SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
BUILDING TECHNOLOGY 1 [BLD61403 / ARC3514 / ARC3512]
ASSIGNMENT 2 (40%) INDIVIDUAL
C O N S T R U C T I O N S O L U T I O N S
S E N T U L C O M M U N I T Y L I B R A R Y
NAME: LEE JO YEE
STUDENT ID: 0314880
TUTOR: MR.MOHD ADIB RAMLI
DATE OF SUBMISSION: 23/06/2016
TABLE OF CONTENT
1.0 INTRODUCTION & BUILDING PLANS
2.0 FAÇADE
2.1 PRECEDENT STUDY 1 - DOCUMENTATION CENTRE IN HINZERT in GERMANY /Wandel Hoefer Lorch + Hirsch
2.2 PRECEDENT STUDY 2 - BINH THANH HOUSE in VIETNAM / Vo Trong Nghia Architect
2.3 FAÇADE PROPOSAL 1
2.4 FAÇADE PROPOSAL 2
3.0 ROOF
3.1 PRECEDENT STUDY - HEYDAR ALIYEV CULTURAL CENTER in BAKU, AZERBAIJAN / ZAHA HADID
4.0 STRUCTURE
4.1 PRECEDENT STUDY 1 - COMMON AREAS OF PUBLIC MULTI-FAMILY HOUSING BUILDINGS / Studio af6
4.2 SECTIONAL PERSPECTIVE 1 (SCALE 1:30) – UPPER AND LOWER GROUND FLOOR
4.3 SECTIONAL PERSPECTIVE 2 (SCALE 1:30) – FIFTH FLOOR AND ROOF
5.0 REFERENCES
PAGE
1 – 3
4
5
6-7
8-9
10
11-12
13
14
15
LOWER GROUND FLOOR PLAN
SCALE 1:200
PROJECT: COMMUNITY LIBRARY
SITE: JALAN IPOH, SENTUL,
SELANGOR
AREA: 22941mm x 23000mm
PLOT RATIO: 1:4
NUMBER OF STOREY: 4
DESIGN STATEMENT:
The designed building specially
for the community of Sentul, not
just serves the function of a library
but also as a public nodes that
aims to gather and unite the
people.
The library provides an
alternative channel of
knowledge that the locals have
yet experience before and also
as a precious hub to record the
memory of Sentul.
1.0 INTRODUCTION
FIRST FLOOR PLAN
SCALE 1:200
UPPER GROUND FLOOR PLAN
SCALE 1:200
SECONDFLOOR PLAN
SCALE 1:200
THIRD FLOOR PLAN
SCALE 1:200
MATERIALS USED
1. Corten steel panels
2. Water repellent mineral-
fibre thermal insulation
3. Birch-veneered composite
wood board soffit
4. Gypsum fibreboard
5. Sound insulation mat
6. Steel I-beam
TYPE OF CONSTRUCTION
SYSTEM USED
Welding of metal: Joining of
two pieces metal together to
form one piece by heating the
metal to the melting points.
2.1 FAÇADE PRECEDENT STUDY 1
DOCUMENTATION CENTRE IN HINZERT in GERMANY
/Wandel Hoefer Lorch + Hirsch
The 43-meter-long structure occupies a gentle slope,
rising from two to seven meters in height. The all-in-
one structure, roof and façade consists of over three
thousand different triangular plates of 12-millimeter
Corten steel. The angles between the individual
panels were calculated to ensure that the elements
have an adequate structural height and that the
entire construction forms a rigid folded plate.
The expressive outer skin in oxidized steel is both load-
bearing structure and façade
Sources:
http://www.archdaily.com/317207/the-hinzert-museum-and-document-center-
wandel-hoefer-lorch-hirsch
ADVANTAGES / DISADVANTAGES INTEGRATION WITH STUDIO DESIGN
Advantages:
• maintenance free as its oxidised surfaces
are the desired effect
• Recyclable
• Low solar reflectivity
Disadvantages:
Insulation of the interiors are required such as
in this case study, there is an inner skin consists
of triangular birch plywood panels to protect
the document centre.
• Corten steel as a materials whereby the
weathering (rusted) effect is sough after as
a aesthetic quality. The materials darken its
colour from time to time symbolizes its age.
• The material tends to rejuvenate the
industrial era and to blend with the rich
historical background of Sentul where the
origin of train works started.
2.2 FAÇADE PRECEDENT STUDY 2
ADVANTAGES / DISADVANTAGES INTEGRATION WITH STUDIO DESIGN
Advantages:
• High thermal mass and provide cooling
effect to the interior
• Concrete are easily obtain and build
with
• Precast blocks posses great flexibility to
design and customize.
Disadvantages:
• Price of the precast blocks.
• Integrated with the concept of the
studio project: blends into the
neighbourhood in the day and
transform into a light lit monument at
night.
• Provide sharing from sun and rain.
• Blends in with the similar architecture
style to the context (Art Deco) and
remains uniquely modern.
• Allow framing of views
BINH THANH HOUSE in VIETNAM / Vo Trong Nghia Architect
Pattern blocks, which used to be a popular shading device
in Vietnam to get natural ventilation, are made of pre-cast
concrete with 60cm width and 40cm height. It not only
prevents the harsh sunlight and heavy rain but also
enhances the privacy and the safety.
MATERIALS USED
The concrete façade has
implied the materials of
1. Precast concrete pattern
blocks
2. Reinforced concrete bars
TYPE OF CONSTRUCTION
SYSTEM USED
Upon discussion with tutor,
conclusion is drawn that the
concrete blocks are precast
and can be easily lay with
cement on the wall.
However, the part where the
concrete blocks extend to
become an overhead ceiling
is perhaps, installed with rebar
in between, to fix them into
position, and rest on the core
beam.
2
3.1 ROOF PRECEDENT STUDY
ADVANTAGES / DISADVANTAGES INTEGRATION WITH STUDIO DESIGN
Advantages:
• Interesting and unique structure due to its
versatility in shape and form
• Light weight
• One of the Industrialised building
components which are often standard size
and shape
Disadvantages:
• High construction cost
• Slight complexion in structural engineering
• A wide span that enables a column free
floor plan for the library
• Strengthen the importance of the roof in
the urban infill
• Replace GFRP with lower cost materials like
fibreglass roof panels (FRP)
HEYDAR ALIYEV CULTURAL CENTER in BAKU,
AZERBAIJAN / ZAHA HADID
A very nimble two-layer space frame plays supportive
bridesmaid to the double envelope that curves smoothly along
the top and bottom of the exterior shell, hiding the skeletal
frame and emphasizing surface rather than structure, as
though the building were all effect and no cause. The 619,000-
square-foot cultural center—for which the client, DIA Holding,
also served as the design/build contractor—manifests the
lightness of a handkerchief billowing in free fall.
MATERIALS USED
Structure: Steel (space frame)
Cladding:
1. Glass Fibre Reinforced
Concrete(GFRC)
2. Glass Fibre Reinforced
Polyester (GFRP)
Reasons: allow for the powerful
plasticity of the building’s
design
TYPE OF CONSTRUCTION
SYSTEM USED
The construction system used is
the double-curved space
frame structure (single layer
membrane).
The axial tubes are joined
together by the MERO
connector consists of a node
that is a spherical hot-pressed
steel forging with flat facets
and tapped holes. Members
are circular hollow sections
with cone- shaped steel
forgings welded at the ends,
which accommodate
connecting bolts.
4.1 STRUCUTURE PRECEDENT STUDY 2
ADVANTAGES / DISADVANTAGES INTEGRATION WITH STUDIO DESIGN
Advantages:
• Stiffer and stronger than many other floor
system, so the weight and size of the
primary structure can be reduced.
Consequently, foundation sizes can be
reduced.
• Safe method and high speed of
construction
• Low cost (saves in transportation)
• Sustainability. 94% of all steel construction
products can be either re-used or recycled.
• Easy construction allow the local to be
involved in the building of the library.
• Low in construction cost
INTERVENTIONS IN COMMON AREAS OF
PUBLIC MULTI-FAMILY HOUSING BUILDINGS /
Studio af6
The bridge structures that contain the lifts are
formed by steel porticoes that span the distance
between the two buildings. Composite galvanized
steel floor decking with reinforced concrete was
used for the floor slabs. And the construction
process allowed for all the homes to be used during
building.
MATERIALS/
COMPONENTS USED
The layers consists of
1. steel deck (profiled
steel sheeting)
2. steel beam or joist
3. cast in situ concrete
topping
4. top reinforcement
mesh
5. bottom reinforcement
6. stud shear connectors
FLOORING SYSTEM:
COMPOSITE STEEL
DECK FLOORING
STRUCTURE SYSTEM:
UNIVERSAL STEEL
COLUMNS &
BEAMS
HOW IS THE SYSTEM CONSTRUCTED?
Steel decks are first lay on the primary and
secondary beams of the building. They are
installed and fastened with shear
connectors/studs through welding techniques.
After installing the slab reinforcement, proper
techniques or quality control are required to
pour the concrete to thickness.
Workmanship and sequences are important as
to prevent deflections, overloading of decks,
irregular surface and etc.
4.1 STRUCUTURE PRECEDENT STUDY 2
MATERIALS USED
Structure: Steel (Cold-Formed Steel Framing)
HOW IS THE SYSTEM CONSTRUCTED?
Steel framing is a practical, code approved solution
to many of the limitations that builders face today
when using traditional building materials.
Steel members are first built in a factory based on the
engineered drawings and layouts. They are precast
components which later arrived at the site and be
erected.
Shallow foundations with concrete floor base is
selected as the construction method for the
community library. Spread footings with steel columns
anchoring to the ground, reinforced with steel grid
are joined together with grade beams to form a grid
work of the slab.
There are various techniques and components for
columns and beam connections. I have adopted the
Stiffened Seated Connection which consists of the
seated angle and cleat angle attached to the
column flange. The structure can be further
enhanced will the angle clips.
Illustrations on the right from above show the
reference images of steel column base plate,
followed by the details of spread footing and lastly
the diagram showing the component in a stiffened
seated connection.
CLEAT ANGLE
SEATED ANGLE
5 REFERENCES:
1. The study of space frame:
http://3dspaceco.com/public/user_data/shokouh/%D9%85%D9%82%D8%A7%D
9%84%D8%A7%D8%AA%20%D9%84%D8%A7%D8%AA%DB%8C%D9%86/13.pdf
2. The study of types of space frames and joints:
a)http://www.slideshare.net/ogustians/space-framesmodular-construction-
technology
b)http://www.columbia.edu/cu/gsapp/BT/BSI/SPACEFRAME/spaceframe.html
3. The study on the failure of space frame:
http://failures.wikispaces.com/Kemper%20Arena,%20Kansas%20City,%20Missour
i
4. The study of typical steel connections:
http://www.engr.mun.ca/~adluri/courses/steel/ppt%20files1/Topic%20-
Connections%20-typical%20joints.pdf
5. The study of composite floor:
a)slab:http://www.scielo.br/img/revistas/jbsmse/v30n1/a09fig03.gif
b)http://www.detallesconstructivos.net/en/category/structures/floor-slabs

Contenu connexe

Tendances

GERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDYGERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDYAJAYS100
 
Raj rewal Asian games Village
Raj rewal Asian games VillageRaj rewal Asian games Village
Raj rewal Asian games VillageWaseem Noor
 
Aranya low cost housing-BV Doshi
Aranya low cost housing-BV DoshiAranya low cost housing-BV Doshi
Aranya low cost housing-BV Doshikusha Ahmed
 
Case study kohinoor square Mumbai
Case study kohinoor square MumbaiCase study kohinoor square Mumbai
Case study kohinoor square MumbaiTapu Taba
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasSustainable Performance Institute
 
Vellodrome Stadium ,London : Long span Structure
Vellodrome Stadium ,London : Long span StructureVellodrome Stadium ,London : Long span Structure
Vellodrome Stadium ,London : Long span StructureDanishPathan7
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use buildingshabbirtg
 
RADIAL CITY PLANNING
RADIAL CITY PLANNINGRADIAL CITY PLANNING
RADIAL CITY PLANNINGTazim Asraf
 
Architect Le corbusier and his works
Architect Le corbusier and his worksArchitect Le corbusier and his works
Architect Le corbusier and his worksOnal Kothari
 
Galaxy soho building beijing
Galaxy soho building beijingGalaxy soho building beijing
Galaxy soho building beijingRajat Nainwal
 

Tendances (20)

GERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDYGERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDY
 
Raj rewal Asian games Village
Raj rewal Asian games VillageRaj rewal Asian games Village
Raj rewal Asian games Village
 
Turning torso
Turning torsoTurning torso
Turning torso
 
Richard Rogers
Richard RogersRichard Rogers
Richard Rogers
 
Aranya low cost housing-BV Doshi
Aranya low cost housing-BV DoshiAranya low cost housing-BV Doshi
Aranya low cost housing-BV Doshi
 
Public Library Design
Public Library DesignPublic Library Design
Public Library Design
 
Raj rewal ppt
Raj rewal pptRaj rewal ppt
Raj rewal ppt
 
Case study kohinoor square Mumbai
Case study kohinoor square MumbaiCase study kohinoor square Mumbai
Case study kohinoor square Mumbai
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
 
Oscar niemeyer
Oscar niemeyerOscar niemeyer
Oscar niemeyer
 
Vellodrome Stadium ,London : Long span Structure
Vellodrome Stadium ,London : Long span StructureVellodrome Stadium ,London : Long span Structure
Vellodrome Stadium ,London : Long span Structure
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use building
 
RADIAL CITY PLANNING
RADIAL CITY PLANNINGRADIAL CITY PLANNING
RADIAL CITY PLANNING
 
RAJ REWAL WORKS
RAJ REWAL WORKSRAJ REWAL WORKS
RAJ REWAL WORKS
 
high rise case study
high rise case studyhigh rise case study
high rise case study
 
Architect Le corbusier and his works
Architect Le corbusier and his worksArchitect Le corbusier and his works
Architect Le corbusier and his works
 
Case study nift final
Case study nift finalCase study nift final
Case study nift final
 
ASIAN GAMES VILLAGE
ASIAN GAMES VILLAGE ASIAN GAMES VILLAGE
ASIAN GAMES VILLAGE
 
Galaxy soho building beijing
Galaxy soho building beijingGalaxy soho building beijing
Galaxy soho building beijing
 
Le corbusier
Le corbusierLe corbusier
Le corbusier
 

En vedette

BUILDING TECHNOLOGY PROJECT 2 BRIEF
BUILDING TECHNOLOGY PROJECT 2 BRIEFBUILDING TECHNOLOGY PROJECT 2 BRIEF
BUILDING TECHNOLOGY PROJECT 2 BRIEFJoyeeLee0131
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingAngeline KH
 
BUILDING TECHNOLOGY PROJECT 1 BRIEF
BUILDING TECHNOLOGY PROJECT 1 BRIEFBUILDING TECHNOLOGY PROJECT 1 BRIEF
BUILDING TECHNOLOGY PROJECT 1 BRIEFJoyeeLee0131
 
Prayas Session: Rain Water Harvesting by Soumalya Nandi
Prayas Session: Rain Water Harvesting by Soumalya NandiPrayas Session: Rain Water Harvesting by Soumalya Nandi
Prayas Session: Rain Water Harvesting by Soumalya NandiTenet Systems Pvt Ltd
 
Heydar aliyev cultural center, baku
Heydar aliyev cultural center, bakuHeydar aliyev cultural center, baku
Heydar aliyev cultural center, bakuPalak Khandelwal
 
Presentation on architect zaha hadid and her work
Presentation on architect zaha hadid and her workPresentation on architect zaha hadid and her work
Presentation on architect zaha hadid and her workrenu rajbahak
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Reportdouglasloon
 
Building Technology 1 Project 2
Building Technology 1 Project 2Building Technology 1 Project 2
Building Technology 1 Project 2Tan Jaden
 
Zaha hadid heydar aliyev cultural centre
Zaha hadid heydar aliyev cultural centreZaha hadid heydar aliyev cultural centre
Zaha hadid heydar aliyev cultural centreKumar Snehansu
 
Building Technology 1 Assignment 2 - Construction Solutions
Building Technology 1 Assignment 2 - Construction SolutionsBuilding Technology 1 Assignment 2 - Construction Solutions
Building Technology 1 Assignment 2 - Construction SolutionsJoe Onn Lim
 
Grid Systems
Grid SystemsGrid Systems
Grid SystemsBas Leurs
 

En vedette (15)

Wet services drainage
Wet services drainageWet services drainage
Wet services drainage
 
BUILDING TECHNOLOGY PROJECT 2 BRIEF
BUILDING TECHNOLOGY PROJECT 2 BRIEFBUILDING TECHNOLOGY PROJECT 2 BRIEF
BUILDING TECHNOLOGY PROJECT 2 BRIEF
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
 
BUILDING TECHNOLOGY PROJECT 1 BRIEF
BUILDING TECHNOLOGY PROJECT 1 BRIEFBUILDING TECHNOLOGY PROJECT 1 BRIEF
BUILDING TECHNOLOGY PROJECT 1 BRIEF
 
Moshe safdie
Moshe safdieMoshe safdie
Moshe safdie
 
Prayas Session: Rain Water Harvesting by Soumalya Nandi
Prayas Session: Rain Water Harvesting by Soumalya NandiPrayas Session: Rain Water Harvesting by Soumalya Nandi
Prayas Session: Rain Water Harvesting by Soumalya Nandi
 
Heydar aliyev cultural center, baku
Heydar aliyev cultural center, bakuHeydar aliyev cultural center, baku
Heydar aliyev cultural center, baku
 
Presentation on architect zaha hadid and her work
Presentation on architect zaha hadid and her workPresentation on architect zaha hadid and her work
Presentation on architect zaha hadid and her work
 
INTEGRATION
INTEGRATIONINTEGRATION
INTEGRATION
 
Btechfinal
BtechfinalBtechfinal
Btechfinal
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Report
 
Building Technology 1 Project 2
Building Technology 1 Project 2Building Technology 1 Project 2
Building Technology 1 Project 2
 
Zaha hadid heydar aliyev cultural centre
Zaha hadid heydar aliyev cultural centreZaha hadid heydar aliyev cultural centre
Zaha hadid heydar aliyev cultural centre
 
Building Technology 1 Assignment 2 - Construction Solutions
Building Technology 1 Assignment 2 - Construction SolutionsBuilding Technology 1 Assignment 2 - Construction Solutions
Building Technology 1 Assignment 2 - Construction Solutions
 
Grid Systems
Grid SystemsGrid Systems
Grid Systems
 

Similaire à BUILDING TECHNOLOGY PROJECT 2 REPORT

Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsJing Fan Koh
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1Gertrude Lee
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS Mohammed Naeem Darwish
 
Building tech Project 2
Building tech Project 2Building tech Project 2
Building tech Project 2zerospaces_
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design SolutionJia Xin Chee
 
B tech individual report
B tech individual reportB tech individual report
B tech individual reportong93
 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportWilden How
 
MSB01_Architect_s_Guide_2010-08-05.pdf
MSB01_Architect_s_Guide_2010-08-05.pdfMSB01_Architect_s_Guide_2010-08-05.pdf
MSB01_Architect_s_Guide_2010-08-05.pdfSameerSawant61
 
Project 1: Structural Design Post Mortem
Project 1: Structural Design Post MortemProject 1: Structural Design Post Mortem
Project 1: Structural Design Post MortemDavidJPCChai
 
Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02Jy Chong
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written ReportYap Xin
 
Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]w ss
 
ct3 presentation slides
ct3 presentation slides ct3 presentation slides
ct3 presentation slides shensin1015
 
BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)ong93
 
Heydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsHeydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsSasanSafar
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Soh Shing
 

Similaire à BUILDING TECHNOLOGY PROJECT 2 REPORT (20)

Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
A3 report
A3 reportA3 report
A3 report
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
 
Btech 1, 2
Btech 1, 2Btech 1, 2
Btech 1, 2
 
Btech
BtechBtech
Btech
 
Building tech Project 2
Building tech Project 2Building tech Project 2
Building tech Project 2
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design Solution
 
B tech individual report
B tech individual reportB tech individual report
B tech individual report
 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 Report
 
MSB01_Architect_s_Guide_2010-08-05.pdf
MSB01_Architect_s_Guide_2010-08-05.pdfMSB01_Architect_s_Guide_2010-08-05.pdf
MSB01_Architect_s_Guide_2010-08-05.pdf
 
Project 1: Structural Design Post Mortem
Project 1: Structural Design Post MortemProject 1: Structural Design Post Mortem
Project 1: Structural Design Post Mortem
 
Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]
 
ct3 presentation slides
ct3 presentation slides ct3 presentation slides
ct3 presentation slides
 
BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)
 
Heydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsHeydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materials
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)
 

Plus de JoyeeLee0131

REPORT AND CALCULATION
REPORT AND CALCULATIONREPORT AND CALCULATION
REPORT AND CALCULATIONJoyeeLee0131
 
Building Science Project 1 Brief
Building Science Project 1 BriefBuilding Science Project 1 Brief
Building Science Project 1 BriefJoyeeLee0131
 
BUILDING SCIENCE II: ACOUSTICS AND LIGHTING ANALYSIS OF DONUTES CAFE, SS15
BUILDING SCIENCE II: ACOUSTICS AND LIGHTING ANALYSIS OF DONUTES CAFE, SS15BUILDING SCIENCE II: ACOUSTICS AND LIGHTING ANALYSIS OF DONUTES CAFE, SS15
BUILDING SCIENCE II: ACOUSTICS AND LIGHTING ANALYSIS OF DONUTES CAFE, SS15JoyeeLee0131
 
Cognitive Mapping of Brickfield
Cognitive Mapping of Brickfield Cognitive Mapping of Brickfield
Cognitive Mapping of Brickfield JoyeeLee0131
 
Reaction Papers toward Theories of Architecture & Urbanism
Reaction Papers toward Theories of Architecture & UrbanismReaction Papers toward Theories of Architecture & Urbanism
Reaction Papers toward Theories of Architecture & UrbanismJoyeeLee0131
 
Personal Values Statement
Personal Values StatementPersonal Values Statement
Personal Values StatementJoyeeLee0131
 
Presentation on Flat Roof Double in Safari Roof House
Presentation on Flat Roof Double in Safari Roof HousePresentation on Flat Roof Double in Safari Roof House
Presentation on Flat Roof Double in Safari Roof HouseJoyeeLee0131
 
Table of Content & Abstracts
Table of Content & AbstractsTable of Content & Abstracts
Table of Content & AbstractsJoyeeLee0131
 
Case Study Paper Topic Proposal
Case Study Paper Topic ProposalCase Study Paper Topic Proposal
Case Study Paper Topic ProposalJoyeeLee0131
 
B. structure project 2 brief august 2015
B. structure project 2 brief august 2015B. structure project 2 brief august 2015
B. structure project 2 brief august 2015JoyeeLee0131
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015JoyeeLee0131
 
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportJoyeeLee0131
 
Building Service Project 2 Case Study Report
Building Service Project 2 Case Study ReportBuilding Service Project 2 Case Study Report
Building Service Project 2 Case Study ReportJoyeeLee0131
 
Lembah Bujang Site Analysis
Lembah Bujang Site AnalysisLembah Bujang Site Analysis
Lembah Bujang Site AnalysisJoyeeLee0131
 
PANTHEON - Solid & Surface Construction
PANTHEON - Solid & Surface ConstructionPANTHEON - Solid & Surface Construction
PANTHEON - Solid & Surface ConstructionJoyeeLee0131
 
Building Construction Project 1 Brief
Building Construction Project 1 BriefBuilding Construction Project 1 Brief
Building Construction Project 1 BriefJoyeeLee0131
 
Building Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportBuilding Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportJoyeeLee0131
 
Measure Drawings Penang Lian Huat Company JAN 2015
Measure Drawings Penang Lian Huat Company JAN 2015Measure Drawings Penang Lian Huat Company JAN 2015
Measure Drawings Penang Lian Huat Company JAN 2015JoyeeLee0131
 
35 final jackroof detail r1 ready plot a1 titleblock landscape updated
35 final jackroof detail r1 ready plot a1 titleblock landscape updated35 final jackroof detail r1 ready plot a1 titleblock landscape updated
35 final jackroof detail r1 ready plot a1 titleblock landscape updatedJoyeeLee0131
 

Plus de JoyeeLee0131 (20)

REPORT AND CALCULATION
REPORT AND CALCULATIONREPORT AND CALCULATION
REPORT AND CALCULATION
 
Building Science Project 1 Brief
Building Science Project 1 BriefBuilding Science Project 1 Brief
Building Science Project 1 Brief
 
BUILDING SCIENCE II: ACOUSTICS AND LIGHTING ANALYSIS OF DONUTES CAFE, SS15
BUILDING SCIENCE II: ACOUSTICS AND LIGHTING ANALYSIS OF DONUTES CAFE, SS15BUILDING SCIENCE II: ACOUSTICS AND LIGHTING ANALYSIS OF DONUTES CAFE, SS15
BUILDING SCIENCE II: ACOUSTICS AND LIGHTING ANALYSIS OF DONUTES CAFE, SS15
 
Cognitive Mapping of Brickfield
Cognitive Mapping of Brickfield Cognitive Mapping of Brickfield
Cognitive Mapping of Brickfield
 
Reaction Papers toward Theories of Architecture & Urbanism
Reaction Papers toward Theories of Architecture & UrbanismReaction Papers toward Theories of Architecture & Urbanism
Reaction Papers toward Theories of Architecture & Urbanism
 
Personal Values Statement
Personal Values StatementPersonal Values Statement
Personal Values Statement
 
Presentation on Flat Roof Double in Safari Roof House
Presentation on Flat Roof Double in Safari Roof HousePresentation on Flat Roof Double in Safari Roof House
Presentation on Flat Roof Double in Safari Roof House
 
Table of Content & Abstracts
Table of Content & AbstractsTable of Content & Abstracts
Table of Content & Abstracts
 
Case Study Paper Topic Proposal
Case Study Paper Topic ProposalCase Study Paper Topic Proposal
Case Study Paper Topic Proposal
 
Report
ReportReport
Report
 
B. structure project 2 brief august 2015
B. structure project 2 brief august 2015B. structure project 2 brief august 2015
B. structure project 2 brief august 2015
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
 
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis Report
 
Building Service Project 2 Case Study Report
Building Service Project 2 Case Study ReportBuilding Service Project 2 Case Study Report
Building Service Project 2 Case Study Report
 
Lembah Bujang Site Analysis
Lembah Bujang Site AnalysisLembah Bujang Site Analysis
Lembah Bujang Site Analysis
 
PANTHEON - Solid & Surface Construction
PANTHEON - Solid & Surface ConstructionPANTHEON - Solid & Surface Construction
PANTHEON - Solid & Surface Construction
 
Building Construction Project 1 Brief
Building Construction Project 1 BriefBuilding Construction Project 1 Brief
Building Construction Project 1 Brief
 
Building Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportBuilding Construction Project 1 Shelter Report
Building Construction Project 1 Shelter Report
 
Measure Drawings Penang Lian Huat Company JAN 2015
Measure Drawings Penang Lian Huat Company JAN 2015Measure Drawings Penang Lian Huat Company JAN 2015
Measure Drawings Penang Lian Huat Company JAN 2015
 
35 final jackroof detail r1 ready plot a1 titleblock landscape updated
35 final jackroof detail r1 ready plot a1 titleblock landscape updated35 final jackroof detail r1 ready plot a1 titleblock landscape updated
35 final jackroof detail r1 ready plot a1 titleblock landscape updated
 

Dernier

How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)jennyeacort
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 

Dernier (20)

How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 

BUILDING TECHNOLOGY PROJECT 2 REPORT

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN BUILDING TECHNOLOGY 1 [BLD61403 / ARC3514 / ARC3512] ASSIGNMENT 2 (40%) INDIVIDUAL C O N S T R U C T I O N S O L U T I O N S S E N T U L C O M M U N I T Y L I B R A R Y NAME: LEE JO YEE STUDENT ID: 0314880 TUTOR: MR.MOHD ADIB RAMLI DATE OF SUBMISSION: 23/06/2016
  • 2. TABLE OF CONTENT 1.0 INTRODUCTION & BUILDING PLANS 2.0 FAÇADE 2.1 PRECEDENT STUDY 1 - DOCUMENTATION CENTRE IN HINZERT in GERMANY /Wandel Hoefer Lorch + Hirsch 2.2 PRECEDENT STUDY 2 - BINH THANH HOUSE in VIETNAM / Vo Trong Nghia Architect 2.3 FAÇADE PROPOSAL 1 2.4 FAÇADE PROPOSAL 2 3.0 ROOF 3.1 PRECEDENT STUDY - HEYDAR ALIYEV CULTURAL CENTER in BAKU, AZERBAIJAN / ZAHA HADID 4.0 STRUCTURE 4.1 PRECEDENT STUDY 1 - COMMON AREAS OF PUBLIC MULTI-FAMILY HOUSING BUILDINGS / Studio af6 4.2 SECTIONAL PERSPECTIVE 1 (SCALE 1:30) – UPPER AND LOWER GROUND FLOOR 4.3 SECTIONAL PERSPECTIVE 2 (SCALE 1:30) – FIFTH FLOOR AND ROOF 5.0 REFERENCES PAGE 1 – 3 4 5 6-7 8-9 10 11-12 13 14 15
  • 3. LOWER GROUND FLOOR PLAN SCALE 1:200 PROJECT: COMMUNITY LIBRARY SITE: JALAN IPOH, SENTUL, SELANGOR AREA: 22941mm x 23000mm PLOT RATIO: 1:4 NUMBER OF STOREY: 4 DESIGN STATEMENT: The designed building specially for the community of Sentul, not just serves the function of a library but also as a public nodes that aims to gather and unite the people. The library provides an alternative channel of knowledge that the locals have yet experience before and also as a precious hub to record the memory of Sentul. 1.0 INTRODUCTION
  • 4. FIRST FLOOR PLAN SCALE 1:200 UPPER GROUND FLOOR PLAN SCALE 1:200
  • 5. SECONDFLOOR PLAN SCALE 1:200 THIRD FLOOR PLAN SCALE 1:200
  • 6. MATERIALS USED 1. Corten steel panels 2. Water repellent mineral- fibre thermal insulation 3. Birch-veneered composite wood board soffit 4. Gypsum fibreboard 5. Sound insulation mat 6. Steel I-beam TYPE OF CONSTRUCTION SYSTEM USED Welding of metal: Joining of two pieces metal together to form one piece by heating the metal to the melting points. 2.1 FAÇADE PRECEDENT STUDY 1 DOCUMENTATION CENTRE IN HINZERT in GERMANY /Wandel Hoefer Lorch + Hirsch The 43-meter-long structure occupies a gentle slope, rising from two to seven meters in height. The all-in- one structure, roof and façade consists of over three thousand different triangular plates of 12-millimeter Corten steel. The angles between the individual panels were calculated to ensure that the elements have an adequate structural height and that the entire construction forms a rigid folded plate. The expressive outer skin in oxidized steel is both load- bearing structure and façade Sources: http://www.archdaily.com/317207/the-hinzert-museum-and-document-center- wandel-hoefer-lorch-hirsch ADVANTAGES / DISADVANTAGES INTEGRATION WITH STUDIO DESIGN Advantages: • maintenance free as its oxidised surfaces are the desired effect • Recyclable • Low solar reflectivity Disadvantages: Insulation of the interiors are required such as in this case study, there is an inner skin consists of triangular birch plywood panels to protect the document centre. • Corten steel as a materials whereby the weathering (rusted) effect is sough after as a aesthetic quality. The materials darken its colour from time to time symbolizes its age. • The material tends to rejuvenate the industrial era and to blend with the rich historical background of Sentul where the origin of train works started.
  • 7. 2.2 FAÇADE PRECEDENT STUDY 2 ADVANTAGES / DISADVANTAGES INTEGRATION WITH STUDIO DESIGN Advantages: • High thermal mass and provide cooling effect to the interior • Concrete are easily obtain and build with • Precast blocks posses great flexibility to design and customize. Disadvantages: • Price of the precast blocks. • Integrated with the concept of the studio project: blends into the neighbourhood in the day and transform into a light lit monument at night. • Provide sharing from sun and rain. • Blends in with the similar architecture style to the context (Art Deco) and remains uniquely modern. • Allow framing of views BINH THANH HOUSE in VIETNAM / Vo Trong Nghia Architect Pattern blocks, which used to be a popular shading device in Vietnam to get natural ventilation, are made of pre-cast concrete with 60cm width and 40cm height. It not only prevents the harsh sunlight and heavy rain but also enhances the privacy and the safety. MATERIALS USED The concrete façade has implied the materials of 1. Precast concrete pattern blocks 2. Reinforced concrete bars TYPE OF CONSTRUCTION SYSTEM USED Upon discussion with tutor, conclusion is drawn that the concrete blocks are precast and can be easily lay with cement on the wall. However, the part where the concrete blocks extend to become an overhead ceiling is perhaps, installed with rebar in between, to fix them into position, and rest on the core beam.
  • 8.
  • 9.
  • 10.
  • 11. 2
  • 12. 3.1 ROOF PRECEDENT STUDY ADVANTAGES / DISADVANTAGES INTEGRATION WITH STUDIO DESIGN Advantages: • Interesting and unique structure due to its versatility in shape and form • Light weight • One of the Industrialised building components which are often standard size and shape Disadvantages: • High construction cost • Slight complexion in structural engineering • A wide span that enables a column free floor plan for the library • Strengthen the importance of the roof in the urban infill • Replace GFRP with lower cost materials like fibreglass roof panels (FRP) HEYDAR ALIYEV CULTURAL CENTER in BAKU, AZERBAIJAN / ZAHA HADID A very nimble two-layer space frame plays supportive bridesmaid to the double envelope that curves smoothly along the top and bottom of the exterior shell, hiding the skeletal frame and emphasizing surface rather than structure, as though the building were all effect and no cause. The 619,000- square-foot cultural center—for which the client, DIA Holding, also served as the design/build contractor—manifests the lightness of a handkerchief billowing in free fall. MATERIALS USED Structure: Steel (space frame) Cladding: 1. Glass Fibre Reinforced Concrete(GFRC) 2. Glass Fibre Reinforced Polyester (GFRP) Reasons: allow for the powerful plasticity of the building’s design TYPE OF CONSTRUCTION SYSTEM USED The construction system used is the double-curved space frame structure (single layer membrane). The axial tubes are joined together by the MERO connector consists of a node that is a spherical hot-pressed steel forging with flat facets and tapped holes. Members are circular hollow sections with cone- shaped steel forgings welded at the ends, which accommodate connecting bolts.
  • 13. 4.1 STRUCUTURE PRECEDENT STUDY 2 ADVANTAGES / DISADVANTAGES INTEGRATION WITH STUDIO DESIGN Advantages: • Stiffer and stronger than many other floor system, so the weight and size of the primary structure can be reduced. Consequently, foundation sizes can be reduced. • Safe method and high speed of construction • Low cost (saves in transportation) • Sustainability. 94% of all steel construction products can be either re-used or recycled. • Easy construction allow the local to be involved in the building of the library. • Low in construction cost INTERVENTIONS IN COMMON AREAS OF PUBLIC MULTI-FAMILY HOUSING BUILDINGS / Studio af6 The bridge structures that contain the lifts are formed by steel porticoes that span the distance between the two buildings. Composite galvanized steel floor decking with reinforced concrete was used for the floor slabs. And the construction process allowed for all the homes to be used during building. MATERIALS/ COMPONENTS USED The layers consists of 1. steel deck (profiled steel sheeting) 2. steel beam or joist 3. cast in situ concrete topping 4. top reinforcement mesh 5. bottom reinforcement 6. stud shear connectors FLOORING SYSTEM: COMPOSITE STEEL DECK FLOORING STRUCTURE SYSTEM: UNIVERSAL STEEL COLUMNS & BEAMS HOW IS THE SYSTEM CONSTRUCTED? Steel decks are first lay on the primary and secondary beams of the building. They are installed and fastened with shear connectors/studs through welding techniques. After installing the slab reinforcement, proper techniques or quality control are required to pour the concrete to thickness. Workmanship and sequences are important as to prevent deflections, overloading of decks, irregular surface and etc.
  • 14. 4.1 STRUCUTURE PRECEDENT STUDY 2 MATERIALS USED Structure: Steel (Cold-Formed Steel Framing) HOW IS THE SYSTEM CONSTRUCTED? Steel framing is a practical, code approved solution to many of the limitations that builders face today when using traditional building materials. Steel members are first built in a factory based on the engineered drawings and layouts. They are precast components which later arrived at the site and be erected. Shallow foundations with concrete floor base is selected as the construction method for the community library. Spread footings with steel columns anchoring to the ground, reinforced with steel grid are joined together with grade beams to form a grid work of the slab. There are various techniques and components for columns and beam connections. I have adopted the Stiffened Seated Connection which consists of the seated angle and cleat angle attached to the column flange. The structure can be further enhanced will the angle clips. Illustrations on the right from above show the reference images of steel column base plate, followed by the details of spread footing and lastly the diagram showing the component in a stiffened seated connection. CLEAT ANGLE SEATED ANGLE
  • 15.
  • 16.
  • 17. 5 REFERENCES: 1. The study of space frame: http://3dspaceco.com/public/user_data/shokouh/%D9%85%D9%82%D8%A7%D 9%84%D8%A7%D8%AA%20%D9%84%D8%A7%D8%AA%DB%8C%D9%86/13.pdf 2. The study of types of space frames and joints: a)http://www.slideshare.net/ogustians/space-framesmodular-construction- technology b)http://www.columbia.edu/cu/gsapp/BT/BSI/SPACEFRAME/spaceframe.html 3. The study on the failure of space frame: http://failures.wikispaces.com/Kemper%20Arena,%20Kansas%20City,%20Missour i 4. The study of typical steel connections: http://www.engr.mun.ca/~adluri/courses/steel/ppt%20files1/Topic%20- Connections%20-typical%20joints.pdf 5. The study of composite floor: a)slab:http://www.scielo.br/img/revistas/jbsmse/v30n1/a09fig03.gif b)http://www.detallesconstructivos.net/en/category/structures/floor-slabs