SlideShare une entreprise Scribd logo
1  sur  3
KESSLERS INTERNATIONAL LIMITED
BRAND TECHNOLOGY LIMITED
INSPECTION REPORT
Customer: Description: AKZ CARD HOLDER
Part No: 07-6035301
Supplied By: KESSLERS
Order: N/A
Date: 15-11-12
ITE
M
PARAMETER /
DESCRIPTION
AC
C /
RE
J
NOTES
1 Complaint received
from the customer,
regarding the
operation of the
leaflet holder not
swinging back to its
original position.
Leaflet holder
mouldings were
modified at the start
of the year due to the
same issue. Weight
of the colour guide
booklets is 2.4kg.
x
Note: issue is to do with the weight of the colour guides
and the position of the colour guides. If the colour
guides are vertically position, then the holder will
swing back to it original position. Leaflet holder needs
more support. See photograph below.
KIL Confidential
Page 1 of 3
2
By inserting a plate
between the inside of
the leaflet holder and
the mounting pivot
moulding. This stops
the leaflet holder
from jamming itself
on to the shoulder of
mounting pivot
moulding.

Technical have designed a plate, this will be sampled.
We also may need to modify the pivot moulding,
remove shoulder. Technical aware.
Regards,
Mike Morgan.
KIL Confidential
Page 2 of 3
1. Proposed version of the plate which can be fitted to existing units in the field. Awaiting
customer approval.
KIL Confidential
Page 3 of 3

Contenu connexe

Plus de MICHAEL MORGAN

ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...MICHAEL MORGAN
 
iso presentation 2010 sept
iso presentation 2010 septiso presentation 2010 sept
iso presentation 2010 septMICHAEL MORGAN
 
2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)MICHAEL MORGAN
 
iso 9001 2008 Downstairs QC 9-2-15
iso 9001 2008 Downstairs QC  9-2-15 iso 9001 2008 Downstairs QC  9-2-15
iso 9001 2008 Downstairs QC 9-2-15 MICHAEL MORGAN
 
November 2014 quality report
November  2014 quality reportNovember  2014 quality report
November 2014 quality reportMICHAEL MORGAN
 
EASA Section 2.3.2 audit October 2014 mm
EASA Section 2.3.2  audit October 2014 mmEASA Section 2.3.2  audit October 2014 mm
EASA Section 2.3.2 audit October 2014 mmMICHAEL MORGAN
 
DC 10,015- C.N.D 008 issue 1
DC 10,015- C.N.D 008 issue 1DC 10,015- C.N.D 008 issue 1
DC 10,015- C.N.D 008 issue 1MICHAEL MORGAN
 
Bosch multi tool dis denham
Bosch multi tool dis denhamBosch multi tool dis denham
Bosch multi tool dis denhamMICHAEL MORGAN
 
flavia inspection report 22.01.03
flavia inspection report 22.01.03flavia inspection report 22.01.03
flavia inspection report 22.01.03MICHAEL MORGAN
 

Plus de MICHAEL MORGAN (9)

ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
ESGPLC - 2015 - ISO Presentation MM 2-7-15 linkin version...
 
iso presentation 2010 sept
iso presentation 2010 septiso presentation 2010 sept
iso presentation 2010 sept
 
2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)2013 Q A Presentation (2) (2)
2013 Q A Presentation (2) (2)
 
iso 9001 2008 Downstairs QC 9-2-15
iso 9001 2008 Downstairs QC  9-2-15 iso 9001 2008 Downstairs QC  9-2-15
iso 9001 2008 Downstairs QC 9-2-15
 
November 2014 quality report
November  2014 quality reportNovember  2014 quality report
November 2014 quality report
 
EASA Section 2.3.2 audit October 2014 mm
EASA Section 2.3.2  audit October 2014 mmEASA Section 2.3.2  audit October 2014 mm
EASA Section 2.3.2 audit October 2014 mm
 
DC 10,015- C.N.D 008 issue 1
DC 10,015- C.N.D 008 issue 1DC 10,015- C.N.D 008 issue 1
DC 10,015- C.N.D 008 issue 1
 
Bosch multi tool dis denham
Bosch multi tool dis denhamBosch multi tool dis denham
Bosch multi tool dis denham
 
flavia inspection report 22.01.03
flavia inspection report 22.01.03flavia inspection report 22.01.03
flavia inspection report 22.01.03
 

Dernier

CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectErbil Polytechnic University
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 

Dernier (20)

CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction Project
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 

Inspection report akz colour card holder 15 11-12 doc

  • 1. KESSLERS INTERNATIONAL LIMITED BRAND TECHNOLOGY LIMITED INSPECTION REPORT Customer: Description: AKZ CARD HOLDER Part No: 07-6035301 Supplied By: KESSLERS Order: N/A Date: 15-11-12 ITE M PARAMETER / DESCRIPTION AC C / RE J NOTES 1 Complaint received from the customer, regarding the operation of the leaflet holder not swinging back to its original position. Leaflet holder mouldings were modified at the start of the year due to the same issue. Weight of the colour guide booklets is 2.4kg. x Note: issue is to do with the weight of the colour guides and the position of the colour guides. If the colour guides are vertically position, then the holder will swing back to it original position. Leaflet holder needs more support. See photograph below. KIL Confidential Page 1 of 3
  • 2. 2 By inserting a plate between the inside of the leaflet holder and the mounting pivot moulding. This stops the leaflet holder from jamming itself on to the shoulder of mounting pivot moulding.  Technical have designed a plate, this will be sampled. We also may need to modify the pivot moulding, remove shoulder. Technical aware. Regards, Mike Morgan. KIL Confidential Page 2 of 3
  • 3. 1. Proposed version of the plate which can be fitted to existing units in the field. Awaiting customer approval. KIL Confidential Page 3 of 3