UNIT-2
• Arcing device
• Electric arc furnaces, arc welders and electric discharge lamps are all
forms of electric arcing device. These devices are highly non-linear
loads.
• All arcing devices are sources of harmonic distortion.
• Load switching
• This type of transient might occur as the result of switching in a heavy
single-phase load.
• Other equipment can be protected from these switching transients by
electrically isolating them from the affecting equipment.
• Large motor starting
• Dynamic nature of induction machines means that they draw current depending on
the mode of operation.
• During starting, this current can be as high as six times the normal rated current. This
increased loading on the local network that has the effect of causing a voltage dip.
• Most modern motors employ a sophisticated power electronic converter ‘drive’,
which control the motor’s starting current to a reasonable level.
• Some lower cost types of motor use series capacitors or resistors to reduce the
starting current. These components are then switched out once the motor’s rated
speed has been reached.
• Autotransformers are used to start some older motors. These have a variable
secondary winding that allows the motor stator voltage to be controlled and hence the
current drawn from the supply.
• Inter-connected of power system
• Increasing levels of interconnection in power system is predicted in the
future are likely to have an effect on power quality. The problem can
propagate and difficult to isolate. Harmonics and flicker are examples of
power quality problems that can be transferred from a utility to another
through interconnection.
• Lightning Strike and Environment Related Damage
• Lightning strikes are a cause of transient overvoltages often leading
to faults on the electricity supply network.
• Lightning strikes that hit overhead lines often cause ‘flash-over’ to
neighbouring conductors as the insulators break down. The strike will
therefore not only consist of a transient overvoltage but also fault-
clearing interruptions and dips.
VARIOUS LINE-VOLTAGE
REGULATOR
1. CONSTANT VOLTAGE TRANSFORMER
2. TRANSFORMER WITH TAP CHANGER
• Transformer based solution
• Ferro-resonant txt has 1:1 turns ratio and with a core that is highly magnetized close
to saturation under normal operation.
• This will provide an output voltage which is not affected by input voltage variations
hence the output is not significantly affected by voltage sag.
• In actual design, a capacitor connected to secondary winding to set the operating point
above the knee of saturation curve.
• Suitable for low-power, constant loads
Typical circuit for a ferro-resonant transformer
• Transformer with electronic tap changers
• Electronic tap changers can be mounted on txt for sensitive load to change
its turn ratio according to change in input voltage.
• They are connected in series on the distribution feeder and placed
between supply and load.
• Part of secondary winding is divided into number of sections which are
connected or disconnected by fast static switches to allow regulation of
secondary voltage in steps.
• This will allow the output voltage to be brought back to level above 90%
of nominal value even during severe sags.
• Thyristor-based switches only turn on once per cycle, thus accomplish the
compensation with a time delay of at least one half cycle.
Transformer with electronic tap changers
UNINTERRUPTIBLE
POWER SUPPLY
1. STANDBY UPS
2. ONLINE UPS
3. HYBRID UPS
• Standby UPS
• Consists of rectifier, battery, inverter and static
switches.
Rectifier / Charger Inverter
Battery Bank
Load
Automatic
Transfer
Switch
Line
Normal Line
• Static switch is controlled to allow load to be fed from main supply.
• Switch open and close respectively below some predetermined level.
• Then, the load will be fed from battery via inverter to ensure continuity of
supply to the load.
• Inverter output of a standby UPS must always operate in synchronism with
the supply frequency to ensure a smooth transition from one supply to the
other.
STANDBY UPS
Rectifier / Charger Inverter
Battery Bank
Load
Manual
Bypass
Line
ONLINE UPS
• Online UPS
• Load is always fed from the UPS; in this way the load is
isolated from the main supply at all times.
• Expensive and have high operating losses.
• It is very similar to a standby system from view of schematic,
but with a manual transfer switch in place of the static transfer
switches.
Rectifier / Charger Inverter
Battery Bank
Ferroresonant
Transformer Load
Line
Normal Line
Hybrid UPS
HYBRID UPS
• Hybrid UPS
• Configuration similar to standby UPS system.
• The only exception is some form of voltage regulator, such as
ferro-resonance transformer where it is used in place of the
static switches.
• The transformer provides regulation to the load and
momentary ride-through when the transfer from main supply
to standby UPS is made.
POWER QUALITY EFFECTS
• Isolation transformer
• Isolate sensitive equipment from transients and noise produced by utility.
• Consists of primary and secondary winding with magnetic core and a grounded
shield made of nonmagnetic foil located in between 2 winding.
• Any noise or transient from utility is transmitted through capacitance between
primary and shield and on to ground.
• Prevent common-mode noise from reaching and damaging sensitive equipment.
Using secondary winding with grounded wye, no common noise can reach the
load.
• Delta-wye txt also protect utility from triplen harmonic (3rd, 9th, 15th,..) created
by end users. Txt transfer harmonic from secondary(wye) to primary (delta).
Triplen harmonic remain in delta primary circulating around and generating
heat in txt but not getting on utility’s system.
1. Single phase shielded isolation transformer
2. Three-phase delta-wye isolation transformer
(1)
(2)

More Related Content

What's hot

Protection against overvoltage
Protection against overvoltageProtection against overvoltage
Protection against overvoltagevishalgohel12195
 
importance of reactive power in power system
importance of reactive power in power systemimportance of reactive power in power system
importance of reactive power in power systemsneh pratap singh
 
Power system stability
Power  system  stabilityPower  system  stability
Power system stabilityrohit kumar
 
Loading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesLoading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesRaja Adapa
 
Speed control of dc motors
Speed control of dc motorsSpeed control of dc motors
Speed control of dc motorsragulkncet
 
Firing angle control
Firing angle controlFiring angle control
Firing angle controljawaharramaya
 
Electromagnetic relay
Electromagnetic relayElectromagnetic relay
Electromagnetic relayjawaharramaya
 
Power System Stability & Control
Power System Stability & ControlPower System Stability & Control
Power System Stability & ControlAzimah Aziz
 
INTRODUCTION TO POWER SYSTEM STABILITY BY Kundur Power Systems Solutions
INTRODUCTION TO POWER SYSTEM STABILITY BY Kundur Power Systems SolutionsINTRODUCTION TO POWER SYSTEM STABILITY BY Kundur Power Systems Solutions
INTRODUCTION TO POWER SYSTEM STABILITY BY Kundur Power Systems SolutionsPower System Operation
 
Active_Power_Filter
Active_Power_FilterActive_Power_Filter
Active_Power_Filteremredurna
 
Classification Of Power System Stability
Classification Of Power System StabilityClassification Of Power System Stability
Classification Of Power System StabilityAravind Shaji
 
Power Electronics-Introduction
Power Electronics-IntroductionPower Electronics-Introduction
Power Electronics-Introductionsangeetha rakhi
 
Power Quality and Monitoring
Power Quality and MonitoringPower Quality and Monitoring
Power Quality and Monitoringash08031996
 
Power factor presentation
Power factor presentationPower factor presentation
Power factor presentationAzhar Abbas
 
Power Quality Issues
Power Quality IssuesPower Quality Issues
Power Quality Issuesmaneesh001
 
Protective relay
Protective relay Protective relay
Protective relay Uday Wankar
 
synchronous motor for presentation
 synchronous motor for presentation synchronous motor for presentation
synchronous motor for presentationprasantakcs
 

What's hot (20)

Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breaker
 
Protection against overvoltage
Protection against overvoltageProtection against overvoltage
Protection against overvoltage
 
importance of reactive power in power system
importance of reactive power in power systemimportance of reactive power in power system
importance of reactive power in power system
 
Power system stability
Power  system  stabilityPower  system  stability
Power system stability
 
Loading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesLoading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission Lines
 
Speed control of dc motors
Speed control of dc motorsSpeed control of dc motors
Speed control of dc motors
 
Firing angle control
Firing angle controlFiring angle control
Firing angle control
 
Electromagnetic relay
Electromagnetic relayElectromagnetic relay
Electromagnetic relay
 
Power System Stability & Control
Power System Stability & ControlPower System Stability & Control
Power System Stability & Control
 
INTRODUCTION TO POWER SYSTEM STABILITY BY Kundur Power Systems Solutions
INTRODUCTION TO POWER SYSTEM STABILITY BY Kundur Power Systems SolutionsINTRODUCTION TO POWER SYSTEM STABILITY BY Kundur Power Systems Solutions
INTRODUCTION TO POWER SYSTEM STABILITY BY Kundur Power Systems Solutions
 
Active_Power_Filter
Active_Power_FilterActive_Power_Filter
Active_Power_Filter
 
Power quality ppt
Power quality pptPower quality ppt
Power quality ppt
 
Classification Of Power System Stability
Classification Of Power System StabilityClassification Of Power System Stability
Classification Of Power System Stability
 
Power Electronics-Introduction
Power Electronics-IntroductionPower Electronics-Introduction
Power Electronics-Introduction
 
Power Quality and Monitoring
Power Quality and MonitoringPower Quality and Monitoring
Power Quality and Monitoring
 
Power factor presentation
Power factor presentationPower factor presentation
Power factor presentation
 
Power Quality Issues
Power Quality IssuesPower Quality Issues
Power Quality Issues
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
 
Protective relay
Protective relay Protective relay
Protective relay
 
synchronous motor for presentation
 synchronous motor for presentation synchronous motor for presentation
synchronous motor for presentation
 

Viewers also liked

Irshad hygiene & cleaning committee
Irshad hygiene & cleaning committeeIrshad hygiene & cleaning committee
Irshad hygiene & cleaning committeeMd Irshad Ahmad
 
Transient voltage distribution in transformer winding (experimental investiga...
Transient voltage distribution in transformer winding (experimental investiga...Transient voltage distribution in transformer winding (experimental investiga...
Transient voltage distribution in transformer winding (experimental investiga...eSAT Journals
 
Modelling of Transformer for Surges by Udaya Kumar (IISc)
Modelling of Transformer for Surges by Udaya Kumar (IISc)Modelling of Transformer for Surges by Udaya Kumar (IISc)
Modelling of Transformer for Surges by Udaya Kumar (IISc)ProSIM R & D Pvt. Ltd.
 
Irshad Caring mother earth day 22nd of April 2016
Irshad Caring mother earth day 22nd of April 2016Irshad Caring mother earth day 22nd of April 2016
Irshad Caring mother earth day 22nd of April 2016Md Irshad Ahmad
 
Analsis of very fast transient over voltages in gas insulated substations
Analsis of very fast transient over voltages in gas insulated substationsAnalsis of very fast transient over voltages in gas insulated substations
Analsis of very fast transient over voltages in gas insulated substationseSAT Journals
 
Synchronous machine Mitesh Kumar
Synchronous machine Mitesh KumarSynchronous machine Mitesh Kumar
Synchronous machine Mitesh KumarMitesh Kumar
 
Switchgear and protection 5
Switchgear and protection 5Switchgear and protection 5
Switchgear and protection 5Md Irshad Ahmad
 
Switchgear and protection 4
Switchgear and protection 4Switchgear and protection 4
Switchgear and protection 4Md Irshad Ahmad
 
Modeling and analysis of power transformers under ferroresonance phenomenon
Modeling and analysis of power transformers under ferroresonance phenomenonModeling and analysis of power transformers under ferroresonance phenomenon
Modeling and analysis of power transformers under ferroresonance phenomenonGilberto Mejía
 
Switchgear and protection 3
Switchgear and protection 3Switchgear and protection 3
Switchgear and protection 3Md Irshad Ahmad
 
Switchgear and protection 2
Switchgear and protection 2Switchgear and protection 2
Switchgear and protection 2Md Irshad Ahmad
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1Md Irshad Ahmad
 

Viewers also liked (19)

Irshad hygiene & cleaning committee
Irshad hygiene & cleaning committeeIrshad hygiene & cleaning committee
Irshad hygiene & cleaning committee
 
Transient voltage distribution in transformer winding (experimental investiga...
Transient voltage distribution in transformer winding (experimental investiga...Transient voltage distribution in transformer winding (experimental investiga...
Transient voltage distribution in transformer winding (experimental investiga...
 
Modelling of Transformer for Surges by Udaya Kumar (IISc)
Modelling of Transformer for Surges by Udaya Kumar (IISc)Modelling of Transformer for Surges by Udaya Kumar (IISc)
Modelling of Transformer for Surges by Udaya Kumar (IISc)
 
Unit 5
Unit 5Unit 5
Unit 5
 
Power quality 4
Power quality 4Power quality 4
Power quality 4
 
Unit ii-2 -
Unit ii-2 -Unit ii-2 -
Unit ii-2 -
 
Thermal Management of Transformers
Thermal Management of TransformersThermal Management of Transformers
Thermal Management of Transformers
 
Irshad Caring mother earth day 22nd of April 2016
Irshad Caring mother earth day 22nd of April 2016Irshad Caring mother earth day 22nd of April 2016
Irshad Caring mother earth day 22nd of April 2016
 
Analsis of very fast transient over voltages in gas insulated substations
Analsis of very fast transient over voltages in gas insulated substationsAnalsis of very fast transient over voltages in gas insulated substations
Analsis of very fast transient over voltages in gas insulated substations
 
Synchronous machine Mitesh Kumar
Synchronous machine Mitesh KumarSynchronous machine Mitesh Kumar
Synchronous machine Mitesh Kumar
 
EMEC-II, unit 1
EMEC-II, unit 1EMEC-II, unit 1
EMEC-II, unit 1
 
Switchgear and protection 5
Switchgear and protection 5Switchgear and protection 5
Switchgear and protection 5
 
Power quality 5
Power quality 5Power quality 5
Power quality 5
 
Transformer Failures and Case Studies
Transformer Failures and Case StudiesTransformer Failures and Case Studies
Transformer Failures and Case Studies
 
Switchgear and protection 4
Switchgear and protection 4Switchgear and protection 4
Switchgear and protection 4
 
Modeling and analysis of power transformers under ferroresonance phenomenon
Modeling and analysis of power transformers under ferroresonance phenomenonModeling and analysis of power transformers under ferroresonance phenomenon
Modeling and analysis of power transformers under ferroresonance phenomenon
 
Switchgear and protection 3
Switchgear and protection 3Switchgear and protection 3
Switchgear and protection 3
 
Switchgear and protection 2
Switchgear and protection 2Switchgear and protection 2
Switchgear and protection 2
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 

Similar to Power quality 2

33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE Lalit Kumar
 
Distribu pQ.pptx
Distribu pQ.pptxDistribu pQ.pptx
Distribu pQ.pptxbhuvana71
 
Electrical Basics-VBR
Electrical Basics-VBRElectrical Basics-VBR
Electrical Basics-VBRVijay Raskar
 
Power quality & demand side management
Power quality & demand side managementPower quality & demand side management
Power quality & demand side managementMark Anthony Enoy
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1anuphowlader1
 
Different method of frequency and voltage control
Different method of frequency and voltage controlDifferent method of frequency and voltage control
Different method of frequency and voltage control8141245710
 
4 PROTECTION OF ALTERNATOR.pptx
4 PROTECTION OF ALTERNATOR.pptx4 PROTECTION OF ALTERNATOR.pptx
4 PROTECTION OF ALTERNATOR.pptxNoname812799
 
Psoc voltage control 2018
Psoc voltage control 2018Psoc voltage control 2018
Psoc voltage control 2018Mohamed Samir
 
Application of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage RegulationApplication of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage RegulationAmeen San
 
Switchgear, protection and measurement
Switchgear, protection and measurementSwitchgear, protection and measurement
Switchgear, protection and measurementBishal Rimal
 
MINI INVERTER PROJECT.pptx
MINI INVERTER PROJECT.pptxMINI INVERTER PROJECT.pptx
MINI INVERTER PROJECT.pptxshamlaK
 
High Tension Current Transformer in Pune
High Tension Current Transformer in PuneHigh Tension Current Transformer in Pune
High Tension Current Transformer in Punebizproto26
 
Current and Voltage Transformers _23_10_2021.pptx
Current and Voltage Transformers _23_10_2021.pptxCurrent and Voltage Transformers _23_10_2021.pptx
Current and Voltage Transformers _23_10_2021.pptxrohith650557
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Rahul Prajapati
 
Frequency control & Voltage control.pptx
Frequency control & Voltage control.pptxFrequency control & Voltage control.pptx
Frequency control & Voltage control.pptxJoseeMusabyimana
 

Similar to Power quality 2 (20)

33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE
 
PQH 3rd chapter.pptx
PQH 3rd chapter.pptxPQH 3rd chapter.pptx
PQH 3rd chapter.pptx
 
Distribu pQ.pptx
Distribu pQ.pptxDistribu pQ.pptx
Distribu pQ.pptx
 
Electrical Basics-VBR
Electrical Basics-VBRElectrical Basics-VBR
Electrical Basics-VBR
 
Power quality & demand side management
Power quality & demand side managementPower quality & demand side management
Power quality & demand side management
 
unit_2.ppt
unit_2.pptunit_2.ppt
unit_2.ppt
 
T&D_Unit V.pdf
T&D_Unit V.pdfT&D_Unit V.pdf
T&D_Unit V.pdf
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1
 
Different method of frequency and voltage control
Different method of frequency and voltage controlDifferent method of frequency and voltage control
Different method of frequency and voltage control
 
4 PROTECTION OF ALTERNATOR.pptx
4 PROTECTION OF ALTERNATOR.pptx4 PROTECTION OF ALTERNATOR.pptx
4 PROTECTION OF ALTERNATOR.pptx
 
Psoc voltage control 2018
Psoc voltage control 2018Psoc voltage control 2018
Psoc voltage control 2018
 
unit_2.ppt
unit_2.pptunit_2.ppt
unit_2.ppt
 
Application of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage RegulationApplication of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage Regulation
 
Switchgear, protection and measurement
Switchgear, protection and measurementSwitchgear, protection and measurement
Switchgear, protection and measurement
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
MINI INVERTER PROJECT.pptx
MINI INVERTER PROJECT.pptxMINI INVERTER PROJECT.pptx
MINI INVERTER PROJECT.pptx
 
High Tension Current Transformer in Pune
High Tension Current Transformer in PuneHigh Tension Current Transformer in Pune
High Tension Current Transformer in Pune
 
Current and Voltage Transformers _23_10_2021.pptx
Current and Voltage Transformers _23_10_2021.pptxCurrent and Voltage Transformers _23_10_2021.pptx
Current and Voltage Transformers _23_10_2021.pptx
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
 
Frequency control & Voltage control.pptx
Frequency control & Voltage control.pptxFrequency control & Voltage control.pptx
Frequency control & Voltage control.pptx
 

More from Md Irshad Ahmad

Academic Council Meet PPT- 19
Academic Council Meet PPT- 19Academic Council Meet PPT- 19
Academic Council Meet PPT- 19Md Irshad Ahmad
 
Power station practice (NEE-702) unit-5
Power station practice (NEE-702) unit-5Power station practice (NEE-702) unit-5
Power station practice (NEE-702) unit-5Md Irshad Ahmad
 
Power station practice (NEE-702) unit-4
Power station practice (NEE-702) unit-4Power station practice (NEE-702) unit-4
Power station practice (NEE-702) unit-4Md Irshad Ahmad
 
Power station practice (NEE-702) unit-3
Power station practice (NEE-702) unit-3Power station practice (NEE-702) unit-3
Power station practice (NEE-702) unit-3Md Irshad Ahmad
 
Power station practice (NEE-702) unit-2
Power station practice (NEE-702) unit-2Power station practice (NEE-702) unit-2
Power station practice (NEE-702) unit-2Md Irshad Ahmad
 
Power station practice (NEE- 702) unit-1
Power station practice (NEE- 702) unit-1Power station practice (NEE- 702) unit-1
Power station practice (NEE- 702) unit-1Md Irshad Ahmad
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-5]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-5]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-5]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-5]Md Irshad Ahmad
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-4]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-4]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-4]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-4]Md Irshad Ahmad
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-3]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-3]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-3]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-3]Md Irshad Ahmad
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]Md Irshad Ahmad
 
ELECTRICAL MEASUREMENT & MEASURING INSTRUMENTS [Emmi- (NEE-302) -unit-1]
ELECTRICAL MEASUREMENT & MEASURING INSTRUMENTS [Emmi- (NEE-302) -unit-1]ELECTRICAL MEASUREMENT & MEASURING INSTRUMENTS [Emmi- (NEE-302) -unit-1]
ELECTRICAL MEASUREMENT & MEASURING INSTRUMENTS [Emmi- (NEE-302) -unit-1]Md Irshad Ahmad
 

More from Md Irshad Ahmad (13)

Academic Council Meet PPT- 19
Academic Council Meet PPT- 19Academic Council Meet PPT- 19
Academic Council Meet PPT- 19
 
Power station practice (NEE-702) unit-5
Power station practice (NEE-702) unit-5Power station practice (NEE-702) unit-5
Power station practice (NEE-702) unit-5
 
Power station practice (NEE-702) unit-4
Power station practice (NEE-702) unit-4Power station practice (NEE-702) unit-4
Power station practice (NEE-702) unit-4
 
Power station practice (NEE-702) unit-3
Power station practice (NEE-702) unit-3Power station practice (NEE-702) unit-3
Power station practice (NEE-702) unit-3
 
Power station practice (NEE-702) unit-2
Power station practice (NEE-702) unit-2Power station practice (NEE-702) unit-2
Power station practice (NEE-702) unit-2
 
Power station practice (NEE- 702) unit-1
Power station practice (NEE- 702) unit-1Power station practice (NEE- 702) unit-1
Power station practice (NEE- 702) unit-1
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-5]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-5]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-5]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-5]
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-4]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-4]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-4]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-4]
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-3]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-3]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-3]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-3]
 
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]Electrical measurement & measuring instruments [emmi  (nee-302) -unit-2]
Electrical measurement & measuring instruments [emmi (nee-302) -unit-2]
 
ELECTRICAL MEASUREMENT & MEASURING INSTRUMENTS [Emmi- (NEE-302) -unit-1]
ELECTRICAL MEASUREMENT & MEASURING INSTRUMENTS [Emmi- (NEE-302) -unit-1]ELECTRICAL MEASUREMENT & MEASURING INSTRUMENTS [Emmi- (NEE-302) -unit-1]
ELECTRICAL MEASUREMENT & MEASURING INSTRUMENTS [Emmi- (NEE-302) -unit-1]
 
Power quality 1
Power quality 1Power quality 1
Power quality 1
 
Electromagnetic Theory
Electromagnetic Theory Electromagnetic Theory
Electromagnetic Theory
 

Recently uploaded

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 

Recently uploaded (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 

Power quality 2

  • 2. • Arcing device • Electric arc furnaces, arc welders and electric discharge lamps are all forms of electric arcing device. These devices are highly non-linear loads. • All arcing devices are sources of harmonic distortion. • Load switching • This type of transient might occur as the result of switching in a heavy single-phase load. • Other equipment can be protected from these switching transients by electrically isolating them from the affecting equipment.
  • 3. • Large motor starting • Dynamic nature of induction machines means that they draw current depending on the mode of operation. • During starting, this current can be as high as six times the normal rated current. This increased loading on the local network that has the effect of causing a voltage dip. • Most modern motors employ a sophisticated power electronic converter ‘drive’, which control the motor’s starting current to a reasonable level. • Some lower cost types of motor use series capacitors or resistors to reduce the starting current. These components are then switched out once the motor’s rated speed has been reached. • Autotransformers are used to start some older motors. These have a variable secondary winding that allows the motor stator voltage to be controlled and hence the current drawn from the supply.
  • 4. • Inter-connected of power system • Increasing levels of interconnection in power system is predicted in the future are likely to have an effect on power quality. The problem can propagate and difficult to isolate. Harmonics and flicker are examples of power quality problems that can be transferred from a utility to another through interconnection. • Lightning Strike and Environment Related Damage • Lightning strikes are a cause of transient overvoltages often leading to faults on the electricity supply network. • Lightning strikes that hit overhead lines often cause ‘flash-over’ to neighbouring conductors as the insulators break down. The strike will therefore not only consist of a transient overvoltage but also fault- clearing interruptions and dips.
  • 5. VARIOUS LINE-VOLTAGE REGULATOR 1. CONSTANT VOLTAGE TRANSFORMER 2. TRANSFORMER WITH TAP CHANGER
  • 6. • Transformer based solution • Ferro-resonant txt has 1:1 turns ratio and with a core that is highly magnetized close to saturation under normal operation. • This will provide an output voltage which is not affected by input voltage variations hence the output is not significantly affected by voltage sag. • In actual design, a capacitor connected to secondary winding to set the operating point above the knee of saturation curve. • Suitable for low-power, constant loads
  • 7. Typical circuit for a ferro-resonant transformer
  • 8. • Transformer with electronic tap changers • Electronic tap changers can be mounted on txt for sensitive load to change its turn ratio according to change in input voltage. • They are connected in series on the distribution feeder and placed between supply and load. • Part of secondary winding is divided into number of sections which are connected or disconnected by fast static switches to allow regulation of secondary voltage in steps. • This will allow the output voltage to be brought back to level above 90% of nominal value even during severe sags. • Thyristor-based switches only turn on once per cycle, thus accomplish the compensation with a time delay of at least one half cycle.
  • 10. UNINTERRUPTIBLE POWER SUPPLY 1. STANDBY UPS 2. ONLINE UPS 3. HYBRID UPS
  • 11. • Standby UPS • Consists of rectifier, battery, inverter and static switches. Rectifier / Charger Inverter Battery Bank Load Automatic Transfer Switch Line Normal Line
  • 12. • Static switch is controlled to allow load to be fed from main supply. • Switch open and close respectively below some predetermined level. • Then, the load will be fed from battery via inverter to ensure continuity of supply to the load. • Inverter output of a standby UPS must always operate in synchronism with the supply frequency to ensure a smooth transition from one supply to the other. STANDBY UPS
  • 13. Rectifier / Charger Inverter Battery Bank Load Manual Bypass Line ONLINE UPS
  • 14. • Online UPS • Load is always fed from the UPS; in this way the load is isolated from the main supply at all times. • Expensive and have high operating losses. • It is very similar to a standby system from view of schematic, but with a manual transfer switch in place of the static transfer switches.
  • 15. Rectifier / Charger Inverter Battery Bank Ferroresonant Transformer Load Line Normal Line Hybrid UPS HYBRID UPS
  • 16. • Hybrid UPS • Configuration similar to standby UPS system. • The only exception is some form of voltage regulator, such as ferro-resonance transformer where it is used in place of the static switches. • The transformer provides regulation to the load and momentary ride-through when the transfer from main supply to standby UPS is made.
  • 18. • Isolation transformer • Isolate sensitive equipment from transients and noise produced by utility. • Consists of primary and secondary winding with magnetic core and a grounded shield made of nonmagnetic foil located in between 2 winding. • Any noise or transient from utility is transmitted through capacitance between primary and shield and on to ground. • Prevent common-mode noise from reaching and damaging sensitive equipment. Using secondary winding with grounded wye, no common noise can reach the load. • Delta-wye txt also protect utility from triplen harmonic (3rd, 9th, 15th,..) created by end users. Txt transfer harmonic from secondary(wye) to primary (delta). Triplen harmonic remain in delta primary circulating around and generating heat in txt but not getting on utility’s system.
  • 19. 1. Single phase shielded isolation transformer 2. Three-phase delta-wye isolation transformer (1) (2)