SlideShare a Scribd company logo
1 of 72
Six Sigma
{Quality Management Systems}
VGD@IIPM
SIX SIGMA
 Statistical concept measures a
process in terms of defects (SIX
sigma) level- 3.4  defects per million
opportunities
But, it is much more!
("Delivering Tomorrow's Performance Today“)
VGD@IIPM
VGD@IIPM
Philosophy
 Reduce variation in business and
make customer-focused, data
driven decisions
 Translate customer
needs into operational
measurements
Six Sigma
 Customer first & uses facts and
data to derive better solution
 Target:
•Improving customer satisfaction
•Reducing cycle time
•Reducing defects
VGD@IIPM
Objectives of Six Sigma
 Critical to quality (CTQ): attributes important to customer
 Defect (D): failure to deliver a product/service as required by
customer
 Process Capability (PC): process can deliver the quality
 Variation (V): perception of the customer, how he/she sees
and feels about the quality of the product
 Stable Operations (SO): guarantee a process consistent and
predictable with recued variation
Six Sigma
Methods Production
Design
Service
Purchase
HRM
Administration
Quality
Depart.
Management
M & S
IT
Where can Six Sigma be applied?
3 Sigma Vs. 6 Sigma
3 Sigma Company 6 Sigma Company
• Spends 15-25% of sales dollars on
cost of failure
• Spends 5% of sales dollars on cost of
failure
• Inspection to find defects • don’t produce defects
• Does not have a disciplined approach
to gather and analyze data
• Use Measure, Analyze, Improve,
Control (MAIC) and Measure, Analyze,
Design (MAD)
• Benchmarks against their competition • Benchmarks against the best in the
world
• Believes 99% is good enough • Believes 99% is unacceptable
• Define CTQs internally • Defines CTQs externally
Non-Liner Decrease
2
3
4
5
6
308,537
66,811
6,210
233
3.4
s PPM
Process
Capability
Defects per Million
Opportunities
* Includes 1.5s shift
Focusing on s requires thorough process
understanding and break-through thinking
Focusing on s requires thorough process
understanding and break-through thinking
0
10
20
30
40
50
60
70
80
1 2 3 4 5 6
Process Sigma
%Change
0
100000
200000
300000
400000
500000
600000
700000
800000
PPM
From 1 to 2
From 3 to 4
From 4 to 5
From 5 to 6
% ChangePPM
WHEN SIX SIGMA BE USED?
 Depends on the type of business,
“Processes generate lot of negative (customer)
feedback,
 Customers internal or external, components of
Six Sigma considered to study and rectify
problem.”
Change Management: Two Alternative
Approaches
Activity Centered
Programs
Result Oriented
Programs
Change
Management
Source: Schaffer and Thomson, HBR, Jan-Feb. 1992
μ
σ
What’s in a name?
 Greek letter representing standard deviation of
population of data.
 Measure of variation
(data spread)
Variation
 Process does not produce
same result (“Y”) every time.
 Appear in all processes.
 Directly affects customer
Customers do not feel averages!
-10
-5
0
5
10
15
20
Measuring Process
Performance
(Pizza delivery example. . .)
 Customers want pizza
delivered fast!
 Guarantee = “30 minutes or less”
 Measured performance found an average delivery
time of 23.5 minutes?
 On-time performance is great, right?
 Customers must be happy with us, right?
How often delivering on time?
Answer: Look at
the variation!
 Managing by average doesn’t tell the whole story.
 Average and variation together show what’s
s
x
30 min. or less
0 10 20 30 40 50
Process Improvement Goals
 Companies want to increase Return On
Investment (ROI)
DMAIC
Six-Sigma - A “Roadmap” for improvement
Training (1 week)Training (1 week)
Work on project
(3 weeks)
Work on project
(3 weeks)
ReviewReview
Define
Throughput time projectThroughput time project
4 months (full time)4 months (full time)
Example of a Classic Training strategy
DMAIC?
(Define, Measure, Analyze, Improve, Control)
 Logical and structured approach to
problem solving and process
improvement.
 Iterative process (continuous
improvement)
 Quality tool focus on change management
Implementation of Six Sigma
 Greek letter Sigma σ - Standard deviation.
 Standard deviation: How much variation exists in a set of data, a
group of items, or a process/service.
 Deliver: 68 percent of service on time, process at "2 sigma" level.
 Deliver: 93 percent on time, sounds goods, but operating at only "3
sigma" level of performance.
 99.4 percent on time, operating at "4 sigma" level
 Six Sigma performed service at 99.9997 percent of the time.
VGD@IIPM
Learning from ManufacturingLearning from Manufacturing
Relevance of Six Sigma in Industry
Companies Advantage
Citibank
General
Electric
Wipro Corp.
Cost reduction from 5 to 10
times
$ 400 - 500 million savings
Eight fold gain over the
investment
Other Companies
Allied Signal, Kodak, Motorola, Texas, Cisco /
Telco,
Taj Hotels
Six Sigma in Banks
ICICI
HDFC
• Customer deliveries
• Account opening
• Turnaround time
• Card / Cheque
• Time taken for credit
approval
Difference between Sigma’s
Cases
1. Wrong drug
prescriptions in
Hospitals
2. Unsafe
drinking water
supply by
Water Supply
Board
99.73 (4.2 sigma)
54000/yr
2 hrs/month
99.9997 (6 Sigma)
One/25 yrs
One second / 16
yrs
99.9% is already VERY GOOD
But what could happen at a quality level of 99.9% (i.e., 1000 ppm),
in our everyday lives (about4.6 )?
• More than 3000 newborns accidentally falling
from the hands of nurses or doctors each year
• 4000 wrong medical prescriptions each year
• 400 letters per hour which never arrive at their destination
•
Two long or short landings at American airports each day
How good is good enough?
Six Sigma Levels
 Identified at three levels:
 Metric
 Methodology
 Philosophy
M2P
Six Sigma Metrics
Defects Per Unit (DPU):Total number of defects / total number
of product units
Total Opportunities (TO): Total number of Units X
Opportunities
Defects Per Opportunities (DPO): Total number of defects /
total opportunity
Defects Per Million Opportunities (DPMP):
Metric
 3.4 Defects Per Million Opportunities
(DPMO)
 DPMO allows to take complexity of
product/process into account
 Refers to statistics. The +-6 standard
deviations (sigmas) away from the
standard mean
 Most companies are within 3 standard
deviations of mean
Methodology
 Higher the sigma
value, better
process is
capable of
producing defect
free results.
• Six sigma range must have a quality product
99 . 9999998 % of time.
Six Sigma Companies
Six Themes of Six Sigma
• Genuine Focus on the Customer
• Data and Fact-Driven Management
• Process are where the Action is
• Proactive Management
• Boundaryless Collaboration
• Drive for Perfection
1. Genuine Focus on the Customer
• Understanding reality of customer
• Customer focus is top priority
• "Sigma" improvement developed on customer satisfaction and
value
2. Data and Fact-Driven Management
• Management by fact than opinions and assumptions
• Measures key variable for better performance
3. Process are where the Action is
• Manager to master in process dimension to build competitive
advantage in delivering value to customer
4. Proactive Management
• Acting in advance of events than reacting to it (e.g.,
HACCP)
5. Boundaryless Collaboration
• Break down barriers and improve team work up, down and
across organization
6. Drive for Perfection
• Aim for perfection and tolerate failure
Six Sigma Roles
Define Measure Analyze Improve Control
• Establish
Team Charter
• Identify
Sponsor and
Team
Resources
• Administrator
Pre-Work
• Confirm
Team Goal
• Define
Current
State
• Collect and
Display
Data
• Determine
Process
Capability
and Speed
• Determine
Sources of
Variation and
Time
Bottlenecks
• Generate
Ideas
• Conduct
Experiments
• Create Straw
Models
• Conduct B’s
and C’s
• Develop
Action Plans
• Implement
• Develop
Control Plan
• Monitor
Performance
• Mistake-
Proof
Process
DMAIC Process and Its Tools
{Define phase for formation of project team}
DMADV
{Methodology for new product or
service}
 Define the project
 Measure the opportunity
 Analyze the process
options
 Design the process
 Verify the performance
Six Sigma Roles
 Champion: Business leader rovides overall strategic direction for
Six Sigma project team. Individual serves as liaison between
management and project team; facilitates the acquisition of
resources and support for the project.
 Master Black Belts: Quality leaders responsible for strategy,
training, mentoring and deployment of Six Sigma.
 Black Belts: Six Sigma experts who work projects across the
business.
 Green Belts: Fully-trained individuals work projects in their job.
Definitions and Tools
Six Sigma: Coined by Motorola describe improvement initiatives which express process
capability in parts per million. Process with a sigma level of six generates a maximum
defect probability of 3.4 parts per million.
Champions: Executives and managers with significant overall business responsibility.
Selection of individuals with ultimate responsibility for the business ensures black belts
to support they need to succeed.
Black belt (BB): Process improvement team leader who is trained and certified in Six
Sigma methodology and tools who is responsible for successful project execution.
Master black belt (MBB): An expert in Six Sigma techniques and application. MBBs play
a key role in training and coaching of BBs.
Green belt (GB): Like black belt but not a full-time role.
DMAIC: Acronym describing the phases of a Six Sigma project – define, measure,
analyze, improve and control.
Who are the Players ?
 Consultants (e.g., Six Sigma Academy) did initial training which is all done
internally now.
 Six Sigma Leaders: Champions responsible for selection and monitoring of
projects and delivering support to the belts.
 Master Black Belts (MBBs): Black belts with a minimum of one extra year of
advanced tool learning, business/leadership training, and teaching experience.
 Black Belts (BBs): Professionals who lead major projects
 Green Belts (GBs): Professionals receive fundamental learning's in the six
sigma tools and specify tool training that relate to their project or functional
processes.
TechnicalTechnical
SkillsSkills
SoftSoft
SkillsSkills
StatisticiansStatisticians
MasterMaster
BlackBlack
BeltsBeltsBlackBlack
BeltsBelts
Quality ImprovementQuality Improvement
FacilitatorsFacilitators
BBBBBBBB
MBBMBB
Key Concepts of Six Sigma
• Critical to Quality: Attributes most important to the customer
• Defect: Failure to deliver what the customer wants
• Process Capability: What your process can deliver
• Variation: What the customer sees and feels
• Stable Operations: Ensuring consistent, predictable processes to improve
what the customer sees and feels
• Design for Six Sigma: Designing to meet customer needs and process
capability
Six Sigma Breakthrough Strategy Players for
RBEDS
Six Sigma Title
Executive Team
Champion
Master Black Belt
Black Belt
Green Belt
Leaders of Extension
RPC & Rubber Board Experts
Deputy RPC
Development Officers
Assistant Development Officer
Senior Field Officer / Field
Officer
One champion
per group
One master black
belt for every 30
black belt
Six Sigma Quality?
 Originated at Motorola in early 80’s
 Motorola win the 1988 MBNQA
 Methodology for disciplined quality improvement
 Juran principles apply
 Doesn’t use “Quality” in name
 With the inclusion of Six Sigma into a sound business system,
the major ingredients of a Total Quality Management System are
usually in place
 Uses a modified Deming Wheel (PDCA)
VGD@IIPM
Six Sigma Process Capability
SIGMA DPMO* COPQ** CAPABILITY
6 sigma 3.4 <10% of sales World Class
5 sigma 230 10 to 15% of sales
4 sigma 6200 15 to 20% of sales Industry average
3 sigma 67,000 20 to 30% of sales
2 sigma 310,000 30 to 40% of sales Noncompetitive
1 sigma 700,000
* Defects Per Million Opportunities
** Cost of Poor Quality
Measurement System:
How Do We Arrive At Sigma Level ?
Identify the CTQs
Define Defect
Opportunities
Look for Defects in
Products or Services
Arrive at DPO
Convert DPMO to
Sigma Level
Sigma Level
Defects Per
Million of
Opportunity
2 308,537
3 66,807
4 6,210
5 233
6 3,4
DPMOZ
Refer Sigma
Table
Z
%
Measurement System:
How Do We Arrive At Sigma Level ?
Identify the
CTQs
Points or steps
that effects
Product Quality
Define Defect
Opportunities
CTQs if not
followed will
become
defects
Look for Defects in
Products or
Services
Number of defects
per opportunity
Arrive at DPO
Sigma
= Total No. of
defects
Total Product x Type of
defects
Convert DPMO
to Sigma Level
DPO x
10,00,000
How to Calculate Six Sigma ?
CTQ=Critical to Quality
Measurement System:
How Do We Arrive At Sigma Level ?
Identify the CTQs
• “Critical to Quality”
characteristics or the
Customer Requirements
for a Product or Service
Define Defect
Opportunities
• Any step in the
process where a
Defect could
occur in a CTQ
Look for Defects in
Products or Services
•Count Defects or failures
to meet CTQ
requirements in all
process steps
Arrive at DPO
• Defects Per Million
Opportunities
Convert DPMO to
Sigma Level
•Use the SIGMA
TABLE
Sigma
level
Defects per
Million of
Opportunity
2 308,537
3 66,807
4 6,210
5 233
6 3,4
DPMOZ
VGD@IIPM
Measurement System:
How Do We Arrive At Sigma Level for Improving Film Industry in India
No. of Films = 2000
Identify the CTQs
• Quality of film
• Acceptability of all types
of audience
• Limited no. of films per
year
• Different subjects
• Cost-effective film making
Define Defect
Opportunities
• Promoting violence
(sex & communal
social disturbance)
• Limited audience
• Films on same subject
• High ticket cost
• Unhealthy competition
Look for Defects in
Products or Services
• Promoting violence - 200
• Limited audience - 500
• Films on same subject-250
• High ticket cost -100
• Unhealthy competition-100
Total - 1150
Arrive at DPO
= 1150/2000 * 5
= 1150/10,000
= 0.115
Convert DPMO to
Sigma Level
0.115 * 10,00,000
= 1,15,000
2.75 89 %
%Z
Refer Sigma
Table
Measurement System:
How Do We Arrive At Sigma Level for Transport Service in Bangalore ?
No. of Buses = 2000
Identify the CTQs
• Timeliness
• Comfort
• Safety
• Cost
• Travel Time
Define Defect
Opportunities
• Late arrival
• Crowd
• Rash driving
• Variations in cost
• Improper time
Management
Look for Defects in
Products or Services
• Late arrival - 50
• Crowd - 100
• Rash driving - 15
• Variations in cost- 20
• Improper time - 200
Management
Total - 385
Arrive at DPO
Sigma= 385/2000 * 5
= 385/10,000
= 0.0385
Convert DPMO to
Sigma Level
0.0385 * 10,00,000
= 38,5001.8 38,500 %
Sigma Level
Defects Per
Million of
Opportunity
DPMOZ
VGD@IIPM
• Maturity at harvest e.g.,
Gladiolus (1-5 buds showing
colour)
• Care at transportation
• Storage at cool temperature (5-
120
c)
• Water balance (time between
harvesting & place in the water)
Measurement System:
How Do We Arrive At Sigma Level for Floriculture Export ?
Total cut flower = 10,000/day
Identify the CTQs
Define Defect
Opportunities
• Less freshness or
failure to bloom
• Physical damages
• Low storage life
• Wilt
Look for Defects in
Products or Services
• Less freshness - 200
• Physical damages - 400
• Low storage life - 300
• Wilt - 200
--------
1100
--------
Arrive at DPO
Sigma
= 1100 = 0.0275
4 x 10000
Convert to DPMO
0.0275 x 10,00,000
= 27,500
Refer Sigma Table
96.96 3.375
Z %
VGD@IIPM
Measurement System:
How Do We Arrive at Sigma Level for Rubber Producer’s Society?
Total growers = 120
Total No. of sheets = 12,000
Identify the CTQs
• Frequent washing of
utensils with formalin or
lysol
• Avoid prolonged dripping
of wet sheet before smoke
• Use of exact quantity of
sodium bisulphide
• High temperature in
smoke house
Define Defect
Opportunities
• Inadequate washing leads
to pinhead bubbles
• Prolonged dripping leads to
rust formation
• Storing in humid
atmosphere or concrete
floor leads to mould growth
• Excessive use of sodium
bisulphide
• High temperature in smoke
house
Look for Defects in Products
or Services
.Inadequate washing - 15
.Prolonged dripping - 10
.Stored in humid - 25
atmosphere
.Excessive use of sodium - 25
bisulphide
.High temperature -10
in smoke house
Total = 85
Arrive at DPO
Sigma
= 15+10+25+25+10 = 85
12,000x5 60000
=0.0014
Convert DPMO to
Sigma Level
= 0.0014 x 10,00,000
= 1416.6
4.5 99.87
Refer Sigma Table
Z %
B.N. The overall sigma percentage is 99.87. Refer sigma column on the Table no. 1 to identify the level of six
sigma (i.e., Z value). For example, level of six sigma for 99.87 is 4.5.
VGD@IIPM
Measurement System:
How Do We Arrive At Sigma Level by PGDM-ABPM students
VGD@IIPM
VGD@IIPM
Six Sigma for IIPM Housekeeping Services
Define
Measure
Analysis
Improve
Control
Figure out what a defect would be
• Leaving streaks on the window
• Not cleaning the doors/window properly
Find out why, how & how often this defects occur
• Less time given for cleaning doors, window, floor (8.30
a.m. to 9.30 a.m.)
• Workers are not very effective
Time taken and efficiency of each worker was measured
• Identify particular employee is better at cleaning
Better employee’s working process was taken as standard
Company teaches new employees the correct techniques
to wash the windows
The Six Sigma Players...
High Level Roll-Out Guidelines
Phase One
Phase Two
Phase Three
Phase Four
Phase Five
Phase Six
Business units select champions and Master black
belts. The number identified depends on the
business priorities, but the rule of thumb is 1
champion per business group and 1 master black
belt for every 30 black belts.
Champions and master black belts are trained in
six sigma breakthrough strategy. A deployment
plan is developed and presented by each business
group.
Champions and master black belts identify the first
“wave” of projects, and select black belts and
cross-functional teams.
Master black belts receive additional training.
They are “trained to train” black belts and others
who will be applying the breakthrough strategy.
Black belts begin training and the first wave of
projects is launched.
Experienced black belts being training green belts.
General
Awareness
Training and
Communica-
tion
CHAMPIONS
Create the vision of six sigma for the company
Define the path to implement six sigma across
the organization
Develop a comprehensive training plan for
implementing the breakthrough strategy
Carefully select high-impact projects
Support development of ‘statistical thinking’
Ask black belts many questions to ensure that
they are properly focused
Realize the gains by supporting six sigma
projects through allocation of resources and
removal of roadblocks
Hold the ground by implementing black belt
recommendations
Make sure that project opportunities are acted
upon by the organization’s leadership and the
finance department
Recognize people for their efforts
Champion training is one week
MASTER BLACK BELTS
Understand the big business picture
Partner with the champions
Get certified as master black belts
Develop and deliver training to various
levels of the organization
Assist in the identification of projects
Coach and support black belts in project
work
Participate in project reviews to offer
technical expertise
Help train and certify black belts
Take on leadership of major programs
Facilitate sharing of best practices across
the corporation
Master black belt training consists of two
one-week sessions
The Roles of Six Sigma Breakthrough Strategy Players
BLACK BELTS
Act as breakthrough strategy experts and be
breakthrough strategy enthusiasts
Stimulate champion thinking
Identify the barriers
Lead and direct teams in project execution
Report progress to appropriate leadership
levels
Solicit help from champions when needed
Influence without direct authority
Determine the most effective tools to apply
Prepare a detailed project assessment
during the measurement phase
Get input from knowledgeable operators,
first-line supervisors, and team leaders
Teach and coach breakthrough strategy
methods and tools
Manage project risk
Ensure that the results are sustained.
GREEN BELTS
Function as green belts on a part-time
basis, while performing their regular duties
Participate on black belt project teams in
the context of their existing
responsibilities
Learn the six sigma methodology as it
applies to a particular project
Continue to learn and practice the six
sigma methods and tools after project
completion
Green belt training consists of two three-
day sessions with three weeks in between.
The Roles of Six Sigma Breakthrough Strategy Players
Black Belts Perform the Following Tasks
Mentor
Teach
Coach
Transfer
Discover
Identify
Influence
Cultivate a network of six sigma individuals
at the local organization or site
Provide formal training of local personnel in
new strategies and tools
Provide one-to-one support to local
personnel
Pass on new strategies and tools in the form
of training, workshops, case studies, and
local symposia
Find application opportunities for six sigma
strategies and tools, both internal and
external (e.g., suppliers and customers)
Highlight/surface business opportunities
through partnerships with other
organizations
Sell the organization on the use of six sigma
Summary
 Process methodology focus on quantitatively
measuring a process in order to control and
improve upon it
 Strives for 3.4 Defects Per Million
Opportunities (DPMO) within six standard
deviations of mean
What is Six Sigma Quality?
 Goal is near elimination of defects from any process,
product, or service.
 Numerical goal 3.467 defects per million opportunities.
 Juran once concluded that in the US, close to 1/3 of the
work done consisted of redoing what had already been
done.
 Depending on the industry, ost of Poor Quality (COPQ)
could be 20 to 40% of total effort!
Six Sigma
 Improvement projects integrated with the goals of the organization.
 “divide and conquer” approach as opposed to Continuous Process
Improvement.
 Implementation is top-down.
 Uses concept of “belts” for levels of competency in Six Sigma
implementation:
 MBB = Master Black Belt
 BB = Black Belt
 GB = Green Belt
Strategy includes:
Define
Measure
Analyze
Improve
Control
Importance of Six Sigma
Focus on improving productivity and quality by
reducing impact of “Hidden Factor” leads to high
Cost of Poor Quality (COPQ).
Statistical and quality tool to increase capacity,
reduce cost and improve yields without spending
significant capital.
2 Sigma Level Service Efficiency
AfterBefore
AfterBefore
4 Sigma Level Service Efficiency
AfterBefore
Six Sigma Breakthrough Strategy Players for
RBEDS
Six Sigma Title
Executive Team
Champion
Master Black Belt
Black Belt
Green Belt
Leaders of Extension
RPC & Rubber Board Experts
Deputy RPC
Development Officers
Assistant Development Officer
Senior Field Officer / Field
Officer
One champion per
group
One master black
belt for every 30
black belt
Six sigma

More Related Content

What's hot

Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
vivekissar
 
Presentation introduction to six sigma
Presentation   introduction to six sigmaPresentation   introduction to six sigma
Presentation introduction to six sigma
jpanchpor
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
ANOOPA NARAYANAN
 
Basic quality concept
Basic quality conceptBasic quality concept
Basic quality concept
Jason Chong
 

What's hot (20)

Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
Presentation introduction to six sigma
Presentation   introduction to six sigmaPresentation   introduction to six sigma
Presentation introduction to six sigma
 
7 tools of quality
7 tools of quality7 tools of quality
7 tools of quality
 
Introduction to six sigma
Introduction to six sigmaIntroduction to six sigma
Introduction to six sigma
 
Qms
QmsQms
Qms
 
Quality control
Quality controlQuality control
Quality control
 
Statistical process control (spc)
Statistical process control (spc)Statistical process control (spc)
Statistical process control (spc)
 
6 sigma
6 sigma6 sigma
6 sigma
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
PDCA Cycle
PDCA CyclePDCA Cycle
PDCA Cycle
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
 
Spc
SpcSpc
Spc
 
statistical process control
 statistical process control statistical process control
statistical process control
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Basic quality concept
Basic quality conceptBasic quality concept
Basic quality concept
 
Lean 6 sigma
Lean 6 sigmaLean 6 sigma
Lean 6 sigma
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
ISO 9000
ISO 9000ISO 9000
ISO 9000
 
Total quality management
Total quality managementTotal quality management
Total quality management
 

Similar to Six sigma

Six Sigma Final
Six Sigma FinalSix Sigma Final
Six Sigma Final
anubhuti10
 
6-sigma-green-belt-introduction-english.ppt
6-sigma-green-belt-introduction-english.ppt6-sigma-green-belt-introduction-english.ppt
6-sigma-green-belt-introduction-english.ppt
1608Lotus
 

Similar to Six sigma (20)

Don Carlson
Don CarlsonDon Carlson
Don Carlson
 
Six Sigma Final
Six Sigma FinalSix Sigma Final
Six Sigma Final
 
6-sigma.ppt
6-sigma.ppt6-sigma.ppt
6-sigma.ppt
 
6-sigma.ppt
6-sigma.ppt6-sigma.ppt
6-sigma.ppt
 
Six Sigma Way
Six Sigma Way Six Sigma Way
Six Sigma Way
 
Six Sigma.pptx
Six Sigma.pptxSix Sigma.pptx
Six Sigma.pptx
 
Six sigma
Six sigmaSix sigma
Six sigma
 
VTU Syllabus, MBA TQM, Module 8
VTU Syllabus, MBA TQM, Module 8VTU Syllabus, MBA TQM, Module 8
VTU Syllabus, MBA TQM, Module 8
 
Six Sigma
Six Sigma Six Sigma
Six Sigma
 
sixsigma-
sixsigma-sixsigma-
sixsigma-
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six sigma - pimg
Six sigma - pimgSix sigma - pimg
Six sigma - pimg
 
Basic overview six sigma
Basic overview six sigmaBasic overview six sigma
Basic overview six sigma
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Continuous improvement 6 sigma
Continuous improvement 6 sigmaContinuous improvement 6 sigma
Continuous improvement 6 sigma
 
Chapter 4 six sigma
Chapter 4 six sigmaChapter 4 six sigma
Chapter 4 six sigma
 
6 sigma
6 sigma6 sigma
6 sigma
 
six sigma
six sigmasix sigma
six sigma
 
TQM - Six sigma - FINAL YEAR ECE - SRI SAIRAM INSTITUTE OF TECHNOLOGY, CHENNA...
TQM - Six sigma - FINAL YEAR ECE - SRI SAIRAM INSTITUTE OF TECHNOLOGY, CHENNA...TQM - Six sigma - FINAL YEAR ECE - SRI SAIRAM INSTITUTE OF TECHNOLOGY, CHENNA...
TQM - Six sigma - FINAL YEAR ECE - SRI SAIRAM INSTITUTE OF TECHNOLOGY, CHENNA...
 
6-sigma-green-belt-introduction-english.ppt
6-sigma-green-belt-introduction-english.ppt6-sigma-green-belt-introduction-english.ppt
6-sigma-green-belt-introduction-english.ppt
 

More from MD SALMAN ANJUM

Competence ,capability & capacity
Competence ,capability & capacityCompetence ,capability & capacity
Competence ,capability & capacity
MD SALMAN ANJUM
 

More from MD SALMAN ANJUM (20)

Nutritious biscuit : Ragi Biscuits
Nutritious biscuit : Ragi BiscuitsNutritious biscuit : Ragi Biscuits
Nutritious biscuit : Ragi Biscuits
 
Jeevan jyoti : Health Loan MFI Product
Jeevan jyoti : Health Loan MFI ProductJeevan jyoti : Health Loan MFI Product
Jeevan jyoti : Health Loan MFI Product
 
Summer Internship Presentation by Salman
Summer Internship Presentation by SalmanSummer Internship Presentation by Salman
Summer Internship Presentation by Salman
 
Wine - ENOLOGY
Wine - ENOLOGY Wine - ENOLOGY
Wine - ENOLOGY
 
Commodity profile of coffee
Commodity profile of coffeeCommodity profile of coffee
Commodity profile of coffee
 
Enology - Wine
Enology - WineEnology - Wine
Enology - Wine
 
Rubber Manufacturing
Rubber ManufacturingRubber Manufacturing
Rubber Manufacturing
 
Processed food
Processed foodProcessed food
Processed food
 
Candle stick for Online Trading
Candle stick  for Online TradingCandle stick  for Online Trading
Candle stick for Online Trading
 
Food parks
Food parks Food parks
Food parks
 
Food packaging
Food packagingFood packaging
Food packaging
 
Farmers buying behavior towards maize hybrid
Farmers buying behavior towards maize hybridFarmers buying behavior towards maize hybrid
Farmers buying behavior towards maize hybrid
 
Energy management
Energy management Energy management
Energy management
 
Internship Project Report Part 2
Internship Project Report Part 2Internship Project Report Part 2
Internship Project Report Part 2
 
Rural market structure
Rural market structureRural market structure
Rural market structure
 
Rural marketing issues, opportunity and challenges
Rural marketing issues, opportunity and challengesRural marketing issues, opportunity and challenges
Rural marketing issues, opportunity and challenges
 
Rural livelihoods
Rural livelihoodsRural livelihoods
Rural livelihoods
 
Labour and trade
Labour and tradeLabour and trade
Labour and trade
 
Emerging rural marketing
Emerging rural marketingEmerging rural marketing
Emerging rural marketing
 
Competence ,capability & capacity
Competence ,capability & capacityCompetence ,capability & capacity
Competence ,capability & capacity
 

Recently uploaded

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 

Recently uploaded (20)

HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 

Six sigma

  • 3. SIX SIGMA  Statistical concept measures a process in terms of defects (SIX sigma) level- 3.4  defects per million opportunities But, it is much more! ("Delivering Tomorrow's Performance Today“)
  • 5. VGD@IIPM Philosophy  Reduce variation in business and make customer-focused, data driven decisions  Translate customer needs into operational measurements
  • 6. Six Sigma  Customer first & uses facts and data to derive better solution  Target: •Improving customer satisfaction •Reducing cycle time •Reducing defects
  • 8.
  • 9. Objectives of Six Sigma  Critical to quality (CTQ): attributes important to customer  Defect (D): failure to deliver a product/service as required by customer  Process Capability (PC): process can deliver the quality  Variation (V): perception of the customer, how he/she sees and feels about the quality of the product  Stable Operations (SO): guarantee a process consistent and predictable with recued variation
  • 11. 3 Sigma Vs. 6 Sigma 3 Sigma Company 6 Sigma Company • Spends 15-25% of sales dollars on cost of failure • Spends 5% of sales dollars on cost of failure • Inspection to find defects • don’t produce defects • Does not have a disciplined approach to gather and analyze data • Use Measure, Analyze, Improve, Control (MAIC) and Measure, Analyze, Design (MAD) • Benchmarks against their competition • Benchmarks against the best in the world • Believes 99% is good enough • Believes 99% is unacceptable • Define CTQs internally • Defines CTQs externally
  • 12. Non-Liner Decrease 2 3 4 5 6 308,537 66,811 6,210 233 3.4 s PPM Process Capability Defects per Million Opportunities * Includes 1.5s shift Focusing on s requires thorough process understanding and break-through thinking Focusing on s requires thorough process understanding and break-through thinking 0 10 20 30 40 50 60 70 80 1 2 3 4 5 6 Process Sigma %Change 0 100000 200000 300000 400000 500000 600000 700000 800000 PPM From 1 to 2 From 3 to 4 From 4 to 5 From 5 to 6 % ChangePPM
  • 13. WHEN SIX SIGMA BE USED?  Depends on the type of business, “Processes generate lot of negative (customer) feedback,  Customers internal or external, components of Six Sigma considered to study and rectify problem.”
  • 14. Change Management: Two Alternative Approaches Activity Centered Programs Result Oriented Programs Change Management Source: Schaffer and Thomson, HBR, Jan-Feb. 1992
  • 15. μ σ What’s in a name?  Greek letter representing standard deviation of population of data.  Measure of variation (data spread)
  • 16. Variation  Process does not produce same result (“Y”) every time.  Appear in all processes.  Directly affects customer Customers do not feel averages! -10 -5 0 5 10 15 20
  • 17. Measuring Process Performance (Pizza delivery example. . .)  Customers want pizza delivered fast!  Guarantee = “30 minutes or less”  Measured performance found an average delivery time of 23.5 minutes?  On-time performance is great, right?  Customers must be happy with us, right?
  • 18. How often delivering on time? Answer: Look at the variation!  Managing by average doesn’t tell the whole story.  Average and variation together show what’s s x 30 min. or less 0 10 20 30 40 50
  • 19. Process Improvement Goals  Companies want to increase Return On Investment (ROI)
  • 20.
  • 21. DMAIC Six-Sigma - A “Roadmap” for improvement
  • 22. Training (1 week)Training (1 week) Work on project (3 weeks) Work on project (3 weeks) ReviewReview Define Throughput time projectThroughput time project 4 months (full time)4 months (full time) Example of a Classic Training strategy
  • 23. DMAIC? (Define, Measure, Analyze, Improve, Control)  Logical and structured approach to problem solving and process improvement.  Iterative process (continuous improvement)  Quality tool focus on change management
  • 24. Implementation of Six Sigma  Greek letter Sigma σ - Standard deviation.  Standard deviation: How much variation exists in a set of data, a group of items, or a process/service.  Deliver: 68 percent of service on time, process at "2 sigma" level.  Deliver: 93 percent on time, sounds goods, but operating at only "3 sigma" level of performance.  99.4 percent on time, operating at "4 sigma" level  Six Sigma performed service at 99.9997 percent of the time.
  • 26. Relevance of Six Sigma in Industry Companies Advantage Citibank General Electric Wipro Corp. Cost reduction from 5 to 10 times $ 400 - 500 million savings Eight fold gain over the investment Other Companies Allied Signal, Kodak, Motorola, Texas, Cisco / Telco, Taj Hotels
  • 27. Six Sigma in Banks ICICI HDFC • Customer deliveries • Account opening • Turnaround time • Card / Cheque • Time taken for credit approval
  • 28. Difference between Sigma’s Cases 1. Wrong drug prescriptions in Hospitals 2. Unsafe drinking water supply by Water Supply Board 99.73 (4.2 sigma) 54000/yr 2 hrs/month 99.9997 (6 Sigma) One/25 yrs One second / 16 yrs
  • 29. 99.9% is already VERY GOOD But what could happen at a quality level of 99.9% (i.e., 1000 ppm), in our everyday lives (about4.6 )? • More than 3000 newborns accidentally falling from the hands of nurses or doctors each year • 4000 wrong medical prescriptions each year • 400 letters per hour which never arrive at their destination • Two long or short landings at American airports each day How good is good enough?
  • 30. Six Sigma Levels  Identified at three levels:  Metric  Methodology  Philosophy M2P
  • 31. Six Sigma Metrics Defects Per Unit (DPU):Total number of defects / total number of product units Total Opportunities (TO): Total number of Units X Opportunities Defects Per Opportunities (DPO): Total number of defects / total opportunity Defects Per Million Opportunities (DPMP):
  • 32. Metric  3.4 Defects Per Million Opportunities (DPMO)  DPMO allows to take complexity of product/process into account  Refers to statistics. The +-6 standard deviations (sigmas) away from the standard mean  Most companies are within 3 standard deviations of mean
  • 33. Methodology  Higher the sigma value, better process is capable of producing defect free results. • Six sigma range must have a quality product 99 . 9999998 % of time.
  • 35. Six Themes of Six Sigma • Genuine Focus on the Customer • Data and Fact-Driven Management • Process are where the Action is • Proactive Management • Boundaryless Collaboration • Drive for Perfection
  • 36. 1. Genuine Focus on the Customer • Understanding reality of customer • Customer focus is top priority • "Sigma" improvement developed on customer satisfaction and value 2. Data and Fact-Driven Management • Management by fact than opinions and assumptions • Measures key variable for better performance 3. Process are where the Action is • Manager to master in process dimension to build competitive advantage in delivering value to customer
  • 37. 4. Proactive Management • Acting in advance of events than reacting to it (e.g., HACCP) 5. Boundaryless Collaboration • Break down barriers and improve team work up, down and across organization 6. Drive for Perfection • Aim for perfection and tolerate failure
  • 39. Define Measure Analyze Improve Control • Establish Team Charter • Identify Sponsor and Team Resources • Administrator Pre-Work • Confirm Team Goal • Define Current State • Collect and Display Data • Determine Process Capability and Speed • Determine Sources of Variation and Time Bottlenecks • Generate Ideas • Conduct Experiments • Create Straw Models • Conduct B’s and C’s • Develop Action Plans • Implement • Develop Control Plan • Monitor Performance • Mistake- Proof Process DMAIC Process and Its Tools {Define phase for formation of project team}
  • 40. DMADV {Methodology for new product or service}  Define the project  Measure the opportunity  Analyze the process options  Design the process  Verify the performance
  • 41. Six Sigma Roles  Champion: Business leader rovides overall strategic direction for Six Sigma project team. Individual serves as liaison between management and project team; facilitates the acquisition of resources and support for the project.  Master Black Belts: Quality leaders responsible for strategy, training, mentoring and deployment of Six Sigma.  Black Belts: Six Sigma experts who work projects across the business.  Green Belts: Fully-trained individuals work projects in their job.
  • 42. Definitions and Tools Six Sigma: Coined by Motorola describe improvement initiatives which express process capability in parts per million. Process with a sigma level of six generates a maximum defect probability of 3.4 parts per million. Champions: Executives and managers with significant overall business responsibility. Selection of individuals with ultimate responsibility for the business ensures black belts to support they need to succeed. Black belt (BB): Process improvement team leader who is trained and certified in Six Sigma methodology and tools who is responsible for successful project execution. Master black belt (MBB): An expert in Six Sigma techniques and application. MBBs play a key role in training and coaching of BBs. Green belt (GB): Like black belt but not a full-time role. DMAIC: Acronym describing the phases of a Six Sigma project – define, measure, analyze, improve and control.
  • 43. Who are the Players ?  Consultants (e.g., Six Sigma Academy) did initial training which is all done internally now.  Six Sigma Leaders: Champions responsible for selection and monitoring of projects and delivering support to the belts.  Master Black Belts (MBBs): Black belts with a minimum of one extra year of advanced tool learning, business/leadership training, and teaching experience.  Black Belts (BBs): Professionals who lead major projects  Green Belts (GBs): Professionals receive fundamental learning's in the six sigma tools and specify tool training that relate to their project or functional processes.
  • 45. Key Concepts of Six Sigma • Critical to Quality: Attributes most important to the customer • Defect: Failure to deliver what the customer wants • Process Capability: What your process can deliver • Variation: What the customer sees and feels • Stable Operations: Ensuring consistent, predictable processes to improve what the customer sees and feels • Design for Six Sigma: Designing to meet customer needs and process capability
  • 46. Six Sigma Breakthrough Strategy Players for RBEDS Six Sigma Title Executive Team Champion Master Black Belt Black Belt Green Belt Leaders of Extension RPC & Rubber Board Experts Deputy RPC Development Officers Assistant Development Officer Senior Field Officer / Field Officer One champion per group One master black belt for every 30 black belt
  • 47. Six Sigma Quality?  Originated at Motorola in early 80’s  Motorola win the 1988 MBNQA  Methodology for disciplined quality improvement  Juran principles apply  Doesn’t use “Quality” in name  With the inclusion of Six Sigma into a sound business system, the major ingredients of a Total Quality Management System are usually in place  Uses a modified Deming Wheel (PDCA)
  • 49. Six Sigma Process Capability SIGMA DPMO* COPQ** CAPABILITY 6 sigma 3.4 <10% of sales World Class 5 sigma 230 10 to 15% of sales 4 sigma 6200 15 to 20% of sales Industry average 3 sigma 67,000 20 to 30% of sales 2 sigma 310,000 30 to 40% of sales Noncompetitive 1 sigma 700,000 * Defects Per Million Opportunities ** Cost of Poor Quality
  • 50. Measurement System: How Do We Arrive At Sigma Level ? Identify the CTQs Define Defect Opportunities Look for Defects in Products or Services Arrive at DPO Convert DPMO to Sigma Level Sigma Level Defects Per Million of Opportunity 2 308,537 3 66,807 4 6,210 5 233 6 3,4 DPMOZ
  • 51. Refer Sigma Table Z % Measurement System: How Do We Arrive At Sigma Level ? Identify the CTQs Points or steps that effects Product Quality Define Defect Opportunities CTQs if not followed will become defects Look for Defects in Products or Services Number of defects per opportunity Arrive at DPO Sigma = Total No. of defects Total Product x Type of defects Convert DPMO to Sigma Level DPO x 10,00,000 How to Calculate Six Sigma ? CTQ=Critical to Quality
  • 52. Measurement System: How Do We Arrive At Sigma Level ? Identify the CTQs • “Critical to Quality” characteristics or the Customer Requirements for a Product or Service Define Defect Opportunities • Any step in the process where a Defect could occur in a CTQ Look for Defects in Products or Services •Count Defects or failures to meet CTQ requirements in all process steps Arrive at DPO • Defects Per Million Opportunities Convert DPMO to Sigma Level •Use the SIGMA TABLE Sigma level Defects per Million of Opportunity 2 308,537 3 66,807 4 6,210 5 233 6 3,4 DPMOZ
  • 53. VGD@IIPM Measurement System: How Do We Arrive At Sigma Level for Improving Film Industry in India No. of Films = 2000 Identify the CTQs • Quality of film • Acceptability of all types of audience • Limited no. of films per year • Different subjects • Cost-effective film making Define Defect Opportunities • Promoting violence (sex & communal social disturbance) • Limited audience • Films on same subject • High ticket cost • Unhealthy competition Look for Defects in Products or Services • Promoting violence - 200 • Limited audience - 500 • Films on same subject-250 • High ticket cost -100 • Unhealthy competition-100 Total - 1150 Arrive at DPO = 1150/2000 * 5 = 1150/10,000 = 0.115 Convert DPMO to Sigma Level 0.115 * 10,00,000 = 1,15,000 2.75 89 % %Z Refer Sigma Table
  • 54. Measurement System: How Do We Arrive At Sigma Level for Transport Service in Bangalore ? No. of Buses = 2000 Identify the CTQs • Timeliness • Comfort • Safety • Cost • Travel Time Define Defect Opportunities • Late arrival • Crowd • Rash driving • Variations in cost • Improper time Management Look for Defects in Products or Services • Late arrival - 50 • Crowd - 100 • Rash driving - 15 • Variations in cost- 20 • Improper time - 200 Management Total - 385 Arrive at DPO Sigma= 385/2000 * 5 = 385/10,000 = 0.0385 Convert DPMO to Sigma Level 0.0385 * 10,00,000 = 38,5001.8 38,500 % Sigma Level Defects Per Million of Opportunity DPMOZ
  • 55. VGD@IIPM • Maturity at harvest e.g., Gladiolus (1-5 buds showing colour) • Care at transportation • Storage at cool temperature (5- 120 c) • Water balance (time between harvesting & place in the water) Measurement System: How Do We Arrive At Sigma Level for Floriculture Export ? Total cut flower = 10,000/day Identify the CTQs Define Defect Opportunities • Less freshness or failure to bloom • Physical damages • Low storage life • Wilt Look for Defects in Products or Services • Less freshness - 200 • Physical damages - 400 • Low storage life - 300 • Wilt - 200 -------- 1100 -------- Arrive at DPO Sigma = 1100 = 0.0275 4 x 10000 Convert to DPMO 0.0275 x 10,00,000 = 27,500 Refer Sigma Table 96.96 3.375 Z %
  • 56. VGD@IIPM Measurement System: How Do We Arrive at Sigma Level for Rubber Producer’s Society? Total growers = 120 Total No. of sheets = 12,000 Identify the CTQs • Frequent washing of utensils with formalin or lysol • Avoid prolonged dripping of wet sheet before smoke • Use of exact quantity of sodium bisulphide • High temperature in smoke house Define Defect Opportunities • Inadequate washing leads to pinhead bubbles • Prolonged dripping leads to rust formation • Storing in humid atmosphere or concrete floor leads to mould growth • Excessive use of sodium bisulphide • High temperature in smoke house Look for Defects in Products or Services .Inadequate washing - 15 .Prolonged dripping - 10 .Stored in humid - 25 atmosphere .Excessive use of sodium - 25 bisulphide .High temperature -10 in smoke house Total = 85 Arrive at DPO Sigma = 15+10+25+25+10 = 85 12,000x5 60000 =0.0014 Convert DPMO to Sigma Level = 0.0014 x 10,00,000 = 1416.6 4.5 99.87 Refer Sigma Table Z % B.N. The overall sigma percentage is 99.87. Refer sigma column on the Table no. 1 to identify the level of six sigma (i.e., Z value). For example, level of six sigma for 99.87 is 4.5.
  • 57. VGD@IIPM Measurement System: How Do We Arrive At Sigma Level by PGDM-ABPM students
  • 60. Six Sigma for IIPM Housekeeping Services Define Measure Analysis Improve Control Figure out what a defect would be • Leaving streaks on the window • Not cleaning the doors/window properly Find out why, how & how often this defects occur • Less time given for cleaning doors, window, floor (8.30 a.m. to 9.30 a.m.) • Workers are not very effective Time taken and efficiency of each worker was measured • Identify particular employee is better at cleaning Better employee’s working process was taken as standard Company teaches new employees the correct techniques to wash the windows
  • 61. The Six Sigma Players... High Level Roll-Out Guidelines Phase One Phase Two Phase Three Phase Four Phase Five Phase Six Business units select champions and Master black belts. The number identified depends on the business priorities, but the rule of thumb is 1 champion per business group and 1 master black belt for every 30 black belts. Champions and master black belts are trained in six sigma breakthrough strategy. A deployment plan is developed and presented by each business group. Champions and master black belts identify the first “wave” of projects, and select black belts and cross-functional teams. Master black belts receive additional training. They are “trained to train” black belts and others who will be applying the breakthrough strategy. Black belts begin training and the first wave of projects is launched. Experienced black belts being training green belts. General Awareness Training and Communica- tion
  • 62. CHAMPIONS Create the vision of six sigma for the company Define the path to implement six sigma across the organization Develop a comprehensive training plan for implementing the breakthrough strategy Carefully select high-impact projects Support development of ‘statistical thinking’ Ask black belts many questions to ensure that they are properly focused Realize the gains by supporting six sigma projects through allocation of resources and removal of roadblocks Hold the ground by implementing black belt recommendations Make sure that project opportunities are acted upon by the organization’s leadership and the finance department Recognize people for their efforts Champion training is one week MASTER BLACK BELTS Understand the big business picture Partner with the champions Get certified as master black belts Develop and deliver training to various levels of the organization Assist in the identification of projects Coach and support black belts in project work Participate in project reviews to offer technical expertise Help train and certify black belts Take on leadership of major programs Facilitate sharing of best practices across the corporation Master black belt training consists of two one-week sessions The Roles of Six Sigma Breakthrough Strategy Players
  • 63. BLACK BELTS Act as breakthrough strategy experts and be breakthrough strategy enthusiasts Stimulate champion thinking Identify the barriers Lead and direct teams in project execution Report progress to appropriate leadership levels Solicit help from champions when needed Influence without direct authority Determine the most effective tools to apply Prepare a detailed project assessment during the measurement phase Get input from knowledgeable operators, first-line supervisors, and team leaders Teach and coach breakthrough strategy methods and tools Manage project risk Ensure that the results are sustained. GREEN BELTS Function as green belts on a part-time basis, while performing their regular duties Participate on black belt project teams in the context of their existing responsibilities Learn the six sigma methodology as it applies to a particular project Continue to learn and practice the six sigma methods and tools after project completion Green belt training consists of two three- day sessions with three weeks in between. The Roles of Six Sigma Breakthrough Strategy Players
  • 64. Black Belts Perform the Following Tasks Mentor Teach Coach Transfer Discover Identify Influence Cultivate a network of six sigma individuals at the local organization or site Provide formal training of local personnel in new strategies and tools Provide one-to-one support to local personnel Pass on new strategies and tools in the form of training, workshops, case studies, and local symposia Find application opportunities for six sigma strategies and tools, both internal and external (e.g., suppliers and customers) Highlight/surface business opportunities through partnerships with other organizations Sell the organization on the use of six sigma
  • 65. Summary  Process methodology focus on quantitatively measuring a process in order to control and improve upon it  Strives for 3.4 Defects Per Million Opportunities (DPMO) within six standard deviations of mean
  • 66. What is Six Sigma Quality?  Goal is near elimination of defects from any process, product, or service.  Numerical goal 3.467 defects per million opportunities.  Juran once concluded that in the US, close to 1/3 of the work done consisted of redoing what had already been done.  Depending on the industry, ost of Poor Quality (COPQ) could be 20 to 40% of total effort!
  • 67.
  • 68. Six Sigma  Improvement projects integrated with the goals of the organization.  “divide and conquer” approach as opposed to Continuous Process Improvement.  Implementation is top-down.  Uses concept of “belts” for levels of competency in Six Sigma implementation:  MBB = Master Black Belt  BB = Black Belt  GB = Green Belt Strategy includes: Define Measure Analyze Improve Control
  • 69. Importance of Six Sigma Focus on improving productivity and quality by reducing impact of “Hidden Factor” leads to high Cost of Poor Quality (COPQ). Statistical and quality tool to increase capacity, reduce cost and improve yields without spending significant capital.
  • 70. 2 Sigma Level Service Efficiency AfterBefore AfterBefore 4 Sigma Level Service Efficiency AfterBefore
  • 71. Six Sigma Breakthrough Strategy Players for RBEDS Six Sigma Title Executive Team Champion Master Black Belt Black Belt Green Belt Leaders of Extension RPC & Rubber Board Experts Deputy RPC Development Officers Assistant Development Officer Senior Field Officer / Field Officer One champion per group One master black belt for every 30 black belt

Editor's Notes

  1. Six Sigma is a methodology that provides businesses with the tools to improve the capability of their business processes. This increase in performance and decrease in process variation leads to defect reduction and vast improvement in profits, employee morale and quality of product.
  2. Data is key here. Six Sigma has it’s foundation in Statistics and measurements
  3. Lean has traditionally focused on cycle time reduction, inventory reduction, reduction of floor space, by the elimination of the 7 hidden wastes. Six Sigma has traditionally focuses on variance reduction (the elimination of “noise factors”) to improve quality. The goal of both is to produce a financial benefit.
  4. Define process goals in terms of key critical parameters (i.e. critical to quality or critical to production) on the basis of customer requirements or Voice Of Customer (VOC) Measure the current process performance in context of goals Analyze the current scenario in terms of causes of variations and defects Improve the process by systematically reducing variation and eliminating defects Control future performance of the process DMAIC is a basic component of the Six Sigma methodology- a way to improve work processes by eliminating defects. The Six Sigma methodology is widely used in many top corporations in the United States and around the world. It is normally defined as a set of practices that improve efficiency and eliminate defects. Six Sigma has been around for more than 20 years and heavily influenced by TQM (total quality management) and Zero Defect principles. In its methodology, it asserts that in order to achieve high quality manufacturing and business processes, continued efforts must be made to reduce variations.
  5. Initial skepticism was fueled somewhat by our learning from manufacturing. However, the bigger skepticism came from our own history with performance improvement.... Flavor of the Month... Bottom up rather than top down... No commitment from the top...
  6. Recall from Elementary Statistics the standard deviation graph
  7. &amp;gt;Juran said that “all quality improvement occurs on a project-by-project basis and in no other way” . This philosophy is considered an essential element in Six Sigma. By not using “quality” or “statistics” in the name, it is perceived to be a business system that improves bottom line and only brings in technical details as needed; TQM is perceived to be a technical quality system owned by technical specialists rather than all employees. &amp;gt;Uses a simple but effective management structure and this in truly a strength. By contrast, TQM required a complex and rigid management structure of many levels.
  8. Why is this so difficult for software and software services? Remember, SS started in Motorola’s manufacturing divisions where the concept of Statistical Process Control (SPC) was already adopted. We refuse to adopt SPC for software projects because we continue to believe that it doesn’t apply. However, if we are going to continue to use the term “process” then we should also use SPC in order to measure and improve those same processes. Most IT shops haven’t a clue as to how well they are doing now.