• Purpose – To identify:
– What? (Processes)
• High level description of the work accomplished
• Work received; work passed on
• Aim for 5‐15 process blocks across the value stream
– Who? (Functions involved)
– When? (Sequence and handoffs)
•
•
•
•
Avoid getting into the details
Approach from a place of humility and curiosity
Capture thoughts, but avoid problem solving
Entire team walks & stays together
© 2014 The Karen Martin Group, Inc.
17
24. 2nd Walk ‐ Gain a Deeper Understanding
• Work input & output; trigger; prioritization
• 3 key metrics for each process block:
– Process Time (PT)
– Lead Time (LT)
– Percent Complete & Accurate (%C&A)
• WIP – quantity of work‐in‐process (queued work)
• Information flow; IT Systems used
• Significant barriers to flow
– Batching, system downtime, inaccessible resources,
long setup, etc.
• # of people who do the work (if relevant)
24
35. Golden State Equipment, Inc.
Capital Equipment Value Stream
Metric
Current State
Timeline PT
Projected %
Improvement
46.0 hours*
Timeline LT
Projected
Future State
44.0 days*
LT – RFQ
(CS blocks 2-4)
LT – PO-Dev
(CS blocks 6-10)
Activity Ratio
(full value stream)
Rolled %C&A
11 days
27 days
13.1%
4.8%
* Specify whether business hours or clock hours; whether business days or calendar days.
** Based on 1,000 orders per year and 1,950 available work hours per employee per year.
© 2014 The Karen Martin Group, Inc.
35
39. Value Stream Mapping Charter
Scope
Accountable Parties
Logistics
Executive
Allen Ward
Sponsor
Value Stream Capital equipment
Specific Engineer to order, requires both hardware &
Conditions software customization
Event Dates July 24-26, 2013
& Times 8:00 am - 5:00 pm
Value Stream
Nancy Little
Champion
Demand Rate 1,000 per year
Base-camp
Surf's Up - Room A
Location
Facilitator Dave Parks
Trigger Customer submits RFQ
First Step Sales reviews the RFQ
Logistics
Dave Parks
Coordinator
Last Step Production ships product
Boundaries & No new software; only minor changes to existing IT
Limitations systems; no additional staff; no budget changes
Meals
Continential breakfast & lunch
Provided
Briefing ** Allen W (COO), Joe M (CIO),
Attendees Sal T (VP Sales)
** required * Bruce R (VP Ops), Carlos P
*optional (HR), Su T (CFO), Bill M (VP CS)
Improvement Time Future state design is fully realized by
Frame December 31, 2013.
Current State Problems & Business Needs
Briefing
July 24, 25, & 26
Dates &
4:00-5:00 pm
Times
Mapping Team
1 Desire to stay ahead of the competition & deepen customer loyalty.
Function / Title
Name
2 Forecasted growth of 15% for next fiscal year.
1 Sales, Director
Sean Michaels
3 Unclear & incorrect information flowing through value stream.
2 IT, Director
Diana Marie
4 Lead time for RFQ turnaround = 2 weeks; PO to software dev = 5 weeks
3 Finance, Controller
Dave Gerald
5 (Competition's RFQ LT is 1 wk and PO to delivery is 4 wks)
4 Scrum Master
Ryan Austin
5 Engineering, Vice President
Nancy Little
1 Reduce RFQ lead time by a minimum of 50%.
6 Manufacturing, Director
Ambreen Motiwala
2 Reduce PO to software development lead time by a minimum of 50%.
7 Customer Service, Manager
Danny Tran
3 Improve quality of information flowing throughout value stream.
8 Customer (contract manufacturer)
Contact Information
JR Hunt
Goals & Measurable Target Conditions
4
9
5
10
Benefits to Customers & Business
On-Call Support
1 Faster delivery; less hassle; less cost.
Function
Name
2 Better working relationships between sales, estimating & engineering.
1 Planning / Purchasing, Planner Lourdes Dwyer
3 Freed capacity to absorb additional business w/o increasing staff.
2 Production Supervisor
4
Contact Information
3
5
Tom St. James
4
Relevant Data
Agreement
1 Sales effectiveness: RFQ conversion rate.
Executive Sponsor
Value Stream Champion
Facilitator
2 Financial: Estimate-to-actual cost comparison.
3 Operational: LT in segments (RFQ to quote; PO to development).
Signature:
Signature:
Signature:
4
Date:
Date:
Date:
© 2014 The Karen Martin Group, Inc.
39
46. Value Stream Transformation Plan
Value Stream Outpatient Imaging
Scheduled Review Dates
Executive Sponsor Allen Ward
Value Stream Champion Paul Scanner
Value Stream Mapping Facilitator Dave Parks
1-Nov-12
21-Nov-12
13-Dec-12
Date Created 10/18/2012
FS VSM
Block #
Measurable Target
10-Jan-13
Proposed Countermeasure
Exec.
Method*
Owner
Improve quality of referral to 85%
Implement standard work for referral
process
KE
Cross-train and co-locate work teams
Proj
Only one check in per patient
Collect copays in Imaging
KE
Reduce wait time in waiting area by 50% Balance work / level demand
KE
Eliminate 6 hour lead time associated
with transcription step
Implement voice recognition technology
Proj
Eliminate redundant data entry
Auto populate between PACS and
Meditech
Proj
Visually managed inventory; no outages
or expired items
5S CT supplies area; implement kanban
KE
Reduce imaging LT to one hour
Value-stream specific radiologists
Proj
Reduce report delivery LT to 30 minutes
Increase % of physicians receiving
electronic delivery
Proj
Reduce LT at image review to 1 day
Visual metrics and indicators
JDI
9
10 11 12
Status
Martha
Allen
7
8
Martha
Allen
8
7
Michael
O'Shea
6
6
Dave
Gerald
5
5
Dave
Gerald
7
4
Dianne
Marie
6
3
Ryan
Austin
4
2
Dianne
Marie
4
1
Sean
Michaels
Reduce lead time between scheduling
and preregistration step to 45 minutes
Planned Timeline for Execution
Dave
Gerald
2
3,4
Agreement
Executive Sponsor
Value Stream Champion
Value Stream Mapping Facilitator
Signature:
Signature:
Signature:
Date:
Date:
Date:
* Execution Method = JDI (Just-do-it), KE (Kaizen Event), or Proj (Project)