1. Page 1 of 8
10April2015
Dubai– United Arab Emirates
Mobile No. 00971 504254641 / 00971 557910560
E-mail : eng_anany@hotmail.com / eng_anany@yahoo.com
U.A.E Valid Driving Licence – Auto Light Vehicle
Date Of Birth : 1st
January 1981
Marital Status : Married + 2 Childs
Nationality : Egyptian
Mohammed Anany Said
Career
Objective
My objective is to focus all my previous experiences, educational and practical background on
productively contributing to my organization and self-improvement. Hence continually aiming at
evolving tasks and responsibilities and reaching higher levels of achievements, Seeking a
challenging Position as [ Construction Manager / Civil Engineer ]
Functional
Summary
Education
Experiences
A Dynamic and Self Motivated Civil Engineering Professional with Solid 12 years exp. ,
Excellent supervisory and communication skills can offer reliability and commitment to the
organization and future assignments. Enjoy the challenges by working both independently and
as team leader to deliver a specific products and targets
Bachelor of Science in civil Engineering, Faculty of Engineering
Helwan University, Cairo, Egypt (From September 1998 To May 2003)
.
July 2013 – Present Day [ Omis Contracting Company ] – Dubai, UAE .
Construction manager / Civil Engineer
Project: Al Ossaimi Apartments and Beach Resort @ Palm Jumeirah - Dubai, UAE.
- Plot C30 (5***** Hotel Apartments): With A plinth Area of 16320 m²@ Palm
Jumeirah Dubai, UAE.
- Plot C31 (52 Chalets and Main Building): With A plinth Area of 8850 m²@ Palm
Jumeirah - Dubai, UAE.
Contract Value: AED 410 Millions
Client : Al Ossaimi Investments & Real Estate
Consultant: Consolidated Engineering Company (Khatib &Alami).
Responsibilities :
Execution, Monitoring, Controlling & Testing of the following tasks:
Preparing the site and liaising with other construction professionals such as
architects, engineers, buyers, estimators and surveyors before construction work
starts.
Developing the program of work and strategy for making the project happen.
Planning ahead to prevent problems on site before they occur, (planning the delivery
and storage of equipment and materials).
Making safety inspections of the site when work is underway and ensuring regulations
relating to health, safety and the environment (HSE) are adhered to.
Using construction management software packages to plan smooth work flows.
Communicating with a range of people including the client, subcontractors, suppliers,
the public and the workforce.
Schedule the project in logical steps and budget time required to meet deadlines.
2. Page 2 of 8
10April2015
Determine labor requirements and dispatch workers to construction sites.
Inspect and review the project to monitor compliance with building and safety
codes, and other regulations.
Interpret and explain plans and contract terms to administrative staff, workers,
and clients, representing the owner or developer.
Prepare contracts and negotiate revisions, changes and additions to contractual
agreements with architects, consultants, clients, suppliers and subcontractors.
Obtain all necessary permits and licenses.
Direct and supervise workers.
Study job specifications to determine appropriate construction methods.
Select, contract, and oversee workers who complete specific pieces of the project,
such as painting or plumbing.
Requisition supplies and materials to complete construction project.
Prepare and submit budget estimates and progress and cost tracking reports.
Develop and implement quality control programs.
Take actions to deal with the results of delays, bad weather, or emergencies at
construction site.
Confer with supervisory personnel, owners, contractors, and design professionals to
discuss and resolve matters such as work procedures, complaints, and construction
problems.
Plan, organize, and direct activities concerned with the construction and maintenance
of structures, facilities, and systems.
Investigate damage, accidents, or delays at construction sites, to ensure that proper
procedures are being carried out.
Evaluate construction methods and determine cost-effectiveness of plans, using
computers.
May 2011 – July 2013 [ Modern Building for General Contracting
Company (MBC) ] – Abu Dhabi, UAE .
Construction manager / Civil Engineer
Project: 2 Buildings at Abu Dhabi Directorate of Traffic and Patrols (Annex Building
for Customer Care Service and Smart Traffic System Building )
With A plinth Area of 950 m²@ Al Zafrana – Abu Dhabi, UAE
Contract Value: AED 28 Millions
Client : MOI - Abu Dhabi Police GHQ
Consultant: SA ENG Consultant / Secure Construction
Responsibilities :
Execution, Monitoring, Controlling & Testing of the following tasks:
Setting up a system for all running items checking procedure i.e.
Reinforced Concrete works including calculation for sections before casting, quantities and
supervision on casting process + troubleshooting any problems during the process i.e.
[opened shuttering] + Quality controlling for concrete during casting process.
Raising [ I.R’s , R.F.I’s ,R .F.M’s ,R.F.C ] to consultant for getting the approvals for the
Consultant ,Following up the Replay from Consultant..
Prepare and Submitting the relevant shop drawing [ strap Beams & foundation& Columns
&Slabs---] to the concerned Authorities and following up the approvals
Monitoring subcontractor Inspection and Quality Control activities. Review, approve
3. Page 3 of 8
10April2015
and ensure implementation of Method Statements and Inspection & Test Plans.
Monitoring of NCR’s, corrective and preventive actions up to its close-out.
Monitoring / ensuring that site activities are executed in conformance with Client
technical specifications approved drawings and approved Method Statements.
Inspection of construction materials used at site.
Material and equipment receiving inspection checking of conformance from material
and equipment certificates.
Coordinating inspection with the Consultant and Third Party regarding Quality Control.
Construction manager / Civil Engineer
Project: Boundary wall ( 1200 L. m ) + Security Rooms and Customer Care
Building for Abu Dhabi Judicial Department with A Plinth Area of 600 m² @
Exhibition Centre– Abu Dhabi, UAE
Contract Value: AED 18 Millions
Client : Emirate of Abu Dhabi Judicial Department
Consultant: Beirut Engineering Consulting Bureau (BEC)
Responsibilities :
Execution, Monitoring, Controlling & Testing of the following tasks:
Prepare Project Scope of Work, Man -Hour Estimating and Mobilization of People
Participate as assigned in Co-Ordination meetings with the Client ,Vendors and
Subcontractors
Follow Up the Progress and the Time Schedule for the Project
Coordinate with the Consultant for Studying and Revise the shop Drawings which
Required for Works
Following with the Consultant the Payment and the Invoices for the Company and
Subcontractors
Follow up all items at the site with project engineers
Revise the time schedule for the site
Update the time schedule if there are any delay for any item
Discuss with the Consultant for any problems and Solutions
Follow up technical office and discussion technical issues with Stuff
Arrangement meeting with the consultant for any obstructions at the site
Coordinate between architectural and civil and MEP engineers to avoid any
obstructions at the site
Follow up safety issue with the safety manager
Writing all correspondence with consultant
Following Authorities (Abu Dhabi Municipality, ADJD, Sorouh, Bunya…).
Oct. 2008 – May 2011 [ Emirates Belbadi Contracting Company (EBC) ]
– Abu Dhabi, UAE
Project Engineer/ Civil Engineer
Project: Residential Tower with A Plinth Area of
1380 m²@ Al-Reem island – Abu Dhabi, UAE
Includes : Building of 2 Basement + Ground + 32 Typical Floors +Roof
Contract Value: AED 165 Millions
4. Page 4 of 8
10April2015
Client : Sea Side Properties
Consultant: Architectural and Planning Group (APG)
Responsibilities :
Execution, Monitoring, Controlling & Testing of the following tasks:
Setting up a system for all running items checking procedure i.e.
Co-Ordinate with Consultant and Concerned Parties to expedite the Approvals for all
activities on site.
Reinforced Concrete works including calculation for sections before casting, quantities and
supervision on casting process + troubleshooting any problems during the process i.e. [opened
shuttering] + Quality controlling for concrete during casting process.
Prepare and Submitting the relevant shop drawing [ pile cape& strap Beams &Raft foundation&
Columns &Slabs---] to the concerned Authorities and following up the approvals
Monitoring subcontractor Inspection and Quality Control activities. Review, approve and
ensure implementation of Method Statements and Inspection & Test Plans.
Study all Variation between Tender drawing &Approved drawing and Prepare Full Files for
Claims and Following up the Approval from Consultant.
Dealing plus Preparation of contracts of Sub-Contractor.
Discuss all technical issue (for steel and concrete details) and prepare all (R.F.I &R.F.C&R.F.M)
Following up the Replay from Consultant.
Estimating , Ordering and follow up the Delivery of construction materials used at site
Material and equipment receiving inspection checking of conformance from material and
equipment certificates.
Casting 208 bored piles (Dia.=100mm) &160 piles (Dia.=600mm)
Temporary De-watering system up to -15.10 m [ 8 Deep wells and pumps )
Excavation till max. excavation level (-8.30) C.L
Finalized all required test for piles:-
1. Static load test
2. Integrity test
3. Sonic test
making as built drawing for shoring(diaphragm wall and Bored piles)
Piles head treatment [ By using a Re-profiling material - master flex 980 t + Epoxy coating material
- master flow 410 plus ]
Casting all pile caps and basement slab.
Water proofing system(water proof main brain and protection board)for pile caps and
basement slab
Apr.2005 – Oct.2008 [ International Construction Group Company (ICGC) ]
– Dubai,UAE
Project Engineer/ Civil Engineer
Project: Multi Use ,Residential Tower with A Plinth area of
1750 m²@ JLT (Jumeirah Lakes Towers ) – Dubai, UAE
Includes : Building of 6 Basement + Ground + 34 Typical Floors +Mech. +Roof
Contract Value: AED 368 Millions
Client : Mr.Bassem SA AlSaqran & Mr.Jassim HA Zainat
Consultant: Dimensions Engineering Consultant (DEC)
5. Page 5 of 8
10April2015
Responsibilities :
Execution, Monitoring, Controlling & Testing of the following tasks:
Setting up a system for all running items checking procedure i.e.
Follow up and Supervise of all Activities of Civil and Arch. Works
Following the Enabling Works (Secant Piles and Diaphragm Wall System), Dewatering ( Deep
Well System ) ,and Excavation Works for the Site Location
Execution of the Central Piles ( 402 Piles ,80 and 120 cm Dia. ) for the Raft Foundation
Coordinate with the Consultant for studying and Revise the Shop Drawings for the Project
and making invoices for Subcontractors
Study project scope of work and prepare man-hour estimating and the project deviation
notices and Variations orders
Attendance of internal co-ordination meetings, co-ordination meetings with Client and
meetings with Vendors
Follow up the progress, document register, and control the man-hours
Reply to Technical Queries and Field design Changes
Preparation and Submission of Construction Procedures for Client approval Prior to
Commencement of Activities
Attend of Supervise Construction Activities of Project Team, Subcontractors and Suppliers
of Required Materials
Following Authorities (Dubai Municipality, Nakheel, EHS and Jafza….etc)
Project Engineer/ Civil Engineer
Projects : JORI (1) &JORI (2) &JOR(3)&JORI(4) PLOT NOS(16N MRH 300)&(16O MRH
300) & (16O MRH100)&(16B MRH 300) @ JV ( Jumeirah Village ) – Dubai, UAE
Secant piles & Diaphragm Wall Shoring System &Bored piles.
Consultant : Architectural and Planning Group
Responsibilities :
Execution, Monitoring, Controlling & Testing of the following tasks:
Supervision of Site preparation during mobilization period in accordance with construction
program.
Review drawings and specification and ensure understanding by Site Engineers, and
General Foreman Resolve any ambiguous technical issues with Construction Manager.
Follow-up with Site Engineer efficient usage of materials to minimize wastage, and supervise
materials storage area.
Monitor materials delivery and take necessary action with Construction Manager to ensure no
delays will occur.
623 Secant piles(750mm) drilled by temporary casing type,
(800mm) diaphragm wall thickness (shoring system).
436 Anchors fixed by wailer beam system and anchor plates drilled by(U.B.W)machine
temporary casing type & then tested by stressing via Hydraulic Jack Strands system
498 Bored Pile piles(700mm) drilled by temporary casing type
Complete excavation till maximum excavation level
Prepare for all tested required for piling :-
1Static load test
2-Integrity test
3-Sonic test
making as built drawing for shoring (diaphragm wall and Bored piles)
6. Page 6 of 8
10April2015
Site Engineer/ Civil Engineer
Project : My Tower Residential Building (5B+G+25FLOORS) building at Marina Dubai –
Diaphragm Wall Shoring System & Bored piles @ Dubai, UAE
Consultant : Dimensions engineering consultant
Responsibilities :
Execution, Monitoring, Controlling & Testing of the following tasks:
Supervision of Site preparation during mobilization period in accordance with construction
program. ( including Gide wall by used steel moulds)
Review drawings and specification and ensure understanding by Site Engineers, and General
Foreman Resolve any ambiguous technical issues with Construction Manager.
Follow-up with Site Engineer efficient usage of materials to minimize wastage, and supervise
materials storage area.
Monitor materials delivery and take necessary action with Construction Manager to ensure no
delays will occur.
(800mm) diaphragm wall thickness (shoring system) .
317Anchors fixed by wailer beam system and anchor plates drilled by(U.B.W)machine
temporary casing type & then tested by stressing via Hydraulic Jack Strands system
350 Bored Pile piles(1000mm) drilled by temporary casing type
Complete excavation till maximum excavation level
Prepare for all tested required for piling :-
1Static load test
2-Integrity test
3-Sonic test
Making as built Drawings for shoring (diaphragm wall and Bored piles)
Site Engineer/ Civil Engineer
Projects : commercial /office building (4B+G+14FLOORS) commercial / office building on
plot no.C-008-018 at tecom Dubai- Diaphragm Wall Shoring System &Bored
piles @ Dubai, UAE
Consultant : National Engineering Bureau
Responsibilities :
Execution, Monitoring, Controlling & Testing of the following tasks:
Setting up a system for all running items checking procedure (including Gide wall and
pentonit plant )
Reinforced Concrete works including calculation for sections before casting, quantities and
supervision on casting process + troubleshooting any problems during the process i.e. [opened
shuttering] + Quality controlling for concrete during casting process.
Prepare all shop drawing and bar bending schedule for steel reinforcement
Raising [ I.R’s , R.F.I’s ,R .F.M’s ,R.F.C ’s] to consultant for getting the approvals for the
running executed works and the Information required for completing the shop drawings in
addition to prepare inspections for the incoming materials to site.
(800mm) diaphragm wall thickness (shoring system) .
350 Anchors fixed by wailer beam system and anchor plates drilled by(U.B.W)machine
temporary casing type & then tested by stressing via Hydraulic Jack Strands system
226 Bored piles (dia=100mm) drilling by temporary casing type
Complete excavation till maximum excavation level
Prepare for all tested required for piling :-
7. Page 7 of 8
10April2015
1-Static load test
2-Integrity test
3-Sonic test
making as built drawing for shoring (diaphragm wall and Bored piles)
Project Engineer/ Civil Engineer
Project : Park Residential Hotel (2B+G+10F) @ Abu Dhabi, UAE
Secant piles shoring system &Bored piles
Consultant : Architectural and Planning Group
Responsibilities :
Execution, Monitoring, Controlling & Testing of the following tasks:
Setting up a system for all running items checking procedure ( including Gide wall by used
steel moulds)
Reinforced Concrete works including calculation for sections before casting, quantities and
supervision on casting process + troubleshooting any problems during the process i.e. [opened
shuttering] + Quality controlling for concrete during casting process.
Raising [ I.R’s , R.F.I’s ,R .F.M’s ,R.F.C, s] to consultant for getting the approvals for the
running executed works and the Information required for completing the shop drawings in
addition to prepare inspections for the incoming materials to site.
Monitoring of NCR’s, corrective and preventive actions up to its close-out.
Inspection of construction materials used at site.
Material and equipment receiving inspection checking of conformance from material and
equipment certificates.
Prepare and install all material for dewatering system(Deep well )
242 Bored piles (750 MM) &108(600mm) drilled by temporary casing type
Prepare for all tested required for piling :-
1Static load test
2-Integrity test
3-Sonic test
432 Secant piles(750mm) drilled by temporary casing type,
236 Anchors fixed by wailer beam system and anchor plates drilled by(U.B.W)machine
temporary casing type & then tested by stressing via Hydraulic Jack Strands system
Complete excavation till maximum excavation level
making as built drawing for shoring (diaphragm wall and Bored piles)
March 2004 – Apr. 2005 [Trobi Two Company for Touristic Development
Member of Amer Group ] – Cairo,Egypt.
Site Engineer/ Civil Engineer
Project : Construction of Porto Sokhna Beach Resort & Spa @ Ain Sokhna, EGYPT
Contract Value: L.E 445 Millions
Client : AMER GROUP
Consultant : Dr.AAbu-Zeid Consultant Engineering Bureau / Free Line
Responsibilities :
Execution, Monitoring, Controlling & Testing of the following tasks:
Review the Structural and Arch Drawings and steel details
8. Page 8 of 8
10April2015
Graduation Project SoilFoundation
Graduation Project Degree Distinction
Languages
Arabic : Mother Tongue
English: very good
Computer Skills Have good Experience in dealing with operating systems
AutoCAD Program
MS Office Products (Word, Excel,…..)
Network Fundamentals and Internet applications
Maintenance for Hard and Software
Casting concrete and follow up all concrete tests and Activities
Review all payment for Subcontractors and Suppliers
Review and checking all shop drawing received from Consultant and subcontractors
Attending the Coordination Meetings Between Clients and Consultant
Review and issue the invoices for Subcontractors
Order the Required Material for Constructions Stages ( Steel ,Concrete ,Blocks,…etc)
Following the Shop Drawings for the Site Activities
Ensure the Safety Issues with the Safety in charges
Participate with the Surveyors for checking the Co-ordinates for column and Slabs
Checking the Progress with the Technical Office to Comply with the Planned Schedule for
the Project
May 2003 – March 2004 [ Egyptian Danish Project Management &
Construction Company (Egydan).(Member of Dr: Bahgat Group)] –
Cairo,Egypt.
Site Engineer/ Civil Engineer
Project: Dreamland Village and Sheraton Dreamland Hotel @ Cairo, EGYPT
Responsibilities :
Execution, Monitoring, Controlling & Testing of the following tasks:
Construction and Finishing Works for SECTOR-5 Buildings at Dream Land and Sheraton
Dreamland Hotel
Review the Structural and Arch Drawings and steel details
Following the Structural Drawings
Making the Invoices for Subcontractor and Materials Suppliers.