Form work
General
 For the different construction activities like
 Brick work above 5 ft
 Surface finishing works like plastering, painting, walling
etc.
 Renovation, repair and alteration works.
 Roof and slab pouring
Some temporary nature supports and structures are required
like
 Formwork (Supporting Structure)
 Scaffoldings (arrangement for working plate forms)
 Shoring (supporting method for unsafe structure)
 Underpinning (Method of strengthening an existing
structure’s footing)
Form work
 Definition
 Qualities of formwork
 Types of formwork
 Formwork detail for different structural
members
 Removal of formwork
 Maintenance of formwork
 Cost of formwork
 Advantages of steel form work
Definition
 Its is an artificial support provided below and around
the precast or cast in situ concrete work.
 Formwork is commonly made of
 Steel
 wood
 Formwork construction & casting is of prime
importance in concrete industry. It share a
significant amount of concrete cost. (20% to 25%).
 When concrete has reached a certain required
strength, the form is no longer needed & removed.
The operation of removing the form work is known
as stripping.
Qualities of formwork
 It should be according to
IS 456-2000.
 It should be practically water proof so
that it should not absorb water from
concrete.
 It should be strong.
 It can be cheaper & reusable
 It should be according to the size of
member.
Qualities of formwork
 It should be with minimum shrinkage &
swelling.
 It should be stiff enough against it’s
deflection, buckling under load.
 Its contact surface should be uniform.
 It should be light in weight
Types of formwork
 Formwork are mainly of two types
 Steel formwork
 Wooden formwork
 Steel formwork is made of
 steel sheets
 Angle Iron
 Tee Iron
 Wooden formwork consists of
 Props
 Planks battens
 Ledgers
 sheeting
Causes of failure
 Overloading of any props when
sufficient number or size of props not
provided.
 Failure of shuttering due to excessive
vibrations of needle surface vibrators.
 Failure due to improper supervision,
inadequate design/ planning of
shuttering, centering & concreting
activity.
Causes of failure
 Failure due to dislocation of props or
bracing due to careless movement of
labours having access below the
formwork of slab or beam.
 Failure due to insufficient cross
bracing. Cross bracing improve the
stiffness of props against buckling.
Formwork detail for different
structural members
 In concrete construction formwork is
commonly provided for the following
structural members.
 Foundations
 Wall
 Column
 Slabs & beams
 Stairs
Formwork for Foundations
 Wall foundations
 It consists of
 Plywood
Sheeting
 Struts
Formwork for Foundations
 Column
Foundations
 It consists of
 Side Supports
 Side Planks
 Cleats
Side Support
Side Planks
Cleats
Formwork
for Wall
 It consists of
 Timber sheeting
 Vertical posts
 Horizontal members
 Rackers
 Stakes
 Wedges
 After completing
one side of
formwork
reinforcement is
provided at the
place then the
second side
formwork is
provided.
Vertical Posts
Struts
Formwork for
Column
 It consists of the
following
 Side & End Planks
 Yoke
 Nut & Bolts
 Two end & two side
planks are joined by
the yokes and bolts.
Column
form work
Formwork for Slabs & beams
 It consists of
 Sole plates
 Wedges
 Props
 Head tree
 Planks
 Batten
 Ledgers
 Beam formwork
rests on head tree
 Slab form work rests
on battens and joists
 If prop height are
more than 8’ provide
horizontal braces.
Lintel or Beam Formwork
Formwork for Stairs
 It consists of
 Vertical & inclined
posts
 Inclined members
 Wooden Planks or
sheeting
 Stringer
 Riser Planks
Riser Planks
Removal of formwork
Time of formwork removal mainly depends on
the following factors
1. Type of Cement
1. Rapid hardening cements require lesser time as
compared to OPC (Ordinary Portland Cement)
2. Ratio of concrete mix
1. Rich ratio concrete gain strength earlier as
compared to weak ratio concrete.
3. Weather condition
1. Hydration process accelerates in hot weather
conditions as compared to cold and humid
weather conditions.
Stripping Time
Sr.
No.
Structural Member Stripping Time
1 Beam sides, walls & Columns 1-2 Days as decided by
Engineer-in-charge
2 Slab Soffits (props left under) 3 Days
3 Beams Soffits (props left under) 7 Days
4 Removal of props to slabs:
i) Spanning up to 4.5 m
ii) Spanning over 4.5 m
7 Days
14 Days
5 Removal of props to Beams & Arches:
i) Spanning up to 6 m
ii) Spanning over 6 m
14 Days
21 Days
Maintenance of formwork
 Due to continuous use wooden planks &
steel plates surfaces become uneven and
require maintenance.
 For wooden formwork use cardboard or
plastic fiber board. Bolt hole places must
also be repaired.
 For steel formwork plates must be leveled
by mallet and loose corners must be
welded.
Cost of formwork
 For normal works cost of formwork is about
30%-40% of the concrete cost.
 For special works cost of formwork is about
50%-60% of the concrete cost.
 Formwork cost is controlled by the following
factors
 Formwork Material cost
 Formwork erecting cost
 Formwork removal cost
 Formwork jointing cost (Nails and Cables)
 Labor charges.
Advantages of steel form work
 It can be used for a numbers of times.
 It is non absorbent.
 Smooth finish surface obtained.
 No shrinkage of formwork occurs.
 Easy to use.
 Its volume is less
 Its strength is more.
Formwork

Contenu connexe

Tendances (20)

Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
 
Foundation & Footings
Foundation & FootingsFoundation & Footings
Foundation & Footings
 
Scaffolding, underepinning and shoring
Scaffolding, underepinning and shoringScaffolding, underepinning and shoring
Scaffolding, underepinning and shoring
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Shoring and underpinning
Shoring and underpinningShoring and underpinning
Shoring and underpinning
 
Bricks
BricksBricks
Bricks
 
Formwork
FormworkFormwork
Formwork
 
Staircases
StaircasesStaircases
Staircases
 
Dampness in buildings
Dampness in buildingsDampness in buildings
Dampness in buildings
 
SCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNINGSCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNING
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU
 
Concrete
ConcreteConcrete
Concrete
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Retaining walls
Retaining walls Retaining walls
Retaining walls
 
Stairs
StairsStairs
Stairs
 
Staircase
StaircaseStaircase
Staircase
 

Similaire à Formwork

8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdfFaizanSolanki
 
8. formworks and scaffoldings
8. formworks and scaffoldings8. formworks and scaffoldings
8. formworks and scaffoldingsHamdija Velagic
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsHamdija Velagic
 
various types of scffolding and formwork with underpining
various types of scffolding and formwork with underpiningvarious types of scffolding and formwork with underpining
various types of scffolding and formwork with underpiningkuldeep361335
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdfFaizanSolanki
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities Pradumn Suryakar
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shutteringKishor Ade
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''Nabeel Rajpoot
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptxMr Amol Ghogare
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
04. superstructure
04. superstructure04. superstructure
04. superstructureThien Hee
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyI'mMiss Lily
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemIan Toisa
 

Similaire à Formwork (20)

8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
 
8. formworks and scaffoldings
8. formworks and scaffoldings8. formworks and scaffoldings
8. formworks and scaffoldings
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
 
formwork.pdf
formwork.pdfformwork.pdf
formwork.pdf
 
various types of scffolding and formwork with underpining
various types of scffolding and formwork with underpiningvarious types of scffolding and formwork with underpining
various types of scffolding and formwork with underpining
 
Temporary Works (Form Work)
Temporary Works (Form Work)Temporary Works (Form Work)
Temporary Works (Form Work)
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
FormWork
FormWork FormWork
FormWork
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
RCC Floor
RCC FloorRCC Floor
RCC Floor
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptx
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 
04. superstructure
04. superstructure04. superstructure
04. superstructure
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building System
 

Plus de Jitesh Dhule

Plus de Jitesh Dhule (10)

Stone masonry
Stone masonryStone masonry
Stone masonry
 
Safety in construction
Safety in constructionSafety in construction
Safety in construction
 
Foundation
FoundationFoundation
Foundation
 
Scaffolding & underpinning
Scaffolding & underpinningScaffolding & underpinning
Scaffolding & underpinning
 
Roofs
RoofsRoofs
Roofs
 
Masonry special features
Masonry special featuresMasonry special features
Masonry special features
 
Flooring
FlooringFlooring
Flooring
 
Doors and windows
Doors and windowsDoors and windows
Doors and windows
 
Bricks
BricksBricks
Bricks
 
Arches
ArchesArches
Arches
 

Dernier

Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 

Dernier (20)

Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 

Formwork

  • 2. General  For the different construction activities like  Brick work above 5 ft  Surface finishing works like plastering, painting, walling etc.  Renovation, repair and alteration works.  Roof and slab pouring Some temporary nature supports and structures are required like  Formwork (Supporting Structure)  Scaffoldings (arrangement for working plate forms)  Shoring (supporting method for unsafe structure)  Underpinning (Method of strengthening an existing structure’s footing)
  • 3. Form work  Definition  Qualities of formwork  Types of formwork  Formwork detail for different structural members  Removal of formwork  Maintenance of formwork  Cost of formwork  Advantages of steel form work
  • 4. Definition  Its is an artificial support provided below and around the precast or cast in situ concrete work.  Formwork is commonly made of  Steel  wood  Formwork construction & casting is of prime importance in concrete industry. It share a significant amount of concrete cost. (20% to 25%).  When concrete has reached a certain required strength, the form is no longer needed & removed. The operation of removing the form work is known as stripping.
  • 5. Qualities of formwork  It should be according to IS 456-2000.  It should be practically water proof so that it should not absorb water from concrete.  It should be strong.  It can be cheaper & reusable  It should be according to the size of member.
  • 6. Qualities of formwork  It should be with minimum shrinkage & swelling.  It should be stiff enough against it’s deflection, buckling under load.  Its contact surface should be uniform.  It should be light in weight
  • 7. Types of formwork  Formwork are mainly of two types  Steel formwork  Wooden formwork  Steel formwork is made of  steel sheets  Angle Iron  Tee Iron  Wooden formwork consists of  Props  Planks battens  Ledgers  sheeting
  • 8. Causes of failure  Overloading of any props when sufficient number or size of props not provided.  Failure of shuttering due to excessive vibrations of needle surface vibrators.  Failure due to improper supervision, inadequate design/ planning of shuttering, centering & concreting activity.
  • 9. Causes of failure  Failure due to dislocation of props or bracing due to careless movement of labours having access below the formwork of slab or beam.  Failure due to insufficient cross bracing. Cross bracing improve the stiffness of props against buckling.
  • 10. Formwork detail for different structural members  In concrete construction formwork is commonly provided for the following structural members.  Foundations  Wall  Column  Slabs & beams  Stairs
  • 11. Formwork for Foundations  Wall foundations  It consists of  Plywood Sheeting  Struts
  • 12. Formwork for Foundations  Column Foundations  It consists of  Side Supports  Side Planks  Cleats Side Support Side Planks Cleats
  • 13. Formwork for Wall  It consists of  Timber sheeting  Vertical posts  Horizontal members  Rackers  Stakes  Wedges  After completing one side of formwork reinforcement is provided at the place then the second side formwork is provided. Vertical Posts Struts
  • 14. Formwork for Column  It consists of the following  Side & End Planks  Yoke  Nut & Bolts  Two end & two side planks are joined by the yokes and bolts.
  • 16.
  • 17. Formwork for Slabs & beams  It consists of  Sole plates  Wedges  Props  Head tree  Planks  Batten  Ledgers  Beam formwork rests on head tree  Slab form work rests on battens and joists  If prop height are more than 8’ provide horizontal braces.
  • 18. Lintel or Beam Formwork
  • 19. Formwork for Stairs  It consists of  Vertical & inclined posts  Inclined members  Wooden Planks or sheeting  Stringer  Riser Planks Riser Planks
  • 20.
  • 21. Removal of formwork Time of formwork removal mainly depends on the following factors 1. Type of Cement 1. Rapid hardening cements require lesser time as compared to OPC (Ordinary Portland Cement) 2. Ratio of concrete mix 1. Rich ratio concrete gain strength earlier as compared to weak ratio concrete. 3. Weather condition 1. Hydration process accelerates in hot weather conditions as compared to cold and humid weather conditions.
  • 22. Stripping Time Sr. No. Structural Member Stripping Time 1 Beam sides, walls & Columns 1-2 Days as decided by Engineer-in-charge 2 Slab Soffits (props left under) 3 Days 3 Beams Soffits (props left under) 7 Days 4 Removal of props to slabs: i) Spanning up to 4.5 m ii) Spanning over 4.5 m 7 Days 14 Days 5 Removal of props to Beams & Arches: i) Spanning up to 6 m ii) Spanning over 6 m 14 Days 21 Days
  • 23. Maintenance of formwork  Due to continuous use wooden planks & steel plates surfaces become uneven and require maintenance.  For wooden formwork use cardboard or plastic fiber board. Bolt hole places must also be repaired.  For steel formwork plates must be leveled by mallet and loose corners must be welded.
  • 24. Cost of formwork  For normal works cost of formwork is about 30%-40% of the concrete cost.  For special works cost of formwork is about 50%-60% of the concrete cost.  Formwork cost is controlled by the following factors  Formwork Material cost  Formwork erecting cost  Formwork removal cost  Formwork jointing cost (Nails and Cables)  Labor charges.
  • 25. Advantages of steel form work  It can be used for a numbers of times.  It is non absorbent.  Smooth finish surface obtained.  No shrinkage of formwork occurs.  Easy to use.  Its volume is less  Its strength is more.