SlideShare une entreprise Scribd logo
1  sur  13
Télécharger pour lire hors ligne
2
We deliver the future for visionary companies.
Together, we deliver beyond component sourcing
with VA/VE, engineering and supply chain
management services.
3
Overview – Intercomp USA
Aerospace
& Defense
Automotive
& Off-Road
Medical
Devices
Consumer
Electronics
4
Overview – Intercomp USA
 Passive Silicon Devices
 Active Silicon Devices
 Sensors
 Connectors
 Wireless Communications
 Power Conversion
 Franchise partner
From prototype to production to distribution
5
Intercomp USA VA/VE and Engineering Services
 Complete BOM component selection and product life cycle analysis using Silicon Expert
 Manage component EOL with strategic last time buys
 Our EE’s will Identify component 2nd sources to mitigate single source supply risk.
 Transition from a fixed overhead cost to a project-based variable cost approach model
 Engineering support ranging from initial clean sheet product concept and prototyping
through full production.
 Complete reverse Engineering of electrical and mechanical assemblies.
 Engineering staffing services available for PCB layout, BOM configuration, schematics,
block diagrams, & mechanical enclosures
Your competitive advantage and friend to your bottom-line.
6
Value Analysis / Value Engineering (VA/VE) Services
A 3 Tier Process for product teardown & reverse engineering with VAVE
analysis to reduce cost.
• BOM cost analysis
• DFM/DFA review
• Manufacturing process improvement
• Direct 2nd source drop-in alternatives
• Board level testing alternatives
• AOI/AXI or functional testing
TIER 1
• Complete PCB re-spin for 2nd sourcing
• Minor circuit & footprint layout optimization
• Material substitutions
• Manufacturing process changes
• Board level testing alternatives adding
test points for ICT or flying probe
TIER 2
• Complete system and architecture changes
• Tooling changes
• Fixture changes
TIER 3
7
Supply Chain Management & Strategic Sourcing
• Pricing & contract negotiation
• Minimum order quantity optimization
• VA/VE services
• Third-party purchasing staffing support
• In-house prototyping
• EMS Kitting Services
• Box build assembly
• KPI dashboards including OTD, PPM, & PPV
• Inventory turn analysis
• Implementation of JIT, KANBAN, & PULL
• Business model scaling
• Vendor alignment
• Preferred strategic supplier collaboration
• Strategic outsourcing
Cost Reduction
Strategic Sourcing
Assistance
Product Acceleration
Purchasing & Operations
Optimization
8
Quality Product Life Cycle Management
 Process quality documentation creation including APQP, DFMEA, and 8D Analysis.
 PPAP submissions including balloon drawings, dimensional reports, process flow,
control plans, PFMEA, and first article inspections.
 Continuous Improvement, Lean, Six Sigma
background.
 Assist with ISO 9001, 14001, and AS9100 certifications.
 Supplier process and systems audits.
 Product verification, validation, testing, and
certifications to ensure compliance.
 Advice on inspection techniques, quality control
gauges, fixtures, and tooling for optimal success.
 Quality sorting and rework capabilities in South Florida
9
Sorting and Rework Services
 Onsite or offsite sorting and containment 24/7.
 Rework or repair in-house or at our warehouse location in South Florida.
 Warehouse and supply inventory back to you as needed.
 Improve Supplier relationships
 ISO-14001 disposition of scrap materials.
 Reduced scrap, labor, and operating costs.
 State-of-the-art scanning technology.
 Reflash support
 Reverse logistics
10
A FREE Bill of Material Assessment
 Evaluation of your new or current bill of materials (BOM).
 Review of current suppliers and sourcing strategies
 Identification of end-of-life components using our proprietary software
 Plan and inventory last time buys for electronic components
 Suggest and sample new design with a low risk soft roll transition plan
 Suggest second sources to reduce supply chain risk and cost on PCBA’s
 Strategic suggestions to reduce cost of sheet metal, die cast, CNC machining,
and plastics parts.
11
Questions?
For a copy of our Line Card please go to www.Intercomp.com
If you have questions or wish to have our engineering staff conduct a FREE
BOM Assessment contact your sales consultant or:
David Sepanik
Director – Engineering and Supply Chain Services
O 954.493.6461
C 954.706.9050
F 954.493.6573
E David.Sepanik@Intercomp.com
12
Glossary of Terms
AOI: Automated optical inspection
AXI: Automated X-Ray Inspection
BOM: Bill of material
CAE: Computer aided engineering analysis
DFA: Design for assembly
DFM: Design for manufacturing
DFMA: Design failure mode and analysis
EMS: Electronics manufacturing service provider
FEA: Finite element analysis
ICT: Integrated circuit test
IP: Intellectual property
JIT: Just in time
KPI: Key performance indicators
OEE: Overall equipment effectiveness
OS: Operating system
OTD: On time delivery
PCB: Printed circuit board (raw fab)
PCBA: Printed circuit board assembly
PLM: Product lifecycle management
PPM: Parts per million
PPAP: Production part approval process
VAVE: Value add value engineering
13
Counterfeit Mitigation
• Intercomp is ISO-9001 & AS9120 Certified and compliant to SAE AS6081 as
well as AS5553
• We purchase materials from authorized franchised source or OCM original
component manufactures
• We retain records providing supply chain traceability back to the OCM
• Intercomp receives counterfeit warnings from ERAI, GIDEP, & IDEA
• In the event our customers buy product without traceable certifications these
are the ways to mitigate any fraudulent or counterfeit parts:
Minimum required tests for ACTIVE and PASSIVE Components
o Documentation and packaging (non-destructive)
o External visual and microscopic inspections
o Remarking and resurfacing (destructive}
o Solvent test for remarking
o Radiological (X-Ray) inspection
o Lead finish evaluation
o Delid/Decapsulation internal analysis (destructive)
o Solderability testing

Contenu connexe

Tendances

ANN SELLERS RESUME 2015
ANN SELLERS RESUME 2015ANN SELLERS RESUME 2015
ANN SELLERS RESUME 2015Ann Sellers
 
John dermody intro
John dermody introJohn dermody intro
John dermody introJohn Dermody
 
Varun singh knowledge_management
Varun singh knowledge_managementVarun singh knowledge_management
Varun singh knowledge_managementVarun Singh
 
CBN Short Presentation
CBN Short PresentationCBN Short Presentation
CBN Short PresentationCBN2014
 
Workshop Presentation_Final
Workshop Presentation_FinalWorkshop Presentation_Final
Workshop Presentation_FinalMICHAEL BLUMBERG
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016Ken Probst
 
Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations Genpact Ltd
 
2016 Resume_SanfordFernades (1)
2016 Resume_SanfordFernades (1)2016 Resume_SanfordFernades (1)
2016 Resume_SanfordFernades (1)sanford fernandes
 
Leadsintec Prensentation
Leadsintec PrensentationLeadsintec Prensentation
Leadsintec PrensentationAmy He
 
Reliability Through Correlation and Colaboration
Reliability Through Correlation and ColaborationReliability Through Correlation and Colaboration
Reliability Through Correlation and ColaborationChad Broussard
 
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsResume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsSanjeeth Thekkada
 
Cognitive Predictive Maintenance for Automotive
Cognitive Predictive Maintenance for AutomotiveCognitive Predictive Maintenance for Automotive
Cognitive Predictive Maintenance for AutomotiveAnita Raj
 
Envision Maximo condition Monitoring
Envision Maximo condition MonitoringEnvision Maximo condition Monitoring
Envision Maximo condition MonitoringRama Raju
 
Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Chad Broussard
 
Envision best practices_maximo_dec12_me
Envision best practices_maximo_dec12_meEnvision best practices_maximo_dec12_me
Envision best practices_maximo_dec12_meRama Raju
 

Tendances (20)

ANN SELLERS RESUME 2015
ANN SELLERS RESUME 2015ANN SELLERS RESUME 2015
ANN SELLERS RESUME 2015
 
John dermody intro
John dermody introJohn dermody intro
John dermody intro
 
Resume
ResumeResume
Resume
 
MTC16 Presentation - eHT
MTC16 Presentation - eHTMTC16 Presentation - eHT
MTC16 Presentation - eHT
 
Joe Bollig
Joe Bollig Joe Bollig
Joe Bollig
 
Varun singh knowledge_management
Varun singh knowledge_managementVarun singh knowledge_management
Varun singh knowledge_management
 
CBN Short Presentation
CBN Short PresentationCBN Short Presentation
CBN Short Presentation
 
Workshop Presentation_Final
Workshop Presentation_FinalWorkshop Presentation_Final
Workshop Presentation_Final
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
 
Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations
 
2016 Resume_SanfordFernades (1)
2016 Resume_SanfordFernades (1)2016 Resume_SanfordFernades (1)
2016 Resume_SanfordFernades (1)
 
Leadsintec Prensentation
Leadsintec PrensentationLeadsintec Prensentation
Leadsintec Prensentation
 
Reliability Through Correlation and Colaboration
Reliability Through Correlation and ColaborationReliability Through Correlation and Colaboration
Reliability Through Correlation and Colaboration
 
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsResume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
 
Lte kpi
Lte kpiLte kpi
Lte kpi
 
Cognitive Predictive Maintenance for Automotive
Cognitive Predictive Maintenance for AutomotiveCognitive Predictive Maintenance for Automotive
Cognitive Predictive Maintenance for Automotive
 
Envision Maximo condition Monitoring
Envision Maximo condition MonitoringEnvision Maximo condition Monitoring
Envision Maximo condition Monitoring
 
Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Reliability Program Approval Presentation_
Reliability Program Approval Presentation_
 
C. Bright Singh
C. Bright SinghC. Bright Singh
C. Bright Singh
 
Envision best practices_maximo_dec12_me
Envision best practices_maximo_dec12_meEnvision best practices_maximo_dec12_me
Envision best practices_maximo_dec12_me
 

En vedette

Netherhall risk-assessment-form
Netherhall risk-assessment-formNetherhall risk-assessment-form
Netherhall risk-assessment-formharry pugh
 
Ejercicio 2 algoritmo
Ejercicio 2   algoritmo Ejercicio 2   algoritmo
Ejercicio 2 algoritmo carcalah
 
QA MeetUp Yerevan - Aug 25
QA MeetUp Yerevan - Aug 25QA MeetUp Yerevan - Aug 25
QA MeetUp Yerevan - Aug 25Sargis Sargsyan
 
Vixen shot list
Vixen shot listVixen shot list
Vixen shot listKrisyty Ng
 
Running Fit Marathon Recovery Talk
Running Fit Marathon Recovery TalkRunning Fit Marathon Recovery Talk
Running Fit Marathon Recovery TalkPure Physio
 
Allaccessaribafinal 110811140909-phpapp01
Allaccessaribafinal 110811140909-phpapp01Allaccessaribafinal 110811140909-phpapp01
Allaccessaribafinal 110811140909-phpapp01SAP Ariba
 
Automotive ERP B2B Integration Infographic - May 2013
Automotive ERP B2B Integration Infographic - May 2013Automotive ERP B2B Integration Infographic - May 2013
Automotive ERP B2B Integration Infographic - May 2013GXS
 
Behaviour Management Plan as a learning tool_simplifiedb
Behaviour Management Plan as a learning tool_simplifiedbBehaviour Management Plan as a learning tool_simplifiedb
Behaviour Management Plan as a learning tool_simplifiedbLu Vechi, PhD
 
Contracts – the Missing Link: Utilizing Contract Management to Close the Gap ...
Contracts – the Missing Link: Utilizing Contract Management to Close the Gap ...Contracts – the Missing Link: Utilizing Contract Management to Close the Gap ...
Contracts – the Missing Link: Utilizing Contract Management to Close the Gap ...SAP Ariba
 
Of Words, Handshakes, and Signatures: The Case for Good Contract Management.
Of Words, Handshakes, and Signatures: The Case for Good Contract Management.Of Words, Handshakes, and Signatures: The Case for Good Contract Management.
Of Words, Handshakes, and Signatures: The Case for Good Contract Management.SAP Ariba
 

En vedette (20)

cv-2
cv-2cv-2
cv-2
 
Netherhall risk-assessment-form
Netherhall risk-assessment-formNetherhall risk-assessment-form
Netherhall risk-assessment-form
 
Ejercicio 2 algoritmo
Ejercicio 2   algoritmo Ejercicio 2   algoritmo
Ejercicio 2 algoritmo
 
QA MeetUp Yerevan - Aug 25
QA MeetUp Yerevan - Aug 25QA MeetUp Yerevan - Aug 25
QA MeetUp Yerevan - Aug 25
 
Vixen shot list
Vixen shot listVixen shot list
Vixen shot list
 
Running Fit Marathon Recovery Talk
Running Fit Marathon Recovery TalkRunning Fit Marathon Recovery Talk
Running Fit Marathon Recovery Talk
 
A4_Investor update - Screen
A4_Investor update - ScreenA4_Investor update - Screen
A4_Investor update - Screen
 
Question 2
Question 2Question 2
Question 2
 
Partes del teclado
Partes del tecladoPartes del teclado
Partes del teclado
 
Allaccessaribafinal 110811140909-phpapp01
Allaccessaribafinal 110811140909-phpapp01Allaccessaribafinal 110811140909-phpapp01
Allaccessaribafinal 110811140909-phpapp01
 
GXS Strategy
GXS StrategyGXS Strategy
GXS Strategy
 
Storyboard
StoryboardStoryboard
Storyboard
 
Automotive ERP B2B Integration Infographic - May 2013
Automotive ERP B2B Integration Infographic - May 2013Automotive ERP B2B Integration Infographic - May 2013
Automotive ERP B2B Integration Infographic - May 2013
 
Behaviour Management Plan as a learning tool_simplifiedb
Behaviour Management Plan as a learning tool_simplifiedbBehaviour Management Plan as a learning tool_simplifiedb
Behaviour Management Plan as a learning tool_simplifiedb
 
History of film
History of filmHistory of film
History of film
 
Contracts – the Missing Link: Utilizing Contract Management to Close the Gap ...
Contracts – the Missing Link: Utilizing Contract Management to Close the Gap ...Contracts – the Missing Link: Utilizing Contract Management to Close the Gap ...
Contracts – the Missing Link: Utilizing Contract Management to Close the Gap ...
 
Auto estima
Auto estimaAuto estima
Auto estima
 
Of Words, Handshakes, and Signatures: The Case for Good Contract Management.
Of Words, Handshakes, and Signatures: The Case for Good Contract Management.Of Words, Handshakes, and Signatures: The Case for Good Contract Management.
Of Words, Handshakes, and Signatures: The Case for Good Contract Management.
 
Starting a CrossFit gym
Starting a CrossFit gymStarting a CrossFit gym
Starting a CrossFit gym
 
Agile testing
Agile testingAgile testing
Agile testing
 

Similaire à Intercomp Capabilities 060415 (1)

AES_Capabilities_09012016
AES_Capabilities_09012016AES_Capabilities_09012016
AES_Capabilities_09012016Svetlana Vasey
 
Faruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgbFaruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgbFaruk Syed
 
Re-Engineering Obsolete Printed Circuit Boards Webinar
Re-Engineering Obsolete Printed Circuit Boards WebinarRe-Engineering Obsolete Printed Circuit Boards Webinar
Re-Engineering Obsolete Printed Circuit Boards WebinarEpec Engineered Technologies
 
Moldflow Analysis Presentation
Moldflow Analysis PresentationMoldflow Analysis Presentation
Moldflow Analysis PresentationRishi Sormare
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1Dave Thompson
 
D david thompson_resume_15_1
D david  thompson_resume_15_1D david  thompson_resume_15_1
D david thompson_resume_15_1Dave Thompson
 
Clobbi cable&wire Cable Designer solution
Clobbi cable&wire Cable Designer solutionClobbi cable&wire Cable Designer solution
Clobbi cable&wire Cable Designer solutionClobbi
 
Sonic Manufacturing Technologies, Inc.
Sonic Manufacturing Technologies, Inc.Sonic Manufacturing Technologies, Inc.
Sonic Manufacturing Technologies, Inc.manmeetwirk
 
Clobbi cable&wire Cable Designer solution
Clobbi cable&wire Cable Designer solutionClobbi cable&wire Cable Designer solution
Clobbi cable&wire Cable Designer solutionClobbi
 
Clobbi cable&wire Cable.Designer solution
Clobbi cable&wire Cable.Designer solutionClobbi cable&wire Cable.Designer solution
Clobbi cable&wire Cable.Designer solutionOlexiy Lyzun
 
Process Certification Implementation Presentation
Process Certification Implementation PresentationProcess Certification Implementation Presentation
Process Certification Implementation Presentationmdmilward
 
IBM ALM for aviation safety compliance aerospace
IBM ALM for aviation safety compliance aerospaceIBM ALM for aviation safety compliance aerospace
IBM ALM for aviation safety compliance aerospaceImran Hashmi
 
Jerry Schwab_2016 combined 3a
Jerry Schwab_2016 combined 3aJerry Schwab_2016 combined 3a
Jerry Schwab_2016 combined 3aJerry Schwab
 
Overview of PTC’s Corporate Vision and Strategy
Overview of PTC’s Corporate Vision and StrategyOverview of PTC’s Corporate Vision and Strategy
Overview of PTC’s Corporate Vision and StrategyPTC
 
Accu-Fab Sales Presentation - Manufacturing and Engineering Introduction
Accu-Fab Sales Presentation - Manufacturing and Engineering IntroductionAccu-Fab Sales Presentation - Manufacturing and Engineering Introduction
Accu-Fab Sales Presentation - Manufacturing and Engineering IntroductionHilary Ohlwein
 
Vtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcsVtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcsHTCS LLC
 
Pivot International Introduction
Pivot International IntroductionPivot International Introduction
Pivot International Introductionraustring
 
Quality & Reliability Consultant
Quality & Reliability ConsultantQuality & Reliability Consultant
Quality & Reliability ConsultantMunirhaq
 

Similaire à Intercomp Capabilities 060415 (1) (20)

AES_Capabilities_09012016
AES_Capabilities_09012016AES_Capabilities_09012016
AES_Capabilities_09012016
 
Faruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgbFaruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgb
 
Re-Engineering Obsolete Printed Circuit Boards Webinar
Re-Engineering Obsolete Printed Circuit Boards WebinarRe-Engineering Obsolete Printed Circuit Boards Webinar
Re-Engineering Obsolete Printed Circuit Boards Webinar
 
Moldflow Analysis Presentation
Moldflow Analysis PresentationMoldflow Analysis Presentation
Moldflow Analysis Presentation
 
Faruk_Syed_Engineer
Faruk_Syed_EngineerFaruk_Syed_Engineer
Faruk_Syed_Engineer
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
D david thompson_resume_15_1
D david  thompson_resume_15_1D david  thompson_resume_15_1
D david thompson_resume_15_1
 
Clobbi cable&wire Cable Designer solution
Clobbi cable&wire Cable Designer solutionClobbi cable&wire Cable Designer solution
Clobbi cable&wire Cable Designer solution
 
Sonic Manufacturing Technologies, Inc.
Sonic Manufacturing Technologies, Inc.Sonic Manufacturing Technologies, Inc.
Sonic Manufacturing Technologies, Inc.
 
Clobbi cable&wire Cable Designer solution
Clobbi cable&wire Cable Designer solutionClobbi cable&wire Cable Designer solution
Clobbi cable&wire Cable Designer solution
 
Clobbi cable&wire Cable.Designer solution
Clobbi cable&wire Cable.Designer solutionClobbi cable&wire Cable.Designer solution
Clobbi cable&wire Cable.Designer solution
 
Process Certification Implementation Presentation
Process Certification Implementation PresentationProcess Certification Implementation Presentation
Process Certification Implementation Presentation
 
IBM ALM for aviation safety compliance aerospace
IBM ALM for aviation safety compliance aerospaceIBM ALM for aviation safety compliance aerospace
IBM ALM for aviation safety compliance aerospace
 
Jerry Schwab_2016 combined 3a
Jerry Schwab_2016 combined 3aJerry Schwab_2016 combined 3a
Jerry Schwab_2016 combined 3a
 
Overview of PTC’s Corporate Vision and Strategy
Overview of PTC’s Corporate Vision and StrategyOverview of PTC’s Corporate Vision and Strategy
Overview of PTC’s Corporate Vision and Strategy
 
Accu-Fab Sales Presentation - Manufacturing and Engineering Introduction
Accu-Fab Sales Presentation - Manufacturing and Engineering IntroductionAccu-Fab Sales Presentation - Manufacturing and Engineering Introduction
Accu-Fab Sales Presentation - Manufacturing and Engineering Introduction
 
Vtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcsVtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcs
 
Carlton R. Albritton QE 1
Carlton R. Albritton QE 1Carlton R. Albritton QE 1
Carlton R. Albritton QE 1
 
Pivot International Introduction
Pivot International IntroductionPivot International Introduction
Pivot International Introduction
 
Quality & Reliability Consultant
Quality & Reliability ConsultantQuality & Reliability Consultant
Quality & Reliability Consultant
 

Intercomp Capabilities 060415 (1)

  • 1.
  • 2. 2 We deliver the future for visionary companies. Together, we deliver beyond component sourcing with VA/VE, engineering and supply chain management services.
  • 3. 3 Overview – Intercomp USA Aerospace & Defense Automotive & Off-Road Medical Devices Consumer Electronics
  • 4. 4 Overview – Intercomp USA  Passive Silicon Devices  Active Silicon Devices  Sensors  Connectors  Wireless Communications  Power Conversion  Franchise partner From prototype to production to distribution
  • 5. 5 Intercomp USA VA/VE and Engineering Services  Complete BOM component selection and product life cycle analysis using Silicon Expert  Manage component EOL with strategic last time buys  Our EE’s will Identify component 2nd sources to mitigate single source supply risk.  Transition from a fixed overhead cost to a project-based variable cost approach model  Engineering support ranging from initial clean sheet product concept and prototyping through full production.  Complete reverse Engineering of electrical and mechanical assemblies.  Engineering staffing services available for PCB layout, BOM configuration, schematics, block diagrams, & mechanical enclosures Your competitive advantage and friend to your bottom-line.
  • 6. 6 Value Analysis / Value Engineering (VA/VE) Services A 3 Tier Process for product teardown & reverse engineering with VAVE analysis to reduce cost. • BOM cost analysis • DFM/DFA review • Manufacturing process improvement • Direct 2nd source drop-in alternatives • Board level testing alternatives • AOI/AXI or functional testing TIER 1 • Complete PCB re-spin for 2nd sourcing • Minor circuit & footprint layout optimization • Material substitutions • Manufacturing process changes • Board level testing alternatives adding test points for ICT or flying probe TIER 2 • Complete system and architecture changes • Tooling changes • Fixture changes TIER 3
  • 7. 7 Supply Chain Management & Strategic Sourcing • Pricing & contract negotiation • Minimum order quantity optimization • VA/VE services • Third-party purchasing staffing support • In-house prototyping • EMS Kitting Services • Box build assembly • KPI dashboards including OTD, PPM, & PPV • Inventory turn analysis • Implementation of JIT, KANBAN, & PULL • Business model scaling • Vendor alignment • Preferred strategic supplier collaboration • Strategic outsourcing Cost Reduction Strategic Sourcing Assistance Product Acceleration Purchasing & Operations Optimization
  • 8. 8 Quality Product Life Cycle Management  Process quality documentation creation including APQP, DFMEA, and 8D Analysis.  PPAP submissions including balloon drawings, dimensional reports, process flow, control plans, PFMEA, and first article inspections.  Continuous Improvement, Lean, Six Sigma background.  Assist with ISO 9001, 14001, and AS9100 certifications.  Supplier process and systems audits.  Product verification, validation, testing, and certifications to ensure compliance.  Advice on inspection techniques, quality control gauges, fixtures, and tooling for optimal success.  Quality sorting and rework capabilities in South Florida
  • 9. 9 Sorting and Rework Services  Onsite or offsite sorting and containment 24/7.  Rework or repair in-house or at our warehouse location in South Florida.  Warehouse and supply inventory back to you as needed.  Improve Supplier relationships  ISO-14001 disposition of scrap materials.  Reduced scrap, labor, and operating costs.  State-of-the-art scanning technology.  Reflash support  Reverse logistics
  • 10. 10 A FREE Bill of Material Assessment  Evaluation of your new or current bill of materials (BOM).  Review of current suppliers and sourcing strategies  Identification of end-of-life components using our proprietary software  Plan and inventory last time buys for electronic components  Suggest and sample new design with a low risk soft roll transition plan  Suggest second sources to reduce supply chain risk and cost on PCBA’s  Strategic suggestions to reduce cost of sheet metal, die cast, CNC machining, and plastics parts.
  • 11. 11 Questions? For a copy of our Line Card please go to www.Intercomp.com If you have questions or wish to have our engineering staff conduct a FREE BOM Assessment contact your sales consultant or: David Sepanik Director – Engineering and Supply Chain Services O 954.493.6461 C 954.706.9050 F 954.493.6573 E David.Sepanik@Intercomp.com
  • 12. 12 Glossary of Terms AOI: Automated optical inspection AXI: Automated X-Ray Inspection BOM: Bill of material CAE: Computer aided engineering analysis DFA: Design for assembly DFM: Design for manufacturing DFMA: Design failure mode and analysis EMS: Electronics manufacturing service provider FEA: Finite element analysis ICT: Integrated circuit test IP: Intellectual property JIT: Just in time KPI: Key performance indicators OEE: Overall equipment effectiveness OS: Operating system OTD: On time delivery PCB: Printed circuit board (raw fab) PCBA: Printed circuit board assembly PLM: Product lifecycle management PPM: Parts per million PPAP: Production part approval process VAVE: Value add value engineering
  • 13. 13 Counterfeit Mitigation • Intercomp is ISO-9001 & AS9120 Certified and compliant to SAE AS6081 as well as AS5553 • We purchase materials from authorized franchised source or OCM original component manufactures • We retain records providing supply chain traceability back to the OCM • Intercomp receives counterfeit warnings from ERAI, GIDEP, & IDEA • In the event our customers buy product without traceable certifications these are the ways to mitigate any fraudulent or counterfeit parts: Minimum required tests for ACTIVE and PASSIVE Components o Documentation and packaging (non-destructive) o External visual and microscopic inspections o Remarking and resurfacing (destructive} o Solvent test for remarking o Radiological (X-Ray) inspection o Lead finish evaluation o Delid/Decapsulation internal analysis (destructive) o Solderability testing