SlideShare une entreprise Scribd logo
1  sur  12
Télécharger pour lire hors ligne
 


Deal
   ling with Constraints in Corpo     Trainin  
                                orate T     ng 
7 Com
    mmon Solutio
               ons to these C
                            Constra  
                                  aints
Capita
     alWave In
             nc. | Wh
                    hite Pape
                            er 
                                   

                          Oct
                            tober 2010
                                     0 
 




 

                                           




                                              1 
 
 
 
Table of Contents: 


	
Training Constraints 1: Time ......................................................................................................................... 3 
Training Constraints 2: Budget  ..................................................................................................................... 4 
                              .
Training Constraints 3: Staffing ..................................................................................................................... 5 
Training Constraints 4: Cultural Constraints ................................................................................................. 6 
Training Constraints 5: Technical Constraints  .............................................................................................. 7 
                                             .
Training Constraints 6: Content and Development ...................................................................................... 8 
Training Constraints 7: Industry, Regulatory, and Delivery Constraints ..................................................... 10 
 

 

 

 

 

 

 

 

 

 

 

 

 

 




                                                                                                                                                      2 
 
Training  g	Constraint   ts	1:	Time	                       revieew the results   s, make changes, and then   n go 
                                                           to geeneral release  e. But how m many projects,  , 
Summary: In this series, we are goin    ng to              espe ecially in a corrporate envir ronment, allow us 
examine s some of the c   common cons   straints we        to hiit every single e one of these e milestones? ? 
face in corporate training and how to deal with            Prob bably not man   ny. But the trick is to exammine 
them effe ectively. One o  of the most c
                                       common              what  t the project entails and choose the rig   ght 
constraint ts when it com mes to corpo orate training      mile stones.  
is time. Le
          et's examine h  how time bec  comes a             
constraint t and how you can effectiv   vely use time      For eexample, if th  he stakeholde er or departm ment 
issues to yyour advantage.                                 head d tells you tha at they need training on a 
                                                           certaain process, p  procedure or system, it ma   ay 
Corporate e training organizations are usually             not bbe necessary to assess tha    at need. In facct, if 
"under the gun" when it comes to t     time.               the sstakeholder c   can provide an SME who can 
Stakehold ders, division heads, and su  ubject             prov vide content, then it may b   be better to mmove 
matter ex xperts (SMEs) want what they want                on bbased on their   r expertise. WWith this apprroach, 
when they want it ‐ and this is most    t often an         you  can spend mo     ore time on tthe design, 
understan ndable issue. After all, the                     pilotting, and evaluation of the   e training proggram. 
organization's ability to o meet its goals is almost       On t he other han   nd, if your stakeholders can  nnot 
always ba ased on a time  e constraint o
                                       of some kind        prov vide an adequ   uate picture oof the problem m, 
or anothe er. Let's look aat how you ca an be faced        then n you obvious   sly need to sppend the bulk of 
with a tim
         me constraint as a corporat    te training        the ttimeline on assessment while shaving t       time 
manager ‐ and how to deal with tho     ose                 off oof the other m milestones. In this case, on nce 
constraint ts.                                             you  know the pro    oblem, you ca an put the pro oject 
                                                           into  "overdrive" t  to get it developed quickly y and 
One of the first things to consider is  s your ideal       withhin the time constraint you    u've been han nded. 
training project placed  d within an ideeal timeline.      Man ny times a "jus   st‐in‐time" in
                                                                                              ntervention ca an be 
In that ide
          eal timeline, w what trainingg milestones        effecctive and solv  ve the problem, and also c  create 
do you wa  ant to include e? For examp ple, you            a "pllaceholder" fo   or further dev velopment an nd 
would mo  ost likely want to start with h a full needss    perfe ection in the future. 
assessment to ensure t     that the cont
                                       tent                 
addresses s the perform mance issue. N Next, you           Whe  en you are fac  ced with a timme constraint t, the 
would wa  ant to include plenty of dev  velopment          nego otiation of a p project can coome down to      a 
time, thatt is, time to coonceive the training             good d old‐fashione   ed compromise between t     the 
programs, methods, m    measurements    s, and             trainning organizat  tion and the s stakeholder. One 
evaluation ns. Along with that develo  opment time,        of thhe first ways t to deal with tthis is to analy
                                                                                                             yze 
you would  d probably want to include   e enough           the ssituation as w we've discusse  ed and then o offer 
design timme to allow th  he developme  ent staff to       an a lternative tim meline. Keep i  in mind that 
write and perfect content, develop instructional           stake eholders or d division heads  s may come u up 
tools, proof those tools, and maybe    e even run          withh a timeline as  s a first blush because it is
                                                                                                            s the 
them by a an SME or two    o. Before you
                                       u deliver the       quic kest route to the solution. In cases like this, 
program, especially for classroom p    programs,           the ddecision maker may be op      pen to a timeline 
your stafff would need "train the tra  ainer" time as s    that  is a little long
                                                                                ger ‐ as long aas you can deeliver 
well as a lengthy pilot t  to ensure tha
                                       at the              what  t they need. 
training is
          s effective. Evven with onlinne                   
interventi ions, you wou  uld want to taake some           If theere's just no ccompromise, determine w     within 
time to piilot to a samp ple of the targ
                                       get audience        the ttraining organ  nization what  t you can deliiver 
and have them test each piece of th    he course. In       in th
                                                               he time allotte  ed. For example, you may have 
addition tto all of this, y
                          you would wa  ant time to        had  plans for an e  elaborate onl  line case stud
                                                                                                            dy 


                                                                                                                  3 
 
program t to be delivere
                       ed before a cl lassroom              withh the extra he elp. When it's time for a ne   ew 
program b begins. If you simply will n
                                     not have time          budg get, roll out y
                                                                               your accompli   ishments as p  proof 
to create the online inttervention, th
                                     hen move               of th
                                                                he need. Anot   ther way to d deal with a sta affing 
          written case s
that to a w             study section that will be          budg get constraint  t is to determ
                                                                                              mine what you   u can 
part of the classroom c course. This w
                                     will shave             accoomplish with t  the current st taff and offer r that 
time off o
         of development while still d delivering            as ann alternative.                try, but if that 
                                                                                . It's worth a t
necessaryy components   s.                                  does sn't work, con nsider retooli ing the existinng 
                                                            train
                                                                ning staff to mmeet the need   d. For example, 
Next, we will discuss another comm   mon                    you  may have ins  structors that t can double a  as 
corporatee training constraint, budgets.                    instr
                                                                ructional desi  igners until th
                                                                                              hey are neede   ed in 
                                                            the cclassroom. 
                                                             
Training  g	Constraint   ts	2:	Budget	                      Whe en the budget   t bottleneck c comes to 
                                                            mate erials and training method   ds, there are s some 
Summary: It's very diff  ficult to get th
                                        hrough a            crea tive workarounds that also may prove your 
fiscal yearr in corporatee training with hout running       genuuine need. Fo  or example, m  most vendors offer 
into a buddget constrain  nt. Let's discu
                                        uss the kinds                           r online development tools. 
                                                            free  trials of their
of constraaints you may  y encounter a  and some            Get tthe free trial,, develop a toop‐notch train  ning 
ways to deal with them   m efficiently.                     piecee, and go to t the table with h the proof. Iff a 
                                                            decission maker ca  an see the finnal product an  nd its 
Budget co onstraints are e common in corporate              effecctiveness, he or she may b   be more likely  y to 
training, e
          especially dur  ring periods oof financial        find  the money to  o fund the pu urchase. If the e 
uncertainty. And any p   phase of a cor rporate             consstraint is relatted to training materials, b  be 
training project can be  e the victim of f a budget         crea tive. Conside er using three‐to‐a‐page 
issue. Stafffing is a typic
                          cal budget co onstraint, in       PowwerPoint printouts instead of handing out 
which you u are told that the money does not                the eentire presen ntation, and d do them in bla  ack 
exist to addd staff when n it is almost ccertainly          and  white. Or, co onsider puttin ng job aids online 
necessary y. Organizatio ons also cut budgets for               ead of into a p
                                                            inste               print format. What about 
materials or training m  methods, such  h as online         crea ting training t that can mak ke a profit? Fo or 
delivery toools. You may  y even see the money cut          exammple, you may be able to s     sell training 
off for delivery, such as locations or   r number of        proggrams to clien nts or other o organizations 
times programs are de    elivered. Let's take a close       withhin the industry. The key here is to analyze 
look at eaach of these c categories of b budget             the mmaterial need  d and determ  mine what 
constraint t and find ways to work ar   round them.         alterrnatives exist. And don't fo  orget to keep p a 
                                                                d record of the amount of money you save ‐ 
                                                            solid
Staffing budget constra   aints are sommetimes the          or m
                                                               make.  
hardest to o break throu ugh. After all, adding and          
retaining staff is the most expensive    e part of          Delivvery constrain nts may be th he easiest to g get 
running a corporation. And with this heavy price       e    arouund. If the issuue is deliveryy staff, consider 
tag, training managers   s are usually pput in the          usingg a well‐deve eloped design  ner to deliver 
position oof having to prove that staff needs to            train
                                                                ning during th he height of th he need. Also  o, 
be added in order to co   ope with a higher                 deliv
                                                                very is anothe  er good use o of contract mo  oney 
workload. One way to work around        d this              for s
                                                                special projec cts or projects s of limited 
constraint t is to ask for contractor m money. Hiring       duraation. If the is
                                                                               ssue is locatioon, analyze the 
contracto ors does not h have the same   e price tag as     cost  of renting sppace for the d delivery. For 
hiring a peermanent em   mployee, and the money is          exammple, you may have a large     e‐scale delive ery 
not somet  thing that is uused for the eentire fiscal       that  must take place in a certa   ain amount of   f 
year. If yo
          ou can get a contract budg    get, keep a         timee. Instead of d doing numero  ous small training 
record of what your de    epartment ac  ccomplishes 

                                                                                                                   4 
 
programs, consolidate it into a coup   ple of large         
ones. In some geograp    phic areas, ho
                                      otels are in         Firstt, let's look at   your staff of 
                                                                                               f instructors oor 
desperate e need of conference center business             faciliitators. Many  y times, this sstaff group is vvery 
and may e  even offer special rates.                       versa atile and flexible by their n  nature. After all, a 
                                                           totallly inflexible i instructor ma ay not be very  y 
The overa all key in dealing with budg get                 effec ctive in the cl lassroom at a all. The memb  bers 
constraint ts is to analyz
                         ze the situatio
                                       on and come         of thhis group know    w training ma aterials and they 
up with either cost‐free or less expe  ensive              also  know how th    he audiences respond to th     hose 
alternativves. But secon ndary to this is the              mate  erials. Why not consider h    having the hig gher‐
absolute n necessity of kkeeping up wi  ith                skille
                                                                ed instructors   s double as innstructional 
accomplis shments base   ed on the lowwer costs. In        desig gners? For ex  xample, a high  h potential juunior 
many case  es, you may e even convince e yourself          faciliitator who te  eaches one or  r two classes may 
that usingg contractors during peak need is the            be a ble to take re  esponsibility f for the updat tes to 
best way to go instead  d of adding staaff. Or you         thos se materials a  and content. O Or, a senior 
may decid de that rentin ng space for ddelivery once       instrructor, such a  as a managem   ment‐training 
a year is m
          more effective  e. On the oth
                                      her hand,            instrructor, might have the ability to take ch     harge 
your finanncial decision makers may see that you           of thhe entire man   nagement‐tra   aining program  m 
have a genuine need and increase t     the budget          insteead of leaving  g it to variouss staff membe   ers. 
          aining department. 
for the tra                                                But y you can also look at delive   ery staff as latteral 
                                                           poss sibilities. For eexample, that  t junior instru
                                                                                                              uctor 
Since stafffing is related
                         d to both time e and              may  be bored wit     th one or two o subject area as ‐ 
budget, wwe will look at t that corporaate training        see h how he or she    e does in a neew subject ar rea 
constraint t next.                                         and  make that pe    erson available for all of th he 
                                                           subje ects.  
                                                            
Training g	Constraint   ts	3:	Staffingg	                   Wha  at about instructional desig    gners and 
                                                           deve elopers? Man    ny traditional instructional    
Summary: Staffing con  nstraints in coorporate             desig gners may ha   ave started ou ut as SMEs or  r 
training ca
          an be relatedd to both time  e and budget.  .    instrructors. It may be possible    e to utilize the
                                                                                                              em in 
Let's take a deeper loook at staffing c constraints        thos se capacities, especially if y  you have high h‐
and how y you can deal with them ef    fficiently.         levell designers w  who are used t   to facilitating 
                                                           grouups as part of their design responsibilities. 
We've already discusse   ed how a staf ffing               Wha  at if you have instructional    l developers w who 
constraintt can be relatted to budget  t issues.           came  e strictly fromm technical ba  ackgrounds a  and 
We've also discussed h  how that staff  fing               only  work in deve   elopment? Co   onsider mentoring 
constraintt can create pproblems whe   en it comes         themm into conten    nt evaluation and even 
to projectt timelines an
                       nd deliverable  es. In simple       proo ofreading ‐ this may take some of the 
terms, a la
          ack of budget  t can mean a lack of staff,       work  kload off of th he instructionnal designers or 
which me eans an additional time con   nstraint            instrructors.  
within thee overall timeelines. But a staffing              
constraintt does not have to mean the end of a             We'v  ve already dis  scussed the b benefits of ask king 
project orr a last‐minute request for  r additional        for ccontractor fun   nds. If you neeed to employ   y 
funds. In t
          today's enviro onment, staff  fing can be        cont tractors in either a design or delivery 
mobile, thhat is, people do not neces  ssarily have        capa acity, it will co
                                                                                ost less than h hiring them 
to be linke
          ed to one jobb function. The key is to           permmanently. And     d this also proovides a solidd 
examine y your staff, theeir areas of re
                                       esponsibility,      recoord of what yo   our departme   ent can and ca  annot 
and their abilities to m
                       make a determ  mination for         accoomplish with t    the extra help p. When it co omes 
multi‐taskking. But howw does this wo  ork in the          to coontractors, ke  eep in mind that the market is 
corporatee training environment? 

                                                                                                                  5 
 
potentially saturated w  with people wwho can and       rules s and regulati ions, and new w processes ‐ and 
will do thee work, so yoou will most likely have a      som e organizatio   ons' very survival depends on 
great deal of choice in terms of exp  perience and      gettiing through these issues. L    Let's look at a a few 
backgroun  nd.                                          diffeerent types of  f cultural constraints and h   how 
                                                        to un nderstand the  em. 
If contracting is not an option, cons  sider             
"sharing" people in oth  her jobs to heelp you          To b egin with, a m major cultura  al constraint c  can 
through the upswing in   n work. For ex xample, a       be tr raining itself. Changes in the way an 
special project may need an SME's expertise in          orga anization is traained and educated can be an 
a certain aarea. Why no ot examine the possibility      obst tacle, especially if new trai  ining courses and 
of having the SME design or deliver    r training       meth  hods are not within the cu   ultural norm. 
during the e special project? If the peerson is         Perh haps you've in ntroduced a L  Learning 
regarded as an SME, he or she can p     probably        Man  nagement Sys   stem (LMS) or   r you've move    ed 
express iddeas well enough to be part of the            tradiitional classro oom training into online 
training detail for the sshort run. And d if you do     form mats. Or mayb  be you've beg  gun experime    enting 
get the oppportunity to add staff in t the future,      with h blended lear  rning where n  none existed 
you may b be able to hir re from withinn and keep       befo ore. One of th he biggest cult  tural constraints 
the initial learning curvve to a minimmum.              in coorporate train ning could be an overall 
                                                        orga anizational lea arning needs assessment t      that 
Staffing coonstraints can n be very frus
                                       strating,        is ma aking the "kn nowledge guardians" 
which me  eans that we a are more likely to throw       unco omfortable. B  Because this c  constraint is 
our hands               nd just deal with the 
          s in the air an                               direc ctly related too training, you have the ab    bility 
situation as it exists. But if you thinkk creatively    to ha andle it very eeffectively. Fi irst, be sure tto 
and consider the altern   natives to cur
                                       rrent            com municate con     nsistently wit th the population. 
staffing, y
          you may be ab   ble to create a situation     Expla ain the benef  fits of the training changes    s to 
that work ks for both the e training dep
                                       partment         the a audience. Hig ghlight your success stories. If 
and the overall organiz   zation.                       you  are dealing w  with "knowled   dge guardians   s" 
                                                        who  are resistant   t to a needs aassessment, 
Next, we will discuss cultural constr  raints that      reas sure them that you are us     sing their 
arise in co
          orporate train ning projects.                 know  wledge for the improveme      ent of the 
                                                        orga anization as a whole. You c    can even offer 
                                                        them m a spot in the change as a    a Subject Mat    tter 
Training  g	Constraint  ts	4:	Cultural	                 Expe ert (SME) or f facilitator. The e idea in trainning 
Constraints	                                            as a  constraint is to help the o  organization's   s 
                                                        cultu ure move tow  ward the train ning knowing that 
Summary: Sometimes the constrain      nts you           it is a
                                                              a big benefit and will help     everyone me   eet 
encounter in corporate   e training are
                                      e cultural.       their r goals. 
Let's exploore these connstraints and determine          
how to ha  andle them.                                  Over  rall organizational changes    s are initially not 
                                                        relat ted to trainingg but sometim  mes move int    to the 
Cultural constraints in corporate tra aining are        trainning realm. Fo or example, there may be 
usually lin
          nked to something that is g  going on         majo  or policy and procedure ch    hanges relate  ed to 
within the e organizationn. Some of thhese              new  regulations o   or rules, or poossibly a merger 
constraint ts may be directly related to training,      or ac cquisition. When these changes are firs       st 
while others may not b  be related to training at       levieed on the orga  anization, you may not be     e 
all. In today's environmment, corpora ate cultures      invo lved. But as t the changes a  are implemen    nted, 
are in uph heaval, especially in certain industries.    trainning most like ely becomes involved to 
There are e organizationnal changes, laayoffs, new      faciliitate knowled  dge transfer. In this case, b  be 


                                                                                                                6 
 
sure that training personnel act as c   change             eithe
                                                               er during or a
                                                                            after the chan
                                                                                         nge, and wait for 
agents and champion t    the benefits oof the change  e    the u
                                                               upheaval to ssettle. 
while they y are carrying
                        g out the train ning                
departme ent's duties.                                     Nextt, we will examine technical corporate 
                                                           train
                                                               ning constrainnts. 
While we are discussin  ng organizatio onal changes         
that may lead to a training constraint, it's 
helpful to
         o remember that the audie     ence may fall       Trai ining	Constr   raints	5:	Tec  chnical	
into threee different grooups. The ent  thusiastic         Con straints	
group embraces chang    ge and keeps a positive             
attitude. TThe second group may be made up of              Sum mary: Techni    ical constrain
                                                                                            nts are commo    on in 
people wh  ho are not sure about the change but            corpporate training, and they so   ometimes occur 
keep mov ving forward a  anyway. The t  third group        whe n all other as spects of a traaining project  t fall 
is comprissed of resistoors, that is, pe
                                       eople who           into  place. Let's e
                                                                              explore these    constraints.
react badly and negatively to chang    ge ‐ and             
make no s  secret about it. The key is to figure out       Techhnical or technology‐relate   ed training 
how training can help members of t      these groups       consstraints can occur at any point during a 
move into o the group above, i.e. the  e "not sures"       train
                                                               ning project, w whether in th he initial stagees or 
can move e into the "ent thusiasts" grooup while           afterr a program h has been runn  ning for some  e 
the "resistors" can move into the "n   not sure"           timee. These types  s of issues cann cause obsta  acles 
group. Looking for this s dynamic wit  thin any            for b
                                                               both online as  s well as class
                                                                                             sroom‐based 
cultural coonstraint can help the training team            train
                                                               ning programs   s. When conf  fronted with a  a 
navigate tthe issue and end up with a positive             tech nical constraint, you can look for 
result.                                                    work karounds or a alternatives. OOr, sometime   es a 
                                                           well‐‐researched c  cost benefit aanalysis can innform 
There aree changes that  t may not be related to           decission makers a  and allow the em to help yo  ou 
training at any point. FFor example, people                mak e changes. Le  et's look at soome common     n 
changes s such as layoffs, staff chang ges, or staff       tech nology‐relate ed training co onstraints and  d how 
realignme ents may be r related to Hum  man                you  can handle th hem. 
Resources  s and the indiividual departments. In            
many case  es of people cchange, training will not         Whe en it comes to o online learn ning, one com  mmon 
be involveed. The key here is to figur  re out if          consstraint is that your audienc  ce does not h  have 
training caan be a partnner or support  t during the       acceess to appropriate hardware for e‐learn      ning. 
change. PPerhaps you can highlight t   the training        This  issue usuallyy surfaces at tthe beginning  g of 
that realig
          gned staff me embers may n   need and            an in
                                                               nitial rollout p
                                                                              project, but itt's certainly no 
assure theem that you w  will be there tto provide it.     reas on to stop the project from   m moving 
In cases such as this, you may have to wait until          forwward. The aud  dience's lack oof access coul  ld be 
the chang ge has passed d and go back to regular           relatted to the wo ork environme   ent. For exam mple, 
business.                                                  asse mbly‐line em mployees may   y not have acc   cess 
                                                           to co
                                                               omputer term   minals anywhere in their 
The key inn dealing withh cultural con nstraints in        immmediate enviro  onment. Or, c  customer‐faci   ing 
corporatee training is to
                        o first identify
                                       y those issues s    emp ployees may h  have access to o a terminal b  but 
that are related directl ly or indirectly to training.     cannnot use it for ttraining becaause of the 
For those issues, deter rmine how yo   ou can work         custoomers' perce  eptions of inac ctivity. In these 
as a strate
          egic partner tto work throu  ugh the             casees, consider innstalling one o or two termin  nals 
constraint t. Next, ident
                        tify those issuues that are            arious locations for online learning activ
                                                           in va                                             vities. 
not relate
         ed to training. For these iss  sues,              Perhhaps the IT de epartment has refurbished     d 
determine  e how traininng can serve a as a support 


                                                                                                                  7 
 
hardware  e that could be redeployed    d as learning        the cclassroom audience hitting    g the online 
centers at  t certain locattions.                            interrvention while another po   ortion works o  on 
                                                             casee studies. Alte               the audience has 
                                                                                ernatively, if t
Another c  common tech    hnical constraint is that          the aability to acce
                                                                                ess online pro ograms away from 
the audience does not yet have the      e technical          the cclassroom, structure the training to 
skill for e‐
           ‐learning, esp pecially e‐learrning that is       accoommodate e‐l    learning at thhe office, follo
                                                                                                              owed 
self‐paced d. In many ind  dustries, this problem is         by a  discussion or               he classroom. If 
                                                                                 r debrief in th
clearing ittself up as org ganizations mmove to more         tech nology is nee eded in the classroom for a    a 
advanced technology in all of its operations. But       t    mass sive training rrollout but simmply is not 
there may   y still be pock
                          kets of inexpe erience out         availlable, consideer leasing or rrenting equip pment 
there. In tthis case, it's a step‐by‐steep education         or sp
                                                                 pace until the e upgrades ca  an be made. S  Some 
process. M Many people are afraid of technology              confference cente  ers lease not o only the spacce but 
simply because they do     on't know how to use it.          the ttechnology as  s well, such as computers,   , 
After all, tthis is an age when centen   narians use         projeectors, and LC CD displays.  
Twitter an nd grandpare   ents use                            
videoconf   ferencing and d email to cha at with their       As w
                                                                with all of the other training constraints    s 
grandchild  dren. So anyo one can learn. One way to          we'vve discussed, the key with technical or 
deal with an inexperienced audienc       ce is to take       tech nology‐relate ed constraints is to explore   e 
training "o on the road" to show the a    audience           poteential workaro  ounds first, and then 
how to us  se the techno  ology. This arrrangement           deteermine when a permanent       t change or 
also allowws you to posi   ition the train
                                         ning                upgrrade can be m  made. And rem   member that   t a 
departme   ent representatives as strategic                  tech nical constraint is no reason to halt a 
partners. You can also consider intr     roducing            projeect that couldd be a major benefit to the   e 
quick refe erence guides  s (QRG's) or video                 orgaanization as a whole. 
tutorials tthat show the  e audience ho  ow easy it is        
to access online learning.                                   Next t, we will examine content    t and 
                                                             deveelopment con   nstraints. 
Sometime   es you'll find tthat the organizational            
infrastruc cture cannot a  accommodate    e a full‐scale 
e‐learning g program. Th  his could be related to            Trai ining	Constr  raints	6:	Con ntent	and	
bandwidth, i.e. too ma    any people hit  tting the          Dev velopment	
network a  at one time co  ould cause se erious               
slowdown   ns in other areas. And som   metimes              Sum mary: Many t   times the training content  t 
organizations are hesit    tant to pay fo
                                        or additional        itself
                                                                  f or the development met   thods are the 
bandwidth space just t    to accommod    date training.      sourrce of the connstraint. Heree are some wa  ays to 
In this casse, consider rolling e‐learning to                work k around this  obstacle. 
smaller au udiences ‐ one at a time. T   This way, the        
entire pop  pulation will nnot need to a access the          Whe en you find thhat issues rela
                                                                                             ating to training 
online app  plication at th
                          he same time   e, thus saving      conttent or develoopment are causing a 
space and  d bandwidth.                                      consstraint, the be
                                                                               est action to ttake is to lookk for 
                                                             a suiitable alterna
                                                                               ative or comp promise. Cont  tent 
In relationn to classroom m technology   y, what if you      and  development   t usually invo
                                                                                             olves a team o of 
wanted to  o roll out a blended learnin   ng program,        peop ple, including
                                                                               g managemen   nt, instructionnal 
only to finnd that there are not enou    ugh                 desiggners, stakehholders, and ssubject matte er 
computer   rs (or funds) tto do it? Again n, you could       expeerts (SMEs), so your skill in
                                                                                             n leading a tea am 
find out iff IT has refurbbished hardw  ware. Or, you        will b
                                                                  be helpful in resolving connstraints. Let's 
can use a "station" me    entality withinn the training      exammine some co  ontent and de evelopment 
program i   itself. For exa
                          ample, have a  a portion of 


                                                                                                                  8 
 
constraint  ts and determmine ways to handle them           heree is to remember that a dif     fferent idea is s not 
efficientlyy.                                               nece essarily a bad    one, even if it is contrary to 
                                                            origiinal specificat tions. The firsst action to taake is 
One of the first and mo    ost common content and           to goo back to the SME or stake     eholder to loo  ok at 
developm  ment constrain  nts occurs wh  hen the SME        the ssource first. D Discuss the differences wit    th the 
and training do not agr    ree. Most training               instrructional desi  igner and point him or her    r into 
projects run across a p  point where th   he SME and        the ddirection that  t will result in
                                                                                                n the closest 
the instruuctional designers have different ideas           outccome, whethe     er that is the original or a 
of how the content sho     ould be developed.               mod dification.  
Sometime   es the SME m may be quite p   possessive of       
the content and does n    not want changes. Or the          At ti mes, content   t scope may g  grow, especia  ally if 
instructional designers   s feel that conntent should       an S ME sees the p    product for th he first time aand is 
be edited or truncated   d in some way   y that does        remiinded of miss    sing pieces or r choppy cont  tent. 
not go aloong with the S  SME's origina al meaning or       In th
                                                                his case, you m  must be highl   ly aware of thhe 
intent. If t              elated to e‐learning, there
           this issue is re                            e    timeeline, delivery  y method, and   d assigned 
may be to oo much cont    tent for the mmedium. If          staff                ssible to add or change 
                                                                 fing. If it's pos
any of the ese problems exist, talk to the SME to           cont tent, go ahead                 f not, discuss a 
                                                                                  d and do it. If
see if therre is a compro  omise. Explain the               poteential timeline  e change with  h the stakeho  olders 
benefits oof the changes and paint a picture of             or SMME, keeping i   in mind that y  your overall ggoal is 
what the end result ma     ay look like. If there is no     to geet the training  g as close to "correct" in the 
comprom  mise, sometimes the best p     path to take iss    first  design. If theere is simply nno compromise, 
to continu ue with the SME's original idea. More            delivver what was originally int    tended and slate it 
often than  n not, he or sshe may see the obstacle              redesign immediately. 
                                                            for r
when the training is de   eveloped.                          
                                                            The  key to handli   ing content and developm     ment 
Another c  content const  traint may arise when you         cons straints is to bbe consistent     in 
discover t that the conte  ent does not match               com munication a     and definition n of training wwith 
what's act  tually going oon in the environment.            SME E's, stakeholde   ers, and desig gners at all tim
                                                                                                                mes. 
For examp   ple, you find out that customer service         Alwa ays look for co  ompromise o   or alternatives s, 
associates  s are skippingg CRM steps in their day‐         and  lead the team   m into being o open to changes 
to‐day int teractions, altthough those steps are            alon g the way. Re   emember tha    at a change is not 
part of a ppolicy or proc cedure. If an SSME is             nece essarily a bad    thing, especially after a 
involved, talk to him or her first. If t there is no        desig gner or SME i   is deeply invoolved in the 
SME, dete  ermine what t   the major dif fferences are      cont tent. When th   here is no com mpromise or 
and prese ent them to th  he training stakeholders.         work karound, mov    ve forward w  with what you 
But keep in mind that y    you may have   e uncovered       have e. When it's ti  ime to evalua ate it, your 
a disconnect between Policy and Pr       rocedure and       learnners will most   t likely be ablle to give youu 
the depar  rtments or ev ven between managers               sugggestions for im  mprovement or change that 
and assoc  ciates. The beest you can do  o is highlight     will w
                                                                 work well. 
the issue, make sugges    stions for chaange, and            
wait until a decision is reached to co    ontinue the       Our  final corporate training co    onstraint will be 
developm  ment of the to opic in questio on.                induustry, regulato  ory, and deliv very constrain nts. 
                                                             
Content c constraints ca an also appear in conflict                                                  	
between t   the instructioonal designer and the 
person managing the d     design or the project 
itself. A deesigner may h  have a differeent idea of 
how the t  training shoul ld be develop ped. The key 


                                                                                                                    9 
 
Training  g	Constraint   ts	7:	Industry,	                 year rs these chang    ges may occu  ur on a daily bbasis. 
Regulato  ory,	and	Delivery	Constr      raints	           Obviiously this is a   a constraint ffor the traininng 
                                                          orga anization. Reg   gulations now w not only 
Summary: What happe      ens when the  e                  stipuulate content    t, but also may stipulate th  he 
environment for training becomes a      a constraint?     lengt  th of trainingg and prohibit  t certain type es of 
Let's defin
          ne this obstac cle and discus ss ways to        trainning. These sa   ame regulatio  ons may require 
work with hin it.                                         orga anizations to s   submit trainin ng plans and 
                                                          repo ort completions within a ce      ertain timelinne. If 
An organization's gene   eral environmment can            you  are dealing w   with a constra  aint like this o
                                                                                                              one 
become a  a training constraint, some  etimes             and  you don't hav     ve the manpo  ower to hand   dle it, 
occurring quickly and n  noticeably and sometimes    s    cons sider outsourc    cing. Many tr raining 
occurring slowly. The c  constraint related to            outs sourcers prov   vide organizat  tions with one  e 
environment could be due to inexperienced                 stop p shopping in regard to cer     rtain regulatio ons, 
facilitator
          rs or training locations, or could be           incluuding content    t, tracking, annd reporting. This 
something altogether larger such as     s regulatory      may  be the way t     to go until things settle down 
or industrry changes. Le et's discuss th
                                       hese               or un ntil you have a good idea o     of how trainin ng 
corporate e training constraints and h  how to            depa  artments should handle th      he requirements. 
manage them.                                              Typic cally there is no workarou     und or alterna ative 
                                                          for rregulatory tra  aining, but you may be able to 
Industry cconstraints ca an occur when  n an overall      work  k within the f  framework to   o determine a  a 
industry bbegins to chan  nge rapidly. In
                                        n today's         trainning method t     that works be est for your 
environment, we see t    that many ind dustries are       orga anization.  
being ove erhauled and must change the way                 
business iis conducted in order to su  urvive. But        We h  have already discussed some delivery 
how does  s this affect tr
                         raining and de evelopment?       cons straints in this  s series, but let's look at thhem a 
Remembe   er that traininng managers s  should            little
                                                               e more closely    y. A common delivery 
always ha ave an idea of f what's goingg on in the        cons straint is due to lack of exp   perienced 
industry aaround them, so that chan    nges do not        faciliitators. For ex  xample, a reg gulatory chan  nge 
surprise the training te eam. So when  n you notice       may  literally chan   nge the playin ng field for alll 
that a chaange is taking place, you m  may not want       trainning personne    el. One way to  o deal with th his is 
to develop training in c  certain subjecct areas          to de etermine whi     ich training personnel are the 
because t they will be af ffected by thee change. In      close est to being a  able to deliver in terms of 
this case, consider crea  ating a "skele
                                       eton" or           know wledge and experience and then determ           mine 
using the least expensi   ive training m
                                       method             what   t it will take t
                                                                                to get them u  up to speed. If f the 
available until the chan  nge comes th hrough. Keep       time eline for readi   iness is too lo
                                                                                               ong, it may be e 
in mind thhat "expense"   " can be relat
                                       ted to             appr  ropriate to co  onsider outsourcing. If you   u 
money, time, or resources. You can also                   outs source, you ca   an work out a  a deal where your 
benchmark other organizations within the                  instrructors are ab   ble to work w with the 
industry tto see how they are dealing with the            outs sourcer's instr  ructors in ord der to best prepare 
coming ch hanges. If the ere is an advis
                                       sory or            them m for the next    t round of deelivery. 
regulatory y body, consider contactin  ng these            
groups to obtain advice or feedback     k on how          Wha  at if there is a constraint re  elated to the 
training caan approach the changes.                       delivvery methods     s themselves?  ? For example   e, an 
                                                          SME  E may be on b   board with de   elivery methods 
Regulator ry constraints s occur hand i in hand with      untill he or she ac  ctually sees th he final produ uct. 
industry cchanges. High  hly regulated industries         He o or she may de    ecide that the e choice of de elivery 
see chang               me, but with the general 
          ges all the tim
                                                          meth  hod doesn't a   achieve the desired outcom     me. If 
upheaval that has occu   urred in the ppast few 
                                                          this  is the case, lo ook for compromise with t      the 

                                                                                                                  10 
 
SME, stak keholders, and
                       d instructionaal designers                 the d delivery meth
                                                                                    hod seems to work but the   ere is 
first. The compromise may be a cha   ange in                      still d
                                                                        disagreement             ME, ask for tim
                                                                                     t from the SM              me to 
length, a qquick convers
                       sion of trainin
                                     ng methods,                  evalu uate the prog
                                                                                    gram first. A g
                                                                                                  green light froom 
or a "backk to the drawing board" or rder. The                    learn ners and their supervisors  is fact‐based
                                                                                                                d and 
idea here, as is usual w
                       whenever you u are dealing                 may  help the SME to understa   and that trainning 
with SMEs, is to positio
                       on yourself ass a partner                  has m met its mark. 
                                                                                    .
and not as an obstacle. On the othe  er hand, if 
                                                                   
© Copyright 2010  Capita
                       alWave Inc. All
                                     l Rights Reserv
                                                   ved. 

Bryant Nieelson – Managing Director at Financial Train ning Solutions aa division of Ca
                                                                                      apitalWave Inc c – 
offers 20+ years of training and talent mmanagement f   for executives,  business owners, and top 
performing g sales executives in taking th
                                         he leap from thhe ordinary to  extraordinaryy. Bryant is a 
trainer, business & leadeership coach, and strategic planner for man  ny sales organizzations. Bryantt’s 
27 year business career hhas been based  d on his results
                                                        s‐oriented styl e of empowering. 

 

                                       




                                                                                                                    11 
 
 




    Finaancial Trainin Solutions (FTS), the instructor-le division of CapitalWave Inc. is
                     ng        s                        ed
    a firm made of up industry professionals having a reputation fo providing first-rate
         m           u                                              or
    train
        ning and co onsultancy to banks and other fi nancial inst
                                t                                   titutions. FT offers
                                                                                TS
    profeessionals who have ex
                    w           xtensive knowledge, ex   xperience a
                                                                   and expertis in the
                                                                                se
    area of banking and financ
        as           g         ce.

     Blennded learning is the philosophy on which th company was found
                                  p            o          he           y         ded. Our
        ning methodology, integrating theory with pract ice using ou own very powerful
    train                                      y                       ur
    train
        ning tools, creates a uniquely exciting and effe  ective learnin environm
                                                                       ng       ment. The
    resu pays imm
        ult          mediate dividdends in the retention of newly-le  earned conc
                                                                                cepts and
    their practical ap
        r            pplication in the financial marketplac
                                                          ce.



                       Cap lWav Inc.
                         pital ve
                                 Delivering Innovativ e Training Solutions
                                          g

                         For further informa
                                           ation, please contact:
                                                       e

              Finan
                  ncial Training Solutions is a division of CapitalW
                               g                                   Wave Inc.

                         Bryant Nielson, Managing Director

                               p://www.Ca
                            http        apitalWave
                                                 e.com

                    http://wwww.FinancialTrainingS
                                                 Solutions.c
                                                           com
                        http://
                              /www.Your rTrainingEdge.com

                               Tele US: +1 (917) 477-3
                               T                      3221
                              Te UK: + 44 (20) 3356 9
                                ele       4            9935
                      bryant.nie
                               elson@financialtrainings
                                                      solutions.com
                                                                  m




                                                                                            12 
 

Contenu connexe

Similaire à Dealing with constraints in corporate training white paper oct 2010

Process Improvement Plan by Barry Botha
Process Improvement Plan by Barry BothaProcess Improvement Plan by Barry Botha
Process Improvement Plan by Barry BothaBarry Botha, CSM
 
Estimating time and cost resoures
Estimating time and cost resouresEstimating time and cost resoures
Estimating time and cost resouresMayank Kothawade
 
Rejuvenating Agile Operations By Putting Lead And Cycle Time Front And Centre.
Rejuvenating Agile Operations By Putting Lead And Cycle Time Front And Centre.Rejuvenating Agile Operations By Putting Lead And Cycle Time Front And Centre.
Rejuvenating Agile Operations By Putting Lead And Cycle Time Front And Centre.Zan Kavtaskin
 
Proj430 advanced program management entire class
Proj430 advanced program management entire classProj430 advanced program management entire class
Proj430 advanced program management entire classHomework Help Online
 
Kaizen, Nemawashi and a Project Management Work Cell
Kaizen, Nemawashi and a Project Management Work CellKaizen, Nemawashi and a Project Management Work Cell
Kaizen, Nemawashi and a Project Management Work CellJeff_Marsh
 
Focal Point | Upskilling Options
Focal Point | Upskilling OptionsFocal Point | Upskilling Options
Focal Point | Upskilling OptionsTom Atwood
 
Tips for Managing a Mainframe Internal Recovery Project
Tips for Managing a Mainframe Internal Recovery ProjectTips for Managing a Mainframe Internal Recovery Project
Tips for Managing a Mainframe Internal Recovery Projecticu812
 
A guide to creating a quality project schedule it-toolkits
A guide to creating a quality project schedule   it-toolkitsA guide to creating a quality project schedule   it-toolkits
A guide to creating a quality project schedule it-toolkitsIT-Toolkits.org
 
Why all deadlines are bad for quality
Why all deadlines are bad for qualityWhy all deadlines are bad for quality
Why all deadlines are bad for qualityJohan Hoberg
 
Planning a project-Gerair M Blair
Planning a project-Gerair M BlairPlanning a project-Gerair M Blair
Planning a project-Gerair M BlairDr Ghaiath Hussein
 
A guide to create a quality project schedule
A guide to create a quality project scheduleA guide to create a quality project schedule
A guide to create a quality project scheduleNirtiSingla
 
7 steps to identifying your organizations training needs white paper - Sept 2010
7 steps to identifying your organizations training needs white paper - Sept 20107 steps to identifying your organizations training needs white paper - Sept 2010
7 steps to identifying your organizations training needs white paper - Sept 2010The Blockchain Academy
 
How To Design And Run A Training Program
How To Design And Run A Training ProgramHow To Design And Run A Training Program
How To Design And Run A Training ProgramGarth Gilmour
 
BCP Phases CPATech Advisor May 2010 Article
BCP Phases CPATech Advisor May 2010 ArticleBCP Phases CPATech Advisor May 2010 Article
BCP Phases CPATech Advisor May 2010 ArticleRickMark
 
Com 140 check point different kinds of messages
Com 140 check point different kinds of messagesCom 140 check point different kinds of messages
Com 140 check point different kinds of messagesrothscarttispi1982
 
How to implement the TBLS Strategy - the strategic workshop
How to implement the TBLS Strategy - the strategic workshopHow to implement the TBLS Strategy - the strategic workshop
How to implement the TBLS Strategy - the strategic workshopRicardo Anselmo de Castro
 
[Guide] How to create a realistic project schedule
[Guide] How to create a realistic project schedule[Guide] How to create a realistic project schedule
[Guide] How to create a realistic project scheduleDmitriy Nizhebetskiy
 

Similaire à Dealing with constraints in corporate training white paper oct 2010 (20)

Time and Projects
Time and ProjectsTime and Projects
Time and Projects
 
Process Improvement Plan by Barry Botha
Process Improvement Plan by Barry BothaProcess Improvement Plan by Barry Botha
Process Improvement Plan by Barry Botha
 
Estimating time and cost resoures
Estimating time and cost resouresEstimating time and cost resoures
Estimating time and cost resoures
 
Rejuvenating Agile Operations By Putting Lead And Cycle Time Front And Centre.
Rejuvenating Agile Operations By Putting Lead And Cycle Time Front And Centre.Rejuvenating Agile Operations By Putting Lead And Cycle Time Front And Centre.
Rejuvenating Agile Operations By Putting Lead And Cycle Time Front And Centre.
 
Proj430 advanced program management entire class
Proj430 advanced program management entire classProj430 advanced program management entire class
Proj430 advanced program management entire class
 
Kaizen, Nemawashi and a Project Management Work Cell
Kaizen, Nemawashi and a Project Management Work CellKaizen, Nemawashi and a Project Management Work Cell
Kaizen, Nemawashi and a Project Management Work Cell
 
Group Project II .docx
Group Project II                                                  .docxGroup Project II                                                  .docx
Group Project II .docx
 
Focal Point | Upskilling Options
Focal Point | Upskilling OptionsFocal Point | Upskilling Options
Focal Point | Upskilling Options
 
Tips for Managing a Mainframe Internal Recovery Project
Tips for Managing a Mainframe Internal Recovery ProjectTips for Managing a Mainframe Internal Recovery Project
Tips for Managing a Mainframe Internal Recovery Project
 
A guide to creating a quality project schedule it-toolkits
A guide to creating a quality project schedule   it-toolkitsA guide to creating a quality project schedule   it-toolkits
A guide to creating a quality project schedule it-toolkits
 
Why all deadlines are bad for quality
Why all deadlines are bad for qualityWhy all deadlines are bad for quality
Why all deadlines are bad for quality
 
Planning a project-Gerair M Blair
Planning a project-Gerair M BlairPlanning a project-Gerair M Blair
Planning a project-Gerair M Blair
 
A guide to create a quality project schedule
A guide to create a quality project scheduleA guide to create a quality project schedule
A guide to create a quality project schedule
 
7 steps to identifying your organizations training needs white paper - Sept 2010
7 steps to identifying your organizations training needs white paper - Sept 20107 steps to identifying your organizations training needs white paper - Sept 2010
7 steps to identifying your organizations training needs white paper - Sept 2010
 
How To Design And Run A Training Program
How To Design And Run A Training ProgramHow To Design And Run A Training Program
How To Design And Run A Training Program
 
BCP Phases CPATech Advisor May 2010 Article
BCP Phases CPATech Advisor May 2010 ArticleBCP Phases CPATech Advisor May 2010 Article
BCP Phases CPATech Advisor May 2010 Article
 
Com 140 check point different kinds of messages
Com 140 check point different kinds of messagesCom 140 check point different kinds of messages
Com 140 check point different kinds of messages
 
Tortillis group approach
Tortillis group approachTortillis group approach
Tortillis group approach
 
How to implement the TBLS Strategy - the strategic workshop
How to implement the TBLS Strategy - the strategic workshopHow to implement the TBLS Strategy - the strategic workshop
How to implement the TBLS Strategy - the strategic workshop
 
[Guide] How to create a realistic project schedule
[Guide] How to create a realistic project schedule[Guide] How to create a realistic project schedule
[Guide] How to create a realistic project schedule
 

Plus de The Blockchain Academy

Transformative Corporate Training with Simulations
Transformative Corporate Training with Simulations Transformative Corporate Training with Simulations
Transformative Corporate Training with Simulations The Blockchain Academy
 
IHRDC 2015 Houston - Technology as a Key Differentiator for Training
IHRDC 2015 Houston - Technology as a Key Differentiator for TrainingIHRDC 2015 Houston - Technology as a Key Differentiator for Training
IHRDC 2015 Houston - Technology as a Key Differentiator for TrainingThe Blockchain Academy
 
Capital wave simulation platforms jan 2014
Capital wave simulation platforms jan 2014Capital wave simulation platforms jan 2014
Capital wave simulation platforms jan 2014The Blockchain Academy
 
Transform your training with simulations January 2014
Transform your training with simulations   January 2014Transform your training with simulations   January 2014
Transform your training with simulations January 2014The Blockchain Academy
 
Video technology uses for social media
Video technology uses for social mediaVideo technology uses for social media
Video technology uses for social mediaThe Blockchain Academy
 
ASTD - How to setup your website - July 2011
ASTD - How to setup your website - July 2011ASTD - How to setup your website - July 2011
ASTD - How to setup your website - July 2011The Blockchain Academy
 
How to pitch your consultancy services
How to pitch your consultancy servicesHow to pitch your consultancy services
How to pitch your consultancy servicesThe Blockchain Academy
 
Using Simulations in Training - White Paper February 2011
Using Simulations in Training - White Paper February 2011Using Simulations in Training - White Paper February 2011
Using Simulations in Training - White Paper February 2011The Blockchain Academy
 
CapitalWave Financial Simulations speaker deck - march 2011
CapitalWave Financial Simulations   speaker deck - march 2011CapitalWave Financial Simulations   speaker deck - march 2011
CapitalWave Financial Simulations speaker deck - march 2011The Blockchain Academy
 
Transform your training with simulations speaker deck - march 2011
Transform your training with simulations   speaker deck - march 2011Transform your training with simulations   speaker deck - march 2011
Transform your training with simulations speaker deck - march 2011The Blockchain Academy
 
Using social media tools to promote your business - astd march 2011
Using social media tools to promote your business  - astd march 2011Using social media tools to promote your business  - astd march 2011
Using social media tools to promote your business - astd march 2011The Blockchain Academy
 

Plus de The Blockchain Academy (20)

Blockchain Tsumani - Chicago May 2017
Blockchain Tsumani - Chicago May 2017Blockchain Tsumani - Chicago May 2017
Blockchain Tsumani - Chicago May 2017
 
Transformative Corporate Training with Simulations
Transformative Corporate Training with Simulations Transformative Corporate Training with Simulations
Transformative Corporate Training with Simulations
 
IHRDC 2015 Houston - Technology as a Key Differentiator for Training
IHRDC 2015 Houston - Technology as a Key Differentiator for TrainingIHRDC 2015 Houston - Technology as a Key Differentiator for Training
IHRDC 2015 Houston - Technology as a Key Differentiator for Training
 
Gamification through Simulation
Gamification through SimulationGamification through Simulation
Gamification through Simulation
 
What are MOOCs? Why you should care?
What are MOOCs? Why you should care? What are MOOCs? Why you should care?
What are MOOCs? Why you should care?
 
13 MOOC Megatrends - June 2014
13 MOOC Megatrends - June 201413 MOOC Megatrends - June 2014
13 MOOC Megatrends - June 2014
 
Capital Market Simulator Value
Capital Market Simulator ValueCapital Market Simulator Value
Capital Market Simulator Value
 
Capital wave simulation platforms jan 2014
Capital wave simulation platforms jan 2014Capital wave simulation platforms jan 2014
Capital wave simulation platforms jan 2014
 
Transform your training with simulations January 2014
Transform your training with simulations   January 2014Transform your training with simulations   January 2014
Transform your training with simulations January 2014
 
Video technology uses for social media
Video technology uses for social mediaVideo technology uses for social media
Video technology uses for social media
 
ASTD: How to setup your website -
ASTD: How to setup your website -ASTD: How to setup your website -
ASTD: How to setup your website -
 
ASTD - How to setup your website - July 2011
ASTD - How to setup your website - July 2011ASTD - How to setup your website - July 2011
ASTD - How to setup your website - July 2011
 
Pricing your consultancy services
Pricing your consultancy servicesPricing your consultancy services
Pricing your consultancy services
 
How to pitch your consultancy services
How to pitch your consultancy servicesHow to pitch your consultancy services
How to pitch your consultancy services
 
Using Simulations in Training - White Paper February 2011
Using Simulations in Training - White Paper February 2011Using Simulations in Training - White Paper February 2011
Using Simulations in Training - White Paper February 2011
 
CapitalWave Financial Simulations speaker deck - march 2011
CapitalWave Financial Simulations   speaker deck - march 2011CapitalWave Financial Simulations   speaker deck - march 2011
CapitalWave Financial Simulations speaker deck - march 2011
 
Transform your training with simulations speaker deck - march 2011
Transform your training with simulations   speaker deck - march 2011Transform your training with simulations   speaker deck - march 2011
Transform your training with simulations speaker deck - march 2011
 
Technology for speakers and trainers
Technology for speakers and trainersTechnology for speakers and trainers
Technology for speakers and trainers
 
Using social media tools to promote your business - astd march 2011
Using social media tools to promote your business  - astd march 2011Using social media tools to promote your business  - astd march 2011
Using social media tools to promote your business - astd march 2011
 
What do we mean by competency
What do we mean by competencyWhat do we mean by competency
What do we mean by competency
 

Dernier

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 

Dernier (20)

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 

Dealing with constraints in corporate training white paper oct 2010

  • 1.   Deal ling with Constraints in Corpo Trainin   orate T ng  7 Com mmon Solutio ons to these C Constra   aints Capita alWave In nc. | Wh hite Pape er    Oct tober 2010 0        1   
  • 2.     Table of Contents:  Training Constraints 1: Time ......................................................................................................................... 3  Training Constraints 2: Budget  ..................................................................................................................... 4  . Training Constraints 3: Staffing ..................................................................................................................... 5  Training Constraints 4: Cultural Constraints ................................................................................................. 6  Training Constraints 5: Technical Constraints  .............................................................................................. 7  . Training Constraints 6: Content and Development ...................................................................................... 8  Training Constraints 7: Industry, Regulatory, and Delivery Constraints ..................................................... 10                              2   
  • 3. Training g Constraint ts 1: Time revieew the results s, make changes, and then n go    to geeneral release e. But how m many projects, ,  Summary: In this series, we are goin ng to  espe ecially in a corrporate envir ronment, allow us  examine s some of the c common cons straints we  to hiit every single e one of these e milestones? ?  face in corporate training and how to deal with  Prob bably not man ny. But the trick is to exammine  them effe ectively. One o of the most c common  what t the project entails and choose the rig ght  constraint ts when it com mes to corpo orate training  mile stones.   is time. Le et's examine h how time bec comes a    constraint t and how you can effectiv vely use time  For eexample, if th he stakeholde er or departm ment  issues to yyour advantage.  head d tells you tha at they need training on a    certaain process, p procedure or system, it ma ay  Corporate e training organizations are usually  not bbe necessary to assess tha at need. In facct, if  "under the gun" when it comes to t time.  the sstakeholder c can provide an SME who can  Stakehold ders, division heads, and su ubject  prov vide content, then it may b be better to mmove  matter ex xperts (SMEs) want what they want  on bbased on their r expertise. WWith this apprroach,  when they want it ‐ and this is most t often an  you  can spend mo ore time on tthe design,  understan ndable issue. After all, the  pilotting, and evaluation of the e training proggram.  organization's ability to o meet its goals is almost  On t he other han nd, if your stakeholders can nnot  always ba ased on a time e constraint o of some kind  prov vide an adequ uate picture oof the problem m,  or anothe er. Let's look aat how you ca an be faced  then n you obvious sly need to sppend the bulk of  with a tim me constraint as a corporat te training  the ttimeline on assessment while shaving t time  manager ‐ and how to deal with tho ose  off oof the other m milestones. In this case, on nce  constraint ts.  you  know the pro oblem, you ca an put the pro oject    into  "overdrive" t to get it developed quickly y and  One of the first things to consider is s your ideal  withhin the time constraint you u've been han nded.  training project placed d within an ideeal timeline.  Man ny times a "jus st‐in‐time" in ntervention ca an be  In that ide eal timeline, w what trainingg milestones  effecctive and solv ve the problem, and also c create  do you wa ant to include e? For examp ple, you  a "pllaceholder" fo or further dev velopment an nd  would mo ost likely want to start with h a full needss  perfe ection in the future.  assessment to ensure t that the cont tent    addresses s the perform mance issue. N Next, you  Whe en you are fac ced with a timme constraint t, the  would wa ant to include plenty of dev velopment  nego otiation of a p project can coome down to   a  time, thatt is, time to coonceive the training  good d old‐fashione ed compromise between t the  programs, methods, m measurements s, and  trainning organizat tion and the s stakeholder. One  evaluation ns. Along with that develo opment time,  of thhe first ways t to deal with tthis is to analy yze  you would d probably want to include e enough  the ssituation as w we've discusse ed and then o offer  design timme to allow th he developme ent staff to  an a lternative tim meline. Keep i in mind that  write and perfect content, develop instructional  stake eholders or d division heads s may come u up  tools, proof those tools, and maybe e even run  withh a timeline as s a first blush because it is s the  them by a an SME or two o. Before you u deliver the  quic kest route to the solution. In cases like this,  program, especially for classroom p programs,  the ddecision maker may be op pen to a timeline  your stafff would need "train the tra ainer" time as s  that  is a little long ger ‐ as long aas you can deeliver  well as a lengthy pilot t to ensure tha at the  what t they need.  training is s effective. Evven with onlinne    interventi ions, you wou uld want to taake some  If theere's just no ccompromise, determine w within  time to piilot to a samp ple of the targ get audience  the ttraining organ nization what t you can deliiver  and have them test each piece of th he course. In  in th he time allotte ed. For example, you may have  addition tto all of this, y you would wa ant time to  had  plans for an e elaborate onl line case stud dy  3   
  • 4. program t to be delivere ed before a cl lassroom  withh the extra he elp. When it's time for a ne ew  program b begins. If you simply will n not have time  budg get, roll out y your accompli ishments as p proof  to create the online inttervention, th hen move  of th he need. Anot ther way to d deal with a sta affing  written case s that to a w study section that will be  budg get constraint t is to determ mine what you u can  part of the classroom c course. This w will shave  accoomplish with t the current st taff and offer r that  time off o of development while still d delivering  as ann alternative. try, but if that  . It's worth a t necessaryy components s.   does sn't work, con nsider retooli ing the existinng    train ning staff to mmeet the need d. For example,  Next, we will discuss another comm mon  you  may have ins structors that t can double a as  corporatee training constraint, budgets.   instr ructional desi igners until th hey are neede ed in    the cclassroom.    Training g Constraint ts 2: Budget Whe en the budget t bottleneck c comes to    mate erials and training method ds, there are s some  Summary: It's very diff ficult to get th hrough a  crea tive workarounds that also may prove your  fiscal yearr in corporatee training with hout running  genuuine need. Fo or example, m most vendors offer  into a buddget constrain nt. Let's discu uss the kinds  r online development tools.  free  trials of their of constraaints you may y encounter a and some  Get tthe free trial,, develop a toop‐notch train ning  ways to deal with them m efficiently.  piecee, and go to t the table with h the proof. Iff a    decission maker ca an see the finnal product an nd its  Budget co onstraints are e common in corporate  effecctiveness, he or she may b be more likely y to  training, e especially dur ring periods oof financial  find  the money to o fund the pu urchase. If the e  uncertainty. And any p phase of a cor rporate  consstraint is relatted to training materials, b be  training project can be e the victim of f a budget  crea tive. Conside er using three‐to‐a‐page  issue. Stafffing is a typic cal budget co onstraint, in  PowwerPoint printouts instead of handing out  which you u are told that the money does not  the eentire presen ntation, and d do them in bla ack  exist to addd staff when n it is almost ccertainly  and  white. Or, co onsider puttin ng job aids online  necessary y. Organizatio ons also cut budgets for  ead of into a p inste print format. What about  materials or training m methods, such h as online  crea ting training t that can mak ke a profit? Fo or  delivery toools. You may y even see the money cut  exammple, you may be able to s sell training  off for delivery, such as locations or r number of  proggrams to clien nts or other o organizations  times programs are de elivered. Let's take a close  withhin the industry. The key here is to analyze  look at eaach of these c categories of b budget  the mmaterial need d and determ mine what  constraint t and find ways to work ar round them. alterrnatives exist. And don't fo orget to keep p a    d record of the amount of money you save ‐  solid Staffing budget constra aints are sommetimes the  or m make.   hardest to o break throu ugh. After all, adding and    retaining staff is the most expensive e part of  Delivvery constrain nts may be th he easiest to g get  running a corporation. And with this heavy price e  arouund. If the issuue is deliveryy staff, consider  tag, training managers s are usually pput in the  usingg a well‐deve eloped design ner to deliver  position oof having to prove that staff needs to  train ning during th he height of th he need. Also o,  be added in order to co ope with a higher  deliv very is anothe er good use o of contract mo oney  workload. One way to work around d this  for s special projec cts or projects s of limited  constraint t is to ask for contractor m money. Hiring  duraation. If the is ssue is locatioon, analyze the  contracto ors does not h have the same e price tag as  cost  of renting sppace for the d delivery. For  hiring a peermanent em mployee, and the money is  exammple, you may have a large e‐scale delive ery  not somet thing that is uused for the eentire fiscal  that  must take place in a certa ain amount of f  year. If yo ou can get a contract budg get, keep a  timee. Instead of d doing numero ous small training  record of what your de epartment ac ccomplishes  4   
  • 5. programs, consolidate it into a coup ple of large    ones. In some geograp phic areas, ho otels are in  Firstt, let's look at   your staff of  f instructors oor  desperate e need of conference center business  faciliitators. Many y times, this sstaff group is vvery  and may e even offer special rates.   versa atile and flexible by their n nature. After all, a    totallly inflexible i instructor ma ay not be very y  The overa all key in dealing with budg get  effec ctive in the cl lassroom at a all. The memb bers  constraint ts is to analyz ze the situatio on and come  of thhis group know w training ma aterials and they  up with either cost‐free or less expe ensive  also  know how th he audiences respond to th hose  alternativves. But secon ndary to this is the  mate erials. Why not consider h having the hig gher‐ absolute n necessity of kkeeping up wi ith  skille ed instructors s double as innstructional  accomplis shments base ed on the lowwer costs. In  desig gners? For ex xample, a high h potential juunior  many case es, you may e even convince e yourself  faciliitator who te eaches one or r two classes may  that usingg contractors during peak need is the  be a ble to take re esponsibility f for the updat tes to  best way to go instead d of adding staaff. Or you  thos se materials a and content. O Or, a senior  may decid de that rentin ng space for ddelivery once  instrructor, such a as a managem ment‐training  a year is m more effective e. On the oth her hand,  instrructor, might have the ability to take ch harge  your finanncial decision makers may see that you  of thhe entire man nagement‐tra aining program m  have a genuine need and increase t the budget  insteead of leaving g it to variouss staff membe ers.  aining department.  for the tra But y you can also look at delive ery staff as latteral    poss sibilities. For eexample, that t junior instru uctor  Since stafffing is related d to both time e and  may  be bored wit th one or two o subject area as ‐  budget, wwe will look at t that corporaate training  see h how he or she e does in a neew subject ar rea  constraint t next.  and  make that pe erson available for all of th he    subje ects.     Training g Constraint ts 3: Staffingg Wha at about instructional desig gners and    deve elopers? Man ny traditional instructional    Summary: Staffing con nstraints in coorporate  desig gners may ha ave started ou ut as SMEs or r  training ca an be relatedd to both time e and budget. .  instrructors. It may be possible e to utilize the em in  Let's take a deeper loook at staffing c constraints  thos se capacities, especially if y you have high h‐ and how y you can deal with them ef fficiently.  levell designers w who are used t to facilitating    grouups as part of their design responsibilities.  We've already discusse ed how a staf ffing  Wha at if you have instructional l developers w who  constraintt can be relatted to budget t issues.  came e strictly fromm technical ba ackgrounds a and  We've also discussed h how that staff fing  only  work in deve elopment? Co onsider mentoring  constraintt can create pproblems whe en it comes  themm into conten nt evaluation and even  to projectt timelines an nd deliverable es. In simple  proo ofreading ‐ this may take some of the  terms, a la ack of budget t can mean a lack of staff,  work kload off of th he instructionnal designers or  which me eans an additional time con nstraint  instrructors.   within thee overall timeelines. But a staffing    constraintt does not have to mean the end of a  We'v ve already dis scussed the b benefits of ask king  project orr a last‐minute request for r additional  for ccontractor fun nds. If you neeed to employ y  funds. In t today's enviro onment, staff fing can be  cont tractors in either a design or delivery  mobile, thhat is, people do not neces ssarily have  capa acity, it will co ost less than h hiring them  to be linke ed to one jobb function. The key is to  permmanently. And d this also proovides a solidd  examine y your staff, theeir areas of re esponsibility,  recoord of what yo our departme ent can and ca annot  and their abilities to m make a determ mination for  accoomplish with t the extra help p. When it co omes  multi‐taskking. But howw does this wo ork in the  to coontractors, ke eep in mind that the market is  corporatee training environment?  5   
  • 6. potentially saturated w with people wwho can and  rules s and regulati ions, and new w processes ‐ and  will do thee work, so yoou will most likely have a  som e organizatio ons' very survival depends on  great deal of choice in terms of exp perience and  gettiing through these issues. L Let's look at a a few  backgroun nd.   diffeerent types of f cultural constraints and h how    to un nderstand the em.  If contracting is not an option, cons sider    "sharing" people in oth her jobs to heelp you  To b egin with, a m major cultura al constraint c can  through the upswing in n work. For ex xample, a  be tr raining itself. Changes in the way an  special project may need an SME's expertise in  orga anization is traained and educated can be an  a certain aarea. Why no ot examine the possibility  obst tacle, especially if new trai ining courses and  of having the SME design or deliver r training  meth hods are not within the cu ultural norm.  during the e special project? If the peerson is  Perh haps you've in ntroduced a L Learning  regarded as an SME, he or she can p probably  Man nagement Sys stem (LMS) or r you've move ed  express iddeas well enough to be part of the  tradiitional classro oom training into online  training detail for the sshort run. And d if you do  form mats. Or mayb be you've beg gun experime enting  get the oppportunity to add staff in t the future,  with h blended lear rning where n none existed  you may b be able to hir re from withinn and keep  befo ore. One of th he biggest cult tural constraints  the initial learning curvve to a minimmum.  in coorporate train ning could be an overall    orga anizational lea arning needs assessment t that  Staffing coonstraints can n be very frus strating,  is ma aking the "kn nowledge guardians"  which me eans that we a are more likely to throw  unco omfortable. B Because this c constraint is  our hands nd just deal with the  s in the air an direc ctly related too training, you have the ab bility  situation as it exists. But if you thinkk creatively  to ha andle it very eeffectively. Fi irst, be sure tto  and consider the altern natives to cur rrent  com municate con nsistently wit th the population.  staffing, y you may be ab ble to create a situation  Expla ain the benef fits of the training changes s to  that work ks for both the e training dep partment  the a audience. Hig ghlight your success stories. If  and the overall organiz zation.  you  are dealing w with "knowled dge guardians s"    who  are resistant t to a needs aassessment,  Next, we will discuss cultural constr raints that  reas sure them that you are us sing their  arise in co orporate train ning projects.  know wledge for the improveme ent of the    orga anization as a whole. You c can even offer  them m a spot in the change as a a Subject Mat tter  Training g Constraint ts 4: Cultural Expe ert (SME) or f facilitator. The e idea in trainning  Constraints as a  constraint is to help the o organization's s    cultu ure move tow ward the train ning knowing that  Summary: Sometimes the constrain nts you  it is a a big benefit and will help   everyone me eet  encounter in corporate e training are e cultural.  their r goals.  Let's exploore these connstraints and determine    how to ha andle them.  Over rall organizational changes s are initially not    relat ted to trainingg but sometim mes move int to the  Cultural constraints in corporate tra aining are  trainning realm. Fo or example, there may be  usually lin nked to something that is g going on  majo or policy and procedure ch hanges relate ed to  within the e organizationn. Some of thhese  new  regulations o or rules, or poossibly a merger  constraint ts may be directly related to training,  or ac cquisition. When these changes are firs st  while others may not b be related to training at  levieed on the orga anization, you may not be e  all. In today's environmment, corpora ate cultures  invo lved. But as t the changes a are implemen nted,  are in uph heaval, especially in certain industries.  trainning most like ely becomes involved to  There are e organizationnal changes, laayoffs, new  faciliitate knowled dge transfer. In this case, b be  6   
  • 7. sure that training personnel act as c change  eithe er during or a after the chan nge, and wait for  agents and champion t the benefits oof the change e  the u upheaval to ssettle.  while they y are carrying g out the train ning    departme ent's duties.  Nextt, we will examine technical corporate    train ning constrainnts.  While we are discussin ng organizatio onal changes    that may lead to a training constraint, it's  helpful to o remember that the audie ence may fall  Trai ining Constr raints 5: Tec chnical into threee different grooups. The ent thusiastic  Con straints group embraces chang ge and keeps a positive    attitude. TThe second group may be made up of  Sum mary: Techni ical constrain nts are commo on in  people wh ho are not sure about the change but  corpporate training, and they so ometimes occur  keep mov ving forward a anyway. The t third group  whe n all other as spects of a traaining project t fall  is comprissed of resistoors, that is, pe eople who  into  place. Let's e explore these   constraints. react badly and negatively to chang ge ‐ and    make no s secret about it. The key is to figure out  Techhnical or technology‐relate ed training  how training can help members of t these groups  consstraints can occur at any point during a  move into o the group above, i.e. the e "not sures"  train ning project, w whether in th he initial stagees or  can move e into the "ent thusiasts" grooup while  afterr a program h has been runn ning for some e  the "resistors" can move into the "n not sure"  timee. These types s of issues cann cause obsta acles  group. Looking for this s dynamic wit thin any  for b both online as s well as class sroom‐based  cultural coonstraint can help the training team  train ning programs s. When conf fronted with a a  navigate tthe issue and end up with a positive  tech nical constraint, you can look for  result.  work karounds or a alternatives. OOr, sometime es a    well‐‐researched c cost benefit aanalysis can innform  There aree changes that t may not be related to  decission makers a and allow the em to help yo ou  training at any point. FFor example, people  mak e changes. Le et's look at soome common n  changes s such as layoffs, staff chang ges, or staff  tech nology‐relate ed training co onstraints and d how  realignme ents may be r related to Hum man  you  can handle th hem.  Resources s and the indiividual departments. In    many case es of people cchange, training will not  Whe en it comes to o online learn ning, one com mmon  be involveed. The key here is to figur re out if  consstraint is that your audienc ce does not h have  training caan be a partnner or support t during the  acceess to appropriate hardware for e‐learn ning.  change. PPerhaps you can highlight t the training  This  issue usuallyy surfaces at tthe beginning g of  that realig gned staff me embers may n need and  an in nitial rollout p project, but itt's certainly no  assure theem that you w will be there tto provide it.  reas on to stop the project from m moving  In cases such as this, you may have to wait until  forwward. The aud dience's lack oof access coul ld be  the chang ge has passed d and go back to regular  relatted to the wo ork environme ent. For exam mple,  business.  asse mbly‐line em mployees may y not have acc cess    to co omputer term minals anywhere in their  The key inn dealing withh cultural con nstraints in  immmediate enviro onment. Or, c customer‐faci ing  corporatee training is to o first identify y those issues s  emp ployees may h have access to o a terminal b but  that are related directl ly or indirectly to training. cannnot use it for ttraining becaause of the  For those issues, deter rmine how yo ou can work  custoomers' perce eptions of inac ctivity. In these  as a strate egic partner tto work throu ugh the  casees, consider innstalling one o or two termin nals  constraint t. Next, ident tify those issuues that are  arious locations for online learning activ in va vities.  not relate ed to training. For these iss sues,  Perhhaps the IT de epartment has refurbished d  determine e how traininng can serve a as a support  7   
  • 8. hardware e that could be redeployed d as learning  the cclassroom audience hitting g the online  centers at t certain locattions.  interrvention while another po ortion works o on    casee studies. Alte the audience has  ernatively, if t Another c common tech hnical constraint is that  the aability to acce ess online pro ograms away from  the audience does not yet have the e technical  the cclassroom, structure the training to  skill for e‐ ‐learning, esp pecially e‐learrning that is  accoommodate e‐l learning at thhe office, follo owed  self‐paced d. In many ind dustries, this problem is  by a  discussion or he classroom. If  r debrief in th clearing ittself up as org ganizations mmove to more  tech nology is nee eded in the classroom for a a  advanced technology in all of its operations. But t  mass sive training rrollout but simmply is not  there may y still be pock kets of inexpe erience out  availlable, consideer leasing or rrenting equip pment  there. In tthis case, it's a step‐by‐steep education  or sp pace until the e upgrades ca an be made. S Some  process. M Many people are afraid of technology  confference cente ers lease not o only the spacce but  simply because they do on't know how to use it.  the ttechnology as s well, such as computers, ,  After all, tthis is an age when centen narians use  projeectors, and LC CD displays.   Twitter an nd grandpare ents use    videoconf ferencing and d email to cha at with their  As w with all of the other training constraints s  grandchild dren. So anyo one can learn. One way to  we'vve discussed, the key with technical or  deal with an inexperienced audienc ce is to take  tech nology‐relate ed constraints is to explore e  training "o on the road" to show the a audience  poteential workaro ounds first, and then  how to us se the techno ology. This arrrangement  deteermine when a permanent t change or  also allowws you to posi ition the train ning  upgrrade can be m made. And rem member that t a  departme ent representatives as strategic  tech nical constraint is no reason to halt a  partners. You can also consider intr roducing  projeect that couldd be a major benefit to the e  quick refe erence guides s (QRG's) or video  orgaanization as a whole.  tutorials tthat show the e audience ho ow easy it is    to access online learning.   Next t, we will examine content t and    deveelopment con nstraints.  Sometime es you'll find tthat the organizational    infrastruc cture cannot a accommodate e a full‐scale  e‐learning g program. Th his could be related to  Trai ining Constr raints 6: Con ntent and bandwidth, i.e. too ma any people hit tting the  Dev velopment network a at one time co ould cause se erious    slowdown ns in other areas. And som metimes  Sum mary: Many t times the training content t  organizations are hesit tant to pay fo or additional  itself f or the development met thods are the  bandwidth space just t to accommod date training.  sourrce of the connstraint. Heree are some wa ays to  In this casse, consider rolling e‐learning to  work k around this  obstacle.  smaller au udiences ‐ one at a time. T This way, the    entire pop pulation will nnot need to a access the  Whe en you find thhat issues rela ating to training  online app plication at th he same time e, thus saving  conttent or develoopment are causing a  space and d bandwidth.  consstraint, the be est action to ttake is to lookk for    a suiitable alterna ative or comp promise. Cont tent  In relationn to classroom m technology y, what if you  and  development t usually invo olves a team o of  wanted to o roll out a blended learnin ng program,  peop ple, including g managemen nt, instructionnal  only to finnd that there are not enou ugh  desiggners, stakehholders, and ssubject matte er  computer rs (or funds) tto do it? Again n, you could  expeerts (SMEs), so your skill in n leading a tea am  find out iff IT has refurbbished hardw ware. Or, you  will b be helpful in resolving connstraints. Let's  can use a "station" me entality withinn the training exammine some co ontent and de evelopment  program i itself. For exa ample, have a a portion of  8   
  • 9. constraint ts and determmine ways to handle them  heree is to remember that a dif fferent idea is s not  efficientlyy.  nece essarily a bad   one, even if it is contrary to    origiinal specificat tions. The firsst action to taake is  One of the first and mo ost common content and  to goo back to the SME or stake eholder to loo ok at  developm ment constrain nts occurs wh hen the SME  the ssource first. D Discuss the differences wit th the  and training do not agr ree. Most training  instrructional desi igner and point him or her r into  projects run across a p point where th he SME and  the ddirection that t will result in n the closest  the instruuctional designers have different ideas  outccome, whethe er that is the original or a  of how the content sho ould be developed.  mod dification.   Sometime es the SME m may be quite p possessive of    the content and does n not want changes. Or the  At ti mes, content t scope may g grow, especia ally if  instructional designers s feel that conntent should  an S ME sees the p product for th he first time aand is  be edited or truncated d in some way y that does  remiinded of miss sing pieces or r choppy cont tent.  not go aloong with the S SME's origina al meaning or  In th his case, you m must be highl ly aware of thhe  intent. If t elated to e‐learning, there this issue is re e  timeeline, delivery y method, and d assigned  may be to oo much cont tent for the mmedium. If  staff ssible to add or change  fing. If it's pos any of the ese problems exist, talk to the SME to  cont tent, go ahead f not, discuss a  d and do it. If see if therre is a compro omise. Explain the  poteential timeline e change with h the stakeho olders  benefits oof the changes and paint a picture of  or SMME, keeping i in mind that y your overall ggoal is  what the end result ma ay look like. If there is no  to geet the training g as close to "correct" in the  comprom mise, sometimes the best p path to take iss  first  design. If theere is simply nno compromise,  to continu ue with the SME's original idea. More  delivver what was originally int tended and slate it  often than n not, he or sshe may see the obstacle  redesign immediately.  for r when the training is de eveloped.      The  key to handli ing content and developm ment  Another c content const traint may arise when you  cons straints is to bbe consistent   in  discover t that the conte ent does not match  com munication a and definition n of training wwith  what's act tually going oon in the environment.  SME E's, stakeholde ers, and desig gners at all tim mes.  For examp ple, you find out that customer service  Alwa ays look for co ompromise o or alternatives s,  associates s are skippingg CRM steps in their day‐ and  lead the team m into being o open to changes  to‐day int teractions, altthough those steps are  alon g the way. Re emember tha at a change is not  part of a ppolicy or proc cedure. If an SSME is  nece essarily a bad   thing, especially after a  involved, talk to him or her first. If t there is no  desig gner or SME i is deeply invoolved in the  SME, dete ermine what t the major dif fferences are  cont tent. When th here is no com mpromise or  and prese ent them to th he training stakeholders.  work karound, mov ve forward w with what you  But keep in mind that y you may have e uncovered  have e. When it's ti ime to evalua ate it, your  a disconnect between Policy and Pr rocedure and  learnners will most t likely be ablle to give youu  the depar rtments or ev ven between managers  sugggestions for im mprovement or change that  and assoc ciates. The beest you can do o is highlight  will w work well.  the issue, make sugges stions for chaange, and    wait until a decision is reached to co ontinue the  Our  final corporate training co onstraint will be  developm ment of the to opic in questio on.  induustry, regulato ory, and deliv very constrain nts.      Content c constraints ca an also appear in conflict  between t the instructioonal designer and the  person managing the d design or the project  itself. A deesigner may h have a differeent idea of  how the t training shoul ld be develop ped. The key  9   
  • 10. Training g Constraint ts 7: Industry, year rs these chang ges may occu ur on a daily bbasis.  Regulato ory, and Delivery Constr raints Obviiously this is a a constraint ffor the traininng    orga anization. Reg gulations now w not only  Summary: What happe ens when the e  stipuulate content t, but also may stipulate th he  environment for training becomes a a constraint?  lengt th of trainingg and prohibit t certain type es of  Let's defin ne this obstac cle and discus ss ways to  trainning. These sa ame regulatio ons may require  work with hin it.   orga anizations to s submit trainin ng plans and    repo ort completions within a ce ertain timelinne. If  An organization's gene eral environmment can  you  are dealing w with a constra aint like this o one  become a a training constraint, some etimes  and  you don't hav ve the manpo ower to hand dle it,  occurring quickly and n noticeably and sometimes s  cons sider outsourc cing. Many tr raining  occurring slowly. The c constraint related to  outs sourcers prov vide organizat tions with one e  environment could be due to inexperienced  stop p shopping in regard to cer rtain regulatio ons,  facilitator rs or training locations, or could be  incluuding content t, tracking, annd reporting. This  something altogether larger such as s regulatory  may  be the way t to go until things settle down  or industrry changes. Le et's discuss th hese  or un ntil you have a good idea o of how trainin ng  corporate e training constraints and h how to  depa artments should handle th he requirements.  manage them.  Typic cally there is no workarou und or alterna ative    for rregulatory tra aining, but you may be able to  Industry cconstraints ca an occur when n an overall  work k within the f framework to o determine a a  industry bbegins to chan nge rapidly. In n today's  trainning method t that works be est for your  environment, we see t that many ind dustries are  orga anization.   being ove erhauled and must change the way    business iis conducted in order to su urvive. But  We h have already discussed some delivery  how does s this affect tr raining and de evelopment?  cons straints in this s series, but let's look at thhem a  Remembe er that traininng managers s should  little e more closely y. A common delivery  always ha ave an idea of f what's goingg on in the  cons straint is due to lack of exp perienced  industry aaround them, so that chan nges do not  faciliitators. For ex xample, a reg gulatory chan nge  surprise the training te eam. So when n you notice  may  literally chan nge the playin ng field for alll  that a chaange is taking place, you m may not want  trainning personne el. One way to o deal with th his is  to develop training in c certain subjecct areas  to de etermine whi ich training personnel are the  because t they will be af ffected by thee change. In  close est to being a able to deliver in terms of  this case, consider crea ating a "skele eton" or  know wledge and experience and then determ mine  using the least expensi ive training m method  what t it will take t to get them u up to speed. If f the  available until the chan nge comes th hrough. Keep  time eline for readi iness is too lo ong, it may be e  in mind thhat "expense" " can be relat ted to  appr ropriate to co onsider outsourcing. If you u  money, time, or resources. You can also  outs source, you ca an work out a a deal where your  benchmark other organizations within the  instrructors are ab ble to work w with the  industry tto see how they are dealing with the  outs sourcer's instr ructors in ord der to best prepare  coming ch hanges. If the ere is an advis sory or  them m for the next t round of deelivery.  regulatory y body, consider contactin ng these    groups to obtain advice or feedback k on how  Wha at if there is a constraint re elated to the  training caan approach the changes.   delivvery methods s themselves? ? For example e, an    SME E may be on b board with de elivery methods  Regulator ry constraints s occur hand i in hand with  untill he or she ac ctually sees th he final produ uct.  industry cchanges. High hly regulated industries  He o or she may de ecide that the e choice of de elivery  see chang me, but with the general  ges all the tim meth hod doesn't a achieve the desired outcom me. If  upheaval that has occu urred in the ppast few  this  is the case, lo ook for compromise with t the  10   
  • 11. SME, stak keholders, and d instructionaal designers  the d delivery meth hod seems to work but the ere is  first. The compromise may be a cha ange in  still d disagreement ME, ask for tim t from the SM me to  length, a qquick convers sion of trainin ng methods,  evalu uate the prog gram first. A g green light froom  or a "backk to the drawing board" or rder. The  learn ners and their supervisors  is fact‐based d and  idea here, as is usual w whenever you u are dealing  may  help the SME to understa and that trainning  with SMEs, is to positio on yourself ass a partner  has m met its mark.  . and not as an obstacle. On the othe er hand, if    © Copyright 2010  Capita alWave Inc. All l Rights Reserv ved.  Bryant Nieelson – Managing Director at Financial Train ning Solutions aa division of Ca apitalWave Inc c –  offers 20+ years of training and talent mmanagement f for executives,  business owners, and top  performing g sales executives in taking th he leap from thhe ordinary to  extraordinaryy. Bryant is a  trainer, business & leadeership coach, and strategic planner for man ny sales organizzations. Bryantt’s  27 year business career hhas been based d on his results s‐oriented styl e of empowering.        11   
  • 12.   Finaancial Trainin Solutions (FTS), the instructor-le division of CapitalWave Inc. is ng s ed a firm made of up industry professionals having a reputation fo providing first-rate m u or train ning and co onsultancy to banks and other fi nancial inst t titutions. FT offers TS profeessionals who have ex w xtensive knowledge, ex xperience a and expertis in the se area of banking and financ as g ce. Blennded learning is the philosophy on which th company was found p o he y ded. Our ning methodology, integrating theory with pract ice using ou own very powerful train y ur train ning tools, creates a uniquely exciting and effe ective learnin environm ng ment. The resu pays imm ult mediate dividdends in the retention of newly-le earned conc cepts and their practical ap r pplication in the financial marketplac ce. Cap lWav Inc. pital ve Delivering Innovativ e Training Solutions g For further informa ation, please contact: e Finan ncial Training Solutions is a division of CapitalW g Wave Inc. Bryant Nielson, Managing Director p://www.Ca http apitalWave e.com http://wwww.FinancialTrainingS Solutions.c com http:// /www.Your rTrainingEdge.com Tele US: +1 (917) 477-3 T 3221 Te UK: + 44 (20) 3356 9 ele 4 9935 bryant.nie elson@financialtrainings solutions.com m 12