Ce diaporama a bien été signalé.
Le téléchargement de votre SlideShare est en cours. ×

CV_Jamie Allen

Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Prochain SlideShare
Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))
Chargement dans…3
×

Consultez-les par la suite

1 sur 5 Publicité

Plus De Contenu Connexe

Publicité

Similaire à CV_Jamie Allen (20)

CV_Jamie Allen

  1. 1. 2017 Page 1 Jamie Allen CV Name Jamie Allen 39, Oaklands View Greenmeadow Cwmbran South Wales (UK) NP44 5EE D.O.B 09.08.1985 Email : allenjamie98@gmail.com Mobile Number: 07912 784073 Profile I have been working within the HV substation environment for over 9 years as a Project Supervisor, predominately worked for Western Power Distribution on various projects throughout the UK. I have experienced work details from a site foreman to supervisor, Field Engineer and now Project manager; I have extensive knowledge within civil works and have adapted myself to the cable and electrical installation side, drawing on my experience within the electrical sector over the past few years. I would consider myself as eager and keen and able to manage both myself and my work teams to solve any site based issues that may arise during the day to day operations within the business. Qualifications  NVQ (QCF) Level 2 DIPLOMA Occupations Construction  EUSR – SHEA Power CSCS  PASMA trained  NRSWA Street works (Supervisor)
  2. 2. 2017 Page 2 Jamie Allen CV  CPCS 360 Operator  CPCS Dumper Operator  NPORS  SSSTS  SMSTS  First Aid  WPD authorized person (SSAC LOAR (b))  SSE authorized person (cat 1c cat 2b cat 3a)  MEWPS for managers  Temporary works coordinator Key skills and experience  12 years construction experience, of which 9 have been within the EHV electrical industry  Analytical approach to problem solving  Project Supervision  Client Liaison Relevant Projects  Western Power Distribution – Presteigne 11/33/66kV built new substation and was involved with new circuit installment.  Western Power Distribution – Shrewsbury 132 kV, built an new switching house and installed trough work and pulled in new cable to switch room  Western Power Distribution – Corby 132 kV, Decommissioning of oil filled 132 kV cable and installment of new 132 kV XLPE x 2 Circuits  Western Power Distribution – Bixhead 33 kV, 3 x circuits running from new switch room through the forest of dean and terminated and newly installed H poles.  Scottish Southern Electric – Stoke Poges lane, Installing new 132/33/11kV and LV circuits through new railway bridge, working alongside Network Rail  National Grid – Shrewsbury 275kV – Decommissioning and overlay inside substation
  3. 3. 2017 Page 3 Jamie Allen CV  Oldbury Power Station – Part of the decommissioning of the site team – Phase 1 & 3  Western Power Distribution – Hartlebury 66kV, Project Manager for new cable installation from a tower into an incinerator site (3km), construction of a SEP on the tower and re - modification of plinths inside the incinerator substation to ensure the cable could run up the steelwork freely.  Western Power Distribution – Bilson 33kV, Project Manager for new sealing end plinth installation, install new steel work onto base, install new circuit from H Pole outside substation into sub onto newly constructed SEP steelwork and terminate.  Western Power Distribution – Lydney 33kV, Project Manager for overlay of new 33kV circuit  Western Power Distribution – Tuffley 33kV, Project Manager for installation of 4 x 33kV circuits, installation and terminating.  Western Power Distribution – Brockworth 33kV, Project Manager for fault repair on oil filled cable, RTS within 24 hours  Western Power Distribution – Brunswick road 33kV, Project manager for decommissioning works on a third party site, extraction and removal of cable.  Western Power Distribution – Old Croft Road 33kV – Project manager on cable installation and terminations on H Pole.  Western Power Distribution – Marle Hill 33kV, Project manager on fault to overlay 2 x 33kV circuits and install bunted concrete plinth around the newly installed cable.  SSE – Denham 22kV – Project manager on fault overlay, 3 x joint bays installed in carriageway and Hot splice joints on oil filled cable to EPR carried out
  4. 4. 2017 Page 4 Jamie Allen CV Specific Project role and responsibilities Role Description: To provide support both to the client and the team designated on the project, to ensure all employees are fully aware of the works due to be undertaken and are competent to do so, I ensure all Risk Assessments and Method Statements conform to the clients and business needs and are approved prior to work commencing. Organise the site set up alongside the site manager/supervisor and ensure CDM regulations are set up accordingly, Problems solve as and when any may arise and ensure a solution is put forward to the client to resolve the issue. Project Duties  Interface management with the client  High standard of professionalism of any civil or associated works for the project works  Delivering high productivity in a safe and efficient manner, ensuring that all work is conducted safely and in compliance with company policies  Overview of day-to-day operations  Recruitment of any specialist skilled personnel required  Procurement of specialist plant & equipment  Supply Chain Management; developing supplier relationships  Identifying training requirements for staff and operatives  Preparation of operational reports  Cost management & financial reporting  Promote a professional image on the site  Proactively motivate and develop the workforce encouraging good communication and team work  Work closely with the project delivery team to ensure that all processes and activities are carried and completed in accordance with the approved procedures  Prioritise own workload in order to meet project deadline without comprising quality standards  Create and maintain good communication and relationships with, client, suppliers, councils, staff and members of the public and any agencies  Understand the scope of works, programme of works with the activities to meet delivery timescales  Assess the level of risk and identify any health and safety risks! financial risks and the development of the associated contingency plans  Assist the team to produce method statements and risk assessment as required  Ensure that all accidents, dangerous occurrences and near miss incidents are reported as per the company procedures
  5. 5. 2017 Page 5 Jamie Allen CV  Accept full responsibility for the compliance with the Construction Design and Management Regulation (CDM) 2015 for the personal safety, safety of all project team members and safety of the general public within project work area  Complying with all Safety rules, site rules and procedures instructed by others  Provide support to ensure that the jointing/cabling related records and as builds are completed, accurate and up to date  Maintain a strong customer focus and provide a positive customer experience References–Available uponrequest

×