RAILWAY ENGINEERING
RAIL GAUGES
1
RAIL GAUGES
The gauge of a railway track is defined as the
clear minimum perpendicular distance between
the inner faces of the two rails.
2
RAIL GAUGES
Following are the factors affecting the choice of a
gauge:
1. Traffic Condition:
If the intensity of traffic on the track is likely to be
more, a gauge wider than the standard gauge is
suitable.
2. Development of Poor Areas:
The narrow gauges are laid in certain parts of the
world to develop a poor area and thus link the
poor area with the outside developed world.
3
RAIL GAUGES
4. Speed of Movement:
 The speed of a train is a function of the diameter
of wheel which in turn is limited by the gauge.
 The wheel diameter is usually about 0.75 times
the gauge width and thus, the speed of a train is
almost proportional to the gauge.
 If higher speeds are to be attained, the B.G track
is preferred to the M.G or N.G track.
4
RAIL GAUGES
3. Cost of Track:
 The cost of railway track is directly proportional
to the width of its gauge.
 If the fund available is not sufficient to construct
a standard gauge, a metre gauge or a narrow
gauge is preferred rather than to have no
railways at all.
5
RAIL GAUGES
5. Nature of Country:
 In mountainous country, it is advisable to have a
narrow gauge of the track since it is more
flexible and can be laid to a smaller radius on
the curves.
 This is the main reason why some important
railways, covering thousands of kilometers, are
laid with a gauge as narrow as 610 mm.
6
RAIL GAUGES
The different gauges can broadly be divided into
the following four categories:
1) Broad Gauge:
width 1676 mm to 1524 mm or 5’6” to 5’0”
2) Standard Gauge:
width 1435 mm and 1451 mm or 4’-8⅟2”
3) Metre Gauge:
width 1067 mm, 1000 mm and 915 mm or 3’-6”,
3’-33/8” and 3’-0”
4) Narrow Gauge:
width 762 mm and 610 mm or 2’-6” and 2’-0”. 7
RAILS
The high carbon rolled steel sections, which are
laid end-to-end, in two parallel lines over sleepers
to provide continuous and leveled surface for the
trains to move and for carrying axle loads of the
rolling stock are called rails.
8
RAILS
Functions of the rails:
To provide continuous and level surface for the
movement of trains with minimum friction with
steel wheels of the rolling stock;
Provide strength, durability and lateral guidance
to the track;
Transmit the axle loads to sleepers which transfer
the same load to the underlying ballast and
formation;
Bear the stresses developed due to heavy vertical
loads, breaking forces and temperature variance.9
RAILS
Types of rails:
1. Double Headed Rails
2. Bull Headed Rails
3. Flat-footed Rails
10
RAILS
1. Double Headed Rails:
 This type of rail consists of three parts – upper
table, web, and lower table;
 Both the upper and lower tables were identical;
 They were introduced with the hope of doubling
the life of rails;
 When the upper table was worn out, the rails can
be reversed in the chair and thus, the lower table
can be brought into use;
11
RAILS
However, this idea soon turned out to be wrong
because it was observed that long contact with
chairs made the surface of lower table very rough
and smooth running of trains was then
impossible.
Thus, these rails are nowadays practically out of
use;
12
RAILS
2. Bull Headed Rails:
 These rails consist of head, web and foot and are
made of steel;
 The head is larger than the foot and the foot is
designed only to properly hold the wooden keys
with which the rails are secured to chairs;
13
RAILS
The two cast-iron chairs are required per each
sleeper when these rails are adopted.
These rails are extensively used in England and in
some parts of Europe.
14
RAILS
3. Flat-footed Rails:
In this type of rail, the foot is spread out to form a
base;
This form of rail was invented by Charles Vignoles
in 1836 and hence, these rails are sometimes
known as Vignoles rails;
At present, about 90% of the railway track in the
world is laid with this form of rails.
15
RAILS
16
Advantages:
i. Chairs: No chairs are required in this form of
rails. The foot of the rail is directly spiked to the
sleepers. This fact makes them economical.
ii. Stiffness: This form of rail is stiffer, both
vertically and laterally than the bull-headed rail
of equal weight. Especially on curves, the lateral
stiffness of rails is very important.
iii. Kinks: This form of rail is less liable to develop
kinks and it maintains a more regular top surface
than the bull-headed rails.
RAILS
iv. Cost: The flat footed rails are found to be
cheaper than the bull-headed rails.
v. Load Distribution: The flat footed rail distributes
the train load over a great number of sleepers.
This results in greater track stability.
17

More Related Content

What's hot

Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian RailwayArbaz Kazi
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossingshiranrathva
 
Sleepers and Ballast
Sleepers and Ballast Sleepers and Ballast
Sleepers and Ballast T.Naga Anusha
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway linesMani Vel
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the trackT.Naga Anusha
 
Railway station and YARD
Railway station and YARD Railway station and YARD
Railway station and YARD Dhruv Makadia
 
Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )mohit kumar panchal
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway TrackArbaz Kazi
 
railway ppt for civil engg.
 railway ppt for civil engg. railway ppt for civil engg.
railway ppt for civil engg.ashrafdgrt
 
Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent waydhara dattani
 
Points and crossing
Points and crossingPoints and crossing
Points and crossingAkash Patel
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenanceMohd Bakhsh
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionBathla Tuition Centre
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gaugeMani Vel
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and jointsDeven Diran
 
Railway Engineering Introduction
Railway Engineering IntroductionRailway Engineering Introduction
Railway Engineering IntroductionT.Naga Anusha
 
Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)comsats
 

What's hot (20)

Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Sleepers and Ballast
Sleepers and Ballast Sleepers and Ballast
Sleepers and Ballast
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
 
Railway station and YARD
Railway station and YARD Railway station and YARD
Railway station and YARD
 
Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway Track
 
railway ppt for civil engg.
 railway ppt for civil engg. railway ppt for civil engg.
railway ppt for civil engg.
 
Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent way
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
 
Points and crossing
Points and crossingPoints and crossing
Points and crossing
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenance
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 
Railway Engineering Introduction
Railway Engineering IntroductionRailway Engineering Introduction
Railway Engineering Introduction
 
Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)
 

Similar to Rail gauges & rail sections Railway Engineering

Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineeringDnyaneshwar More
 
1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptxMayuriPatel90
 
Railway engineering
Railway engineeringRailway engineering
Railway engineeringjmaghade99
 
Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1AJEETH B
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railwayKHUSHBU SHAH
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railwaysVipul Naidu
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Railssrinivas2036
 
Railway and highways, Airways material.pptx
Railway and highways, Airways material.pptxRailway and highways, Airways material.pptx
Railway and highways, Airways material.pptxRajuyadav437367
 
1.Rail ist slide.pdf
1.Rail ist slide.pdf1.Rail ist slide.pdf
1.Rail ist slide.pdfshtanim
 
Railway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bdRailway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bdMd. Sultan Ali
 
Rail Gauges and Rail standards [Useful for Civil Engineering Students IECT SPPU]
Rail Gauges and Rail standards [Useful for Civil Engineering Students IECT SPPU]Rail Gauges and Rail standards [Useful for Civil Engineering Students IECT SPPU]
Rail Gauges and Rail standards [Useful for Civil Engineering Students IECT SPPU]Tushar Sonawane
 
Unit 1- Railway Planning & Construction.pptx
Unit 1- Railway Planning & Construction.pptxUnit 1- Railway Planning & Construction.pptx
Unit 1- Railway Planning & Construction.pptxSRIDHAR NATARAJAN
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONMasudul Robin
 

Similar to Rail gauges & rail sections Railway Engineering (20)

Rail gauge
Rail gaugeRail gauge
Rail gauge
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
 
1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
 
P.way
P.wayP.way
P.way
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railways
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Railway and highways, Airways material.pptx
Railway and highways, Airways material.pptxRailway and highways, Airways material.pptx
Railway and highways, Airways material.pptx
 
1.Rail ist slide.pdf
1.Rail ist slide.pdf1.Rail ist slide.pdf
1.Rail ist slide.pdf
 
Railway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bdRailway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bd
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Shri.ppt
Shri.pptShri.ppt
Shri.ppt
 
railwaypartPPT
railwaypartPPTrailwaypartPPT
railwaypartPPT
 
Rail Gauges and Rail standards [Useful for Civil Engineering Students IECT SPPU]
Rail Gauges and Rail standards [Useful for Civil Engineering Students IECT SPPU]Rail Gauges and Rail standards [Useful for Civil Engineering Students IECT SPPU]
Rail Gauges and Rail standards [Useful for Civil Engineering Students IECT SPPU]
 
Railway track
Railway trackRailway track
Railway track
 
Unit 1- Railway Planning & Construction.pptx
Unit 1- Railway Planning & Construction.pptxUnit 1- Railway Planning & Construction.pptx
Unit 1- Railway Planning & Construction.pptx
 
railway.pdf
railway.pdfrailway.pdf
railway.pdf
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATION
 

More from Latif Hyder Wadho

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRWLatif Hyder Wadho
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWLatif Hyder Wadho
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papersLatif Hyder Wadho
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testLatif Hyder Wadho
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global languageLatif Hyder Wadho
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2Latif Hyder Wadho
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical EngineeringLatif Hyder Wadho
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2Latif Hyder Wadho
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footingLatif Hyder Wadho
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of pilesLatif Hyder Wadho
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)Latif Hyder Wadho
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)Latif Hyder Wadho
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation EngineeringLatif Hyder Wadho
 

More from Latif Hyder Wadho (20)

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRW
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
 
SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papers
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening test
 
Engineering drawing
Engineering drawingEngineering drawing
Engineering drawing
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global language
 
Bricks
BricksBricks
Bricks
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical Engineering
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
 
Plate load test
Plate load testPlate load test
Plate load test
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
 

Recently uploaded

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 

Recently uploaded (20)

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 

Rail gauges & rail sections Railway Engineering

  • 2. RAIL GAUGES The gauge of a railway track is defined as the clear minimum perpendicular distance between the inner faces of the two rails. 2
  • 3. RAIL GAUGES Following are the factors affecting the choice of a gauge: 1. Traffic Condition: If the intensity of traffic on the track is likely to be more, a gauge wider than the standard gauge is suitable. 2. Development of Poor Areas: The narrow gauges are laid in certain parts of the world to develop a poor area and thus link the poor area with the outside developed world. 3
  • 4. RAIL GAUGES 4. Speed of Movement:  The speed of a train is a function of the diameter of wheel which in turn is limited by the gauge.  The wheel diameter is usually about 0.75 times the gauge width and thus, the speed of a train is almost proportional to the gauge.  If higher speeds are to be attained, the B.G track is preferred to the M.G or N.G track. 4
  • 5. RAIL GAUGES 3. Cost of Track:  The cost of railway track is directly proportional to the width of its gauge.  If the fund available is not sufficient to construct a standard gauge, a metre gauge or a narrow gauge is preferred rather than to have no railways at all. 5
  • 6. RAIL GAUGES 5. Nature of Country:  In mountainous country, it is advisable to have a narrow gauge of the track since it is more flexible and can be laid to a smaller radius on the curves.  This is the main reason why some important railways, covering thousands of kilometers, are laid with a gauge as narrow as 610 mm. 6
  • 7. RAIL GAUGES The different gauges can broadly be divided into the following four categories: 1) Broad Gauge: width 1676 mm to 1524 mm or 5’6” to 5’0” 2) Standard Gauge: width 1435 mm and 1451 mm or 4’-8⅟2” 3) Metre Gauge: width 1067 mm, 1000 mm and 915 mm or 3’-6”, 3’-33/8” and 3’-0” 4) Narrow Gauge: width 762 mm and 610 mm or 2’-6” and 2’-0”. 7
  • 8. RAILS The high carbon rolled steel sections, which are laid end-to-end, in two parallel lines over sleepers to provide continuous and leveled surface for the trains to move and for carrying axle loads of the rolling stock are called rails. 8
  • 9. RAILS Functions of the rails: To provide continuous and level surface for the movement of trains with minimum friction with steel wheels of the rolling stock; Provide strength, durability and lateral guidance to the track; Transmit the axle loads to sleepers which transfer the same load to the underlying ballast and formation; Bear the stresses developed due to heavy vertical loads, breaking forces and temperature variance.9
  • 10. RAILS Types of rails: 1. Double Headed Rails 2. Bull Headed Rails 3. Flat-footed Rails 10
  • 11. RAILS 1. Double Headed Rails:  This type of rail consists of three parts – upper table, web, and lower table;  Both the upper and lower tables were identical;  They were introduced with the hope of doubling the life of rails;  When the upper table was worn out, the rails can be reversed in the chair and thus, the lower table can be brought into use; 11
  • 12. RAILS However, this idea soon turned out to be wrong because it was observed that long contact with chairs made the surface of lower table very rough and smooth running of trains was then impossible. Thus, these rails are nowadays practically out of use; 12
  • 13. RAILS 2. Bull Headed Rails:  These rails consist of head, web and foot and are made of steel;  The head is larger than the foot and the foot is designed only to properly hold the wooden keys with which the rails are secured to chairs; 13
  • 14. RAILS The two cast-iron chairs are required per each sleeper when these rails are adopted. These rails are extensively used in England and in some parts of Europe. 14
  • 15. RAILS 3. Flat-footed Rails: In this type of rail, the foot is spread out to form a base; This form of rail was invented by Charles Vignoles in 1836 and hence, these rails are sometimes known as Vignoles rails; At present, about 90% of the railway track in the world is laid with this form of rails. 15
  • 16. RAILS 16 Advantages: i. Chairs: No chairs are required in this form of rails. The foot of the rail is directly spiked to the sleepers. This fact makes them economical. ii. Stiffness: This form of rail is stiffer, both vertically and laterally than the bull-headed rail of equal weight. Especially on curves, the lateral stiffness of rails is very important. iii. Kinks: This form of rail is less liable to develop kinks and it maintains a more regular top surface than the bull-headed rails.
  • 17. RAILS iv. Cost: The flat footed rails are found to be cheaper than the bull-headed rails. v. Load Distribution: The flat footed rail distributes the train load over a great number of sleepers. This results in greater track stability. 17