Resume for Thai Electrical Engineer with Offshore Experience
1. RESUME
Name : Komsan Kanyakhiew
Age : 45
Sex : Male
Nationality : Thai
Religion : Buddhism
Language spoken : Thai, English, and Chinese
Present Address : 39/195 Moo 4 T. Tupma
Muang, Rayong, 21000
Contact Address : 39/195 Moo 4 T. Tupma
Muang,Rayong,21000
(081) 4296291
komsanka@gmail.com
Education : Certificate of Vocational Electrical Power
Khonkaen Technical College, Khonkaen
GPA. 2.84
: Diploma of Vocational, Electrical Power
Technology
Udonthani Technical College, Udonthani,
GPA. 3.54
: Bachelor degree of Occupational Health and
Safety
Sukhothai Thammathirat University
Summary qualification : Total more fifteen (20) years working
experience in High Voltage Substation Power Generation System, Steam
Boiler. Chiller and air condition system Water Plant Control System , Air
compressor system, Also involve in Preventive maintenance of Switchgear,
Motor Control Center High & Low voltage motor, Overhead cranes, PLC.
Control system ( Mitsubishi ) (S7-300 SIEMENS)
Off shore experience 7 years and Rig Electrician 5 years
Other Skills : Computer Literate, Microsoft word / Excel,
Knowledge in Instrumentation SCADA system, MMI system, Program PM
MAXIMO, ERP SAP
Experience : Rig Electrician
2. Sapurakencana drilling Asia LTD(Rig
Tender T-12)
21 September 2012 – Up to Present
Responsibility : Total preventive maintenance &
troubleshooting electrical system at Tender Rig T-12 such as Diesel
Generator 6X2000 KVA, UPS ,Battery charger system , VFD for TDS(LTI),
Draw work. Mud pump system ,
Instrument system so Flow ,level , Pressure, Fire & Gas detector system ,
Gai-Tronic phone system, HVAC system, Electronic Drilling system, Electrical
crane system , Anchor winch , Fresh water maker,
Experience : Advance E&I Technician
B.E.S Energy Resources ( Offshore Chevron
Thailand)
25 September 2010- 25 September 2012
Responsibility : Total preventive maintenance &
troubleshooting electrical system at Chevron Thailand Benchamas field such
as Gas turbine Generator , Gas Generator Diesel Generator, UPS ,Battery
charger system , Medium & Low Volts Switch gear HVAC system ,MCC ,
Lighting and Navigation Aid system, Gai-Tronic Phone, Instrument system
whole plant
Experience : Electrical Utility & Instrument Senior
Supervisor
G-Steel Public Company Limited, Rayong,
Thailand.
4 January 1999 – 10 September 2010
Responsibility : Total preventive maintenance &
troubleshooting for main transformer 3x130 MV 23OKV/33KV equip by gas
insulated switchgear which are supply to Electrical Arc Furnace & Hot
Rolling Mill & Auxiliaries. Online with 175 MVA Thyristor Control Reactor &
185 MVA High Harmonic Filter. This system is back up By 3 units of
Emergency Generators (1250 KVA each) with fully automatic
start during power failure. All status monitor by SCADA system.
Also responsible for preventive maintenance 6,6KV & low voltage motors
control center instrumentation using in Water Treatment Plant & Air
compressor system there are operate and monitor by MMI system. And
Responsible to preventive maintenance Overhead crane 32 units maximum
load 220 tons and Lighting system whole plant. All Protection Relay &
Circuit Breaker of substation and distribution schedule annual testing Oil
transformer annual analysis, Battery back up system. Also responsibility to
preventive maintenance air condition system whole plant, schedule plan
man power and assign job follow up maintenance program. Create practice
or procedure follow up manual all machine responsible for training
subordinate. Experience PLC program Mitshubishi (A-series and FXseries)
Siemens (S7-300) can be create or apply for development program also
3. experience to use Program maintenance control (MAXIMO,ERP,SAP) so to
work with safety committee for risk assessment all job responsible.
Experience : Operation & Maintenance Technician
Bangkok Polyester Company Limited,
Rayong
December 1997- December 1998
Responsibility : Responsible for preventive maintenance &
operation combination Gas Turbine Generator (11KV, 8MVA ) Series to
18MVA,11KV/22KV Transformer Which synchronized to PEA, 115KV/22KV
Transformer including Steam Boiler Supply to Absorption Chiller, 730 Ton,
Instrument of COGEN
Waste Water Control System.
Experience : Electrical Technician
TFM Packaging Film Company Limited,
Rayong
May 1996 - November 1997
Responsibility : Preventive maintenance on 18 MVA,
115KV/22KV transformer Switchgear, Overhead cranes, Motor drive system (
Somer & Vecter), PLC system. (Mitsubishi) Basic instrumentation yard
facilities in the whole plant
Absorption Chiller & Boiler system.
Experience : Industrial Electrician
Continental Engineering Corporation
Taiwan, Republic of China
February 1994 - February 1996
Responsibility : Maintenance & troubleshooting Steam
Boiler for fabrication of cement block Mold motor, lighting system,
overhead crane.
Training Crouse : Electrical High voltage TOSHIBA 10-12 May
1999
Power Harmonic Chulalongkorn University 18-20 Sep 2002
Intouch Basic training Sagitate (Thailand) 14-17
June 2004
SCADA System for Industrial Thai-German
Institute 29-31 Aug 2005
Safety for supervisor level NPC 25-26 February
2008
SIMETIC MANAGER Step 7 & WINCC Flexible OF
SIEMENS 60 Hr. by Ministry of Industry
TDS-8SA/1000 Top Drive system electrical cause
at NOV Singapore on 23-27 March 2015