2. 3/31/2014
2
Contract 10 Locations
• North Main Street
1,000 Feet
Dana to Estabrook Cir.
• Dana Street
250 Feet
Main to Prospect
• Highland Avenue
925 Feet
Prospect to Green West
• Prospect Street West
600 Feet
• Pearl Street
600 Feet
• Winter Street West
675 Feet
• Green Street West
960 Feet
• Timothy Avenue
500 Feet
June 15, 2013
Walkabout
• Conducted site walkabout on June 15, 2013
• Discussed resident concerns
• City willing to meet resident at property in the
future to discuss concerns
3. 3/31/2014
3
October 23, 2013
First Public Meeting
• Discussed project design and schedule
• Discussed protection of trees
• Reviewed design drawings
• Discussed resident concerns
Protection of Trees
• Walkabout with arborist will be conducted.
• Invites via mailing will be forthcoming.
• Contact City staff if you have a concern about a
particular tree or planting.
4. 3/31/2014
4
Schedule
• 50% Design – December 2013
• 90% Design – March 2014
• Final Construction Documents – May 2014*
• Bid Period – June 2014
• Start Construction – July 2014
• End Construction – September 2015
* Final Public Meeting
Project Contacts
• Christina Hall, City Engineer
Christina.Hall@lebcity.com
603.448.3112
• Mike Lavalla, Director of Public Works
Mike.Lavalla@lebcity.com
603.448.3112
• Ryan Wingard, Wright-Pierce Project Manager
Ryan.Wingard@wright-pierce.com
603.430.3728
5. 3/31/2014
5
Small Group Sessions
North Main Street
Component Existing Proposed
Width 28’ 28’
Esplanade 2’-4’ (west) no change (west)
4’-9’ (east) no change (east)
Sidewalk 3.5’-5.5’ (both) no change (both)
Drainage Vert. Curb/CBs Vert. Curb/CBs