SlideShare a Scribd company logo
1 of 2
KANNAN.R
Ph: +91 9944591756 Email: kannanram189434@gmail.com
PIPING DESIGNER/DRAFTSMAN - Oil & Gas
Proactive decision maker, targeting challenging assignments as piping designer in
oil & gas – offshore / onshore industry.
A BRIEF SYNOPSIS
Accomplished senior level professional with demonstrated experience of 11 years in Design & Detail engineering
in Contracting & Construction Companies for Oil & Gas field (Offshore & Onshore projects), Wellhead platforms,
Production platforms, Oil & Gas Plants, Oil Refineries piping. (Clients: Chevron, KOC, KNPC). Possessing valuable
insights, keen analysis and team approach to implement best practices, adept at working in high pressure
environments with strict deadlines and multiple deliverables.
 Proficient in preparation of complex Piping routing on 3D Cadworx and PDMS (Piping, Pipe Supports) for Well
Head flow lines Pig Launcher & Receiver, Production and Test Separators/Header, Manifold, injection pumps,
Flare line, Knockout drum, Gas scrubber, Compressors, Vessels, Air Fin Coolers, Pipe racks, Tank area and many
much equipment’s piping including all vents, Drain lines, instrument air, Fire water & Potable water.
 Solid domain knowledge and understanding of design and drafting scope in P&ID, preparing the fabrication
drawings as per company standard specification across all three functional verticals of industry (Contracting,
Project Management & Client Service). Results - oriented with the ability to coordinate multiple projects & teams
simultaneously, coupled with the skill to effectively manage staff of all levels & diverse background.
 Rich experience of handling the development of Plot plan, equipment layout, piping layout, isometric drawings,
pipe support drawings as per stranded, site visit report, Tie-in schedule & MTO. Modification of Exporting Crude
Line (Takula-Field, GS-Mike). Track record of effectively interfacing with the construction team to resolve site
problem during construction.
 Comprehensive knowledge of managing projects, with a proven track record of executing large scale projects,
skilled in swiftly ramping up projects with competent skills and ensuring on time deliverables.
 Perfect team manager having ability to lead cross-functional project teams and integrate their efforts to
maximize operational efficiency, proficient in striking perfect coordination with all involved agencies ensuring
bottleneck-free work execution. Armed with strong analytical and problem solving skills. Superior
communication and interpersonal abilities.
Technology Overview: PDMS (Plant Design Management System) 11.5, 11.6, 12 ♦ CADWorx 2008 to 2012 ♦ AutoCAD
2000 to 2014
Core Competencies: Piping Layout ♦ Isometric Drawings ♦ Fabrication Drawings ♦ Site Survey ♦ Quality Compliance
♦ Cross Functional Coordination ♦ Process Enhancement ♦ Team Leadership ♦ Training & Development
ORGANISATIONAL SCAN
PIPING DESIGNER, SAIPEM-Angola (Offshore) Dec 2012 – Present
Key Responsibilities:
 Tasked with the preparation and checking of General arrangement drawings, Isometrics drawings, Bill of
materials and Material Take off. Detail design of surfer landing fender, ladder, staircase, handrails, and pipe
supports drawings. Overseeing the Offshore/Onshore Site Visited for Site Survey and Site Queries.
 Accountable for handling the preparation of Plot Plan & Area division, Equipment layout drawings. Preparation
& Updating Equipment’s Nozzles Elevation and Nozzle Orientation drawings as per site instructions.
 Spearheading efforts in the accurate selection and preparation of pipe supports as per support standard and
interact with Stress Engineers for critical/stress Lines, detailing of Special Pipe.
 Ensuring smooth coordination with junior draftsman and checking drawings produced by them Involved in
reviewing client documents and understand scope of work, explain to junior draftsmen for making site survey and
prepare drawings.
Project Name: Southern Africa Strategic Business Unit.(Block 0 &14). Brownfield Project ♦ Client: Chevron, Cabinda
Gulf Oil Company Limited.
Major Projects: Modification of Vertical Pig Launcher (Numbi-Field, GS-Nov PL-6320)
Key Repossibilities:
 Spearheading efforts in the development of detail piping layout, ISO drawings for 30”, 16” process line, 4” drain
line, 2” drip pan drain lines (FRP), cellar deck pig launcher support, sub cellar deck pipe support drawings as per
stranded, site visit report, Tie-in schedule, MTO & coordination to construction team to resolve site problem
during construction.
Project Name: Modification of Exporting Crude Line (TAKULA-FIELD, GS-MIKE)
 Involved in the development of detail piping layout, ISO drawings for 20”, 12” and 6” process line, pipe support
drawings as per stranded, site visit report, Tie-in schedule, MTO, and coordination to construction team to
resolve site problem during construction.
PIPING DESIGNER, Advanced Water TEK-Dubai Aug 2012 - Sep 2012
PIPING DRAFTSMAN, Gulf Spic General Trading & Cont. CO. W.L.L – Kuwait Jun 2010 – Sep 2011
Project Name: RFP-2089 Improvement to crude sampling points at all South and East Kuwait gathering centers.
(Modelling & ISO Generated in CAD WORX) ♦ Client: Kuwait Oil Company. (K.S.C), Kuwait.
Project Details:
 Installation of Multi cyclone Scrubbers and Condensate Filter in West Kuwait.
Client: Kuwait Oil Company. (K.S.C), Kuwait.
PIPING DRAFTSMAN, SPIC-SMO. Chennai, India May 2008 – Jun 2010
Project Name: 36751-Installation of New Gravity Drain System in GC’s 17, 27 & 28 ♦ Client: Kuwait National
Petroleum Company. (K.S.C), Kuwait.
Project Details:
 Updating of As-Built Drawings in South Kuwait, East Kuwait, North Kuwait, West Kuwait, Tank Farms & Export
Facilities including Mina Al Ahmadi and the Ex-Ministry Crude and Fuel Oil Pipelines located anywhere within
State of Kuwait and performing all work which could be reasonably deemed necessary to complete.
Client: Kuwait Oil Company. (K.S.C), Kuwait.
PIPING DRAFTSMAN, Kamsun Engineering System. Trichy, India Jun 2005 - Apr 2008
Project Name: 2x7.5 Tg Inter Connection Piping ♦ Client: Prakash Industries Ltd Sponge Iron Plant Champa, MP
Project Name: 40 MW Captive Power Plants ♦ Client: M/S S.A.L Steel Limited, Gandhidham, (Gujarat).
PRODUCTION SUPERVISOR, Sree Devi Infrastructures (Trichy) Jun 2003 - Jun 2005
EDUCATION
DIPLOMA IN MECHANICAL ENGINEERING, A.V.C College of Polytechnic, Tamil Nadu, 2003
Training Attended: BOSIET Training, (OPITO CERTIFIED), (Offshore Survival Training) ♦ H2S Training ♦ CSE
Awareness Training
PERSONAL DOSSIER:
Date of Birth: 20 June 1984 ♦ Passport Details: Valid upto Nov 2024 ♦ Languages Known: English, Hindi & Tamil
References: Available on request

More Related Content

What's hot

R. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteRameshchandra Prajapati
 
James R Smith Resume May-2015
James R Smith Resume May-2015James R Smith Resume May-2015
James R Smith Resume May-2015Jim Smith
 
CV (Up-Date)-Taisir El-Khader (Nov. 2016)
CV (Up-Date)-Taisir El-Khader (Nov. 2016)CV (Up-Date)-Taisir El-Khader (Nov. 2016)
CV (Up-Date)-Taisir El-Khader (Nov. 2016)Taisir El-khader
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CVManish Ray
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.walaa ahmed ahmed attiia
 
Brief Profile Sanjeev Kadam - 2016
Brief Profile Sanjeev Kadam -    2016Brief Profile Sanjeev Kadam -    2016
Brief Profile Sanjeev Kadam - 2016sanjeev kadam
 
A Gomez Resume Pipe Designer_Checker_plain
A Gomez Resume Pipe Designer_Checker_plainA Gomez Resume Pipe Designer_Checker_plain
A Gomez Resume Pipe Designer_Checker_plainAmerico Gomez
 
Jacob Dustin Crawford Resume
Jacob Dustin Crawford  ResumeJacob Dustin Crawford  Resume
Jacob Dustin Crawford ResumeDustin Crawford
 
Mark_Rowland_CV_2016
Mark_Rowland_CV_2016Mark_Rowland_CV_2016
Mark_Rowland_CV_2016Mark Rowland
 
Resume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistResume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistAlanna Scott
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)Pinak Biswas
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Haider
 

What's hot (20)

Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
R. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas Website
 
James R Smith Resume May-2015
James R Smith Resume May-2015James R Smith Resume May-2015
James R Smith Resume May-2015
 
cv
cvcv
cv
 
CV (Up-Date)-Taisir El-Khader (Nov. 2016)
CV (Up-Date)-Taisir El-Khader (Nov. 2016)CV (Up-Date)-Taisir El-Khader (Nov. 2016)
CV (Up-Date)-Taisir El-Khader (Nov. 2016)
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
 
Brief Profile Sanjeev Kadam - 2016
Brief Profile Sanjeev Kadam -    2016Brief Profile Sanjeev Kadam -    2016
Brief Profile Sanjeev Kadam - 2016
 
A Gomez Resume Pipe Designer_Checker_plain
A Gomez Resume Pipe Designer_Checker_plainA Gomez Resume Pipe Designer_Checker_plain
A Gomez Resume Pipe Designer_Checker_plain
 
Jacob Dustin Crawford Resume
Jacob Dustin Crawford  ResumeJacob Dustin Crawford  Resume
Jacob Dustin Crawford Resume
 
Mark_Rowland_CV_2016
Mark_Rowland_CV_2016Mark_Rowland_CV_2016
Mark_Rowland_CV_2016
 
Pradeep s (resume)
Pradeep s (resume)Pradeep s (resume)
Pradeep s (resume)
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
Resume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistResume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls Specialist
 
Ravi's CV
Ravi's CVRavi's CV
Ravi's CV
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
PAUL FOTHERGILL CV
PAUL FOTHERGILL CVPAUL FOTHERGILL CV
PAUL FOTHERGILL CV
 
BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping Supervisor
 

Similar to KANNAN RESUME

Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekar ramamurthy
 
Lisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newLisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newlisa zhang
 
mahadev prasad resume_feb2016
mahadev prasad resume_feb2016mahadev prasad resume_feb2016
mahadev prasad resume_feb2016Mahadev Prasad
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L NBasavaraj L N
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSrinivas Sirigineedi
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designerbharath kumar
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015Suresha Rao
 
Gajendra_Resume
Gajendra_ResumeGajendra_Resume
Gajendra_ResumeGajendra V
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkatesh Rajendran
 

Similar to KANNAN RESUME (20)

CV_Vijaya Kumar
CV_Vijaya KumarCV_Vijaya Kumar
CV_Vijaya Kumar
 
Resume for Pipeline Designer
Resume for Pipeline DesignerResume for Pipeline Designer
Resume for Pipeline Designer
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.Designer
 
RESUME DJT van der Merwe
RESUME DJT van der MerweRESUME DJT van der Merwe
RESUME DJT van der Merwe
 
Lisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newLisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -new
 
ARafer Resume
ARafer ResumeARafer Resume
ARafer Resume
 
mahadev prasad resume_feb2016
mahadev prasad resume_feb2016mahadev prasad resume_feb2016
mahadev prasad resume_feb2016
 
Amar Updated CV
Amar Updated CVAmar Updated CV
Amar Updated CV
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L N
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
Perumal_CV_PD_Jan 2017
Perumal_CV_PD_Jan 2017Perumal_CV_PD_Jan 2017
Perumal_CV_PD_Jan 2017
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
 
Gajendra_Resume
Gajendra_ResumeGajendra_Resume
Gajendra_Resume
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16
 

KANNAN RESUME

  • 1. KANNAN.R Ph: +91 9944591756 Email: kannanram189434@gmail.com PIPING DESIGNER/DRAFTSMAN - Oil & Gas Proactive decision maker, targeting challenging assignments as piping designer in oil & gas – offshore / onshore industry. A BRIEF SYNOPSIS Accomplished senior level professional with demonstrated experience of 11 years in Design & Detail engineering in Contracting & Construction Companies for Oil & Gas field (Offshore & Onshore projects), Wellhead platforms, Production platforms, Oil & Gas Plants, Oil Refineries piping. (Clients: Chevron, KOC, KNPC). Possessing valuable insights, keen analysis and team approach to implement best practices, adept at working in high pressure environments with strict deadlines and multiple deliverables.  Proficient in preparation of complex Piping routing on 3D Cadworx and PDMS (Piping, Pipe Supports) for Well Head flow lines Pig Launcher & Receiver, Production and Test Separators/Header, Manifold, injection pumps, Flare line, Knockout drum, Gas scrubber, Compressors, Vessels, Air Fin Coolers, Pipe racks, Tank area and many much equipment’s piping including all vents, Drain lines, instrument air, Fire water & Potable water.  Solid domain knowledge and understanding of design and drafting scope in P&ID, preparing the fabrication drawings as per company standard specification across all three functional verticals of industry (Contracting, Project Management & Client Service). Results - oriented with the ability to coordinate multiple projects & teams simultaneously, coupled with the skill to effectively manage staff of all levels & diverse background.  Rich experience of handling the development of Plot plan, equipment layout, piping layout, isometric drawings, pipe support drawings as per stranded, site visit report, Tie-in schedule & MTO. Modification of Exporting Crude Line (Takula-Field, GS-Mike). Track record of effectively interfacing with the construction team to resolve site problem during construction.  Comprehensive knowledge of managing projects, with a proven track record of executing large scale projects, skilled in swiftly ramping up projects with competent skills and ensuring on time deliverables.  Perfect team manager having ability to lead cross-functional project teams and integrate their efforts to maximize operational efficiency, proficient in striking perfect coordination with all involved agencies ensuring bottleneck-free work execution. Armed with strong analytical and problem solving skills. Superior communication and interpersonal abilities. Technology Overview: PDMS (Plant Design Management System) 11.5, 11.6, 12 ♦ CADWorx 2008 to 2012 ♦ AutoCAD 2000 to 2014 Core Competencies: Piping Layout ♦ Isometric Drawings ♦ Fabrication Drawings ♦ Site Survey ♦ Quality Compliance ♦ Cross Functional Coordination ♦ Process Enhancement ♦ Team Leadership ♦ Training & Development ORGANISATIONAL SCAN PIPING DESIGNER, SAIPEM-Angola (Offshore) Dec 2012 – Present Key Responsibilities:  Tasked with the preparation and checking of General arrangement drawings, Isometrics drawings, Bill of materials and Material Take off. Detail design of surfer landing fender, ladder, staircase, handrails, and pipe supports drawings. Overseeing the Offshore/Onshore Site Visited for Site Survey and Site Queries.  Accountable for handling the preparation of Plot Plan & Area division, Equipment layout drawings. Preparation & Updating Equipment’s Nozzles Elevation and Nozzle Orientation drawings as per site instructions.  Spearheading efforts in the accurate selection and preparation of pipe supports as per support standard and interact with Stress Engineers for critical/stress Lines, detailing of Special Pipe.  Ensuring smooth coordination with junior draftsman and checking drawings produced by them Involved in reviewing client documents and understand scope of work, explain to junior draftsmen for making site survey and prepare drawings. Project Name: Southern Africa Strategic Business Unit.(Block 0 &14). Brownfield Project ♦ Client: Chevron, Cabinda Gulf Oil Company Limited.
  • 2. Major Projects: Modification of Vertical Pig Launcher (Numbi-Field, GS-Nov PL-6320) Key Repossibilities:  Spearheading efforts in the development of detail piping layout, ISO drawings for 30”, 16” process line, 4” drain line, 2” drip pan drain lines (FRP), cellar deck pig launcher support, sub cellar deck pipe support drawings as per stranded, site visit report, Tie-in schedule, MTO & coordination to construction team to resolve site problem during construction. Project Name: Modification of Exporting Crude Line (TAKULA-FIELD, GS-MIKE)  Involved in the development of detail piping layout, ISO drawings for 20”, 12” and 6” process line, pipe support drawings as per stranded, site visit report, Tie-in schedule, MTO, and coordination to construction team to resolve site problem during construction. PIPING DESIGNER, Advanced Water TEK-Dubai Aug 2012 - Sep 2012 PIPING DRAFTSMAN, Gulf Spic General Trading & Cont. CO. W.L.L – Kuwait Jun 2010 – Sep 2011 Project Name: RFP-2089 Improvement to crude sampling points at all South and East Kuwait gathering centers. (Modelling & ISO Generated in CAD WORX) ♦ Client: Kuwait Oil Company. (K.S.C), Kuwait. Project Details:  Installation of Multi cyclone Scrubbers and Condensate Filter in West Kuwait. Client: Kuwait Oil Company. (K.S.C), Kuwait. PIPING DRAFTSMAN, SPIC-SMO. Chennai, India May 2008 – Jun 2010 Project Name: 36751-Installation of New Gravity Drain System in GC’s 17, 27 & 28 ♦ Client: Kuwait National Petroleum Company. (K.S.C), Kuwait. Project Details:  Updating of As-Built Drawings in South Kuwait, East Kuwait, North Kuwait, West Kuwait, Tank Farms & Export Facilities including Mina Al Ahmadi and the Ex-Ministry Crude and Fuel Oil Pipelines located anywhere within State of Kuwait and performing all work which could be reasonably deemed necessary to complete. Client: Kuwait Oil Company. (K.S.C), Kuwait. PIPING DRAFTSMAN, Kamsun Engineering System. Trichy, India Jun 2005 - Apr 2008 Project Name: 2x7.5 Tg Inter Connection Piping ♦ Client: Prakash Industries Ltd Sponge Iron Plant Champa, MP Project Name: 40 MW Captive Power Plants ♦ Client: M/S S.A.L Steel Limited, Gandhidham, (Gujarat). PRODUCTION SUPERVISOR, Sree Devi Infrastructures (Trichy) Jun 2003 - Jun 2005 EDUCATION DIPLOMA IN MECHANICAL ENGINEERING, A.V.C College of Polytechnic, Tamil Nadu, 2003 Training Attended: BOSIET Training, (OPITO CERTIFIED), (Offshore Survival Training) ♦ H2S Training ♦ CSE Awareness Training PERSONAL DOSSIER: Date of Birth: 20 June 1984 ♦ Passport Details: Valid upto Nov 2024 ♦ Languages Known: English, Hindi & Tamil References: Available on request