 Current Activities this Week:

 Underground Utilities:
 Area 3 - Deep underground Plumbing continues.

 Foundations:
 Area 2 Concourse Level – Excavation for remaining D-Line
 footing has started.
                                                              Area 3 – Underground plumbing installation
 Concrete Flatwork:                                           is nearly complete at the lower dock area.
 Area 4 Field Level – Prep work for lower dock slab on
 grade has started.

 Structural Steel Erection:
 Area 3 – Main Canopy Truss Erection are set to Column
 Line 1. Area 4 – Metal decking installation in Sequence
 3-3 has started. Field Level Area 1 – Subroof decking
 installation is ongoing

 MEP Rough-in:
 Area 3 – Shallow electrical and plumbing rough-in is         Area 2 – CMU perimeter wall installation at
 ongoing. West Building - Ductwork installation on            Stage are nearly topped out.
 Concourse, Suite and Press Levels are ongoing.
 Plumbing rough-in is ongoing on Suite and
 Press Levels. Fire Protection rough-in is ongoing on
 Concourse, Suite and Press Levels. Electrical rough-in is
 ongoing on Concourse, Suite and Press Levels.

 Metal Stud Framing:
 Area 1 – Metal stud framing for Field, Concourse, Suite
 and Press Levels are ongoing. Exterior metal stud framing
 and sheathing installation is ongoing at Field, Suite, and
                                                              Area 4 – Decking being installed at North
                                                              Elevation.
Building the Future
Press Levels.

 Masonry:
 Area 1 Field Level – Masonry wall installation is ongoing
 in Areas E, F, G and H.

 Area 1, 2, 3 Concourse Level – Masonry wall installation at
 Main Concourse Buildings are ongoing.
                                                               Area 3 – Canopy Truss erection is nearly
 Curtainwall:
                                                               complete in Sequence 3-5.
 Area 1 – Curtainwall framing installation will continue
 at West Elevation. Installation of Curtainwall glass is
 ongoing.

 Projected Activities occurring next Week:

 Underground Utilities:
 Deep Plumbing installation will continue in Area 3, moving
 to the north.

 Foundations:
 Area 4 Field Level – Foundation wall installation for Main
 Stair will begin.                                             Field Level Area 3 – Formwork for Stairs to
                                                               Cauldron Club is set.
 Concrete Flatwork:
 Area 3 Field Level – Concrete placement for Slab-on
 Grade at lower dock area will begin. Prep work for slab-
 on-grade for lower dock area will continue.

 Area 3 and 4 Field Level – Installation of on-grade seating
 risers and intermediate stairs will continue.

 Structural Steel Erection:
 Area 2 – Canopy truss installation at North side of Stadium
 will continue.                                                Area 1/2 – Filled and polished CMU Block
                                                               walls at the Southwest and South Concourse
 MEP Rough-in:                                                 Buildings.
 MEP Rough-in at Concourse, Suite and Press Levels will
 continue. Ductwork installation on Concourse, Suite, and
 Press Level will continue. Fire Sprinkler installation will
 continue on Concourse, Suite and Press Levels.


Building the Future
Metal Stud Framing:
 Area 1 – Metal stud framing for Field, Concourse, Suite
 and Press Levels will continue. Exterior Framing and
 sheathing installation will continue.

 Curtainwall:
 Area 1 – Curtain Framing and Glass installation will
 continue.
                                                           Area 1 – Installation of curtainwall framing
                                                           at Stair 4.




                                                           Area 1 – Shot of the west building showing
                                                           the progress of the canopy decking on
                                                           trusses.




Building the Future
Additional Photos:




Concourse Level Area 3 – Exterior CMU walls
started northeast Concession and Men’s         Field Level Area 3 – Upper Dock concrete is
Restroom Buildings.                            placed.




                                               Bowl – Shot of the bowl from the roof of the
Field Level Area 1 – Subroof decking           Stadium Suite, showing the elevation
installation is ongoing.                       change of the canopy trusses.




Area 3 – 300 Ton Crane lifting Column Line 1   Suite Level Area 1 – Metal stud framing and
Truss into place.                              in wall MEP rough-in is ongoing.




Building the Future

More Related Content

Featured

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Construction Update 09-15-2010

  • 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 9.15.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 9.13.2010 Current Activities this Week: Underground Utilities: Area 3 - Deep underground Plumbing continues. Foundations: Area 2 Concourse Level – Excavation for remaining D-Line footing has started. Area 3 – Underground plumbing installation Concrete Flatwork: is nearly complete at the lower dock area. Area 4 Field Level – Prep work for lower dock slab on grade has started. Structural Steel Erection: Area 3 – Main Canopy Truss Erection are set to Column Line 1. Area 4 – Metal decking installation in Sequence 3-3 has started. Field Level Area 1 – Subroof decking installation is ongoing MEP Rough-in: Area 3 – Shallow electrical and plumbing rough-in is Area 2 – CMU perimeter wall installation at ongoing. West Building - Ductwork installation on Stage are nearly topped out. Concourse, Suite and Press Levels are ongoing. Plumbing rough-in is ongoing on Suite and Press Levels. Fire Protection rough-in is ongoing on Concourse, Suite and Press Levels. Electrical rough-in is ongoing on Concourse, Suite and Press Levels. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels are ongoing. Exterior metal stud framing and sheathing installation is ongoing at Field, Suite, and Area 4 – Decking being installed at North Elevation. Building the Future
  • 2. Press Levels. Masonry: Area 1 Field Level – Masonry wall installation is ongoing in Areas E, F, G and H. Area 1, 2, 3 Concourse Level – Masonry wall installation at Main Concourse Buildings are ongoing. Area 3 – Canopy Truss erection is nearly Curtainwall: complete in Sequence 3-5. Area 1 – Curtainwall framing installation will continue at West Elevation. Installation of Curtainwall glass is ongoing. Projected Activities occurring next Week: Underground Utilities: Deep Plumbing installation will continue in Area 3, moving to the north. Foundations: Area 4 Field Level – Foundation wall installation for Main Stair will begin. Field Level Area 3 – Formwork for Stairs to Cauldron Club is set. Concrete Flatwork: Area 3 Field Level – Concrete placement for Slab-on Grade at lower dock area will begin. Prep work for slab- on-grade for lower dock area will continue. Area 3 and 4 Field Level – Installation of on-grade seating risers and intermediate stairs will continue. Structural Steel Erection: Area 2 – Canopy truss installation at North side of Stadium will continue. Area 1/2 – Filled and polished CMU Block walls at the Southwest and South Concourse MEP Rough-in: Buildings. MEP Rough-in at Concourse, Suite and Press Levels will continue. Ductwork installation on Concourse, Suite, and Press Level will continue. Fire Sprinkler installation will continue on Concourse, Suite and Press Levels. Building the Future
  • 3. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels will continue. Exterior Framing and sheathing installation will continue. Curtainwall: Area 1 – Curtain Framing and Glass installation will continue. Area 1 – Installation of curtainwall framing at Stair 4. Area 1 – Shot of the west building showing the progress of the canopy decking on trusses. Building the Future
  • 4. Additional Photos: Concourse Level Area 3 – Exterior CMU walls started northeast Concession and Men’s Field Level Area 3 – Upper Dock concrete is Restroom Buildings. placed. Bowl – Shot of the bowl from the roof of the Field Level Area 1 – Subroof decking Stadium Suite, showing the elevation installation is ongoing. change of the canopy trusses. Area 3 – 300 Ton Crane lifting Column Line 1 Suite Level Area 1 – Metal stud framing and Truss into place. in wall MEP rough-in is ongoing. Building the Future