SlideShare une entreprise Scribd logo
1  sur  19
Optimizing Shutdowns:
10 Ways to Cut Maintenance Costs the Right Way
© Life Cycle Engineering
Shutdowns and outages consume
a lion’s share of both maintenance
and capital budgets.
© Life Cycle Engineering
Until recently the attitude has been
“Get it done and we’ll worry about
the budget when it’s over.”
© Life Cycle Engineering
Times have changed. Companies are
finding better processes and saving
exponentially by planning ahead.
© Life Cycle Engineering
What are they doing?
© Life Cycle Engineering
1. Reducing the number of jobs
that are “discovered” after the
shutdown starts.
© Life Cycle Engineering
2. Eliminating ineffective meeting practices
when planning for shutdowns.
© Life Cycle Engineering
3. Utilizing project management
software to lean up the
shutdown process.
© Life Cycle Engineering
4. Planning and scheduling before
the shutdown begins.
© Life Cycle Engineering
5. Reducing the number of over-ordered
materials and returning unused inventory.
© Life Cycle Engineering
6. Noting explicitly whether there
are enough supplies for the
entire shutdown.
© Life Cycle Engineering
7. Keeping an eye on excessive numbers
of rented assets such as cranes,
generators, scaffolding, etc.
© Life Cycle Engineering
8. Keeping a lookout for resources
paid for but not utilized.
© Life Cycle Engineering
9. Validating the work list and
removing duplications.
© Life Cycle Engineering
10. Settling claims with contractors to
avoid additional fees and penalties.
© Life Cycle Engineering
Reducing the fat during shutdowns
can provide large payoffs in both
time and money.
© Life Cycle Engineering
Remember, small improvements
yield big results.
© Life Cycle Engineering
Need to Know More
About Optimizing
Shutdowns?
A comprehensive version of this
content is available on our website.
The article, written by recognized
expert Joel Levitt, provides a more
in-depth look into the methods and
techniques reliability experts use
when optimizing shutdowns.
Click to Read the Full Article
For more resources and to learn more about
Life Cycle Engineering visit: www.LCE.com
About Life Cycle Engineering
Life Cycle Engineering (LCE) provides consulting, engineering, applied technology
and education solutions that deliver lasting results for private industry, the
Department of Defense and other government organizations. The quality, expertise
and dedication of our employees enable Life Cycle Engineering to serve as a
trusted resource that helps people and organizations to achieve their full potential.
Founded in 1976, LCE is headquartered in Charleston, South Carolina with offices
across North America and experience around the globe.
To learn more about Life Cycle Engineering visit: www.LCE.com
About the Author
Joel Levitt is the Director of International Projects with Life Cycle Engineering
(LCE). He has over 30 years’ experience in the maintenance field including
process control design, source equipment inspection, electrical expertise, field
service technician, maritime operations, and property management. A recognized
expert training maintenance professionals, Joel has trained more than 15,000
maintenance leaders from 3,000 organizations around the world.

Contenu connexe

En vedette

Introduction to Reliability Excellence
Introduction to Reliability ExcellenceIntroduction to Reliability Excellence
Introduction to Reliability ExcellenceLife Cycle Engineering
 
Shutdown Turnaround and Outage Competency Improvement Program
Shutdown Turnaround and Outage Competency Improvement ProgramShutdown Turnaround and Outage Competency Improvement Program
Shutdown Turnaround and Outage Competency Improvement ProgramLife Cycle Engineering
 
Institute of Asset Management Certificate Workshop
Institute of Asset Management Certificate WorkshopInstitute of Asset Management Certificate Workshop
Institute of Asset Management Certificate WorkshopLife Cycle Engineering
 
ISO 55000: Asset Management System Workshop
ISO 55000: Asset Management System WorkshopISO 55000: Asset Management System Workshop
ISO 55000: Asset Management System WorkshopLife Cycle Engineering
 
Planning for Shutdowns, Turnarounds and Outages Workshop
Planning for Shutdowns, Turnarounds and Outages WorkshopPlanning for Shutdowns, Turnarounds and Outages Workshop
Planning for Shutdowns, Turnarounds and Outages WorkshopLife Cycle Engineering
 
5 Biggest Risks to Effective Asset Management
5 Biggest Risks to Effective Asset Management5 Biggest Risks to Effective Asset Management
5 Biggest Risks to Effective Asset ManagementLife Cycle Engineering
 
Hack Warz® Cyber Attack: A Hands-On Lab for Network Defenders
Hack Warz® Cyber Attack: A Hands-On Lab for Network DefendersHack Warz® Cyber Attack: A Hands-On Lab for Network Defenders
Hack Warz® Cyber Attack: A Hands-On Lab for Network DefendersLife Cycle Engineering
 
Cybersecurity Risk Management Framework Strategy Workshop
Cybersecurity Risk Management Framework Strategy WorkshopCybersecurity Risk Management Framework Strategy Workshop
Cybersecurity Risk Management Framework Strategy WorkshopLife Cycle Engineering
 
Cultura e Gestão de Mudanças: um olhar a partir da complexidade
Cultura e Gestão de Mudanças: um olhar a partir da complexidadeCultura e Gestão de Mudanças: um olhar a partir da complexidade
Cultura e Gestão de Mudanças: um olhar a partir da complexidadeLuciana Annunziata
 
Guia Rápido | Gestão de Mudança - processos, pessoas e produtos
Guia Rápido | Gestão de Mudança - processos, pessoas e produtosGuia Rápido | Gestão de Mudança - processos, pessoas e produtos
Guia Rápido | Gestão de Mudança - processos, pessoas e produtosCompanyWeb
 
PD220 Advanced Turnaround, Shutdown and Outage Management
PD220 Advanced Turnaround, Shutdown and Outage ManagementPD220 Advanced Turnaround, Shutdown and Outage Management
PD220 Advanced Turnaround, Shutdown and Outage ManagementpetroEDGE
 
Change Management Process
Change Management ProcessChange Management Process
Change Management Processgianarosetti
 
Gestão de Mudança | Pessoas, Processos e Produtos
Gestão de Mudança | Pessoas, Processos e ProdutosGestão de Mudança | Pessoas, Processos e Produtos
Gestão de Mudança | Pessoas, Processos e ProdutosCompanyWeb
 

En vedette (16)

Introduction to Reliability Excellence
Introduction to Reliability ExcellenceIntroduction to Reliability Excellence
Introduction to Reliability Excellence
 
Shutdown Turnaround and Outage Competency Improvement Program
Shutdown Turnaround and Outage Competency Improvement ProgramShutdown Turnaround and Outage Competency Improvement Program
Shutdown Turnaround and Outage Competency Improvement Program
 
Institute of Asset Management Certificate Workshop
Institute of Asset Management Certificate WorkshopInstitute of Asset Management Certificate Workshop
Institute of Asset Management Certificate Workshop
 
ISO 55000: Asset Management System Workshop
ISO 55000: Asset Management System WorkshopISO 55000: Asset Management System Workshop
ISO 55000: Asset Management System Workshop
 
Planning for Shutdowns, Turnarounds and Outages Workshop
Planning for Shutdowns, Turnarounds and Outages WorkshopPlanning for Shutdowns, Turnarounds and Outages Workshop
Planning for Shutdowns, Turnarounds and Outages Workshop
 
5 Biggest Risks to Effective Asset Management
5 Biggest Risks to Effective Asset Management5 Biggest Risks to Effective Asset Management
5 Biggest Risks to Effective Asset Management
 
Hack Warz® Cyber Attack: A Hands-On Lab for Network Defenders
Hack Warz® Cyber Attack: A Hands-On Lab for Network DefendersHack Warz® Cyber Attack: A Hands-On Lab for Network Defenders
Hack Warz® Cyber Attack: A Hands-On Lab for Network Defenders
 
Lean Maintenance Training
Lean Maintenance Training Lean Maintenance Training
Lean Maintenance Training
 
Cybersecurity Risk Management Framework Strategy Workshop
Cybersecurity Risk Management Framework Strategy WorkshopCybersecurity Risk Management Framework Strategy Workshop
Cybersecurity Risk Management Framework Strategy Workshop
 
Wrench Time
Wrench TimeWrench Time
Wrench Time
 
Cultura e Gestão de Mudanças: um olhar a partir da complexidade
Cultura e Gestão de Mudanças: um olhar a partir da complexidadeCultura e Gestão de Mudanças: um olhar a partir da complexidade
Cultura e Gestão de Mudanças: um olhar a partir da complexidade
 
Melhoria de Gestao Empresarial
Melhoria de Gestao EmpresarialMelhoria de Gestao Empresarial
Melhoria de Gestao Empresarial
 
Guia Rápido | Gestão de Mudança - processos, pessoas e produtos
Guia Rápido | Gestão de Mudança - processos, pessoas e produtosGuia Rápido | Gestão de Mudança - processos, pessoas e produtos
Guia Rápido | Gestão de Mudança - processos, pessoas e produtos
 
PD220 Advanced Turnaround, Shutdown and Outage Management
PD220 Advanced Turnaround, Shutdown and Outage ManagementPD220 Advanced Turnaround, Shutdown and Outage Management
PD220 Advanced Turnaround, Shutdown and Outage Management
 
Change Management Process
Change Management ProcessChange Management Process
Change Management Process
 
Gestão de Mudança | Pessoas, Processos e Produtos
Gestão de Mudança | Pessoas, Processos e ProdutosGestão de Mudança | Pessoas, Processos e Produtos
Gestão de Mudança | Pessoas, Processos e Produtos
 

Plus de Life Cycle Engineering

LCE Corporate Capabilities Brief-Life Cycle Talent
LCE Corporate Capabilities Brief-Life Cycle TalentLCE Corporate Capabilities Brief-Life Cycle Talent
LCE Corporate Capabilities Brief-Life Cycle TalentLife Cycle Engineering
 
10 Factors that May Affect the Future of Subsea Production
10 Factors that May Affect the Future of Subsea Production10 Factors that May Affect the Future of Subsea Production
10 Factors that May Affect the Future of Subsea ProductionLife Cycle Engineering
 
ISO 55000 for Leaders: Developing an Asset Management Policy
ISO 55000 for Leaders: Developing an Asset Management PolicyISO 55000 for Leaders: Developing an Asset Management Policy
ISO 55000 for Leaders: Developing an Asset Management PolicyLife Cycle Engineering
 
Connecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 FrameworkConnecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 FrameworkLife Cycle Engineering
 
Introduction to Agile Software Development
Introduction to Agile Software DevelopmentIntroduction to Agile Software Development
Introduction to Agile Software DevelopmentLife Cycle Engineering
 

Plus de Life Cycle Engineering (7)

LCE Corporate Capabilities Brief-Life Cycle Talent
LCE Corporate Capabilities Brief-Life Cycle TalentLCE Corporate Capabilities Brief-Life Cycle Talent
LCE Corporate Capabilities Brief-Life Cycle Talent
 
10 Factors that May Affect the Future of Subsea Production
10 Factors that May Affect the Future of Subsea Production10 Factors that May Affect the Future of Subsea Production
10 Factors that May Affect the Future of Subsea Production
 
ISO 55000 for Leaders: Developing an Asset Management Policy
ISO 55000 for Leaders: Developing an Asset Management PolicyISO 55000 for Leaders: Developing an Asset Management Policy
ISO 55000 for Leaders: Developing an Asset Management Policy
 
Connecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 FrameworkConnecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 Framework
 
ISO 55000 Overview
ISO 55000 OverviewISO 55000 Overview
ISO 55000 Overview
 
Introduction to Agile Software Development
Introduction to Agile Software DevelopmentIntroduction to Agile Software Development
Introduction to Agile Software Development
 
Leading a Lean Implementation
Leading a Lean ImplementationLeading a Lean Implementation
Leading a Lean Implementation
 

Dernier

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 

Dernier (20)

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 

Optimizing Shutdowns: 10 Ways to Cut Maintenance Costs the Right Way

  • 1. Optimizing Shutdowns: 10 Ways to Cut Maintenance Costs the Right Way © Life Cycle Engineering
  • 2. Shutdowns and outages consume a lion’s share of both maintenance and capital budgets. © Life Cycle Engineering
  • 3. Until recently the attitude has been “Get it done and we’ll worry about the budget when it’s over.” © Life Cycle Engineering
  • 4. Times have changed. Companies are finding better processes and saving exponentially by planning ahead. © Life Cycle Engineering
  • 5. What are they doing? © Life Cycle Engineering
  • 6. 1. Reducing the number of jobs that are “discovered” after the shutdown starts. © Life Cycle Engineering
  • 7. 2. Eliminating ineffective meeting practices when planning for shutdowns. © Life Cycle Engineering
  • 8. 3. Utilizing project management software to lean up the shutdown process. © Life Cycle Engineering
  • 9. 4. Planning and scheduling before the shutdown begins. © Life Cycle Engineering
  • 10. 5. Reducing the number of over-ordered materials and returning unused inventory. © Life Cycle Engineering
  • 11. 6. Noting explicitly whether there are enough supplies for the entire shutdown. © Life Cycle Engineering
  • 12. 7. Keeping an eye on excessive numbers of rented assets such as cranes, generators, scaffolding, etc. © Life Cycle Engineering
  • 13. 8. Keeping a lookout for resources paid for but not utilized. © Life Cycle Engineering
  • 14. 9. Validating the work list and removing duplications. © Life Cycle Engineering
  • 15. 10. Settling claims with contractors to avoid additional fees and penalties. © Life Cycle Engineering
  • 16. Reducing the fat during shutdowns can provide large payoffs in both time and money. © Life Cycle Engineering
  • 17. Remember, small improvements yield big results. © Life Cycle Engineering
  • 18. Need to Know More About Optimizing Shutdowns? A comprehensive version of this content is available on our website. The article, written by recognized expert Joel Levitt, provides a more in-depth look into the methods and techniques reliability experts use when optimizing shutdowns. Click to Read the Full Article For more resources and to learn more about Life Cycle Engineering visit: www.LCE.com
  • 19. About Life Cycle Engineering Life Cycle Engineering (LCE) provides consulting, engineering, applied technology and education solutions that deliver lasting results for private industry, the Department of Defense and other government organizations. The quality, expertise and dedication of our employees enable Life Cycle Engineering to serve as a trusted resource that helps people and organizations to achieve their full potential. Founded in 1976, LCE is headquartered in Charleston, South Carolina with offices across North America and experience around the globe. To learn more about Life Cycle Engineering visit: www.LCE.com About the Author Joel Levitt is the Director of International Projects with Life Cycle Engineering (LCE). He has over 30 years’ experience in the maintenance field including process control design, source equipment inspection, electrical expertise, field service technician, maritime operations, and property management. A recognized expert training maintenance professionals, Joel has trained more than 15,000 maintenance leaders from 3,000 organizations around the world.