Owner: SR Hotel Devel...
McKenney’s installed a complex HVAC system at the St. Regis Hotel &
Residences during construction in Atlanta.
The Challenge
High expectations surrounded this 25-story luxury hotel and
condominium project. Meticulous planning and seq...
The Results
McKenney’s completed the job on time, paving the way for the
opening of this high-end travel destination and l...
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
sales@mckenneys.com
3601 Performance Road
Charlo...
HVAC System Installation in Atlanta, Georgia
Prochain SlideShare
Chargement dans…5
×

HVAC System Installation in Atlanta, Georgia

1 017 vues

Publié le

McKenney’s installed a complex HVAC system at the St. Regis Hotel & Residences during construction in Atlanta.

Publié dans : Business
  • Soyez le premier à commenter

  • Soyez le premier à aimer ceci

HVAC System Installation in Atlanta, Georgia

  1. 1. Project Name The St. Regis Atlanta Hotel & Residences Project Location Atlanta, Georgia Project Team Owner: SR Hotel Development, LLLP Specializations Markets General Contractor: Bovis Lend Lease Architect: Rabun Rasche Rector Reece Architects Sheet Metal Shop Prefab Mixed-use & Multifamily Engineer: B&A Consulting Engineers Hospitality Subcontractor: McKenney’s, Inc. Pipe Shop Prefab
  2. 2. McKenney’s installed a complex HVAC system at the St. Regis Hotel & Residences during construction in Atlanta.
  3. 3. The Challenge High expectations surrounded this 25-story luxury hotel and condominium project. Meticulous planning and sequencing were required to prevent delays and allow all trades ample space to work. Each hotel room and residence had its own air conditioning system, making trade coordination vital to stay on schedule. The content of this document is not intended as an endorsement. The Solution Two 250-ton water-cooled chillers and a gas boiler were installed along with horizontal fan coil units above the bathroom ceilings for the 10 floors of hotel rooms. Air handling units were installed in the public spaces, and variable air volume systems were used in the public and back-of-house areas to control temperature fluctuations needed for zero occupancy to full occupancy times. After closely coordinating a mechanical transition floor, a water source heat pump and gas boiler system allowed a shell build-out of the condominiums.
  4. 4. The Results McKenney’s completed the job on time, paving the way for the opening of this high-end travel destination and luxury residence.