1. Projects completed in 2014 to May 2015
Actra Projects
1. Exchange migration / co-existence from exchange server 2010 to VM exchange server 210
Design role based exchange infrastructure maximizing security and scalability;
Migrate Databases and exchange store data to new VM server;
Create exchange relays;
Owa configuration and Outlook auto discovery;
Decommission old server;
Mobile intergration with MAS360 for mobile security and management;
2. Core firewall upgrade from PF sense Linux based router/Firewall to Fortigate clusterd
firewall infrastructure
Source Hardware from vendor that would meet the needs of the company;
Research current infrastructure permissions , access lists , routing tables ;
Deploy tandem core firewall for testing , AC configuration and VPN user migration ;
Document firewall setup, IP information, AC list, user accounts VPN setup and backup
startup configuration as part of DR plan.
Security testing;
SSL Vlan configuration
Decommission old infrastructure;
3. Hyper-v Cluster Migration to New hardware , VMM integration
Migrate hyper-v roles and VHD’s to new cluster infrastructure;
Virtualize existing legacy systems , Sage , ERP , Finance , File server, Webservers to
VM’s;
Cluster san integration , migrate from Nic team configuration to MPOI connectivity;
Cluster failover load balancing between 4 hosts , host home for optimal performance;
Disaster recovery testing , VM failover , failover on performance degradation;
Decommission old hyper-v cluster removing remaining AD objects;
4. Infrastructure Backup planning and deployment
Source required equipment to meet the backup requirements of Actra;
Setup and configure Unitrends Recover 822 Backup appliance;
Create backups jobs , VM , full , Incremental , SQL and file;
Create replication to remote Montreal based Hyper-v running Unitreds UVB;
Create archived HD backup set to be shipped to branch office in case of Montreal and
Toronto Disaster occurrence;
Create detailed backup reports for disaster recovery planning , what resources need first
priority in recovery and time estimate of recovery process;
5. San migration from HP4300 to HP 3Par
Facilitate setup of HP 3Par San
Configure 3Par Volumes , SSD , Performance and Near line storage pools;
Migrate data from HP 4300 San to 3Par San;
6. SCCM and VMM deployment
Deploy SCCM for desktop application, WSUS patch and image delivery;
Configure SCCM for remote control of branch sites;
Create reporting of desktop inventory , hardware software audits;
VMM deployment to manage HA failover cluster and single legacy VMware ESX host;
Build hyper-v templates for quick VM builds for future server builds;
Automate disaster recover failover to 2 hosts allowing 2 hosts to fail in a 4 host cluster;
2. 7. Core switch upgrade head office
Research project requirements;
Audit current equipment for future usability;
VLAN consolidation from 10 vlans to 2 Vlans Server and User;
Deploy switches slowly migrating users to corresponding VLANS;
SNMP monitoring V1 V3;
Document switching infrastructure;
8. San switch upgrade Head Office Datacenter
Switch configuration , MTU sizing , Jombo packet optimization
Switch Stacking module installation;
Switch Fiber connecting module installation;
Snmp configuration , Switch monitoring configuration;
9. Disaster Recovery Planning
Audit current infrastructure;
Design and create cost effective Recover for servers and network infrastructure;
Test and implement;
Documentation of DR policy for effective DR planning;
10. Network monitoring of all Servers , switches , firewalls
Source and configure monitoring software Whatsupgold (servers) Spiceworks (desktops);
Configure ICMP and SNMP monitoring on all servers and VM , system state , Storage ,
Ram;
Create alert profiles , system outage , state change;
Create detailed state change reports of all state changes within network weekly;
11. Other Projects
Create helpdesk knowledge base using Jira and evernote ;