Extending Cast-In-Place Box Culverts
               With
       Precast Box Culverts
       ADOT Tucson District




                                       1
WHY PRECAST ?
Anticipated future improvements of transportation
system
 • Upgrades
 • Widening current roadways
Increased capacity
Safety improvements
Less impact to traveling public during construction
Improvements of internal costs for construction through
work zone efficiency




                                                          2
Innovative
       Construction Methods
Precast concrete pipes
Implemented use of precast items
 • AASHTO Girders
 • Concrete Barrier
 • MSE Wall Panels
 • Cattle Guards
 • Catch Basins
 • Manholes
Precast box culverts
 • Accelerates construction schedule
 • Reduces work zone exposure to traveling public and workers




                                                                3
Recent Projects with
           Precast CBCs
SR 79, MP 124.1 to 127.4 (Constructed)
 • First Tucson District Project with Precast Box Culverts
SR 86, Brawley Wash to MP 141 (Constructed)
SR 86, MP 141 to Reservation Boundary (Constructed)
I-10, Val Vista Road to Earley Road (Parsons Brinckerhoff)
(Under Construction)
SR 86, San Pedro Segment (Under Construction)
SR 86, Kitt Peak (Kimley-Horn) (Stage IV)
SR 86, Santa Rosa Segment (Stage IV)
SR 86, Fresnal to Sells (Stage II)


                                                             4
Projects
SR 79, MP 124.1 to 125.7
James Gomes, ADOT R.E.




                           5
SR 79, MP 124.1 to 125.7




                           6
SR 79, MP 124.1 to 125.7




                           7
SR 79, MP 124.1 to 125.7
 Contract Documents
 •   Special Provisions
      •   Project specific requirements
 •   Project Plans
      •   Locations
      •   Details
 •   Standard Drawings
      •   B-Standards
      •   C-Standards




                                          8
SR 79, MP 124.1 to 125.7
 Pre-Cast RCBC Submittal
 • Manufacturer through Contractor
 • ADOT Bridge Group
 • ADOT Review & Approval


 Production
 • Prepare formwork
 • Fabrication
 • Materials Group – Oversight and Inspection




                                                9
SR 79, MP 124.1 to 125.7
 Project Site Preparation
 •   Traffic Control
 •   RCBC Wingwall and Headwall Removal
 •   Structural Excavation
 •   Bedding Material




                                          10
SR 79, MP 124.1 to 125.7




                           11
SR 79, MP 124.1 to 125.7
 Installation
 •   Delivery and Inspection
 •   Survey
 •   Crane Location
 •   Alignment and Installation
 •   Finish Work




                                  12
SR 79, MP 124.1 to 125.7
       Installation




                           13
SR 79, MP 124.1 to 125.7
       Installation




                           14
SR 79, MP 124.1 to 125.7
       Installation




                           15
SR 79, MP 124.1 to 125.7
       Installation




                           16
SR 79, MP 124.1 to 125.7
       Installation




                           17
SR 79, MP 124.1 to 125.7
 Closure Pour
 •   Approved Concrete Mix
 •   Reinforcement
 •   Formwork
 •   Constructability Issues
      o   Rebar Clearances
      o   Formwork
      o   Concrete Clearances




                                18
Reinforcement




                19
Constructability
 “Formwork”




                   20
Constructability
“Concrete Placement”




                       21
SR 79, MP 124.1 to 125.7
Backfill and Clean-up




                           22
Lessons Learned
    Benefits                   Drawbacks
Reduced Durations             Closure Pour
  •   Work Zone Hazard        Constructability
  •   Traffic Control Costs   Need for Standardization
  •   QA Inspection Time
Less Impacts to Public
Higher Strength Material




                                                         23
Next Project
 I-10, Val Vista Road to Earley Road
Greg Bambauer, Parsons Brinckerhoff




                                       24
I-10, Val Vista Road to
               Earley Road
Nine-mile interim widening project
A total of 44 cross-drainage structures
•   24 box culvert extensions
     o   6-Single Cells
     o   6-Double Cells
     o   8-Triple Cells
     o   1-Four Cell
     o   1-Five Cell
     o   1-Six Cell



                                          25
I-10, Val Vista Road to
               Earley Road
Discussions with District identified design criteria
• Limit precast extensions to 3-cells or less
• Minimize closure pour
     o   Preference to 1-foot
•   PB structural engineers designed the closure pour
    and the cast-in-place end section




                                                        26
I-10, Val Vista Road to
             Earley Road
3-Cell Closure




                                 27
I-10, Val Vista Road to
            Earley Road
3-Cell Closure




                                28
I-10, Val Vista Road to
          Earley Road
CIP closure and end Section
•   No standard available
•   Many precast options: choice is difficult
     o   Need to design a generic closure and end section
•   District provided previous design for closure pour
•   PB reviewed and revised slightly to achieve
    enhanced strength




                                                            29
I-10, Val Vista Road to
      Earley Road




                          30
I-10, Val Vista Road to
               Earley Road
Construction Award
•   Manufacturer Submitted Shop Drawings for Review
•   Identified Large Bevels at Base of Precast Section
     o   Concerns
            Hydraulics
            Transition to CIP is Abrupt
            Potential Debris Collection




                                                         31
Hydraulics
Haunches        Abrupt Transition




                                    32
I-10, Val Vista Road to
      Earley Road
 Concerns
 •   Hydraulics
      o   Conducted a simplified HECRAS analysis
          for low flows through Structure
      o   Found minor increases in headwater




                                                   33
I-10, Val Vista Road to Earley
             Road                                               Change In Headloss
Hydraulics                                                                                       ∆hL=0.10'
                                  12.0%                                     ∆hL=0.10'
• Single 10’x4’ CBC
• Varied discharge                10.0%                         ∆hL=0.07'




                                                                                                  ∆hL=0.04'
• Compared                                 8.0%




                                                                                     ∆hL=0.03'
                            Increase (%)




                                                                      ∆hL=0.02'
    o Standard CIP                         6.0%   ∆hL=0.04'




                                                    ∆hL=0.01'
    o Precast with abrupt
                                           4.0%
      and smooth
      transition                           2.0%

                                           0.0%
                                                        50            100               150        200
                                                                            Flow Rates (cfs)
                                Standard Coefficients
                                Smooth: 0.1 Contraction and 0.3 Expansion
                                Abrupt: 0.3 Contraction and 0.5 Expansion


                                                                                                              34
I-10, Val Vista Road to
               Earley Road
Concerns, con’t
•   Potential Debris Collection
     o   Transition to CIP End section to precast section is abrupt
     o   Revised detail to provide smoothing within the closure and CIP
         end section to mitigate clogging & enhance performance




                                                                          35
I-10, Val Vista Road to
      Earley Road
   Revised Detail for Smoothing




                                  36
I-10, Val Vista Road to
      Earley Road




                          37
Next Project
SR 86, Kitt Peak Segment
 Rick Solis, Kimley-Horn




                           38
SR 86, Kitt Peak Segment


PROJECT BACKGROUND
 4.3 Mile Roadway Widening Project
 Purpose to improve Safety and Operational
 Characteristics
 Rural Roadway Located Approx. 30 miles Southwest of
 Tucson and within the Tohono O'odham Nation
 44 Total Cross Drainage Structures


                                                       39
SR 86, Kitt Peak Segment
 General Considerations
 •   Number of barrels
 •   Existing skew vs. extension skew
       o Design the extension to the flow-line path
       o Hydraulic limitation
 •   Field measure existing CBC wall thickness
 •   Utilize AASHTO guidelines for precast unit dimensions
 •   Design extension to clear zone with 1-foot holdback
 •   Determine the required closure pour width (2-foot minimum)
 •   Duration of closure




                                                                  40
SR 86, Kitt Peak Segment
 Closure-pour and end section design considerations
 •   Minimum closure length: 2-foot
      o   Allows for a transition between existing CBC and precast CBC
      o   Allows for development of edge beam
      o   Constructability is driving the minimum closure length
 •   Closure-pour transition rate
      o   2:1 maximum
 •   Precast extensions are designed with 1-foot holdback
      o Allows for development of edge beam incorporated into CIP
        headwalls and wing walls
      o Allows for construction of haunch transitions and wedge transition




                                                                             41
SR 86, Kitt Peak Segment
Closure pour and end section
design considerations, cont’d
• AASHTO standards include
  haunches at all four corners
• Haunches require transitions at the
  bottom of the corners within the
  closure and end section
• Some precast companies in Arizona
  do not have forms for the AASHTO
  standard
• Review shop drawings for
  concurrence with AASHTO




                                        42
SR 86 Kitt Peak Segment
 Moving Beyond the Old 3-Cell Limit for Extensions
 •   Consultation with Local Contractors
 •   4-Cell Box Culvert Extension Using Precast Box Culverts
      o   Resulting 3-foot Closure Pour
 •   8-Cell Extension Using Precast Box Culverts
      o   Resulting 6-ft Closure Pour
 •   Project is expected to Bid April 2012




                                                               43
8-Cell Box Extension




                       44
Further Evaluation
      Cost / Benefit




                       45
Cost - Benefit Analysis
Acceleration of construction
 • Reduced Work Zone Exposure
 • Reduced Impact to Traffic
 • Reduced Inspection Time
Higher Strength Material
Reduced Material Waste (Concrete, Forms, etc…)
Partnering Between ADOT, Contractors and material suppliers
improves construction efficiency and reduces Public Expenditures




                                                                   46
Precast verses Cast-In-Place




                               47
Maintenance and Protection
     of Traffic (MPT)
 MPT costs include traffic control devices
 Cost can vary
 Shorter schedules reduce MPT costs




                                             48
User Costs
User costs through the traffic control factor
• Travel delays as a result of speed limit reductions
• Queues as a result of lane capacity reductions
• Travel time for use of detours
• Delays from flagging operations




                                                        49
Compare MPT and User Costs
 Precast verses Cast-In-Place
 Determine MPT Costs:
  • Determine a traffic control plan
  • Quantify traffic control items
  • Estimate duration for Precast and for Cast-In-Place
  • Summarize MPT costs for Precast and Cast-In-Place




                                                          50
Compare MPT and User Costs
 Precast verses Cast-In-Place
 Determine User Cost Approach
 •   FHWA has outline of user cost and considerations

 •   NJDOT has developed Road User Cost Manual
     with worksheets for quantifying costs




                                                        51
Compare MPT and User Costs
 Precast verses Cast-In-Place
 Compare Costs
 •   Total MPT, User Costs, Construction Costs
      o   Precast
      o   Cast-In-Place
 • Compare cost differential
 • Evaluate the overall benefits/costs
      o   Are costs worth the savings?




                                                 52
Compare MPT and User Costs
 Precast verses Cast-In-Place
 Example – SR 79 Culvert Extension
  •   MPT Costs - Typical flagging MPT plan
       o   Includes: Vertical Panels, Portable Sign Stands,
           Type A and C Warning Lights, Signs, and Flagging Services
       o   Duration Estimated: 250 Days for Precast
                                330 Days for Cast-In-Place
       o   MPT costs estimated: $76,000 – Precast
                                  $104,000 – Cast-In-Place




                                                                       53
Compare MPT and User Costs
 Precast verses Cast-In-Place
 Example – SR 79 Culvert Extension
 •   User Costs – Using NJDOT Spreadsheets
      o   SR 79, 2-lane roadway, 3000 ADT
      o   No anticipated queues from MPT plan
      o   No detour delays
      o   Travel delay in reducing speed from 65 to 35 mph
          through work zone
      o   Calculated Road User Costs factoring CPI: $800/day
      o   Estimated User Cost: $200,000 – Precast
                                $264,000 – Cast-In-Place


                                                               54
Compare MPT and User Costs
 Precast verses Cast-In-Place
Example – SR 79 Culvert Extension

                              Cost Comparison
                     MPT            User     Construction    Total

     Precast       $76,000        $200,000      $483,000    $759,000


   Cast-In-Place   $104,000       $264,000      $480,000    $848,000




                                                                       55
Other Costs
 Work Zone Exposure
 Client Internal Costs
 •   Inspector Time
 •   Certificate Processing
 Contractor Overhead
 •   Move to next project sooner
 Efficiency Leads to Cost Saving




                                   56
FUTURE
Todd Emery, ADOT Tucson District Engineer




                                            57
FUTURE
Precast Transition/Connection
•   Alternative Connection Options
Precast Wingwalls
Standardization of Precast Box Culverts
•   ADOT Bridge Group
Other Precast Elements
• Bridge Substructure
• Bridge Decks




                                          58
QUESTIONS



            59

Contenu connexe

Tendances

teknologi kinerja (intervention selection tool)
teknologi kinerja (intervention selection tool)teknologi kinerja (intervention selection tool)
teknologi kinerja (intervention selection tool)Aprilia putri
 
Perkembangan dan pemanfaatan teknologi dalam dunia pendidikan
Perkembangan dan pemanfaatan teknologi dalam dunia pendidikanPerkembangan dan pemanfaatan teknologi dalam dunia pendidikan
Perkembangan dan pemanfaatan teknologi dalam dunia pendidikanFrisilia Bukamo
 
Construct Validity
Construct ValidityConstruct Validity
Construct Validityguest3f37c
 
Telecommunications and networks
Telecommunications and networksTelecommunications and networks
Telecommunications and networksSopon Tumchota
 
Wireless Communication Technologies (WIFI ,Bluetooth , NFC )
Wireless Communication Technologies (WIFI ,Bluetooth , NFC )Wireless Communication Technologies (WIFI ,Bluetooth , NFC )
Wireless Communication Technologies (WIFI ,Bluetooth , NFC )layth jasim
 
Computer communication
Computer communicationComputer communication
Computer communicationMukul Kumar
 
20372748 case-study-on-computer-networking-kotak-mahindra-bank
20372748 case-study-on-computer-networking-kotak-mahindra-bank20372748 case-study-on-computer-networking-kotak-mahindra-bank
20372748 case-study-on-computer-networking-kotak-mahindra-bankShivani Joshi
 

Tendances (9)

teknologi kinerja (intervention selection tool)
teknologi kinerja (intervention selection tool)teknologi kinerja (intervention selection tool)
teknologi kinerja (intervention selection tool)
 
Perkembangan dan pemanfaatan teknologi dalam dunia pendidikan
Perkembangan dan pemanfaatan teknologi dalam dunia pendidikanPerkembangan dan pemanfaatan teknologi dalam dunia pendidikan
Perkembangan dan pemanfaatan teknologi dalam dunia pendidikan
 
Materi 1; tik
Materi 1; tikMateri 1; tik
Materi 1; tik
 
Construct Validity
Construct ValidityConstruct Validity
Construct Validity
 
Telecommunications and networks
Telecommunications and networksTelecommunications and networks
Telecommunications and networks
 
Wireless Communication Technologies (WIFI ,Bluetooth , NFC )
Wireless Communication Technologies (WIFI ,Bluetooth , NFC )Wireless Communication Technologies (WIFI ,Bluetooth , NFC )
Wireless Communication Technologies (WIFI ,Bluetooth , NFC )
 
Computer communication
Computer communicationComputer communication
Computer communication
 
case study
case studycase study
case study
 
20372748 case-study-on-computer-networking-kotak-mahindra-bank
20372748 case-study-on-computer-networking-kotak-mahindra-bank20372748 case-study-on-computer-networking-kotak-mahindra-bank
20372748 case-study-on-computer-networking-kotak-mahindra-bank
 

En vedette

Jensen Precast Redi-Rock Retaining Walls
Jensen Precast Redi-Rock Retaining WallsJensen Precast Redi-Rock Retaining Walls
Jensen Precast Redi-Rock Retaining WallsJensen Precast
 
Analysis of box culvert cost optimization for different aspect ratios of cell
Analysis of box culvert   cost optimization for different aspect ratios of cellAnalysis of box culvert   cost optimization for different aspect ratios of cell
Analysis of box culvert cost optimization for different aspect ratios of celleSAT Publishing House
 
Moldtech SL - Moulds for precast concrete catalogue
Moldtech SL - Moulds for precast concrete catalogueMoldtech SL - Moulds for precast concrete catalogue
Moldtech SL - Moulds for precast concrete catalogueMoldtech SL
 
Perfect Manhole cpd
Perfect Manhole cpdPerfect Manhole cpd
Perfect Manhole cpdDan Mulkern
 
Faswall® Building Project
Faswall® Building ProjectFaswall® Building Project
Faswall® Building Projectstephenpalmer76
 
Prepare for the "How will You Contribute to our Success" Job Interview Question
Prepare for the "How will You Contribute to our Success" Job Interview QuestionPrepare for the "How will You Contribute to our Success" Job Interview Question
Prepare for the "How will You Contribute to our Success" Job Interview QuestionDan Armishaw
 
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsKeep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsCommunications Branding
 
Rcc box culvert methodology and designs including computer method
Rcc box culvert   methodology and designs including computer methodRcc box culvert   methodology and designs including computer method
Rcc box culvert methodology and designs including computer methodcoolidiot07
 
Asentamiento en suelos granulares
Asentamiento en suelos granularesAsentamiento en suelos granulares
Asentamiento en suelos granularessondorman
 
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionM.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionvaignan
 
11.effects of bad drainage on roads
11.effects of bad drainage on roads11.effects of bad drainage on roads
11.effects of bad drainage on roadsAlexander Decker
 
Experimental study of precast portal frame
Experimental study of precast portal frameExperimental study of precast portal frame
Experimental study of precast portal frameSatish Kambaliya
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction ReportSheau Hui Tan
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Communications Branding
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...Bhaddin Al-Naqshabandi
 
Marketing strategy mba ppt
Marketing strategy mba pptMarketing strategy mba ppt
Marketing strategy mba pptBabasab Patil
 

En vedette (20)

Jensen Precast Redi-Rock Retaining Walls
Jensen Precast Redi-Rock Retaining WallsJensen Precast Redi-Rock Retaining Walls
Jensen Precast Redi-Rock Retaining Walls
 
Analysis of box culvert cost optimization for different aspect ratios of cell
Analysis of box culvert   cost optimization for different aspect ratios of cellAnalysis of box culvert   cost optimization for different aspect ratios of cell
Analysis of box culvert cost optimization for different aspect ratios of cell
 
Moldtech SL - Moulds for precast concrete catalogue
Moldtech SL - Moulds for precast concrete catalogueMoldtech SL - Moulds for precast concrete catalogue
Moldtech SL - Moulds for precast concrete catalogue
 
Perfect Manhole cpd
Perfect Manhole cpdPerfect Manhole cpd
Perfect Manhole cpd
 
Faswall® Building Project
Faswall® Building ProjectFaswall® Building Project
Faswall® Building Project
 
Diseño de sapatas
Diseño de sapatasDiseño de sapatas
Diseño de sapatas
 
Prepare for the "How will You Contribute to our Success" Job Interview Question
Prepare for the "How will You Contribute to our Success" Job Interview QuestionPrepare for the "How will You Contribute to our Success" Job Interview Question
Prepare for the "How will You Contribute to our Success" Job Interview Question
 
Vm house
Vm house Vm house
Vm house
 
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsKeep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
 
Rcc box culvert methodology and designs including computer method
Rcc box culvert   methodology and designs including computer methodRcc box culvert   methodology and designs including computer method
Rcc box culvert methodology and designs including computer method
 
Asentamiento en suelos granulares
Asentamiento en suelos granularesAsentamiento en suelos granulares
Asentamiento en suelos granulares
 
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionM.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
 
11.effects of bad drainage on roads
11.effects of bad drainage on roads11.effects of bad drainage on roads
11.effects of bad drainage on roads
 
Experimental study of precast portal frame
Experimental study of precast portal frameExperimental study of precast portal frame
Experimental study of precast portal frame
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction Report
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...
 
Mpat tahap 3
Mpat tahap 3Mpat tahap 3
Mpat tahap 3
 
Marketing strategy mba ppt
Marketing strategy mba pptMarketing strategy mba ppt
Marketing strategy mba ppt
 

Similaire à Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts - ADOT, Tucson District

Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...mecocca5
 
M station Additional HCl Storage TanKs
 M station Additional HCl Storage TanKs M station Additional HCl Storage TanKs
M station Additional HCl Storage TanKsAhmad Moharram
 
Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...
Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...
Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...marcus evans Network
 
Proof load testing of the viaduct De Beek
Proof load testing of the viaduct De BeekProof load testing of the viaduct De Beek
Proof load testing of the viaduct De BeekEva Lantsoght
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007yudi05
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxodiliagilby
 
Proposed stop criteria for proof load testing of concrete bridges and verific...
Proposed stop criteria for proof load testing of concrete bridges and verific...Proposed stop criteria for proof load testing of concrete bridges and verific...
Proposed stop criteria for proof load testing of concrete bridges and verific...Eva Lantsoght
 
Proof load testing of viaduct De Beek
Proof load testing of viaduct De BeekProof load testing of viaduct De Beek
Proof load testing of viaduct De BeekEva Lantsoght
 
Civil - Structural Works
Civil - Structural WorksCivil - Structural Works
Civil - Structural WorksBabu Arumugam
 
Advancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanksAdvancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanksAudubon Engineering Company
 
Final Presentation
Final PresentationFinal Presentation
Final PresentationMonique F M
 
Ken Edgar CV
Ken Edgar CVKen Edgar CV
Ken Edgar CVKen Edgar
 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)dgonano
 
Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsM.T.H Group
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsHammerHead Trenchless Equipment
 
Collie Hub presentation groundwater issues
Collie Hub presentation groundwater issuesCollie Hub presentation groundwater issues
Collie Hub presentation groundwater issuesGlobal CCS Institute
 
Professional WORK EXPERIENCE
Professional WORK EXPERIENCEProfessional WORK EXPERIENCE
Professional WORK EXPERIENCEJesse Marley
 
Water pipe Lines Progress Planned Vs actual.pptx
Water pipe Lines  Progress Planned Vs actual.pptxWater pipe Lines  Progress Planned Vs actual.pptx
Water pipe Lines Progress Planned Vs actual.pptxDILIP KUMAR M.Tech (ACT)
 
WSPE Seminar 1 May 15, 2009 WADOT
WSPE Seminar 1 May 15, 2009 WADOTWSPE Seminar 1 May 15, 2009 WADOT
WSPE Seminar 1 May 15, 2009 WADOTWSPE
 

Similaire à Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts - ADOT, Tucson District (20)

Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...
 
M station Additional HCl Storage TanKs
 M station Additional HCl Storage TanKs M station Additional HCl Storage TanKs
M station Additional HCl Storage TanKs
 
Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...
Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...
Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...
 
Proof load testing of the viaduct De Beek
Proof load testing of the viaduct De BeekProof load testing of the viaduct De Beek
Proof load testing of the viaduct De Beek
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
 
Proposed stop criteria for proof load testing of concrete bridges and verific...
Proposed stop criteria for proof load testing of concrete bridges and verific...Proposed stop criteria for proof load testing of concrete bridges and verific...
Proposed stop criteria for proof load testing of concrete bridges and verific...
 
Proof load testing of viaduct De Beek
Proof load testing of viaduct De BeekProof load testing of viaduct De Beek
Proof load testing of viaduct De Beek
 
Civil - Structural Works
Civil - Structural WorksCivil - Structural Works
Civil - Structural Works
 
Advancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanksAdvancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanks
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
Ken Edgar CV
Ken Edgar CVKen Edgar CV
Ken Edgar CV
 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)
 
Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirs
 
Recent Trends in Pile Foundations Auger Cast Piles for Low Noise / Low Vibration
Recent Trends in Pile Foundations Auger Cast Piles for Low Noise / Low VibrationRecent Trends in Pile Foundations Auger Cast Piles for Low Noise / Low Vibration
Recent Trends in Pile Foundations Auger Cast Piles for Low Noise / Low Vibration
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
 
Collie Hub presentation groundwater issues
Collie Hub presentation groundwater issuesCollie Hub presentation groundwater issues
Collie Hub presentation groundwater issues
 
Professional WORK EXPERIENCE
Professional WORK EXPERIENCEProfessional WORK EXPERIENCE
Professional WORK EXPERIENCE
 
Water pipe Lines Progress Planned Vs actual.pptx
Water pipe Lines  Progress Planned Vs actual.pptxWater pipe Lines  Progress Planned Vs actual.pptx
Water pipe Lines Progress Planned Vs actual.pptx
 
WSPE Seminar 1 May 15, 2009 WADOT
WSPE Seminar 1 May 15, 2009 WADOTWSPE Seminar 1 May 15, 2009 WADOT
WSPE Seminar 1 May 15, 2009 WADOT
 

Dernier

Design and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryDesign and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryrioverosanniejoy
 
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一diploma 1
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
Chapter 6(1)system devolopment life .ppt
Chapter 6(1)system devolopment life .pptChapter 6(1)system devolopment life .ppt
Chapter 6(1)system devolopment life .pptDoaaRezk5
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
澳洲UQ学位证,昆士兰大学毕业证书1:1制作
澳洲UQ学位证,昆士兰大学毕业证书1:1制作澳洲UQ学位证,昆士兰大学毕业证书1:1制作
澳洲UQ学位证,昆士兰大学毕业证书1:1制作aecnsnzk
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Servicejennyeacort
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...Rishabh Aryan
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
Iconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic global solution
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一A SSS
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social MediaD SSS
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...mrchrns005
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 

Dernier (20)

Design and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryDesign and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industry
 
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
Chapter 6(1)system devolopment life .ppt
Chapter 6(1)system devolopment life .pptChapter 6(1)system devolopment life .ppt
Chapter 6(1)system devolopment life .ppt
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
澳洲UQ学位证,昆士兰大学毕业证书1:1制作
澳洲UQ学位证,昆士兰大学毕业证书1:1制作澳洲UQ学位证,昆士兰大学毕业证书1:1制作
澳洲UQ学位证,昆士兰大学毕业证书1:1制作
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
Iconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing services
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 

Innovation - Extending Cast-In-Place Box Culverts with Precast Box Culverts - ADOT, Tucson District

  • 1. Innovation Extending Cast-In-Place Box Culverts With Precast Box Culverts ADOT Tucson District 1
  • 2. WHY PRECAST ? Anticipated future improvements of transportation system • Upgrades • Widening current roadways Increased capacity Safety improvements Less impact to traveling public during construction Improvements of internal costs for construction through work zone efficiency 2
  • 3. Innovative Construction Methods Precast concrete pipes Implemented use of precast items • AASHTO Girders • Concrete Barrier • MSE Wall Panels • Cattle Guards • Catch Basins • Manholes Precast box culverts • Accelerates construction schedule • Reduces work zone exposure to traveling public and workers 3
  • 4. Recent Projects with Precast CBCs SR 79, MP 124.1 to 127.4 (Constructed) • First Tucson District Project with Precast Box Culverts SR 86, Brawley Wash to MP 141 (Constructed) SR 86, MP 141 to Reservation Boundary (Constructed) I-10, Val Vista Road to Earley Road (Parsons Brinckerhoff) (Under Construction) SR 86, San Pedro Segment (Under Construction) SR 86, Kitt Peak (Kimley-Horn) (Stage IV) SR 86, Santa Rosa Segment (Stage IV) SR 86, Fresnal to Sells (Stage II) 4
  • 5. Projects SR 79, MP 124.1 to 125.7 James Gomes, ADOT R.E. 5
  • 6. SR 79, MP 124.1 to 125.7 6
  • 7. SR 79, MP 124.1 to 125.7 7
  • 8. SR 79, MP 124.1 to 125.7 Contract Documents • Special Provisions • Project specific requirements • Project Plans • Locations • Details • Standard Drawings • B-Standards • C-Standards 8
  • 9. SR 79, MP 124.1 to 125.7 Pre-Cast RCBC Submittal • Manufacturer through Contractor • ADOT Bridge Group • ADOT Review & Approval Production • Prepare formwork • Fabrication • Materials Group – Oversight and Inspection 9
  • 10. SR 79, MP 124.1 to 125.7 Project Site Preparation • Traffic Control • RCBC Wingwall and Headwall Removal • Structural Excavation • Bedding Material 10
  • 11. SR 79, MP 124.1 to 125.7 11
  • 12. SR 79, MP 124.1 to 125.7 Installation • Delivery and Inspection • Survey • Crane Location • Alignment and Installation • Finish Work 12
  • 13. SR 79, MP 124.1 to 125.7 Installation 13
  • 14. SR 79, MP 124.1 to 125.7 Installation 14
  • 15. SR 79, MP 124.1 to 125.7 Installation 15
  • 16. SR 79, MP 124.1 to 125.7 Installation 16
  • 17. SR 79, MP 124.1 to 125.7 Installation 17
  • 18. SR 79, MP 124.1 to 125.7 Closure Pour • Approved Concrete Mix • Reinforcement • Formwork • Constructability Issues o Rebar Clearances o Formwork o Concrete Clearances 18
  • 22. SR 79, MP 124.1 to 125.7 Backfill and Clean-up 22
  • 23. Lessons Learned Benefits Drawbacks Reduced Durations Closure Pour • Work Zone Hazard Constructability • Traffic Control Costs Need for Standardization • QA Inspection Time Less Impacts to Public Higher Strength Material 23
  • 24. Next Project I-10, Val Vista Road to Earley Road Greg Bambauer, Parsons Brinckerhoff 24
  • 25. I-10, Val Vista Road to Earley Road Nine-mile interim widening project A total of 44 cross-drainage structures • 24 box culvert extensions o 6-Single Cells o 6-Double Cells o 8-Triple Cells o 1-Four Cell o 1-Five Cell o 1-Six Cell 25
  • 26. I-10, Val Vista Road to Earley Road Discussions with District identified design criteria • Limit precast extensions to 3-cells or less • Minimize closure pour o Preference to 1-foot • PB structural engineers designed the closure pour and the cast-in-place end section 26
  • 27. I-10, Val Vista Road to Earley Road 3-Cell Closure 27
  • 28. I-10, Val Vista Road to Earley Road 3-Cell Closure 28
  • 29. I-10, Val Vista Road to Earley Road CIP closure and end Section • No standard available • Many precast options: choice is difficult o Need to design a generic closure and end section • District provided previous design for closure pour • PB reviewed and revised slightly to achieve enhanced strength 29
  • 30. I-10, Val Vista Road to Earley Road 30
  • 31. I-10, Val Vista Road to Earley Road Construction Award • Manufacturer Submitted Shop Drawings for Review • Identified Large Bevels at Base of Precast Section o Concerns  Hydraulics  Transition to CIP is Abrupt  Potential Debris Collection 31
  • 32. Hydraulics Haunches Abrupt Transition 32
  • 33. I-10, Val Vista Road to Earley Road Concerns • Hydraulics o Conducted a simplified HECRAS analysis for low flows through Structure o Found minor increases in headwater 33
  • 34. I-10, Val Vista Road to Earley Road Change In Headloss Hydraulics ∆hL=0.10' 12.0% ∆hL=0.10' • Single 10’x4’ CBC • Varied discharge 10.0% ∆hL=0.07' ∆hL=0.04' • Compared 8.0% ∆hL=0.03' Increase (%) ∆hL=0.02' o Standard CIP 6.0% ∆hL=0.04' ∆hL=0.01' o Precast with abrupt 4.0% and smooth transition 2.0% 0.0% 50 100 150 200 Flow Rates (cfs) Standard Coefficients Smooth: 0.1 Contraction and 0.3 Expansion Abrupt: 0.3 Contraction and 0.5 Expansion 34
  • 35. I-10, Val Vista Road to Earley Road Concerns, con’t • Potential Debris Collection o Transition to CIP End section to precast section is abrupt o Revised detail to provide smoothing within the closure and CIP end section to mitigate clogging & enhance performance 35
  • 36. I-10, Val Vista Road to Earley Road Revised Detail for Smoothing 36
  • 37. I-10, Val Vista Road to Earley Road 37
  • 38. Next Project SR 86, Kitt Peak Segment Rick Solis, Kimley-Horn 38
  • 39. SR 86, Kitt Peak Segment PROJECT BACKGROUND 4.3 Mile Roadway Widening Project Purpose to improve Safety and Operational Characteristics Rural Roadway Located Approx. 30 miles Southwest of Tucson and within the Tohono O'odham Nation 44 Total Cross Drainage Structures 39
  • 40. SR 86, Kitt Peak Segment General Considerations • Number of barrels • Existing skew vs. extension skew o Design the extension to the flow-line path o Hydraulic limitation • Field measure existing CBC wall thickness • Utilize AASHTO guidelines for precast unit dimensions • Design extension to clear zone with 1-foot holdback • Determine the required closure pour width (2-foot minimum) • Duration of closure 40
  • 41. SR 86, Kitt Peak Segment Closure-pour and end section design considerations • Minimum closure length: 2-foot o Allows for a transition between existing CBC and precast CBC o Allows for development of edge beam o Constructability is driving the minimum closure length • Closure-pour transition rate o 2:1 maximum • Precast extensions are designed with 1-foot holdback o Allows for development of edge beam incorporated into CIP headwalls and wing walls o Allows for construction of haunch transitions and wedge transition 41
  • 42. SR 86, Kitt Peak Segment Closure pour and end section design considerations, cont’d • AASHTO standards include haunches at all four corners • Haunches require transitions at the bottom of the corners within the closure and end section • Some precast companies in Arizona do not have forms for the AASHTO standard • Review shop drawings for concurrence with AASHTO 42
  • 43. SR 86 Kitt Peak Segment Moving Beyond the Old 3-Cell Limit for Extensions • Consultation with Local Contractors • 4-Cell Box Culvert Extension Using Precast Box Culverts o Resulting 3-foot Closure Pour • 8-Cell Extension Using Precast Box Culverts o Resulting 6-ft Closure Pour • Project is expected to Bid April 2012 43
  • 45. Further Evaluation Cost / Benefit 45
  • 46. Cost - Benefit Analysis Acceleration of construction • Reduced Work Zone Exposure • Reduced Impact to Traffic • Reduced Inspection Time Higher Strength Material Reduced Material Waste (Concrete, Forms, etc…) Partnering Between ADOT, Contractors and material suppliers improves construction efficiency and reduces Public Expenditures 46
  • 48. Maintenance and Protection of Traffic (MPT) MPT costs include traffic control devices Cost can vary Shorter schedules reduce MPT costs 48
  • 49. User Costs User costs through the traffic control factor • Travel delays as a result of speed limit reductions • Queues as a result of lane capacity reductions • Travel time for use of detours • Delays from flagging operations 49
  • 50. Compare MPT and User Costs Precast verses Cast-In-Place Determine MPT Costs: • Determine a traffic control plan • Quantify traffic control items • Estimate duration for Precast and for Cast-In-Place • Summarize MPT costs for Precast and Cast-In-Place 50
  • 51. Compare MPT and User Costs Precast verses Cast-In-Place Determine User Cost Approach • FHWA has outline of user cost and considerations • NJDOT has developed Road User Cost Manual with worksheets for quantifying costs 51
  • 52. Compare MPT and User Costs Precast verses Cast-In-Place Compare Costs • Total MPT, User Costs, Construction Costs o Precast o Cast-In-Place • Compare cost differential • Evaluate the overall benefits/costs o Are costs worth the savings? 52
  • 53. Compare MPT and User Costs Precast verses Cast-In-Place Example – SR 79 Culvert Extension • MPT Costs - Typical flagging MPT plan o Includes: Vertical Panels, Portable Sign Stands, Type A and C Warning Lights, Signs, and Flagging Services o Duration Estimated: 250 Days for Precast 330 Days for Cast-In-Place o MPT costs estimated: $76,000 – Precast $104,000 – Cast-In-Place 53
  • 54. Compare MPT and User Costs Precast verses Cast-In-Place Example – SR 79 Culvert Extension • User Costs – Using NJDOT Spreadsheets o SR 79, 2-lane roadway, 3000 ADT o No anticipated queues from MPT plan o No detour delays o Travel delay in reducing speed from 65 to 35 mph through work zone o Calculated Road User Costs factoring CPI: $800/day o Estimated User Cost: $200,000 – Precast $264,000 – Cast-In-Place 54
  • 55. Compare MPT and User Costs Precast verses Cast-In-Place Example – SR 79 Culvert Extension Cost Comparison MPT User Construction Total Precast $76,000 $200,000 $483,000 $759,000 Cast-In-Place $104,000 $264,000 $480,000 $848,000 55
  • 56. Other Costs Work Zone Exposure Client Internal Costs • Inspector Time • Certificate Processing Contractor Overhead • Move to next project sooner Efficiency Leads to Cost Saving 56
  • 57. FUTURE Todd Emery, ADOT Tucson District Engineer 57
  • 58. FUTURE Precast Transition/Connection • Alternative Connection Options Precast Wingwalls Standardization of Precast Box Culverts • ADOT Bridge Group Other Precast Elements • Bridge Substructure • Bridge Decks 58
  • 59. QUESTIONS 59