle (9)

GW Clinical Learning and Simulation Skills Center
GW Clinical Learning and Simulation Skills CenterGW Clinical Learning and Simulation Skills Center
GW Clinical Learning and Simulation Skills Center
 
GW Research Center for the Neglected Diseases of Poverty
GW Research Center for the Neglected Diseases of PovertyGW Research Center for the Neglected Diseases of Poverty
GW Research Center for the Neglected Diseases of Poverty
 
Letters
LettersLetters
Letters
 
College Projects
College ProjectsCollege Projects
College Projects
 
Sketch Page
Sketch PageSketch Page
Sketch Page
 
Commercial Portfolio
Commercial PortfolioCommercial Portfolio
Commercial Portfolio
 
Island Home
Island HomeIsland Home
Island Home
 
arch system components review
arch system components reviewarch system components review
arch system components review
 
From 200 to 300 MM Fabs
From 200 to 300 MM FabsFrom 200 to 300 MM Fabs
From 200 to 300 MM Fabs
 

James Ingle's Technology Portfolio

  • 1.
  • 2. Currently based in Alexandria, Virginia. I started my Architectural career in 1988 and over the last 19 years has held a number of senior project positions within IDC/Jacobs, LTD-Ireland, IDC-Israel, ADP Marshall-Taipei, Fluor Daniel, Inc.-Philippines and the United States. My project management skills have enabled me to lead successful projects in six different countries. I have worked in all Architectural/Engineering phases of project management from programming, design development, construction documentation and administration, Equipment Fit-up/Hook-up too Client Move-in. Prior to my current role as Senior Project Manager for USCIS Headquarters in Washington, D.C., I held the position of Architectural program lead for Fluor Daniel, Inc.-Philippines, responsible for the crossover training of Fluor Daniel’s Oil, Gas & Petroleum A/E staff into the Semiconductor business portfolio of large scale mixed use Micro-Electronics Parks within the Pacific Rim. Bachelor of Arts: Architecture from Portland State University. American Institute of Architects- Associate Accredited Professional- The U.S. Green Building Council, LEED 2.0 RE License- Virginia Real Estate Board 2
  • 3. 3 Location: Tainan, Taiwan | Year: 2000
  • 4. 4 Location: Gaithersburg, MD | Year: 2001
  • 5. 5 Location: Chandler, AZ | Year: 1997
  • 6. 6 Location: Hillsbourgh, OR | Year: 1996 Location: Santa Clara, CA | Year: 1992
  • 7. 7 Websites: Work Experience: http://www.linkedin.com/in/jaingle  Art and Architecture: http://www.slideshare.net/JamesIngle  
  • 8. 8 Project: National Institute of Standards and Technology (N.I.S.T.)- Y2001 http://cnst.nist.gov / General Scope: 47,480 square meters, or 511,070 square feet total. Cost: $235.2 million. 2 single-floor metrology laboratory sections completely below grade with 151 lab modules and 2 single-floor instrument laboratory sections above ground with 187 lab modules. Labs have a baseline temperature control to within ±0.25 degree Celsius and temperature control to within ±0.1 or ±0.01 degree Celsius for 48 precision temperature control laboratories in metrology sections. Included several types of vibration isolation foundations in metrology laboratory sections, for velocity amplitude of 3 micrometers per second or less. In special metrology laboratories, hold humidity control is to within 1 percent and 5 percent in the rest of the facility. Building-wide conditioned power supply system that will meet IEEE Std. 1100-1992 for critical electronic loads. Ceiling heights in laboratory modules adaptable to 7 meters (22 feet). Natural day lighting, energy conservation, and recycling incorporated into the AML’s design and planned operation. The AML facility includes an above ground Class 100 clean room wing, 80,000 square feet (3.5 or fewer particles per liter), upgradeable to Class 10.   Project: WINBOND (Fab 6)- Y2000 http://www.winbond.com/hq/enu/AboutWinbond/WinbondWorldwide/Locations/ General Scope: Greenfield design of semiconductor manufacturing facility. Main fabrication building included 180,000 S.F. ballroom, Class 1000, mini-environment cleanroom, utilizing over-sized and multi-level automation systems. The facility was designed for DRAM products on 300-mm wafers, utilizing copper application technologies. Phase 1 total building space was 2.3M S.F.   Project: SAP Labs- Y1999 http://www.devconconstruction.com/sap.html General Scope: 140,000 S.F. ($21M), Greenfield corporate office building, with below grade parking garage adjacent to an environmentally protected site (Coyote Hill open space). The Design and Construction was committed not only to the mitigation of physical impacts from development against the Coyote Hill open space, but to do so by the creation of an exemplary project, which delivered sustainable ideologies inherent in the project's design, construction and lifecycle.   Project: GUIDANT, Santa Clara, CA.- Y1998 http://www.ir2.com/index.php/flash/ General Scope: 400,000 S.F. ($23M) Master Space Plan, Tenant Improvements to Santa Clara campus. Projects include major infrastructure upgrades to HVAC (cooling tower addition), UPS and Telecom. A 10,000 S.F. fully automated one-touch assembly/training rooms with video/satellite links, integrated with the Temecula facility. Designs included major cafeteria expansions. Also, major signature lobby remodel. PROJECT LIST
  • 9. 9 Project: GUIDANT, Temecula, CA.- Y1998 General Scope: 350,000 S.F. ($21M) Master Space Plan, Tenant Improvements to Temecula campus. Projects include major infrastructure upgrades to HVAC, UPS and Telecom. A 10,000 S.F. fully automated one-touch assembly/training rooms with video/satellite links, integrated with the Santa Clara facility. Designs included major cafeteria addition. Life Safety/Security upgrades, which included CCTV, digital fire alarm station, and card readers. Full ADA/T24 upgrade, to all bathrooms, building entrances, and required exits and public spaces. Remodel of open office floor plates to include break rooms, conference rooms, teaming space, coffee bars and private offices.   Project: MAXIM Technologies (Fab X3)- Y1997 General Scope: Design/Build for 80,000 S.F. Bay and chase, Class 1 Cleanroom conversion of an existing open office space. Major service yard addition included elevated platforms for generators and cooling towers. Existing building was partially demolished and major structural modifications where made, including new interior steel frame structural systems and foundations. Tenant Improvement to existing open office, bathrooms, cafeteria and new signature lobby. Temporary detached gowning and bathroom facilities were deployed to keep on going operations fully functional. Building height restrictions required the design to incorporate a suspended make-up air deck.   Project: Motorola (MOS 12)- Y1997 General Scope: Greenfield Design/Build for 80,000 S.F. C4 Process Class 1 bay and chase, cleanroom. Utilized a utility tunnel and six-foot high, 4x4-raised access flooring understructure to eliminate sub-fab level. Locate support office functions above the "cleanbox" area. Design to existing campus exterior materials, finish and color palette.   Project: National Semiconductor- Y1997 General Scope: 20,000 S.F. Class 1 bay and chase, Cleanroom Addition. Utilized four foot high, 4x4 raised access-flooring understructure with deep process trenches and central utility tunnel to eliminate sub-fab level.   Project: Intel (Fab D1B)- Y1996 General Scope: Greenfield Design/Build for 707,000 S.F. facility, including an 75,000 S.F. Class 1 Cleanroom, 75,000 S.F. central utility building, 307,000 S.F. three story office building and 80,000 S.F. office/warehouse.   Project: Intel (Fab 18)- 1995 General Scope: Greenfield Design/Build for 707,000 S.F. facility including an 85,000 S.F. bay and chase, Class 1 Cleanroom and 75,000 S.F. central utility building, 400,000 S.F. four story office building, 80,000 S.F. office/warehouse and 30,000 S.F. hazardous material storage building.
  • 10. 10 Project: Intel (Fab 14)- Y1994 General Scope: Greenfield Design/Build for 660,000 S.F. facilities, including a 76,000 S.F. Class 1 Cleanroom, 40,000 S.F. Fab support building, an energy center and process support building.   Project: Intel (Fab 12)- Y1994 General Scope: Greenfield Design/Build for 40,000 S.F. Class 1 Cleanroom   Project: Intel (Fab 11.2)- Y1993 General Scope: Design/Build expansion for 233,000 S.F. facilities including 43,000 S.F. Class 1 Cleanroom. Project: Intel (Fab 11) General Scope: Design/Build fit-up for 35,000 S.F. Class 1 Cleanroom   Project: Intel (Fab 9.2)- Y1993 General Scope: Design/Build fit-up for 25,000 S.F. Class 10 Cleanroom   Project: Intel (Fab D2 Automation)- Y1992 General Scope: Implement class 1 overhead transport, automated wafer material handling to ongoing production Fab, both D2-P1 and D2-P2.   Project: Intel (D2P2)- Y1991 General Scope: Fit-up shell space of D2 Fab, for 20,000 S.F. Class 1 Cleanroom .   Project: Intel (SC9)- Y1991 General Scope: Retrofit/expand existing class 10,000 Cleanroom.   Project: National Semiconductor- Y1990 General Scope: 10,000 S.F. C4 Class 1 Cleanroom addition.   Project: Millar Library Addition- Y1989 General Scope: Fit up interior finishes for new five stories, inverted circular shell.