The article describes the repair of two power transformers ra ted 150 MVA that had been und er at RTP Divača and RTP Beričevo Power Substations. The repair was executed at ETRA 33 Energetski transformatorji d. d. in the years 1993 and 1999. The scope of repair: The electrical part, i.e. all windings, insulation, connections, was made completely new. The active [Xlrt was.filled with new oil. The short description (i the damages, description of the repair and the results of the test~ conce ming the transjormer se1vice characteristics are presented in the article.
The article describes the repair of two power transformers ra ted 150 MVA that had been und er at RTP Divača and RTP Beričevo Power Substations. The repair was executed at ETRA 33 Energetski transformatorji d. d. in the years 1993 and 1999. The scope of repair: The electrical part, i.e. all windings, insulation, connections, was made completely new. The active [Xlrt was.filled with new oil. The short description (i the damages, description of the repair and the results of the test~ conce ming the transjormer se1vice characteristics are presented in the article.