Ce diaporama a bien été signalé.
Le téléchargement de votre SlideShare est en cours. ×

Michael Rafferty CV

Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Prochain SlideShare
CV_Jamie Allen
CV_Jamie Allen
Chargement dans…3
×

Consultez-les par la suite

1 sur 2 Publicité

Plus De Contenu Connexe

Publicité

Michael Rafferty CV

  1. 1. Michael Rafferty 62 Dalswinton Avenue Lochside Dumfries DG2 9NE 07532283899 michaelrafferty109@yahoo.co.uk Personal Profile I consider my personal qualities are that I am flexible, adaptable and reliable. I can also work calmly under pressure and in difficult situations. I have good communication, management and administrative skills and can organise work to a high standard. I feel I would be an asset to your company as I can work well within a team environment and can also work comfortably on my own. Key Skills  Design and management skills  Excellent timekeeping and attendance records  Ability to meet targets and deadlines  Security conscious Employment History 2008 – 2009: Hill McGylnn – London Electrical Technician Duties included: Delivering on and ad-hoc basis mainly installations involving racking tray work, S.W.A, cabling, trunking and switchgear on behalf of various agencies. 2008: Network Rail – Euston Station Multi-Skilled Electrician Duties included: P.P.M, breakdown and installation works at London major station. 2006 – 2008: University College Hospital Electrical Technician Duties included: Maintaining all plant and equipment to University standards, such as main cat generators all coilers (Cochrane) and all associated equipment. Also water treatment including transferring to C.T.R.L at Kingscross and Panchras and installation work on Thames link tunnel. 1997 – 2006: Waterloo Station Site Supervisor Duties included: Responsible for Waterloo, Charine cross and London Bridge Stations. This included organising shutdowns for out of work maintenance, liaise with Euro-Star when overlapping. Also keeping all records up to date, weekly meetings with network rail on any issues and pricing up any major installations required. As well as, arranging courses for personnel and adhering to Health and Safety procedures. 1988 – 1997: Brown and Root International Aberdeen Electrical Supervisor Duties included: Responsible for build installation and design changes and appointing staff to oversee contracts when on other installations. To make sure to keep all drawings were up to date and adding on as required and keeping contract dates on time.
  2. 2. 1986 – 1988: Torness Power Station QA/QC Inspector Duties included: Inspection of all contractors’ installations, as well as liaising with clients on weekly engineering reports. Ensuring clients that all work is being carried out to their agreement and attending weekly meetings with clients and contractors to solve any problems whether it is compliance or contract related. 1984 – 1986: Haden Moore Engineering Foreman Electrician Duties included: Installation work on Thistle, Brentalpha and North Cormorant which mainly included upgrading fire and gas systems, record keeping and commissioning registered clients. 1977 – 1984: McDermotts International Electrician Foreman Dutiesincluded:Off shore installations,hookupsonmajoroil fieldsandsupervisoryexperiencein southernsectorandyard experience.Workedinvariousrolessuch – Beryl ‘B’Platform:pre-commissioning AllwynPlatform:pre-commissioning Beatrice:QA/QCEngineering CormorantAlpha:E&I InstallationSupervisor Dunlinalpha- Electrical Charge hand Miller– Electrical Foreman IndiesandRavenspurn:Electrical Supervisor 1975 – 1977: Malcolmand Allan’sElectrician Electrical Technician WillingtonQuayShipyardonmodulesforoffshore/claymore,thentransferredtoBrentBravo Offshore. 1968 – 1975: ChaplecrossNuclearPower Station Apprentice Electrician CompletedapprenticeshipinElectrical Engineering andwasawardedapprenticeof the year1970. Education and Training DumfriesTechnical College Network Rail 1967 – 1968: CGLI EngineeringCrafts S.A.E.P – Water treatment 1968 – 1972: CGLI Technicians NVQ3– Cochrane BoilerCourse Hobbiesand Interests I enjoyreadinghistoricandphysicbooks,walkingdownthe riverandrelaxingonfrontof the television watchingweakestlinkandotherquizshows. References Available uponrequest.

×