SlideShare a Scribd company logo
1 of 31
Download to read offline
Webinar
May 13, 2014
Reducing Resistance to Change
Welcome!
• Great Britain
• Guatemala
• Hong Kong
• India
• Indonesia
• Ireland
• Korea (South)
• Lithuania
• Latvia
• Mexico
• Nicaragua
• Netherlands
• New Zealand
• Philippines
• Portugal
• Russia
• Saudi Arabia
• South Africa
• Spain
• Sweden
• Switzerland
• Tunisia
• Turkey
• United States
www.ksmartin.com/subscribe
• Australia
• Burundi
• Bermuda
• Bolivia
• Brazil
• Canada
• Costa Rica
• Czech Republic
• Denmark
• Germany
• Ecuador
• France
 Coach / Facilitator / Consultant / Trainer:
Lean transformation & business performance
improvement in all industries.
 Teacher: University of California, San Diego
 Author & Speaker:
Karen Martin, President
@KarenMartinOpEx
www.linkedin.com/in/karenmartinopex
3
2013 Shingo
Prize winner!
www.ksmartin.com/subscribe
@karenmartinopex
After the webinar…
• Recordings:
– www.ksmartin.com/webinars
– www.vimeo.com/karenmartingroup
– www.youtube.com/karenmartingroup
– www.slideshare.net/karenmartingroup (+ slides)
Before the webinar…
• Materials available one hour prior:
– www.ksmartin.com/files/webinarmaterials/MM-DD-YYYY_slides.pdf
(or _handout.pdf)
5
More Webinars!
11:00 am-12:15 pm PT
www.ksmartin.com/webinars
Coaching: The Art of
Asking the Right Questions
Respect for People:
The Lean Way
DATE CHANGE
A3 Management:
Effective Problem Solving
Holding Effective
Kaizen Events
You will learn…
• The power behind properly designed and
socialized charters.
• Techniques for aligning all stakeholders
around the need for change.
• How to assure that a proposed change is
truly an improvement.
• Techniques for using psychology to reduce
resistance.
People are Highly Predictable Creatures
© 2014 The Karen Martin Group, Inc. 8
Resistance is a Sign
that You’ve Done
Something Wrong *
* With a few exceptions.
© 2014 The Karen Martin Group, Inc. 9
Why People Resist Change
1. They don’t understand why
it’s needed.
2. They weren’t involved.
3. It’s a “change” vs. true
improvement.
© 2014 The Karen Martin Group, Inc. 10
Why People Resist Change
1. They don’t understand why
it’s needed.
2. They weren’t involved.
3. It’s a “change” vs. true
improvement.
1
2 1
3 2
4 3
5 4
5
1 6
2 7
3 8
4 9
5 10
1
2 1
3 2
4 3
5 4
1
2
3
4 Date: Date:
Specific
Conditions
Land-based
Value Stream
Champion
Janice Mitchell
Demand Rate 300 units (40 projects; 20 POs) per year
Facilitator Karen Martin
Value Stream Mapping Charter
Scope Accountable Parties Logistics
Value Stream Equipment type A
Executive
Sponsor
Joe Abrams
Event Dates
& Times
Mon, Tue, Wed
Feb 3, 4 & 5, 2014
8:00 am - 5:00 pm
Last Step Product shipped
Boundaries &
Limitations
Must use existing resources (people, IT, etc.) Briefing
Attendees
** required
*optional
** Frank L, Rick M, Cory C, Glen
S, Sinan, Ben, Jane, Sal,
Malaika, Andrew, AE's, Sales
Mgr's, Rachel, Adam, Dustan
Base-camp
Location
Bldg B, Conf Room A
Trigger Customer submits RFQ
First Step Sales receives RFQ Logistics
Coordinator
Georgette Winters
Meals
Provided
Continental breakfast, lunch,
snacks
Projects are not scoped accurately (voice of the customer). Function Name
Lack of consistent processes and execution. Operations John Morgan
Briefing
Dates
&Times
Feb 3, 4 & 5, 2014
4:00 - 5:00 pmImprovement
Timeframe
Future state realized by December 31, 2014
Current State Problems & Business Needs Mapping Team
Contact Information
On-going changes to project parameters (design, test dates, & supply chain). Supply Chain, purch, log, ware Tom Johnson
Consistently late delivery. CEO Mark Simpson
Increase average ontime delivery (to "ready to ship") from 17% to 60%. Quality Sally Jones
Reduce lead time (PO to ready to ship) from 12 mos to 8 mos. CFO Sharon Prince
No KPIs. Sales Ed Borge
Goals & Measurable Targets Engineering Joakim Gutan
Sales Kellie McMahon
Benefits to Customers & Business On-Call Support
Create variance tracking methodology. Program Mgmt Leia Chang
Standardize the change process to reduce the # of Change Orders. Manufacturing Robert Cashman
Finance Lori P
Capable processes that are repeatable (process focused). Design Manager Andrew M
Projects completed on time (customer) & under budget (business). Function Name
Reduced lead times & increased sales opportunities. IT Mars L
Contact Information
Budget-to-actual expenses per PO/project. Signature: Signature: Signature:
Date:
2013 average ontime delivery. Executive Sponsor Value Stream Champion Facilitator
Annualized quantity of change orders.
Profitably grow our business and open new markets. Prod Development Charlie F
Relevant Data Agreement
Reduce customer's warranty & LD exposure.
3 Purposes of Charters:
Plan, Communicate, Build Consensus
Download: www.ksmartin.com/charter
© 2014 The Karen Martin Group, Inc. 12
1
2 1
3 2
4 3
5 4
5
1 6
2 7
3 8
4 9
5 10
1
2 1
3 2
4 3
5 4
1
2
3
4 Date: Date:
Specific
Conditions
Land-based
Value Stream
Champion
Janice Mitchell
Demand Rate 300 units (40 projects; 20 POs) per year
Facilitator Karen Martin
Value Stream Mapping Charter
Scope Accountable Parties Logistics
Value Stream Equipment type A
Executive
Sponsor
Joe Abrams
Event Dates
& Times
Mon, Tue, Wed
Feb 3, 4 & 5, 2014
8:00 am - 5:00 pm
Last Step Product shipped
Boundaries &
Limitations
Must use existing resources (people, IT, etc.) Briefing
Attendees
** required
*optional
** Frank L, Rick M, Cory C, Glen
S, Sinan, Ben, Jane, Sal,
Malaika, Andrew, AE's, Sales
Mgr's, Rachel, Adam, Dustan
Base-camp
Location
Bldg B, Conf Room A
Trigger Customer submits RFQ
First Step Sales receives RFQ Logistics
Coordinator
Georgette Winters
Meals
Provided
Continental breakfast, lunch,
snacks
Projects are not scoped accurately (voice of the customer). Function Name
Lack of consistent processes and execution. Operations John Morgan
Briefing
Dates
&Times
Feb 3, 4 & 5, 2014
4:00 - 5:00 pmImprovement
Timeframe
Future state realized by December 31, 2014
Current State Problems & Business Needs Mapping Team
Contact Information
On-going changes to project parameters (design, test dates, & supply chain). Supply Chain, purch, log, ware Tom Johnson
Consistently late delivery. CEO Mark Simpson
Increase average ontime delivery (to "ready to ship") from 17% to 60%. Quality Sally Jones
Reduce lead time (PO to ready to ship) from 12 mos to 8 mos. CFO Sharon Prince
No KPIs. Sales Ed Borge
Goals & Measurable Targets Engineering Joakim Gutan
Sales Kellie McMahon
Benefits to Customers & Business On-Call Support
Create variance tracking methodology. Program Mgmt Leia Chang
Standardize the change process to reduce the # of Change Orders. Manufacturing Robert Cashman
Finance Lori P
Capable processes that are repeatable (process focused). Design Manager Andrew M
Projects completed on time (customer) & under budget (business). Function Name
Reduced lead times & increased sales opportunities. IT Mars L
Contact Information
Budget-to-actual expenses per PO/project. Signature: Signature: Signature:
Date:
2013 average ontime delivery. Executive Sponsor Value Stream Champion Facilitator
Annualized quantity of change orders.
Profitably grow our business and open new markets. Prod Development Charlie F
Relevant Data Agreement
Reduce customer's warranty & LD exposure.
Common Components of the A3 Report
Theme: “What is our area of focus?” Owner: Person accountable for results.
Plan Do, Study, Adjust
Background
Current Condition
Countermeasures / Implementation Plan
Effect Confirmation
Follow-up Actions
• What?
• Who?
• When?
• Where? (if relevant)
Target Condition / Measurable Objectives
• Diagram of desired state
• Measurable targets – how will we know that the
improvement has been successful?
• Diagram of current situation or process
• What about it is not ideal?
• Extent of the problem (metrics)
• Problem statement
• Context - Why is this a problem? How large is the
problem?
Root Cause & Gap Analysis
• Graphical depiction of the most likely direct (root)
causes
• What measurable results did the solution
achieve (or will be measured to verify
effectiveness)?
• Who’s responsible for ongoing measurement?
• Where else in the organization can this solution
be applied?
• How will the improved state be standardized
and communicated?
© 2014 The Karen Martin Group, Inc. 14
Why People Resist Change
1. They don’t understand why
it’s needed.
2. They weren’t involved.
3. It’s a “change” vs. true
improvement.
© 2014 The Karen Martin Group, Inc. 15
It’s Uplifting to Kaizen…
It’s
traumatizing
to be
kaizen’d.
© 2014 The Karen Martin Group, Inc. 16
The People
Who Do the
Work are the
Experts
© 2014 The Karen Martin Group, Inc. 17
Leaders determine strategy
(what needs to happen)
Workers determine tactics
(how it will happen)
© 2014 The Karen Martin Group, Inc. 18
1
2 1
3 2
4 3
5 4
5
1 6
2 7
3 8
4 9
5 10
1
2 1
3 2
4 3
5 4
1
2
3
4 Date: Date:
Specific
Conditions
Land-based
Value Stream
Champion
Janice Mitchell
Demand Rate 300 units (40 projects; 20 POs) per year
Facilitator Karen Martin
Value Stream Mapping Charter
Scope Accountable Parties Logistics
Value Stream Equipment type A
Executive
Sponsor
Joe Abrams
Event Dates
& Times
Mon, Tue, Wed
Feb 3, 4 & 5, 2014
8:00 am - 5:00 pm
Last Step Product shipped
Boundaries &
Limitations
Must use existing resources (people, IT, etc.) Briefing
Attendees
** required
*optional
** Frank L, Rick M, Cory C, Glen
S, Sinan, Ben, Jane, Sal,
Malaika, Andrew, AE's, Sales
Mgr's, Rachel, Adam, Dustan
Base-camp
Location
Bldg B, Conf Room A
Trigger Customer submits RFQ
First Step Sales receives RFQ Logistics
Coordinator
Georgette Winters
Meals
Provided
Continental breakfast, lunch,
snacks
Projects are not scoped accurately (voice of the customer). Function Name
Lack of consistent processes and execution. Operations John Morgan
Briefing
Dates
&Times
Feb 3, 4 & 5, 2014
4:00 - 5:00 pmImprovement
Timeframe
Future state realized by December 31, 2014
Current State Problems & Business Needs Mapping Team
Contact Information
On-going changes to project parameters (design, test dates, & supply chain). Supply Chain, purch, log, ware Tom Johnson
Consistently late delivery. CEO Mark Simpson
Increase average ontime delivery (to "ready to ship") from 17% to 60%. Quality Sally Jones
Reduce lead time (PO to ready to ship) from 12 mos to 8 mos. CFO Sharon Prince
No KPIs. Sales Ed Borge
Goals & Measurable Targets Engineering Joakim Gutan
Sales Kellie McMahon
Benefits to Customers & Business On-Call Support
Create variance tracking methodology. Program Mgmt Leia Chang
Standardize the change process to reduce the # of Change Orders. Manufacturing Robert Cashman
Finance Lori P
Capable processes that are repeatable (process focused). Design Manager Andrew M
Projects completed on time (customer) & under budget (business). Function Name
Reduced lead times & increased sales opportunities. IT Mars L
Contact Information
Budget-to-actual expenses per PO/project. Signature: Signature: Signature:
Date:
2013 average ontime delivery. Executive Sponsor Value Stream Champion Facilitator
Annualized quantity of change orders.
Profitably grow our business and open new markets. Prod Development Charlie F
Relevant Data Agreement
Reduce customer's warranty & LD exposure.
© 2014 The Karen Martin Group, Inc. 19
Who Needs to be Involved?
Function Activity
Marketing 1. Generates sales leads
Sales 2. Calls on and qualifies customers
Customer 3. Submits RFQ to sales
Sales 4. Reviews RFQ
Estimating 5. Generates quote
Sales 6. Approve quote
Customer 7. Accepts quote; submits a PO
Sales 8. Approves PO
Customer service 9. Creates SO; compiles spec package
EE/ME design 10. Designs product; generates BOM
Customer 11. Approves design
EE/ME design 12. Forwards design to SW dev
Software Dev 13. Writes code
Purchasing/Planning 14. Releases WO; schedules production
Supplier (external) 15. Delivers materials
Production 16. Manufactures & ships product
Customer 17. Installs equipment
Field service 18. Conducts 90-day follow-up
Problem:
Product
Quality
Available on the CD that Accompanies
The Kaizen Event Planner (www.bitly.com/TKEP)
The Power of Periodic Briefings
21
Purpose: Deepen understanding, gain commitment,
help people “grow” with change, surface hidden issues.
© 2014 The Karen Martin Group, Inc. 22
Why People Resist Change
1. They don’t understand why
it’s needed.
2. They weren’t involved.
3. It’s a “change” vs. true
improvement.
© 2014 The Karen Martin Group, Inc. 23
Beware of
Process
Tampering!
© 2014 The Karen Martin Group, Inc. 24
Develop
hypothesis
Conduct
experiment
Measure
results
Refine
Standardize
Stabilize
© 2014 The Karen Martin Group, Inc. 25
Begin at the Beginning, Not the End!
1. What’s the problem?
2. How big is the problem?
3. Why is it a problem?
4. What’s the root cause?
© 2014 The Karen Martin Group, Inc. 26
What About the One Resister
That You Can’t Turn?
1. Determine root cause via
candid conversation.
2. They may need to find a
new “home.” 
© 2014 The Karen Martin Group, Inc. 27
In Summary…
• Use well-designed charters.
• Socialize the charters.
• Use robust problem solving (PDSA) to
make true improvement.
• Involve the people who do the work being
improved (or who work in the
environment being improved).
– Include upstream suppliers and downstream
customers.
• Hold periodic briefings.
© 2014 The Karen Martin Group, Inc. 28
Change Doesn’t Have to Be
As Hard as We Make It
© 2014 The Karen Martin Group, Inc. 30
Your Questions
• What are some examples of the hardest
resistance to change you’ve encountered
& how did you overcome them?
• When does one decide that a company
has a totally hopeless culture to change?
Examples?
• How do you deal with people who are
close to retirement?
© 2014 The Karen Martin Group, Inc. 31
Karen Martin, President
858.677.6799
@karenmartinopex
Blog & newsletter: www.ksmartin.com/subscribe

More Related Content

What's hot

The Outstanding Organization: The Power of Discipline
The Outstanding Organization: The Power of DisciplineThe Outstanding Organization: The Power of Discipline
The Outstanding Organization: The Power of DisciplineTKMG, Inc.
 
Change Management PowerPoint Presentation Slides
Change Management PowerPoint Presentation SlidesChange Management PowerPoint Presentation Slides
Change Management PowerPoint Presentation SlidesSlideTeam
 
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)TKMG, Inc.
 
value stream mapping and metrics based process mapping
value stream mapping and metrics based process mappingvalue stream mapping and metrics based process mapping
value stream mapping and metrics based process mappingTKMG, Inc.
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...TKMG, Inc.
 
Building a Lean Enterprise: Navigating the Common Obstacles to Success
Building a Lean Enterprise: Navigating the Common Obstacles to SuccessBuilding a Lean Enterprise: Navigating the Common Obstacles to Success
Building a Lean Enterprise: Navigating the Common Obstacles to SuccessTKMG, Inc.
 
The Trick to Employee Engagement—It’s Not What You Think
The Trick to Employee Engagement—It’s Not What You ThinkThe Trick to Employee Engagement—It’s Not What You Think
The Trick to Employee Engagement—It’s Not What You ThinkTKMG, Inc.
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & PerformanceTKMG, Inc.
 
Process Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightProcess Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightTKMG, Inc.
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
Value Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeValue Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeTKMG, Inc.
 
Value Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InValue Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InTKMG, Inc.
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3TKMG, Inc.
 

What's hot (20)

Process mapping v2
Process mapping v2Process mapping v2
Process mapping v2
 
The Outstanding Organization: The Power of Discipline
The Outstanding Organization: The Power of DisciplineThe Outstanding Organization: The Power of Discipline
The Outstanding Organization: The Power of Discipline
 
Lean transformation
Lean transformationLean transformation
Lean transformation
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Change Management PowerPoint Presentation Slides
Change Management PowerPoint Presentation SlidesChange Management PowerPoint Presentation Slides
Change Management PowerPoint Presentation Slides
 
Lean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence ConsultingLean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence Consulting
 
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
 
value stream mapping and metrics based process mapping
value stream mapping and metrics based process mappingvalue stream mapping and metrics based process mapping
value stream mapping and metrics based process mapping
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
 
Building a Lean Enterprise: Navigating the Common Obstacles to Success
Building a Lean Enterprise: Navigating the Common Obstacles to SuccessBuilding a Lean Enterprise: Navigating the Common Obstacles to Success
Building a Lean Enterprise: Navigating the Common Obstacles to Success
 
The Trick to Employee Engagement—It’s Not What You Think
The Trick to Employee Engagement—It’s Not What You ThinkThe Trick to Employee Engagement—It’s Not What You Think
The Trick to Employee Engagement—It’s Not What You Think
 
Change management ppt 3 mba
Change management ppt 3 mbaChange management ppt 3 mba
Change management ppt 3 mba
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & Performance
 
Process Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It RightProcess Management: Why So Few Companies Get It Right
Process Management: Why So Few Companies Get It Right
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
Value Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeValue Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management Practice
 
Value Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InValue Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive In
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3
 

Viewers also liked

Plan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep DivePlan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep DiveTKMG, Inc.
 
How to Truly Establish a CI Culture
How to Truly Establish a CI CultureHow to Truly Establish a CI Culture
How to Truly Establish a CI CultureTKMG, Inc.
 
Putting an End to "Organizational ADD"
Putting an End to "Organizational ADD"Putting an End to "Organizational ADD"
Putting an End to "Organizational ADD"TKMG, Inc.
 
Respect for People: The Lean Way
Respect for People: The Lean WayRespect for People: The Lean Way
Respect for People: The Lean WayTKMG, Inc.
 
Lean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesLean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesTKMG, Inc.
 
Problem Solving: The P in PDSA
Problem Solving: The P in PDSAProblem Solving: The P in PDSA
Problem Solving: The P in PDSATKMG, Inc.
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3TKMG, Inc.
 
resistance to change management (final)
resistance to change management (final)resistance to change management (final)
resistance to change management (final)Aparna Bakre
 
How Organizational Chaos Destroys Improvement Initiatives & What to Do to Pre...
How Organizational Chaos Destroys Improvement Initiatives & What to Do to Pre...How Organizational Chaos Destroys Improvement Initiatives & What to Do to Pre...
How Organizational Chaos Destroys Improvement Initiatives & What to Do to Pre...TKMG, Inc.
 
Coaching: Asking the Right Questions
Coaching: Asking the Right QuestionsCoaching: Asking the Right Questions
Coaching: Asking the Right QuestionsTKMG, Inc.
 
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and AlignmentStrategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and AlignmentTKMG, Inc.
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
A3 Management (Part 2 of 2)
A3 Management (Part 2 of 2)A3 Management (Part 2 of 2)
A3 Management (Part 2 of 2)TKMG, Inc.
 
A3 Management - From Structured Problem-Solving to Workplace Development (Par...
A3 Management - From Structured Problem-Solving to Workplace Development (Par...A3 Management - From Structured Problem-Solving to Workplace Development (Par...
A3 Management - From Structured Problem-Solving to Workplace Development (Par...TKMG, Inc.
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3TKMG, Inc.
 
Lean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerLean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerTKMG, Inc.
 

Viewers also liked (17)

Plan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep DivePlan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep Dive
 
How to Truly Establish a CI Culture
How to Truly Establish a CI CultureHow to Truly Establish a CI Culture
How to Truly Establish a CI Culture
 
Putting an End to "Organizational ADD"
Putting an End to "Organizational ADD"Putting an End to "Organizational ADD"
Putting an End to "Organizational ADD"
 
Respect for People: The Lean Way
Respect for People: The Lean WayRespect for People: The Lean Way
Respect for People: The Lean Way
 
Lean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesLean and Your Top & Bottom Lines
Lean and Your Top & Bottom Lines
 
Problem Solving: The P in PDSA
Problem Solving: The P in PDSAProblem Solving: The P in PDSA
Problem Solving: The P in PDSA
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3
 
resistance to change management (final)
resistance to change management (final)resistance to change management (final)
resistance to change management (final)
 
How Organizational Chaos Destroys Improvement Initiatives & What to Do to Pre...
How Organizational Chaos Destroys Improvement Initiatives & What to Do to Pre...How Organizational Chaos Destroys Improvement Initiatives & What to Do to Pre...
How Organizational Chaos Destroys Improvement Initiatives & What to Do to Pre...
 
Coaching: Asking the Right Questions
Coaching: Asking the Right QuestionsCoaching: Asking the Right Questions
Coaching: Asking the Right Questions
 
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and AlignmentStrategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
A3 Management (Part 2 of 2)
A3 Management (Part 2 of 2)A3 Management (Part 2 of 2)
A3 Management (Part 2 of 2)
 
A3 Management - From Structured Problem-Solving to Workplace Development (Par...
A3 Management - From Structured Problem-Solving to Workplace Development (Par...A3 Management - From Structured Problem-Solving to Workplace Development (Par...
A3 Management - From Structured Problem-Solving to Workplace Development (Par...
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3
 
Lean 101
Lean 101Lean 101
Lean 101
 
Lean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerLean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob Stoller
 

Similar to Reducing Resistance to Change

Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesTKMG, Inc.
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream MappingTKMG, Inc.
 
UPSTART Live Spring Summit - LinkedIn
UPSTART Live Spring Summit - LinkedInUPSTART Live Spring Summit - LinkedIn
UPSTART Live Spring Summit - LinkedInWorkforceNEXT
 
Value Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupValue Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupTKMG, Inc.
 
Ten Essentials of Treasury Technology TMANE 2009
Ten Essentials of Treasury Technology TMANE 2009Ten Essentials of Treasury Technology TMANE 2009
Ten Essentials of Treasury Technology TMANE 2009rthompson89
 
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)TKMG, Inc.
 
How Talent Analytics Can Help You Maximize Your HR Strategy
How Talent Analytics Can Help You Maximize Your HR StrategyHow Talent Analytics Can Help You Maximize Your HR Strategy
How Talent Analytics Can Help You Maximize Your HR StrategyGlassdoor
 
LoCC Measurable Improvement in Your Development Process
LoCC Measurable Improvement in Your Development ProcessLoCC Measurable Improvement in Your Development Process
LoCC Measurable Improvement in Your Development ProcessJoseph Horwedel
 
Vendor Profile: Act-On
Vendor Profile: Act-OnVendor Profile: Act-On
Vendor Profile: Act-OnDemand Metric
 
Spring Group Presentation Ht12
Spring Group Presentation   Ht12Spring Group Presentation   Ht12
Spring Group Presentation Ht12hannahthorpe
 
Vcu Stm Transformation 02 15 10
Vcu Stm Transformation 02 15 10Vcu Stm Transformation 02 15 10
Vcu Stm Transformation 02 15 10guesta24f4bc
 
Socitm Supplier Briefing London
Socitm Supplier Briefing LondonSocitm Supplier Briefing London
Socitm Supplier Briefing LondonSocitm Briefings
 
Socitm Supplier Briefing London
Socitm Supplier Briefing LondonSocitm Supplier Briefing London
Socitm Supplier Briefing LondonSocitm
 
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...TKMG, Inc.
 
4 Barriers to creating predictive talent analytics and how to overcome them
4 Barriers to creating predictive talent analytics and how to overcome them4 Barriers to creating predictive talent analytics and how to overcome them
4 Barriers to creating predictive talent analytics and how to overcome themMartin Sutherland
 
Technology Market Landscape - Trends and Issues Q3 2013
Technology Market Landscape - Trends and Issues Q3 2013Technology Market Landscape - Trends and Issues Q3 2013
Technology Market Landscape - Trends and Issues Q3 2013FiveTen_Group
 
Research Services
Research ServicesResearch Services
Research ServicesEminenture
 

Similar to Reducing Resistance to Change (20)

Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case Studies
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
UPSTART Live Spring Summit - LinkedIn
UPSTART Live Spring Summit - LinkedInUPSTART Live Spring Summit - LinkedIn
UPSTART Live Spring Summit - LinkedIn
 
Value Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupValue Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User Group
 
Paine webber
Paine webberPaine webber
Paine webber
 
Ten Essentials of Treasury Technology TMANE 2009
Ten Essentials of Treasury Technology TMANE 2009Ten Essentials of Treasury Technology TMANE 2009
Ten Essentials of Treasury Technology TMANE 2009
 
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
 
How Talent Analytics Can Help You Maximize Your HR Strategy
How Talent Analytics Can Help You Maximize Your HR StrategyHow Talent Analytics Can Help You Maximize Your HR Strategy
How Talent Analytics Can Help You Maximize Your HR Strategy
 
Company Overview
Company OverviewCompany Overview
Company Overview
 
Prem Dsilva
Prem DsilvaPrem Dsilva
Prem Dsilva
 
LoCC Measurable Improvement in Your Development Process
LoCC Measurable Improvement in Your Development ProcessLoCC Measurable Improvement in Your Development Process
LoCC Measurable Improvement in Your Development Process
 
Vendor Profile: Act-On
Vendor Profile: Act-OnVendor Profile: Act-On
Vendor Profile: Act-On
 
Spring Group Presentation Ht12
Spring Group Presentation   Ht12Spring Group Presentation   Ht12
Spring Group Presentation Ht12
 
Vcu Stm Transformation 02 15 10
Vcu Stm Transformation 02 15 10Vcu Stm Transformation 02 15 10
Vcu Stm Transformation 02 15 10
 
Socitm Supplier Briefing London
Socitm Supplier Briefing LondonSocitm Supplier Briefing London
Socitm Supplier Briefing London
 
Socitm Supplier Briefing London
Socitm Supplier Briefing LondonSocitm Supplier Briefing London
Socitm Supplier Briefing London
 
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
 
4 Barriers to creating predictive talent analytics and how to overcome them
4 Barriers to creating predictive talent analytics and how to overcome them4 Barriers to creating predictive talent analytics and how to overcome them
4 Barriers to creating predictive talent analytics and how to overcome them
 
Technology Market Landscape - Trends and Issues Q3 2013
Technology Market Landscape - Trends and Issues Q3 2013Technology Market Landscape - Trends and Issues Q3 2013
Technology Market Landscape - Trends and Issues Q3 2013
 
Research Services
Research ServicesResearch Services
Research Services
 

More from TKMG, Inc.

Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
CLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsCLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsTKMG, Inc.
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.TKMG, Inc.
 
Clarity First - Problem Solving
Clarity First - Problem Solving Clarity First - Problem Solving
Clarity First - Problem Solving TKMG, Inc.
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesTKMG, Inc.
 
Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)TKMG, Inc.
 
Know How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleKnow How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleTKMG, Inc.
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management SystemsTKMG, Inc.
 
The Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemThe Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemTKMG, Inc.
 
Metrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeMetrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeTKMG, Inc.
 
Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)TKMG, Inc.
 
A3 Management: Effective Problem Solving via PDSA
A3 Management: Effective Problem Solving via PDSAA3 Management: Effective Problem Solving via PDSA
A3 Management: Effective Problem Solving via PDSATKMG, Inc.
 

More from TKMG, Inc. (12)

Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
CLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsCLEAR Problem-Solving Questions
CLEAR Problem-Solving Questions
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.
 
Clarity First - Problem Solving
Clarity First - Problem Solving Clarity First - Problem Solving
Clarity First - Problem Solving
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and Priorities
 
Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)
 
Know How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleKnow How Data is Calculated - OEE example
Know How Data is Calculated - OEE example
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management Systems
 
The Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemThe Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable System
 
Metrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeMetrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount Code
 
Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)
 
A3 Management: Effective Problem Solving via PDSA
A3 Management: Effective Problem Solving via PDSAA3 Management: Effective Problem Solving via PDSA
A3 Management: Effective Problem Solving via PDSA
 

Recently uploaded

7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 

Recently uploaded (20)

7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 

Reducing Resistance to Change

  • 1. Webinar May 13, 2014 Reducing Resistance to Change
  • 2. Welcome! • Great Britain • Guatemala • Hong Kong • India • Indonesia • Ireland • Korea (South) • Lithuania • Latvia • Mexico • Nicaragua • Netherlands • New Zealand • Philippines • Portugal • Russia • Saudi Arabia • South Africa • Spain • Sweden • Switzerland • Tunisia • Turkey • United States www.ksmartin.com/subscribe • Australia • Burundi • Bermuda • Bolivia • Brazil • Canada • Costa Rica • Czech Republic • Denmark • Germany • Ecuador • France
  • 3.  Coach / Facilitator / Consultant / Trainer: Lean transformation & business performance improvement in all industries.  Teacher: University of California, San Diego  Author & Speaker: Karen Martin, President @KarenMartinOpEx www.linkedin.com/in/karenmartinopex 3 2013 Shingo Prize winner! www.ksmartin.com/subscribe @karenmartinopex
  • 4. After the webinar… • Recordings: – www.ksmartin.com/webinars – www.vimeo.com/karenmartingroup – www.youtube.com/karenmartingroup – www.slideshare.net/karenmartingroup (+ slides) Before the webinar… • Materials available one hour prior: – www.ksmartin.com/files/webinarmaterials/MM-DD-YYYY_slides.pdf (or _handout.pdf)
  • 5. 5 More Webinars! 11:00 am-12:15 pm PT www.ksmartin.com/webinars Coaching: The Art of Asking the Right Questions Respect for People: The Lean Way DATE CHANGE A3 Management: Effective Problem Solving Holding Effective Kaizen Events
  • 6. You will learn… • The power behind properly designed and socialized charters. • Techniques for aligning all stakeholders around the need for change. • How to assure that a proposed change is truly an improvement. • Techniques for using psychology to reduce resistance.
  • 7. People are Highly Predictable Creatures
  • 8. © 2014 The Karen Martin Group, Inc. 8 Resistance is a Sign that You’ve Done Something Wrong * * With a few exceptions.
  • 9. © 2014 The Karen Martin Group, Inc. 9 Why People Resist Change 1. They don’t understand why it’s needed. 2. They weren’t involved. 3. It’s a “change” vs. true improvement.
  • 10. © 2014 The Karen Martin Group, Inc. 10 Why People Resist Change 1. They don’t understand why it’s needed. 2. They weren’t involved. 3. It’s a “change” vs. true improvement.
  • 11. 1 2 1 3 2 4 3 5 4 5 1 6 2 7 3 8 4 9 5 10 1 2 1 3 2 4 3 5 4 1 2 3 4 Date: Date: Specific Conditions Land-based Value Stream Champion Janice Mitchell Demand Rate 300 units (40 projects; 20 POs) per year Facilitator Karen Martin Value Stream Mapping Charter Scope Accountable Parties Logistics Value Stream Equipment type A Executive Sponsor Joe Abrams Event Dates & Times Mon, Tue, Wed Feb 3, 4 & 5, 2014 8:00 am - 5:00 pm Last Step Product shipped Boundaries & Limitations Must use existing resources (people, IT, etc.) Briefing Attendees ** required *optional ** Frank L, Rick M, Cory C, Glen S, Sinan, Ben, Jane, Sal, Malaika, Andrew, AE's, Sales Mgr's, Rachel, Adam, Dustan Base-camp Location Bldg B, Conf Room A Trigger Customer submits RFQ First Step Sales receives RFQ Logistics Coordinator Georgette Winters Meals Provided Continental breakfast, lunch, snacks Projects are not scoped accurately (voice of the customer). Function Name Lack of consistent processes and execution. Operations John Morgan Briefing Dates &Times Feb 3, 4 & 5, 2014 4:00 - 5:00 pmImprovement Timeframe Future state realized by December 31, 2014 Current State Problems & Business Needs Mapping Team Contact Information On-going changes to project parameters (design, test dates, & supply chain). Supply Chain, purch, log, ware Tom Johnson Consistently late delivery. CEO Mark Simpson Increase average ontime delivery (to "ready to ship") from 17% to 60%. Quality Sally Jones Reduce lead time (PO to ready to ship) from 12 mos to 8 mos. CFO Sharon Prince No KPIs. Sales Ed Borge Goals & Measurable Targets Engineering Joakim Gutan Sales Kellie McMahon Benefits to Customers & Business On-Call Support Create variance tracking methodology. Program Mgmt Leia Chang Standardize the change process to reduce the # of Change Orders. Manufacturing Robert Cashman Finance Lori P Capable processes that are repeatable (process focused). Design Manager Andrew M Projects completed on time (customer) & under budget (business). Function Name Reduced lead times & increased sales opportunities. IT Mars L Contact Information Budget-to-actual expenses per PO/project. Signature: Signature: Signature: Date: 2013 average ontime delivery. Executive Sponsor Value Stream Champion Facilitator Annualized quantity of change orders. Profitably grow our business and open new markets. Prod Development Charlie F Relevant Data Agreement Reduce customer's warranty & LD exposure. 3 Purposes of Charters: Plan, Communicate, Build Consensus Download: www.ksmartin.com/charter
  • 12. © 2014 The Karen Martin Group, Inc. 12 1 2 1 3 2 4 3 5 4 5 1 6 2 7 3 8 4 9 5 10 1 2 1 3 2 4 3 5 4 1 2 3 4 Date: Date: Specific Conditions Land-based Value Stream Champion Janice Mitchell Demand Rate 300 units (40 projects; 20 POs) per year Facilitator Karen Martin Value Stream Mapping Charter Scope Accountable Parties Logistics Value Stream Equipment type A Executive Sponsor Joe Abrams Event Dates & Times Mon, Tue, Wed Feb 3, 4 & 5, 2014 8:00 am - 5:00 pm Last Step Product shipped Boundaries & Limitations Must use existing resources (people, IT, etc.) Briefing Attendees ** required *optional ** Frank L, Rick M, Cory C, Glen S, Sinan, Ben, Jane, Sal, Malaika, Andrew, AE's, Sales Mgr's, Rachel, Adam, Dustan Base-camp Location Bldg B, Conf Room A Trigger Customer submits RFQ First Step Sales receives RFQ Logistics Coordinator Georgette Winters Meals Provided Continental breakfast, lunch, snacks Projects are not scoped accurately (voice of the customer). Function Name Lack of consistent processes and execution. Operations John Morgan Briefing Dates &Times Feb 3, 4 & 5, 2014 4:00 - 5:00 pmImprovement Timeframe Future state realized by December 31, 2014 Current State Problems & Business Needs Mapping Team Contact Information On-going changes to project parameters (design, test dates, & supply chain). Supply Chain, purch, log, ware Tom Johnson Consistently late delivery. CEO Mark Simpson Increase average ontime delivery (to "ready to ship") from 17% to 60%. Quality Sally Jones Reduce lead time (PO to ready to ship) from 12 mos to 8 mos. CFO Sharon Prince No KPIs. Sales Ed Borge Goals & Measurable Targets Engineering Joakim Gutan Sales Kellie McMahon Benefits to Customers & Business On-Call Support Create variance tracking methodology. Program Mgmt Leia Chang Standardize the change process to reduce the # of Change Orders. Manufacturing Robert Cashman Finance Lori P Capable processes that are repeatable (process focused). Design Manager Andrew M Projects completed on time (customer) & under budget (business). Function Name Reduced lead times & increased sales opportunities. IT Mars L Contact Information Budget-to-actual expenses per PO/project. Signature: Signature: Signature: Date: 2013 average ontime delivery. Executive Sponsor Value Stream Champion Facilitator Annualized quantity of change orders. Profitably grow our business and open new markets. Prod Development Charlie F Relevant Data Agreement Reduce customer's warranty & LD exposure.
  • 13. Common Components of the A3 Report Theme: “What is our area of focus?” Owner: Person accountable for results. Plan Do, Study, Adjust Background Current Condition Countermeasures / Implementation Plan Effect Confirmation Follow-up Actions • What? • Who? • When? • Where? (if relevant) Target Condition / Measurable Objectives • Diagram of desired state • Measurable targets – how will we know that the improvement has been successful? • Diagram of current situation or process • What about it is not ideal? • Extent of the problem (metrics) • Problem statement • Context - Why is this a problem? How large is the problem? Root Cause & Gap Analysis • Graphical depiction of the most likely direct (root) causes • What measurable results did the solution achieve (or will be measured to verify effectiveness)? • Who’s responsible for ongoing measurement? • Where else in the organization can this solution be applied? • How will the improved state be standardized and communicated?
  • 14. © 2014 The Karen Martin Group, Inc. 14 Why People Resist Change 1. They don’t understand why it’s needed. 2. They weren’t involved. 3. It’s a “change” vs. true improvement.
  • 15. © 2014 The Karen Martin Group, Inc. 15 It’s Uplifting to Kaizen… It’s traumatizing to be kaizen’d.
  • 16. © 2014 The Karen Martin Group, Inc. 16 The People Who Do the Work are the Experts
  • 17. © 2014 The Karen Martin Group, Inc. 17 Leaders determine strategy (what needs to happen) Workers determine tactics (how it will happen)
  • 18. © 2014 The Karen Martin Group, Inc. 18 1 2 1 3 2 4 3 5 4 5 1 6 2 7 3 8 4 9 5 10 1 2 1 3 2 4 3 5 4 1 2 3 4 Date: Date: Specific Conditions Land-based Value Stream Champion Janice Mitchell Demand Rate 300 units (40 projects; 20 POs) per year Facilitator Karen Martin Value Stream Mapping Charter Scope Accountable Parties Logistics Value Stream Equipment type A Executive Sponsor Joe Abrams Event Dates & Times Mon, Tue, Wed Feb 3, 4 & 5, 2014 8:00 am - 5:00 pm Last Step Product shipped Boundaries & Limitations Must use existing resources (people, IT, etc.) Briefing Attendees ** required *optional ** Frank L, Rick M, Cory C, Glen S, Sinan, Ben, Jane, Sal, Malaika, Andrew, AE's, Sales Mgr's, Rachel, Adam, Dustan Base-camp Location Bldg B, Conf Room A Trigger Customer submits RFQ First Step Sales receives RFQ Logistics Coordinator Georgette Winters Meals Provided Continental breakfast, lunch, snacks Projects are not scoped accurately (voice of the customer). Function Name Lack of consistent processes and execution. Operations John Morgan Briefing Dates &Times Feb 3, 4 & 5, 2014 4:00 - 5:00 pmImprovement Timeframe Future state realized by December 31, 2014 Current State Problems & Business Needs Mapping Team Contact Information On-going changes to project parameters (design, test dates, & supply chain). Supply Chain, purch, log, ware Tom Johnson Consistently late delivery. CEO Mark Simpson Increase average ontime delivery (to "ready to ship") from 17% to 60%. Quality Sally Jones Reduce lead time (PO to ready to ship) from 12 mos to 8 mos. CFO Sharon Prince No KPIs. Sales Ed Borge Goals & Measurable Targets Engineering Joakim Gutan Sales Kellie McMahon Benefits to Customers & Business On-Call Support Create variance tracking methodology. Program Mgmt Leia Chang Standardize the change process to reduce the # of Change Orders. Manufacturing Robert Cashman Finance Lori P Capable processes that are repeatable (process focused). Design Manager Andrew M Projects completed on time (customer) & under budget (business). Function Name Reduced lead times & increased sales opportunities. IT Mars L Contact Information Budget-to-actual expenses per PO/project. Signature: Signature: Signature: Date: 2013 average ontime delivery. Executive Sponsor Value Stream Champion Facilitator Annualized quantity of change orders. Profitably grow our business and open new markets. Prod Development Charlie F Relevant Data Agreement Reduce customer's warranty & LD exposure.
  • 19. © 2014 The Karen Martin Group, Inc. 19 Who Needs to be Involved? Function Activity Marketing 1. Generates sales leads Sales 2. Calls on and qualifies customers Customer 3. Submits RFQ to sales Sales 4. Reviews RFQ Estimating 5. Generates quote Sales 6. Approve quote Customer 7. Accepts quote; submits a PO Sales 8. Approves PO Customer service 9. Creates SO; compiles spec package EE/ME design 10. Designs product; generates BOM Customer 11. Approves design EE/ME design 12. Forwards design to SW dev Software Dev 13. Writes code Purchasing/Planning 14. Releases WO; schedules production Supplier (external) 15. Delivers materials Production 16. Manufactures & ships product Customer 17. Installs equipment Field service 18. Conducts 90-day follow-up Problem: Product Quality
  • 20. Available on the CD that Accompanies The Kaizen Event Planner (www.bitly.com/TKEP)
  • 21. The Power of Periodic Briefings 21 Purpose: Deepen understanding, gain commitment, help people “grow” with change, surface hidden issues.
  • 22. © 2014 The Karen Martin Group, Inc. 22 Why People Resist Change 1. They don’t understand why it’s needed. 2. They weren’t involved. 3. It’s a “change” vs. true improvement.
  • 23. © 2014 The Karen Martin Group, Inc. 23 Beware of Process Tampering!
  • 24. © 2014 The Karen Martin Group, Inc. 24 Develop hypothesis Conduct experiment Measure results Refine Standardize Stabilize
  • 25. © 2014 The Karen Martin Group, Inc. 25 Begin at the Beginning, Not the End! 1. What’s the problem? 2. How big is the problem? 3. Why is it a problem? 4. What’s the root cause?
  • 26. © 2014 The Karen Martin Group, Inc. 26 What About the One Resister That You Can’t Turn? 1. Determine root cause via candid conversation. 2. They may need to find a new “home.” 
  • 27. © 2014 The Karen Martin Group, Inc. 27 In Summary… • Use well-designed charters. • Socialize the charters. • Use robust problem solving (PDSA) to make true improvement. • Involve the people who do the work being improved (or who work in the environment being improved). – Include upstream suppliers and downstream customers. • Hold periodic briefings.
  • 28. © 2014 The Karen Martin Group, Inc. 28
  • 29. Change Doesn’t Have to Be As Hard as We Make It
  • 30. © 2014 The Karen Martin Group, Inc. 30 Your Questions • What are some examples of the hardest resistance to change you’ve encountered & how did you overcome them? • When does one decide that a company has a totally hopeless culture to change? Examples? • How do you deal with people who are close to retirement?
  • 31. © 2014 The Karen Martin Group, Inc. 31 Karen Martin, President 858.677.6799 @karenmartinopex Blog & newsletter: www.ksmartin.com/subscribe