Project study report prepared by M G
Morshad , ADGM
CIRCULATING WATER TREATMENT
SYSTEM
Project Consultant
LAHMEYER INTERNATIONAL(INDIA) pvt. Ltd.
Client : NLC / TPS II
Clients Representative
1. GM Operation
2. DGM / Chemical
3. DGM / Turbine Auxiliaries
4. CM / Chemical
5. CM / C& I
6. CM/ Turbine (O&S)
7. CM/ Electrical Mtce
1. To reduce/control the corrosion, scaling and
microbiological fouling in circulating water system
by improving water treatment procedure based on
recent water analysis report.
2. To reduce specific Water consumption of
circulating water system below 3.5 m3/MWH by
increasing COC from 1.2 to 5 as result of
improvement in water treatment procedure.
Project Objective
Process flow diagram
CT
CWPump
House
ForeBay
Lake
Power
House
Hot CW
Cold CW
Blow Down
water
ADPH
( Utilized for wet
ash disposal )
Excess water is
discharged out
side of TPS II at
village Nallahs
Evaporation
loss
Drift loss
Make up water
Bore well /TPSII
Make up water
Mine II
Circulating water parameters for stage I Units (3 x 210MW)
Parameters Formula Design Actual
Unit Load MW 210 210
Total load TL = 3 x MW 630 630
Circulating water flow per unit (m3/Hr) Q 30810 16500
Total flow (m3/Hr) TQ = 3 x Q 92430 49500
Hold up capaciy (m3) HC 114698 114698
Water untilazation U = (TQ/HC)x100 80.59% 43.16%
Reserve water R = 100 -U 19.41% 56.84%
Inlet Temperature T1 42.5 46
Outlet Temperature T2 34 38
Total Evaporation loss (m3/Hr) TE = 0.00085 x2.03 x TQx(T1-T2) 1355.65 683.30
% Evaporation Loss TE/TQ 1.47% 1.38%
Total Drift Loss (m3/Hr) TD = 0.02% x TQ 18.49 9.9
Blow down per unit (m3/Hr) BD 2193.3 670.3
Total Blow down (m3/Hr) TBD = 3 x BD 6579.9 2010.9
COC 1 + {TE / (TBD + TD)} 1.21 1.34
Total Make up (m3/Hr) TM = TE + TBD + TD 7954.03 2704.10
SWC (m3/MWhr) TM/TL 12.63 4.29
Circulating water parameters for stage I Units (4 x 210MW)
Parameters Formula Design Actual
Unit Load MW 210 210
Total load TL = 4 x MW 840 840
Circulating water flow per unit (m3/Hr) Q 31000 16500
Total flow (m3/Hr) TQ = 4 x Q 124000 66000
Hold up capaciy (m3) HC 120000 120000
Water untilazation U = (TQ/HC)x100 103.33% 55.00%
Reserve water R = 100 -U -3.33% 45.00%
Inlet Temperature T1 42.5 46
Outlet Temperature T2 34 37
Total Evaporation loss (m3/Hr) TE = 0.00085 x2.03 x TQx(T1-T2) 1861.47 1024.95
% Evaporation Loss TE/TQ 1.50% 1.55%
Total Drift Loss (m3/Hr) TD = 0.02% x TQ 24.80 13.2
Blow down per unit (m3/Hr) BD 2193.3 2011
Total Blow down (m3/Hr) TBD = 4 x BD 8773.2 8044
COC 1 + {TE / (TBD + TD)} 1.21 1.13
Total Make up (m3/Hr) TM = TE + TBD + TD 10659.47 9082.15
SWC (m3/MWhr) TM/TL 12.69 10.81
COC and SWC for Stage I Units
Cycle of
Concentration
COC 1.2 1.7 2 2.5 3 3.5 4 4.5 5
CW flow
(m3/Hr)
Q 92430 92430 92430 92430 92430 92430 92430 92430 92430
Evaporation Loss
(m3/Hr)
E 1357 1357 1357 1357 1357 1357 1357 1357 1357
Drift loss
(m3/Hr)
D 18.6 18.6 18.6 18.6 18.6 18.6 18.6 18.6 18.6
Blow Down
(m3/Hr)
BD =[E/(COC-1)]- D 6766.4 1920 1338 886.07 659.9 524.2 433.7 369.11 320.65
Make up
(m3/Hr)
MU =E +D+BD 8142 3295.6 2714 2261.7 2036 1900 1809 1744.7 1696.25
Unit Generation
(MW)
MW 630 630 630 630 630 630 630 630 630
Specific Water
Consumption
(m3/MWhr)
MU/MW 12.92 5.23 4.31 3.59 3.23 3.02 2.87 2.77 2.69
COC and SWC for Stage II Units
Cycle of
Concentration
COC 1.2 1.8 2 2.5 3 3.5 4 4.5 5
CW flow
(m3/Hr)
Q 93000 93000 93000 93000 93000 93000 93000 93000 93000
Evaporation Loss
(m3/Hr)
E 2077.44 2077.4 2077 2077.4 2077 2077 2077 2077.4 2077.44
Drift loss
(m3/Hr)
D 39.6 39.6 39.6 39.6 39.6 39.6 39.6 39.6 39.6
Blow Down
(m3/Hr)
BD = [E/(COC-1)]- D 10347.6 2557.2 2038 1345.4 999.1 791.4 652.9 553.95 479.76
Make up
(m3/Hr)
MU =E +D+BD 12464.64 4674.2 4155 3462.4 3116 2908 2770 2671 2596.8
Unit Generation
(MW)
MW 840 840 840 840 840 840 840 840 840
Specific Water
Consumption
(m3/MWhr)
MU/MW 14.84 5.56 4.95 4.12 3.71 3.46 3.30 3.18 3.09
1
10
100
1000
10000
1 2 3 4 5 6 7 8 9
COC
SWC
MU
BD
Water analysis report
I. The turbidity and TSS are below detection level for CW makeup water, Circulating
water for both stages This is due to the filtration property of soil for ground water.
Turbidity & Total
Suspended Solids
Unit
Limiting value :As per
IS-8188
Make up
water
Stage I /
Fore bay
Stage II /
Fore bay
Turbidity NTU
Not Greater than 50
NTU
BDL BDL BDL
Suspended solid(TSS) (mg/l ) or ppm NA BDL BDL BDL
I. As the feed water is from bore wells, the degree of hardness of CW makeup is Very
hard and so are the circulating water of both stages.
Water analysis report
Total
Hardness
Unit Limiting value :As per IS-8188
Make up
water
Stage I
/Fore bay
Stage II
/Fore bay
Total hardness (caco3) (mg/l ) or ppm Not Greater than 250 ppm as CaCO3 370 425 470
Mg+Fe (mg/l ) or ppm Not Greater than 0.5 ppm 31.59 39 46.17
Fe (mg/l ) or ppm ****** BDL BDL BDL
Na (mg/l ) or ppm NA 72 96 98
No3 (mg/l ) or ppm NA 4.32 4.92 5.06
I. Alkalinity is found to be higher in make up and circulating water in both stages
II. Higher the alkalinity, greater is the capacity of water to neutralize the acids.
III. Alkalinity is an important factor for calcium carbonate scales formed on the heat
exchanger surfaces.
Total
Alkalinity
Unit Limiting value :As per IS-8188
Make up
water
Stage I
/Fore bay
Stage II
/Fore
bay
Total Alkanity (caco3) (mg/l ) or ppm Not Greater than 200 ppm as CaCO3 240 250 320
Bi carbonate (mg/l ) or ppm NA 240 290 300
Carbonate (mg/l ) or ppm NA BDL 20 29
Water analysis report
Total Dissolved Solids,
Conductivity & Silica:
Unit
Limiting value :As per IS-
8188
Make up
water
Stage I /
Fore bay
Stage II /
Fore bay
Total Dissolved solids (TDS) (mg/l ) or ppm Not Greater than 500 ppm 621 671 841
Ca (mg/l ) or ppm NA 96.19 106 112.22
Mg (mg/l ) or ppm ****** 31.59 39 46.17
K (mg/l ) or ppm NA 4 6 5
So4 (mg/l ) or ppm Not Greater than 600 ppm 96.24 105.62 125.01
Fluoride (mg/l ) or ppm NA 0.61 0.69 0.67
Electrical Conductivity (μS/cm) NA 1248 1547 1813
Sio2 (mg/l ) or ppm Not Greater than 75 ppm 12.84 28.86 47.08
Cl (mg/l ) or ppm Approximately 1.3 118.77 139.2 173.21
Free Cl (mg/l ) or ppm 0.2-0.5 ppm BDL BDL BDL
Water analysis report
1. TDS comprise dissolved inorganic salts (principally calcium, magnesium, potassium,
sodium, bicarbonates, chlorides, and sulphates ) and some small amounts of organic
matter are found to be higher side.
2. Dissolved Chlorine is higher but free chlorine is found to be below detection level.
I. The dissolved oxygen is higher than limiting values.
II. Higher values of dissolved oxygen in water (more than 3 mg/l) promotes healthy
environment for microorganisms and increases the tendency of corrosion.
III. As dissolved oxygen in water is on higher side, demand of oxygen (COD) is not
detected.
IV. COD is the amount of oxygen required for degradation of organic compounds of
water to occur.
Dissolved Oxygen &
COD
Unit
Limiting value :As per IS-
8188
Make up
water
Stage I
/Fore bay
Stage II
/Fore bay
Chemical Oxygen Demand(COD) (mg/l ) or ppm Not Greater than 4 ppm BDL BDL BDL
Dissolved O2 (mg/l ) or ppm Not Greater than 3 ppm 6.1 5.9 5
Water analysis report
Stability Indices
(LSI & RSI)
Formula Make up Stage I Stage II
pH pH 7.71 8.53 8.48
TDS 621 671 841
TDS Factor - A A 0.2 0.2 0.2
Temperature 28.7 28.9 29.1
Temp Factor - B B 1.9 1.9 1.9
Calcium Hardness 370 425 470
Hardness Factor -C C 2.2 2.2 2.3
Alkalinity 240 250 320
Alkanity Factor -D D 2.4 2.4 2.5
pHs pHs =9.3+A+B – (C+D) 6.8 6.8 6.6
Langelier Index (LSI) = pH- pHs 0.91 1.73 1.88
Ryznar Index (RSI) = 2 pHs – pH 5.89 5.07 4.72
LSI=0 or RSI=6: Water is chemically balanced or Neutral
Moderate Scale
forming
Tendency
Very sever
Scale forming
Tendency
Very sever Scale
forming
Tendency
LSI<0 or RSI>6: Water has a Corrosive Tendency
LSI>0 or RSI<6: Water has a Scale forming Tendency
Water analysis report
Desired Circulating Water Quality Parameters
As per IS-8188
Microbiological
fouling in NDCT
Fills area
Microbial slimes in NDCT outer columnsMicrobiological fouling in CW channel
Physical conditions
COLTCS sponge balls removed along with Scale from
condenser tubes
PHE plates with microbiological fouling
being cleaned
Physical conditions
Blow down Chlorination Scale inhibitor
dosing
Present chemical treatment system
It is carried out for
maintaining calcium
concentration around
200 ppm based on
the water analysis at
frequent intervals.
"Shock dosing of
Chlorine“ at the rate
of 1.08 ppm and 0.81
ppm for Stage-I & II
respectively.
Continuous dosing of
HEDP“ at the rate of
0.57 ppm and 0.42
ppm for stage-I & II
respectively.
Continuous
monitoring
of water
parameters
Acid dosing
Proposed chemical treatment system
Dosing rate to
be increased
further to the
desire level
utilizing the
existing
facilities to
control the
growth of
microorganisms
Automatic
blow down
to maintain
the desire
parameters
Chlorination
To be
introduced to
reduce water
harness to
the desire
level
Dosing for
Corrosion
Inhibitor
To be
introduced
at the
require rate
to reduce
corrosion
Dosing for
Scale
Inhibitor
To be
introduced
at the
require rate
to reduce
scale
formation
Dosing for
Biocide
To be
introduced at
the require rate
to control the
growth of
microorganisms
New facilities to be created with capital investment
Chlorine Dosing Stage I Stage II Unit
Total Circulating Water Flow Q 92395 124000 m3/hr
Present Dosage Rate PDR 1.08 0.81 ppm
Maximum Dosage Rate MDR 7.79 7.74 ppm
Recommended dosing rate RDR = (MDR-PDR) 5 5 ppm
Required dosing per Hr RDH = Q x RDR/1000 461.975 620 Kg/Hr
Operating Hrs / day H 1.5 1.5 Hr
Required dosing per /day RDH x H 692.96 930.00 Kg/day
COC & water cost for Stage – I
COC
Corrosion
Inhibitor
Consumption
Scale
Inhibitor
Consumption
Biocide
Consumption
Chlorine
Consumption
Sulphuric Acid
Consumption
TotalannualchemicalcostCrRs
SWC(m3/MWhr)
Annualgen@85%PLF(MWHr)
Annualwaterconsumption(m3)
WatercostinRs/m3
Kg/day
Rs/Kg
AnnualcostCrRs
Kg/day
Rs/Kg
AnnualcostCrRs
Kg/day
Rs/Kg
AnnualcostCrRs
Kg/day
Rs/Kg
AnnualcostCrRs
Kg/day
Rs/Kg
AnnualcostCrRs
5 217.7 250 1.99 217.7 85 0.68 9.9 46 0.02 692.9 85 2.15 1467 270 14.46 17.30 2.69 195457 525780 329.02
2 158.3 250 1.44 158.3 85 0.49 3.17 46 0.01 692.9 85 2.15 855.9 270 8.43 11.08 4.31 195457 842421 131.54
1.2 380 250 3.47 380 85 1.18 0 46 0.00 692.9 85 2.15 0 270 0.00 3.33 12.92 195457 2525310 13.18
COC & water cost for Stage – II
COC
Corrosion
Inhibitor
Consumption
Scale Inhibitor
Consumption
Biocide
Consumption
Chlorine
Consumption
Sulphuric Acid
Consumption
TotalannualchemicalcostCrRs
SWC(m3/MWhr)
Annualgen@85%PLF(MWHr)
Annualwaterconsumption(m3)
WatercostinRs/m3
Kg/day
Rs/Kg
AnnualcostCrRs
Kg/day
Rs/Kg
AnnualcostCrRs
Kg/day
Rs/Kg
AnnualcostCrRs
Kg/day
Rs/Kg
AnnualcostCrRs
Kg/day
Rs/Kg
AnnualcostCrRs
5 346.8 250 3.16 346.8 85 1.08 15.75 46 0.03 930 85 2.89 2385 270 23.50 27.49 3.09 260610 805284 341.39
2 252.2 250 2.30 252.23 85 0.78 5.04 46 0.01 930 85 2.89 1363 270 13.43 17.11 4.95 260610 1290019 132.62
1.2 832.6 250 7.60 832.6 85 2.58 0 46 0.00 930 85 2.89 0 270 0.00 5.47 14.84 260610 3867452 14.14
Water cost = 81.588 x COC- 60.291
0
50
100
150
200
250
300
350
400
0 1 2 3 4 5 6
WatercostRs/m3
COC
Cost Analysis - Chlorination plant (Existing Plant)
CAPITAL COST RUNNING COST
Items Cr Rs
Consumable
Items
Annual cost
in Cr Rs
Operation &
maintenance
Annual cost
in Cr Rs
Construction of
building
0.00
Chlorine
(stage I +II)
5.04
Machine spare items
@10% of investment
0.00
Mechanical
equipment
0.25
Electrical
equipment
0.00 Manpower 0.00
Monitoring
equipment
0.00 Electrical energy for
250KW load at 65%
PLF @ Rs 3.90/Kwhr
0.00
Others 0.00
Total Investment 0.25
Total Annual
cost
5.04
Deprication @10% 0.03
Total Annual Cost 0.00Annual cost for
expected life span
of 20 years
0.01
Total annual Operation & maintenance cost of the plant : Rs 5.05 Cr
Cost Analysis - CW treatment plant (New Plant)
CAPITAL COST RUNNING COST
Items Cr Rs
Consumable
Items
Annual cost in
Cr Rs
Operation &
maintenance
Annual cost in
Cr Rs
Construction of
building
3.00
Corrosion Inhibitor
(stage I +II)
5.15 Machine spare
items @10% of
investment
0.80
Mechanical
equipment
2.00
Scale Inhibitor
(Sage I+II)
1.76
Electrical
equipment
0.50 Biocide(Stage I +II) 0.05 Manpower 0.50
Monitoring
equipment
2.00 Acid (Stage I +II) 37.96 Electrical energy
for 250KW load at
65% PLF @ Rs
3.90/Kwhr
0.02Others 0.50 Others 0.5
Total Investment 8.00
Total Annual cost 45.42
Deprication @10% 0.80
Total Annual Cost 1.32Annual cost for
expected life span
of 20 years
0.36
Total annual Operation & maintenance cost of the plant : Rs 47.10 Cr
MCC1MCC2
CWPH TR 1
1250 KVA
CWPH TR 2
1250 KVA
Location Lay Out of the new plant
StageIICirculating
WaterPumpHouse
Fore Bay
Existing
Chlorination
plant
Proposed
plantof
250KWload
Circulation
waterpumpfor
dryflyash
compressor
Load on CWPH Tr - 2 Load on CWPH Tr - 1
Feeder
(A)
Fire water
pump P5
(KW)
Dry Ash
pump
(KW)
Chlorination
house
feeder (A)
Feeder
(A)
Fire water
pump P4
(KW)
Fire
water
pump M3
(KW)
600 160 75 200 600 160 75
KVA 249 136 63.75 83 249 136 63.75
Total KVA 531.75 448.75
Operating KVA
@75%
398.8125 336.5625
Transformer KVA
capacity
1250 1250
% Loading level 31.91% 26.93%
Existing loading level for transformer
Loading level calculation with additional load
Normal Emergency
Stages Stage II Stage II
Formula CWPH Tr 1 CWPH Tr 2 CWPH Tr 1 CWPH Tr 2
Rated KVA Capacity KVA 1250 1250 1250 1250
Rated primary KV KVp 6.6 6.6 6.6 6.6
Rated Primary Amps Ip = KVA/(1.732xKVp) 109.35 109.35 109.35 109.35
Rated secondary KV KVs 0.415 0.415 0.415 0.415
Rated Primary Amps Is = KVA/(1.732xKVs) 152.13 152.13 152.13 152.13
Operating primary current
(Amps)
A 35.00 35.00 70.00 0.00
Max operating KVA KVA1 = 1.732 xA x KVp 400.09 400.09 800.18 0.00
% Loading KVA1/KVA 32.01% 32.01% 64.01% 0.00%
Addition Load (KW) AL 125 125 250 0
Additional KVA KVA2= AL/0.85 147.06 147.06 294.12 0.00
Current additional Load KVA2/(1.732*KVs) 204.60 204.60 409.19 0.00
Operating additional KVA
@70%
KVA3 = (KVA2 x70%) 102.94 102.94 205.88 0.00
Operating KVA with
additional load
KVA4 = (KVA3+KVA2) 503.03 503.03 1006.07 0.00
Expected % Loading with
additional load
EL = (KVA3/KVA)x100 40.24% 40.24% 80.49% 0.00%
Clarification required
1. As per water analysis report , chlorine (Cl) level is 118 - 173 mg/l above the limiting
values 1.3mg/l . But free chlorine is found to be below detection level. It is to be
clarified.
2. When chlorine level is already very high, why additional chlorine dosing has been
recommended?
3. When chlorine dosing is already in practice , why biocide is required for controlling
micro organism
4. COC has been calculated on the basis of design water flow . Because of this reason
chemical requirement for the treatment is found to be too high and therefore the cost
of the water has become as high as Rs 340/ m3 or Rs 0. 34 / litre . Effort may be made
to minimize the cost of water by calculating the actual flow or some alternate water
treatment methods.
5. Huge quantity of acid dosing has been recommended. The impact of acid dosing on
metal corrosion is to be clarified. Environmental impact is also be clarified.
6. It is to be confirmed whether similar CW treatment method has been adopted by any
thermal power plant in India.
THANK YOU

More Related Content

What's hot

Daikin Dhont - R-32 refrigerant installation & design aspects
Daikin   Dhont - R-32 refrigerant installation & design aspectsDaikin   Dhont - R-32 refrigerant installation & design aspects
Daikin Dhont - R-32 refrigerant installation & design aspects
Centro Studi Galileo
 
Flexigas symposium 20130415 dmt - jort langerak
Flexigas symposium 20130415   dmt - jort langerakFlexigas symposium 20130415   dmt - jort langerak
Flexigas symposium 20130415 dmt - jort langerak
Flexigas_Site
 
4. biogas upgrading with the carborex ms system small
4. biogas upgrading with the carborex ms system small4. biogas upgrading with the carborex ms system small
4. biogas upgrading with the carborex ms system small
Flexigas_Site
 
2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL
Sandra Broekema
 
New ton presentation_c
New ton  presentation_cNew ton  presentation_c
New ton presentation_c
EUROPAGES
 
Use of nitrogen purge in flare and vent systems
Use of nitrogen purge in flare and vent systemsUse of nitrogen purge in flare and vent systems
Use of nitrogen purge in flare and vent systems
Lanphuong Pham
 

What's hot (20)

Daikin Dhont - R-32 refrigerant installation & design aspects
Daikin   Dhont - R-32 refrigerant installation & design aspectsDaikin   Dhont - R-32 refrigerant installation & design aspects
Daikin Dhont - R-32 refrigerant installation & design aspects
 
Changing Best Practices in Flue Gas Analysis
Changing Best Practices in Flue Gas AnalysisChanging Best Practices in Flue Gas Analysis
Changing Best Practices in Flue Gas Analysis
 
G 1 sns-new era of cnt sensing technology
G 1  sns-new era of cnt sensing technologyG 1  sns-new era of cnt sensing technology
G 1 sns-new era of cnt sensing technology
 
Benfield system
Benfield systemBenfield system
Benfield system
 
Flexigas symposium 20130415 dmt - jort langerak
Flexigas symposium 20130415   dmt - jort langerakFlexigas symposium 20130415   dmt - jort langerak
Flexigas symposium 20130415 dmt - jort langerak
 
Europe User Conference: thermodynamic behaviour of HPHT reservoir fluids and ...
Europe User Conference: thermodynamic behaviour of HPHT reservoir fluids and ...Europe User Conference: thermodynamic behaviour of HPHT reservoir fluids and ...
Europe User Conference: thermodynamic behaviour of HPHT reservoir fluids and ...
 
Understanding DGA Techniques & Interpretations Presentation
Understanding DGA Techniques & Interpretations PresentationUnderstanding DGA Techniques & Interpretations Presentation
Understanding DGA Techniques & Interpretations Presentation
 
4. biogas upgrading with the carborex ms system small
4. biogas upgrading with the carborex ms system small4. biogas upgrading with the carborex ms system small
4. biogas upgrading with the carborex ms system small
 
Dissolve gas anylysis measurement and interpretation technique
Dissolve gas anylysis measurement and interpretation techniqueDissolve gas anylysis measurement and interpretation technique
Dissolve gas anylysis measurement and interpretation technique
 
2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL
 
Dissolved gas analysis
Dissolved gas analysisDissolved gas analysis
Dissolved gas analysis
 
Selection of Optimal Solid Sorbents for CO2 Capture Based on Gas Phase CO2 Co...
Selection of Optimal Solid Sorbents for CO2 Capture Based on Gas Phase CO2 Co...Selection of Optimal Solid Sorbents for CO2 Capture Based on Gas Phase CO2 Co...
Selection of Optimal Solid Sorbents for CO2 Capture Based on Gas Phase CO2 Co...
 
SYNGAS production
SYNGAS productionSYNGAS production
SYNGAS production
 
New ton presentation_c
New ton  presentation_cNew ton  presentation_c
New ton presentation_c
 
Dissolved Gas Analysis of conventional diagnosis techniques for transformer
Dissolved Gas Analysis of conventional diagnosis techniques for transformer Dissolved Gas Analysis of conventional diagnosis techniques for transformer
Dissolved Gas Analysis of conventional diagnosis techniques for transformer
 
Maximizing the Gas Processing Market by Combining NGL Recovery with LNG
Maximizing the Gas Processing Market by Combining NGL Recovery with LNGMaximizing the Gas Processing Market by Combining NGL Recovery with LNG
Maximizing the Gas Processing Market by Combining NGL Recovery with LNG
 
Dissolved Gas Analysis in Transformer Oil
Dissolved Gas Analysis in Transformer OilDissolved Gas Analysis in Transformer Oil
Dissolved Gas Analysis in Transformer Oil
 
GEO's Presentation on In Situ Thermal Remediation to EPA Region 9
GEO's Presentation on In Situ Thermal Remediation to EPA Region 9GEO's Presentation on In Situ Thermal Remediation to EPA Region 9
GEO's Presentation on In Situ Thermal Remediation to EPA Region 9
 
Nitrogen purging
Nitrogen  purgingNitrogen  purging
Nitrogen purging
 
Use of nitrogen purge in flare and vent systems
Use of nitrogen purge in flare and vent systemsUse of nitrogen purge in flare and vent systems
Use of nitrogen purge in flare and vent systems
 

Similar to Circulating water treatment project

WVWC - Alt Oxidant & CC - AZ Presentation May 2012
WVWC - Alt Oxidant & CC - AZ Presentation May 2012WVWC - Alt Oxidant & CC - AZ Presentation May 2012
WVWC - Alt Oxidant & CC - AZ Presentation May 2012
Joel Wade
 
C:\Documents And Settings\Jbalent\My Documents\Tio061610
C:\Documents And Settings\Jbalent\My Documents\Tio061610C:\Documents And Settings\Jbalent\My Documents\Tio061610
C:\Documents And Settings\Jbalent\My Documents\Tio061610
Jean Balent
 
P&U Operations Review Presentation_14032019.pptx
P&U Operations Review Presentation_14032019.pptxP&U Operations Review Presentation_14032019.pptx
P&U Operations Review Presentation_14032019.pptx
Aastharaj16
 
Shale Canada Water Recycling and Reuse 2015 Congress
Shale Canada Water Recycling and Reuse 2015 Congress Shale Canada Water Recycling and Reuse 2015 Congress
Shale Canada Water Recycling and Reuse 2015 Congress
Krzysztof (Kris) Palka
 

Similar to Circulating water treatment project (20)

IRJET- Hardness Removal of Groundwater by using Optimum Lime-Soda Process
IRJET-  	  Hardness Removal of Groundwater by using Optimum Lime-Soda ProcessIRJET-  	  Hardness Removal of Groundwater by using Optimum Lime-Soda Process
IRJET- Hardness Removal of Groundwater by using Optimum Lime-Soda Process
 
ELECTRODIALYSIS
ELECTRODIALYSISELECTRODIALYSIS
ELECTRODIALYSIS
 
Application on Semi-aerobic Landfill. Technology in in Tropical Climate: Lysi...
Application on Semi-aerobic Landfill. Technology in in Tropical Climate: Lysi...Application on Semi-aerobic Landfill. Technology in in Tropical Climate: Lysi...
Application on Semi-aerobic Landfill. Technology in in Tropical Climate: Lysi...
 
EM 365_Ch6_WATER POLLUTION ISSUES-1.pptx
EM 365_Ch6_WATER POLLUTION ISSUES-1.pptxEM 365_Ch6_WATER POLLUTION ISSUES-1.pptx
EM 365_Ch6_WATER POLLUTION ISSUES-1.pptx
 
WVWC - Alt Oxidant & CC - AZ Presentation May 2012
WVWC - Alt Oxidant & CC - AZ Presentation May 2012WVWC - Alt Oxidant & CC - AZ Presentation May 2012
WVWC - Alt Oxidant & CC - AZ Presentation May 2012
 
Water Analysis.pdf
Water Analysis.pdfWater Analysis.pdf
Water Analysis.pdf
 
C:\Documents And Settings\Jbalent\My Documents\Tio061610
C:\Documents And Settings\Jbalent\My Documents\Tio061610C:\Documents And Settings\Jbalent\My Documents\Tio061610
C:\Documents And Settings\Jbalent\My Documents\Tio061610
 
Water Treatment Plant Design by Damora, Waite, Yu, Maroofian
Water Treatment Plant Design by Damora, Waite, Yu, MaroofianWater Treatment Plant Design by Damora, Waite, Yu, Maroofian
Water Treatment Plant Design by Damora, Waite, Yu, Maroofian
 
Ge remove oxygen
Ge   remove oxygenGe   remove oxygen
Ge remove oxygen
 
WW Concept for students.pptx
WW Concept for students.pptxWW Concept for students.pptx
WW Concept for students.pptx
 
Wastewater Concepts for students.pptx
Wastewater Concepts for students.pptxWastewater Concepts for students.pptx
Wastewater Concepts for students.pptx
 
Noh reverse osmosis
Noh reverse osmosisNoh reverse osmosis
Noh reverse osmosis
 
P&U Operations Review Presentation_14032019.pptx
P&U Operations Review Presentation_14032019.pptxP&U Operations Review Presentation_14032019.pptx
P&U Operations Review Presentation_14032019.pptx
 
ReverseOsmosis recent trends.pptx
ReverseOsmosis recent trends.pptxReverseOsmosis recent trends.pptx
ReverseOsmosis recent trends.pptx
 
A Breaker-free, Non-damaging Friction Reducer for All-Brine Field Conditions
A Breaker-free, Non-damaging Friction Reducer for All-Brine Field ConditionsA Breaker-free, Non-damaging Friction Reducer for All-Brine Field Conditions
A Breaker-free, Non-damaging Friction Reducer for All-Brine Field Conditions
 
Desalination_BrineWaste
Desalination_BrineWasteDesalination_BrineWaste
Desalination_BrineWaste
 
Mark Killar, Western Pennsylvania Conservancy, “Sewickley Creek Cost/Benefit ...
Mark Killar, Western Pennsylvania Conservancy, “Sewickley Creek Cost/Benefit ...Mark Killar, Western Pennsylvania Conservancy, “Sewickley Creek Cost/Benefit ...
Mark Killar, Western Pennsylvania Conservancy, “Sewickley Creek Cost/Benefit ...
 
Basics on Cooling Tower & Water.pdf sana parveen
Basics on Cooling Tower & Water.pdf sana parveenBasics on Cooling Tower & Water.pdf sana parveen
Basics on Cooling Tower & Water.pdf sana parveen
 
Shale Canada Water Recycling and Reuse 2015 Congress
Shale Canada Water Recycling and Reuse 2015 Congress Shale Canada Water Recycling and Reuse 2015 Congress
Shale Canada Water Recycling and Reuse 2015 Congress
 
Water technology and green chemistry
Water technology and green chemistryWater technology and green chemistry
Water technology and green chemistry
 

More from Molla Morshad

More from Molla Morshad (20)

Solar generation for APC
Solar generation for APC Solar generation for APC
Solar generation for APC
 
Condition Monitoring of electrical machine
Condition Monitoring of electrical machine Condition Monitoring of electrical machine
Condition Monitoring of electrical machine
 
Design turbo generator
Design turbo generatorDesign turbo generator
Design turbo generator
 
Turbo generator
Turbo generator Turbo generator
Turbo generator
 
electrical system
electrical system electrical system
electrical system
 
insulation monitoring in electrical machine
insulation monitoring in electrical machine insulation monitoring in electrical machine
insulation monitoring in electrical machine
 
smart grid
smart grid smart grid
smart grid
 
southern grid
southern grid southern grid
southern grid
 
Motor Bearings
Motor Bearings Motor Bearings
Motor Bearings
 
Electrical Motor
Electrical Motor Electrical Motor
Electrical Motor
 
APC in thermal power plant
APC in thermal power plant APC in thermal power plant
APC in thermal power plant
 
Transformer oil analysis
Transformer oil analysisTransformer oil analysis
Transformer oil analysis
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance
 
ESP Rectifier transformer
ESP Rectifier transformerESP Rectifier transformer
ESP Rectifier transformer
 
Resource
ResourceResource
Resource
 
Islamic prayer namaz
Islamic prayer namazIslamic prayer namaz
Islamic prayer namaz
 
Swachh bharat
Swachh bharatSwachh bharat
Swachh bharat
 
Basic concept of inventory management
Basic concept of inventory management Basic concept of inventory management
Basic concept of inventory management
 
Reactors
ReactorsReactors
Reactors
 
Transformer oil-specifications new
Transformer oil-specifications newTransformer oil-specifications new
Transformer oil-specifications new
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 

Recently uploaded (20)

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 

Circulating water treatment project

  • 1. Project study report prepared by M G Morshad , ADGM CIRCULATING WATER TREATMENT SYSTEM Project Consultant LAHMEYER INTERNATIONAL(INDIA) pvt. Ltd. Client : NLC / TPS II Clients Representative 1. GM Operation 2. DGM / Chemical 3. DGM / Turbine Auxiliaries 4. CM / Chemical 5. CM / C& I 6. CM/ Turbine (O&S) 7. CM/ Electrical Mtce
  • 2. 1. To reduce/control the corrosion, scaling and microbiological fouling in circulating water system by improving water treatment procedure based on recent water analysis report. 2. To reduce specific Water consumption of circulating water system below 3.5 m3/MWH by increasing COC from 1.2 to 5 as result of improvement in water treatment procedure. Project Objective
  • 3. Process flow diagram CT CWPump House ForeBay Lake Power House Hot CW Cold CW Blow Down water ADPH ( Utilized for wet ash disposal ) Excess water is discharged out side of TPS II at village Nallahs Evaporation loss Drift loss Make up water Bore well /TPSII Make up water Mine II
  • 4. Circulating water parameters for stage I Units (3 x 210MW) Parameters Formula Design Actual Unit Load MW 210 210 Total load TL = 3 x MW 630 630 Circulating water flow per unit (m3/Hr) Q 30810 16500 Total flow (m3/Hr) TQ = 3 x Q 92430 49500 Hold up capaciy (m3) HC 114698 114698 Water untilazation U = (TQ/HC)x100 80.59% 43.16% Reserve water R = 100 -U 19.41% 56.84% Inlet Temperature T1 42.5 46 Outlet Temperature T2 34 38 Total Evaporation loss (m3/Hr) TE = 0.00085 x2.03 x TQx(T1-T2) 1355.65 683.30 % Evaporation Loss TE/TQ 1.47% 1.38% Total Drift Loss (m3/Hr) TD = 0.02% x TQ 18.49 9.9 Blow down per unit (m3/Hr) BD 2193.3 670.3 Total Blow down (m3/Hr) TBD = 3 x BD 6579.9 2010.9 COC 1 + {TE / (TBD + TD)} 1.21 1.34 Total Make up (m3/Hr) TM = TE + TBD + TD 7954.03 2704.10 SWC (m3/MWhr) TM/TL 12.63 4.29
  • 5. Circulating water parameters for stage I Units (4 x 210MW) Parameters Formula Design Actual Unit Load MW 210 210 Total load TL = 4 x MW 840 840 Circulating water flow per unit (m3/Hr) Q 31000 16500 Total flow (m3/Hr) TQ = 4 x Q 124000 66000 Hold up capaciy (m3) HC 120000 120000 Water untilazation U = (TQ/HC)x100 103.33% 55.00% Reserve water R = 100 -U -3.33% 45.00% Inlet Temperature T1 42.5 46 Outlet Temperature T2 34 37 Total Evaporation loss (m3/Hr) TE = 0.00085 x2.03 x TQx(T1-T2) 1861.47 1024.95 % Evaporation Loss TE/TQ 1.50% 1.55% Total Drift Loss (m3/Hr) TD = 0.02% x TQ 24.80 13.2 Blow down per unit (m3/Hr) BD 2193.3 2011 Total Blow down (m3/Hr) TBD = 4 x BD 8773.2 8044 COC 1 + {TE / (TBD + TD)} 1.21 1.13 Total Make up (m3/Hr) TM = TE + TBD + TD 10659.47 9082.15 SWC (m3/MWhr) TM/TL 12.69 10.81
  • 6. COC and SWC for Stage I Units Cycle of Concentration COC 1.2 1.7 2 2.5 3 3.5 4 4.5 5 CW flow (m3/Hr) Q 92430 92430 92430 92430 92430 92430 92430 92430 92430 Evaporation Loss (m3/Hr) E 1357 1357 1357 1357 1357 1357 1357 1357 1357 Drift loss (m3/Hr) D 18.6 18.6 18.6 18.6 18.6 18.6 18.6 18.6 18.6 Blow Down (m3/Hr) BD =[E/(COC-1)]- D 6766.4 1920 1338 886.07 659.9 524.2 433.7 369.11 320.65 Make up (m3/Hr) MU =E +D+BD 8142 3295.6 2714 2261.7 2036 1900 1809 1744.7 1696.25 Unit Generation (MW) MW 630 630 630 630 630 630 630 630 630 Specific Water Consumption (m3/MWhr) MU/MW 12.92 5.23 4.31 3.59 3.23 3.02 2.87 2.77 2.69
  • 7. COC and SWC for Stage II Units Cycle of Concentration COC 1.2 1.8 2 2.5 3 3.5 4 4.5 5 CW flow (m3/Hr) Q 93000 93000 93000 93000 93000 93000 93000 93000 93000 Evaporation Loss (m3/Hr) E 2077.44 2077.4 2077 2077.4 2077 2077 2077 2077.4 2077.44 Drift loss (m3/Hr) D 39.6 39.6 39.6 39.6 39.6 39.6 39.6 39.6 39.6 Blow Down (m3/Hr) BD = [E/(COC-1)]- D 10347.6 2557.2 2038 1345.4 999.1 791.4 652.9 553.95 479.76 Make up (m3/Hr) MU =E +D+BD 12464.64 4674.2 4155 3462.4 3116 2908 2770 2671 2596.8 Unit Generation (MW) MW 840 840 840 840 840 840 840 840 840 Specific Water Consumption (m3/MWhr) MU/MW 14.84 5.56 4.95 4.12 3.71 3.46 3.30 3.18 3.09
  • 8. 1 10 100 1000 10000 1 2 3 4 5 6 7 8 9 COC SWC MU BD
  • 9. Water analysis report I. The turbidity and TSS are below detection level for CW makeup water, Circulating water for both stages This is due to the filtration property of soil for ground water. Turbidity & Total Suspended Solids Unit Limiting value :As per IS-8188 Make up water Stage I / Fore bay Stage II / Fore bay Turbidity NTU Not Greater than 50 NTU BDL BDL BDL Suspended solid(TSS) (mg/l ) or ppm NA BDL BDL BDL
  • 10. I. As the feed water is from bore wells, the degree of hardness of CW makeup is Very hard and so are the circulating water of both stages. Water analysis report Total Hardness Unit Limiting value :As per IS-8188 Make up water Stage I /Fore bay Stage II /Fore bay Total hardness (caco3) (mg/l ) or ppm Not Greater than 250 ppm as CaCO3 370 425 470 Mg+Fe (mg/l ) or ppm Not Greater than 0.5 ppm 31.59 39 46.17 Fe (mg/l ) or ppm ****** BDL BDL BDL Na (mg/l ) or ppm NA 72 96 98 No3 (mg/l ) or ppm NA 4.32 4.92 5.06
  • 11. I. Alkalinity is found to be higher in make up and circulating water in both stages II. Higher the alkalinity, greater is the capacity of water to neutralize the acids. III. Alkalinity is an important factor for calcium carbonate scales formed on the heat exchanger surfaces. Total Alkalinity Unit Limiting value :As per IS-8188 Make up water Stage I /Fore bay Stage II /Fore bay Total Alkanity (caco3) (mg/l ) or ppm Not Greater than 200 ppm as CaCO3 240 250 320 Bi carbonate (mg/l ) or ppm NA 240 290 300 Carbonate (mg/l ) or ppm NA BDL 20 29 Water analysis report
  • 12. Total Dissolved Solids, Conductivity & Silica: Unit Limiting value :As per IS- 8188 Make up water Stage I / Fore bay Stage II / Fore bay Total Dissolved solids (TDS) (mg/l ) or ppm Not Greater than 500 ppm 621 671 841 Ca (mg/l ) or ppm NA 96.19 106 112.22 Mg (mg/l ) or ppm ****** 31.59 39 46.17 K (mg/l ) or ppm NA 4 6 5 So4 (mg/l ) or ppm Not Greater than 600 ppm 96.24 105.62 125.01 Fluoride (mg/l ) or ppm NA 0.61 0.69 0.67 Electrical Conductivity (μS/cm) NA 1248 1547 1813 Sio2 (mg/l ) or ppm Not Greater than 75 ppm 12.84 28.86 47.08 Cl (mg/l ) or ppm Approximately 1.3 118.77 139.2 173.21 Free Cl (mg/l ) or ppm 0.2-0.5 ppm BDL BDL BDL Water analysis report 1. TDS comprise dissolved inorganic salts (principally calcium, magnesium, potassium, sodium, bicarbonates, chlorides, and sulphates ) and some small amounts of organic matter are found to be higher side. 2. Dissolved Chlorine is higher but free chlorine is found to be below detection level.
  • 13. I. The dissolved oxygen is higher than limiting values. II. Higher values of dissolved oxygen in water (more than 3 mg/l) promotes healthy environment for microorganisms and increases the tendency of corrosion. III. As dissolved oxygen in water is on higher side, demand of oxygen (COD) is not detected. IV. COD is the amount of oxygen required for degradation of organic compounds of water to occur. Dissolved Oxygen & COD Unit Limiting value :As per IS- 8188 Make up water Stage I /Fore bay Stage II /Fore bay Chemical Oxygen Demand(COD) (mg/l ) or ppm Not Greater than 4 ppm BDL BDL BDL Dissolved O2 (mg/l ) or ppm Not Greater than 3 ppm 6.1 5.9 5 Water analysis report
  • 14. Stability Indices (LSI & RSI) Formula Make up Stage I Stage II pH pH 7.71 8.53 8.48 TDS 621 671 841 TDS Factor - A A 0.2 0.2 0.2 Temperature 28.7 28.9 29.1 Temp Factor - B B 1.9 1.9 1.9 Calcium Hardness 370 425 470 Hardness Factor -C C 2.2 2.2 2.3 Alkalinity 240 250 320 Alkanity Factor -D D 2.4 2.4 2.5 pHs pHs =9.3+A+B – (C+D) 6.8 6.8 6.6 Langelier Index (LSI) = pH- pHs 0.91 1.73 1.88 Ryznar Index (RSI) = 2 pHs – pH 5.89 5.07 4.72 LSI=0 or RSI=6: Water is chemically balanced or Neutral Moderate Scale forming Tendency Very sever Scale forming Tendency Very sever Scale forming Tendency LSI<0 or RSI>6: Water has a Corrosive Tendency LSI>0 or RSI<6: Water has a Scale forming Tendency Water analysis report
  • 15. Desired Circulating Water Quality Parameters As per IS-8188
  • 16.
  • 17. Microbiological fouling in NDCT Fills area Microbial slimes in NDCT outer columnsMicrobiological fouling in CW channel Physical conditions
  • 18. COLTCS sponge balls removed along with Scale from condenser tubes PHE plates with microbiological fouling being cleaned Physical conditions
  • 19. Blow down Chlorination Scale inhibitor dosing Present chemical treatment system It is carried out for maintaining calcium concentration around 200 ppm based on the water analysis at frequent intervals. "Shock dosing of Chlorine“ at the rate of 1.08 ppm and 0.81 ppm for Stage-I & II respectively. Continuous dosing of HEDP“ at the rate of 0.57 ppm and 0.42 ppm for stage-I & II respectively.
  • 20. Continuous monitoring of water parameters Acid dosing Proposed chemical treatment system Dosing rate to be increased further to the desire level utilizing the existing facilities to control the growth of microorganisms Automatic blow down to maintain the desire parameters Chlorination To be introduced to reduce water harness to the desire level Dosing for Corrosion Inhibitor To be introduced at the require rate to reduce corrosion Dosing for Scale Inhibitor To be introduced at the require rate to reduce scale formation Dosing for Biocide To be introduced at the require rate to control the growth of microorganisms New facilities to be created with capital investment
  • 21. Chlorine Dosing Stage I Stage II Unit Total Circulating Water Flow Q 92395 124000 m3/hr Present Dosage Rate PDR 1.08 0.81 ppm Maximum Dosage Rate MDR 7.79 7.74 ppm Recommended dosing rate RDR = (MDR-PDR) 5 5 ppm Required dosing per Hr RDH = Q x RDR/1000 461.975 620 Kg/Hr Operating Hrs / day H 1.5 1.5 Hr Required dosing per /day RDH x H 692.96 930.00 Kg/day
  • 22. COC & water cost for Stage – I COC Corrosion Inhibitor Consumption Scale Inhibitor Consumption Biocide Consumption Chlorine Consumption Sulphuric Acid Consumption TotalannualchemicalcostCrRs SWC(m3/MWhr) Annualgen@85%PLF(MWHr) Annualwaterconsumption(m3) WatercostinRs/m3 Kg/day Rs/Kg AnnualcostCrRs Kg/day Rs/Kg AnnualcostCrRs Kg/day Rs/Kg AnnualcostCrRs Kg/day Rs/Kg AnnualcostCrRs Kg/day Rs/Kg AnnualcostCrRs 5 217.7 250 1.99 217.7 85 0.68 9.9 46 0.02 692.9 85 2.15 1467 270 14.46 17.30 2.69 195457 525780 329.02 2 158.3 250 1.44 158.3 85 0.49 3.17 46 0.01 692.9 85 2.15 855.9 270 8.43 11.08 4.31 195457 842421 131.54 1.2 380 250 3.47 380 85 1.18 0 46 0.00 692.9 85 2.15 0 270 0.00 3.33 12.92 195457 2525310 13.18
  • 23. COC & water cost for Stage – II COC Corrosion Inhibitor Consumption Scale Inhibitor Consumption Biocide Consumption Chlorine Consumption Sulphuric Acid Consumption TotalannualchemicalcostCrRs SWC(m3/MWhr) Annualgen@85%PLF(MWHr) Annualwaterconsumption(m3) WatercostinRs/m3 Kg/day Rs/Kg AnnualcostCrRs Kg/day Rs/Kg AnnualcostCrRs Kg/day Rs/Kg AnnualcostCrRs Kg/day Rs/Kg AnnualcostCrRs Kg/day Rs/Kg AnnualcostCrRs 5 346.8 250 3.16 346.8 85 1.08 15.75 46 0.03 930 85 2.89 2385 270 23.50 27.49 3.09 260610 805284 341.39 2 252.2 250 2.30 252.23 85 0.78 5.04 46 0.01 930 85 2.89 1363 270 13.43 17.11 4.95 260610 1290019 132.62 1.2 832.6 250 7.60 832.6 85 2.58 0 46 0.00 930 85 2.89 0 270 0.00 5.47 14.84 260610 3867452 14.14
  • 24. Water cost = 81.588 x COC- 60.291 0 50 100 150 200 250 300 350 400 0 1 2 3 4 5 6 WatercostRs/m3 COC
  • 25. Cost Analysis - Chlorination plant (Existing Plant) CAPITAL COST RUNNING COST Items Cr Rs Consumable Items Annual cost in Cr Rs Operation & maintenance Annual cost in Cr Rs Construction of building 0.00 Chlorine (stage I +II) 5.04 Machine spare items @10% of investment 0.00 Mechanical equipment 0.25 Electrical equipment 0.00 Manpower 0.00 Monitoring equipment 0.00 Electrical energy for 250KW load at 65% PLF @ Rs 3.90/Kwhr 0.00 Others 0.00 Total Investment 0.25 Total Annual cost 5.04 Deprication @10% 0.03 Total Annual Cost 0.00Annual cost for expected life span of 20 years 0.01 Total annual Operation & maintenance cost of the plant : Rs 5.05 Cr
  • 26. Cost Analysis - CW treatment plant (New Plant) CAPITAL COST RUNNING COST Items Cr Rs Consumable Items Annual cost in Cr Rs Operation & maintenance Annual cost in Cr Rs Construction of building 3.00 Corrosion Inhibitor (stage I +II) 5.15 Machine spare items @10% of investment 0.80 Mechanical equipment 2.00 Scale Inhibitor (Sage I+II) 1.76 Electrical equipment 0.50 Biocide(Stage I +II) 0.05 Manpower 0.50 Monitoring equipment 2.00 Acid (Stage I +II) 37.96 Electrical energy for 250KW load at 65% PLF @ Rs 3.90/Kwhr 0.02Others 0.50 Others 0.5 Total Investment 8.00 Total Annual cost 45.42 Deprication @10% 0.80 Total Annual Cost 1.32Annual cost for expected life span of 20 years 0.36 Total annual Operation & maintenance cost of the plant : Rs 47.10 Cr
  • 27. MCC1MCC2 CWPH TR 1 1250 KVA CWPH TR 2 1250 KVA Location Lay Out of the new plant StageIICirculating WaterPumpHouse Fore Bay Existing Chlorination plant Proposed plantof 250KWload Circulation waterpumpfor dryflyash compressor
  • 28. Load on CWPH Tr - 2 Load on CWPH Tr - 1 Feeder (A) Fire water pump P5 (KW) Dry Ash pump (KW) Chlorination house feeder (A) Feeder (A) Fire water pump P4 (KW) Fire water pump M3 (KW) 600 160 75 200 600 160 75 KVA 249 136 63.75 83 249 136 63.75 Total KVA 531.75 448.75 Operating KVA @75% 398.8125 336.5625 Transformer KVA capacity 1250 1250 % Loading level 31.91% 26.93% Existing loading level for transformer
  • 29. Loading level calculation with additional load Normal Emergency Stages Stage II Stage II Formula CWPH Tr 1 CWPH Tr 2 CWPH Tr 1 CWPH Tr 2 Rated KVA Capacity KVA 1250 1250 1250 1250 Rated primary KV KVp 6.6 6.6 6.6 6.6 Rated Primary Amps Ip = KVA/(1.732xKVp) 109.35 109.35 109.35 109.35 Rated secondary KV KVs 0.415 0.415 0.415 0.415 Rated Primary Amps Is = KVA/(1.732xKVs) 152.13 152.13 152.13 152.13 Operating primary current (Amps) A 35.00 35.00 70.00 0.00 Max operating KVA KVA1 = 1.732 xA x KVp 400.09 400.09 800.18 0.00 % Loading KVA1/KVA 32.01% 32.01% 64.01% 0.00% Addition Load (KW) AL 125 125 250 0 Additional KVA KVA2= AL/0.85 147.06 147.06 294.12 0.00 Current additional Load KVA2/(1.732*KVs) 204.60 204.60 409.19 0.00 Operating additional KVA @70% KVA3 = (KVA2 x70%) 102.94 102.94 205.88 0.00 Operating KVA with additional load KVA4 = (KVA3+KVA2) 503.03 503.03 1006.07 0.00 Expected % Loading with additional load EL = (KVA3/KVA)x100 40.24% 40.24% 80.49% 0.00%
  • 30. Clarification required 1. As per water analysis report , chlorine (Cl) level is 118 - 173 mg/l above the limiting values 1.3mg/l . But free chlorine is found to be below detection level. It is to be clarified. 2. When chlorine level is already very high, why additional chlorine dosing has been recommended? 3. When chlorine dosing is already in practice , why biocide is required for controlling micro organism 4. COC has been calculated on the basis of design water flow . Because of this reason chemical requirement for the treatment is found to be too high and therefore the cost of the water has become as high as Rs 340/ m3 or Rs 0. 34 / litre . Effort may be made to minimize the cost of water by calculating the actual flow or some alternate water treatment methods. 5. Huge quantity of acid dosing has been recommended. The impact of acid dosing on metal corrosion is to be clarified. Environmental impact is also be clarified. 6. It is to be confirmed whether similar CW treatment method has been adopted by any thermal power plant in India.