SlideShare a Scribd company logo
1 of 7
Download to read offline
Executive Summary




RiverFIRST:
A Park Design Proposal and Implementation Framework
for the Minneapolis Upper Riverfront




DRAFT
Table of Contents                                                                       MR|DI Team
Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3               Minneapolis Park and Recreation Board                               Design Team
                                                                                        Jayne Miller, Superintendent                                        KVA Architecture & Planning
Executive Summary . . . . . . . . . . . . . . . . 4 ā€“ 7
                                                                                        Bruce Chamberlain, Assistant Superintendent for Planning            Sheila Kennedy, AIA
KVA RiverFIRST . . . . . . . . . . . . . . . . . . . . . . . . 8                        Dawn Sommers, Communications & Marketing Manager                    Frano Violich, FAIA
Guiding Principles . . . . . . . . . . . . . . . . . . . . . . . . . . 8 ā€“15            John Goodrich, Executive Assistant                                  Jungmin Nam
Overall Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 ā€“17
                                                                                        Tom Johnson, Engineering Technician II                              Kyle Coburn
Priority Projects
                                                                                        Tyler Stearns, Communications Intern                                Jeffrey Mansļ¬eld
Riverfront Trail System:
                                                                                                                                                            Katie Heinrich
   Loops . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 ā€“ 21
   Knot Bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
                                                                                        Project Management Team
                                                                                                                                                            TLS Landscape Architecture
   BioHaven . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23    Mary deLaittre, MR|DI Project Manager, Principal, Groundwork: The
                                                                                                                                                            Tom Leader, ASLA
                                                                                        Foundation for City Building
Farview Park Extension . . . . . . . . . . . . . . . . . . . . . 24 ā€“ 27                                                                                    Sara Peschel
                                                                                        Janette Law, Public Relations, Tableau Pro
Scherer Park District . . . . . . . . . . . . . . . . . . . . . . . . 28 ā€“ 31                                                                               Erik Prince
Northside Wetlands Park. . . . . . . . . . . . . . . . . . . . 32 ā€“ 37                  Pamela Miller, Graphic Design
                                                                                                                                                            Lily Ciammaichella
Downtown Gateway Park . . . . . . . . . . . . . . . . . . . . . . . 38                  Jeff Lin, BustOut Solutions
Visionary Projects                                                                                                                                          Structural Engineering
   Spirit Island . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39   Economic Advisors                                                   Hauke Jungjosian, Knippers Helbig, New York, NY/
   Northeast Riverfront Park . . . . . . . . . . . . . . . . . 40 ā€“ 43                  HR&A Advisors                                                       Stuttgart, Germany
                                                                                        Candace Damon
Implementation                                                                                                                                              Ecology
                                                                                        Danny Fuchs
Framework . . . . . . . . . . . . . . . . . . . . . . . . . . 44 ā€“ 47                                                                                       Peter MacDonagh, Kestrel Design Group, Minenapolis, MN
                                                                                        Dara Goldberg
Appendix A . . . . . . . . . . . . . . . . . . . . . . . . . 48 ā€“ 51                                                                                        Sarah Sutherland, Kestrel Design Group, Minneapolis, MN
                                                                                                                                                            Marty Melchoir, Inter-Fluve, Madison, WI
Appendix B . . . . . . . . . . . . . . . . . . . . . . . . . 52 ā€“ 70                    Step-Up Interns
                                                                                        Ciera McDufļ¬e                                                       Construction Management
Appendix C . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71                                                                                     Nate Pearson, Mortensen Construction, Minneapolis, MN
                                                                                        Kendall Ray
Thanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72       Abdifatah Yusuf                                                     Clark White
                                                                                        Martice Creamer
                                                                                        Ahmad Aly




                                                                                                                                 AFT
                                                                                        LaJeanna Fuller




                                                                                                                               DR
2
Introduction
20 September 2011                                                                and urban design teams as ļ¬nalists.The four teams included Ken Smith             Strategy
                                                                                 Workshop, New York; Stoss Landscape Urbanism, Boston; TLS/KVA, Berkeley;         The MR|DI has operated along seven strategic tracks to produce
Minneapolis Park and Recreation Board                                            and Turenscape, Beijing. Each were paid $30,000 and given two and a half         the development plan for the Upper Riverfront. This design-based
2117 West River Road                                                             months to create a vision. During this time, the MR|DC sponsored a series        process incorporated research, analysis and synthesis to produceā€”and
Minneapolis, MN 55411                                                            of community engagement events to cultivate support, provide information         realizeā€”a feasible implementation process that is equal parts inspiration
Dear Commissioners,                                                              to the designers about our community and its river, and educate the next         and sustainability.
                                                                                 generation of park stewards. The competing design teams made a public
We are at an historic moment. Just as Minneapolisā€™ civic leaders 125 years       presentation of their work at the Walker Art Center to an overļ¬‚ow crowd            Organizational Development. Create community-based Steering,
ago had the opportunity and foresight to create the park system we all           in January, and the following day the jury selected the winning team. TLS/         Technical and Advisory committees to help shape the design
enjoy today, the Minneapolis Park and Recreation Board (MPRB) now has            KVA and their RiverFIRST proposal were selected for their depth of research,       development strategy.
the opportunity to substantively plan for future generations of park users.      innovative and inspiring design, and fulļ¬llment of the competition goals.          Planning and Design. Research, analyze and synthesize information
                                                                                 There was tremendous interest in and support of the design competitionā€”a           to create the ļ¬nal deliverable: recommendations for a long-term
In this spirit, the Minneapolis Riverfront Development Initiative (MR|DI)
                                                                                 testament to the communityā€™s love of parks, passion for the Mississippi River      development framework and short- term project(s) identiļ¬cation.
submits a comprehensive vision, recommendation and implementation
                                                                                 and desire to be inspired by innovative city building.
plan for the RiverFIRST design proposal. The work of a team comprised of                                                                                            Community Engagement. Reconnect the broader community with the
Kennedy & Violich Architecture (KVA), Boston; Tom Leader Studio (TLS),           In April 2011, MPRB established the Minneapolis Riverfront Development             river and provide opportunities for community members to substantively
Berkeley; HR&A Advisorsā€”a real estate and economic development                   Initiative (MR|DI) as an interdisciplinary, comprehensive and integrated           engage in the creation of the design development strategy and
planning ļ¬rm from New York City; and Groundwork: The Foundation for City         planning endeavor to follow through with the promise of the competition,           contribute their knowledge of the river and neighborhoods.
Buildingā€”a Minneapolis-based planning ļ¬rm which managed the processā€”             to connect citizens and visitors with new multi-functional Upper Riverfront
this report is the culmination of a 12-month process and a milestone in what     parks. The MR|DI team was charged with taking the RiverFIRST proposal              Resource Identiļ¬cation. Identify public and private ļ¬nancing to ensure
will be a long-term Upper Mississippi River development strategy.                from vision to reality, researching the feasibility of the eight sites and 3       sustainable development.
                                                                                 systems that made up the plan and creating workable plan for short- and            Political. Cultivate support and advocacy.
Process                                                                          long-term development. Beginning in April, TLS/KVA and HR&A Advisors
In September of 2010, the MPRB and The Minneapolis Parks Foundation,                                                                                                Integration. Analyze existing plans, projects, proposals and
                                                                                 launched a three-month, in-depth information gathering process that
along with creative partners The University of Minnesota College                                                                                                    organizational structures to coordinate efforts and outcomes, including
                                                                                 was led by the MR|DI project team and included the Steering, Advisory
of Design and Walker Art Center, launched an international design                                                                                                   Above the Falls and the Park Boardā€™s Comprehensive Plan(s).
                                                                                 and Technical committees and the public. From June through August,
competition addressing Minneapolisā€™ Upper Riverfront. The competition,           as the team continued to reļ¬ne its proposal, the MR|DI implemented                 Communication. Maintain the open exchange of information among the
the Minneapolis Riverfront Design Competition (MR|DC) sought design              a multidimensional community engagement process to present the                     MR|DI, the public and stakeholders, communicate clearly, frequently and
proposals for the area of the Mississippi River extending from the Stone         RiverFIRST concept to interested communities, gather input and identify            with transparency.
Arch Bridge, north 5.5 miles to Minneapolisā€™ city limits, including land along   priority projects. What follows are the results of that intensive effort.
both sides of the river.                                                                                                                                          It is within this context that we submit this report, to assist the
                                                                                 Approach                                                                         Commissioners to imagine what could be and to make informed decisions.
The goals of the competition were to create a vision that:                                                                                                        Our hope is that we can continue to work together, as a community, to
                                                                                 The RiverFIRST proposal is critical to the creation of a larger regional
    Established parks as the engine for economic development                                                                                                      build on our past success and create an even better region for the future.
                                                                                 parks and trails network, as well as ecological and infrastructure systems.
    along the river                                                              It ļ¬lls a gap in the Mississippi River parks and trails system and contributes   Thank you for this historic opportunity,
    Knit both sides of the riverfront together with their surrounding            signiļ¬cantly to the improved water quality of the river, completes a critical
    communities, thereby transforming the river from a barrier to a connector    connection in the larger City of Minneapolis Grand Rounds and links into
                                                                                 the existing corridor initiatives taking place on both sides of the river.
    Re-focused the city toward one of the three great rivers of the world,                                                                                        Mary deLaittre
                                                                                 Furthermore, it creates a healthy community network and opportunities for
    an extraordinary environmental amenity that deļ¬nes Minneapolisā€™ civic                                                                                         MR|DI Project Manager
                                                                                 economic development, by tying into the expansive regional parks and trails
    identityā€”past, present and future                                                                                                                             Principal, Groundwork: The Foundation for City Building
                                                                                 system managed by the Three Rivers Park District and the Metropolitan




                                                                                                                                                     AFT
The competition attracted 55 preliminary designs from 14 countries on ļ¬ve        Council. When realized, the RiverFIRST proposal will enhance our regional
                                                                                 identity and reinforce our role as civic leaders in the 21st century.




                                                                                                                                                   DR
continents. From that pool of applicants a jury of 14 community decision
makers and design professionals selected four award-winning landscape




                                                                                                                                                                                                                                              3
Executive Summary
The Minneapolis Riverfront Development Initiative (MR|DI)      RiverFIRST                                                                  Farview Park Expansion: This major new park extension bridges
is a visionary planning effort for the Minneapolis Upper       The KVA/TLS concept, RiverFIRST, offers a dynamic vision for a              Interstate 94 and reconnects the high point of the city and
                                                               renewed and revitalized Upper River corridor through a proposed             communities in North Minneapolis with the Mississippi River. The
Mississippi River corridor that has comprised extensive
                                                               series of eight areas of opportunity. RiverFIRST well fulļ¬lls the three     proposal could ultimately cap the portion of I-94 between 26th and
research and analysis, design inquiry, community outreach,                                                                                 28th Streets North with a major expansion of Farview Park and the
                                                               goals of the design competition:
and consensus building. The Initiative is a collaboration                                                                                  greening of both streets.
among its sponsor, the Minneapolis Park and Recreation             Establish parks as the engine for economic development
                                                                   along the river                                                         Northside Wetlands Park: A molded alluvial wetland landscape is
Board (MPRB); two design ļ¬rmsā€”Kennedy & Violich
                                                                                                                                           reclaimed to create a civic-scaled climate change eco-infrastructure,
Architecture (KVA), Boston and Tom Leader Studio (TLS)             Knit both sides of the riverfront together with their surrounding       providing bio-ļ¬ltration for storm water ļ¬‚ows, increased ļ¬‚ood
Berkeley; HR&A Advisors, a real estate and economic                communities, thereby transforming the river from a barrier              protection, and new riverfront habitats.
development planning ļ¬rm from New York City; and                   to a connector
                                                                                                                                           Northeast Riverfront Park: Ravine landscapes remediate storm
Groundwork City Building, a Minneapolis-based planning             Re-focus the city toward one of the three great rivers of the world,    water and form stepped eco-stairs for ļ¬‚ows of water, people, and
ļ¬rm which is responsible for guiding the process, with             an extraordinary environmental amenity that deļ¬nes Minneapolisā€™         wildlife, and serve as high points to overlook the Mississippi, as well
public relations ļ¬rm Tableau Pro.                                  civic identityā€”past, present and future                                 as downtown Minneapolis.

The 5-month long collaboration of the MR|DI followed a         The eight RiverFIRST areas of opportunity include:                          Scherer Park: With the restoration of Hallā€™s Island and the creation
12-month process that began with an international design       Riverfront Trails: The RiverFIRST trail systemā€”a combination of             of a river beach cove, Scherer Park will serve as a recreational entry
                                                                                                                                           point to the Mississippi trail and park system for kayaks, bikes, skiers,
competition which awarded the commission to KVA/TLS out        pedestrian and bicycle trails along the riverā€™s banks and ā€œKnot
                                                               Bridgesā€ attached to existing bridgesā€”will complete critical                runners and walkers. The park will become a signature 21st-century
of 55 entries from around the world. It culminates with this                                                                               urban park landscape. It will be the center of a riverfront destination
comprehensive vision and implementation framework for 5.5      connections in the Grand Rounds system, and better connect North
                                                               Minneapolis to Northeast Minneapolis for pedestrians and cyclists.          ļ¬‚anked by Boom Island and Sheridan Park and surrounded by a
miles of the Minneapolis Upper Mississippi River corridor.                                                                                 vibrant mix of development that will energize the riverfront.
                                                               BioHavens: A protected network of ļ¬‚oating islands made of robust,
                                                               lightweight geo-textiles and 100% recycled PET materials, the               Spirit Island: A sacred place for the Dakota Indians for generations,
                                                               BioHavens will create riparian habitat for endangered species and           the now vanished Spirit Island will be symbolized by an illuminated
                                                               migratory birds by providing nesting and staging areas for endangered       river weir, which marks the site as the oracle and soul of the river. This
                                                               aquatic and land animals and plants while also cleaning water.              visual gesture will mark a commitment to a much deeper cross-cultural




   AFT
                                                                                                                                           understanding so important to the life of our city.




 DR
                                                               Downtown Gateway Park: A dramatic gateway to Minneapolis at
                                                               the historic gateway site of the Hennepin Avenue Bridge, linked to
                                                               the new Public Library via a proposed signature park and to Nicollet
                                                               Mall via a linear park. This project is lead by Trust for Public Land and
                                                               downtown interests.




4
Implementation                                                               Flexibility                                                               Priority Projects: 0-5 Year Plan
Local Solutions, Regional Impact                                             The RiverFIRST proposal offers built-in ļ¬‚exibility to phase investments   Based on the reļ¬nement of preliminary plans, extensive community
The Minneapolis park system is renown for the network of parkways,           and to be opportunistic. Land availability, funding changes,              engagement, and the ļ¬ve guiding implementation criteria listed
trails and greenways that interlink regional park destinations. The          philanthropy and development interests prompt the importance of           above, a series of systems and sites have emerged as priority
RiverFIRST proposal builds on this powerful legacy with the creation         altering course to capitalize on opportunities. The RiverFIRST proposal   demonstration projects for implementation in the near term:
of riverfront regional parks connected by a sophisticated network of         facilitates ļ¬‚exibility for those overseeing implementation.
                                                                                                                                                         Riverfront Trail System + Farview Park Connections:
ecological, infrastructure trail systems. It ļ¬lls a gap in the Mississippi   Phasing                                                                     Development of pedestrian and bike trails, ā€œKnot Bridgesā€ and
River parks and trails system and contributes signiļ¬cantly to the            Given its ambition, RiverFIRST will likely be built over a generation,      implementation of the Farview Park connections to the River via the
improved water quality of the river, completes a critical connection         or more. Successful completion of the plan will depend in substantial       North 26th Avenue Greenway and 28th Avenue connection.
in the larger Minneapolis Grand Rounds and links into the existing           part on thoughtful phasing. Getting the ļ¬rst phases right will set the
corridor initiatives taking place on both sides of the river. Furthermore,   stage for the long-term build-out of the grand vision presented in this     BioHavens: Builds on the highly successful demonstration project
it creates a healthy community network and opportunities for                 document. The early phases will need to embrace at least four criteria      launched in August, 2011 by ASLA at Spring Lake in Minneapolis.
economic development, by tying into the expansive regional parks             for success:
and trails system managed by the Three Rivers Park District and the                                                                                      Scherer Park: The proposal leverages a new signature riverfront
Metropolitan Council. When realized, the RiverFIRST proposal will                Bring the city from all neighborhoods and backgrounds                   park for economic development, and captures a portion of that
enhance our regional identity and reinforce our role as civic leaders in         to the river                                                            value for the long-term operations and maintenance of that park
the 21st century.                                                                                                                                        Northside Wetlands Park: Re-establishes historic ļ¬‚oodplain
                                                                                 Foster advocacy for plan completion from citizens, businesses,
A Focus of City-Building                                                         and institutions alike                                                  wetlands that create a public and ecological amenity offering an
Like the Minneapolis Grand Rounds have done throughout history, the                                                                                      opportunity to partner with research and education institutions. The
                                                                                 Secure positive media attention and promote a Minneapolis               park could anchor and create value for the Upper Harbor Terminal
RiverFIRST proposal establishes the Minneapolis Upper River corridor
                                                                                 brand of 21st century parks                                             redevelopment.
as a central public amenity around which economic development in
this part of the City will focus.                                                Cooperation among public sector agencies and partnership                Downtown Gateway Park: Establishes a downtown park
                                                                                 with private sector organizations and institutions                      destination of national signiļ¬cance, reestablishes an open space
Multiple Leaders
The proposal provides the opportunity for multiple organizations,                                                                                        link between downtown and the riverfront, and leverages existing
institutions and community interests to take leadership and/or                                                                                           efforts led by the Trust for Public Land and downtown stakeholders.
collaborative and supporting roles in implementation, depending on                                                                                     These ļ¬ve projects each have the potential to establish a successful
the project and the myriad variables that deļ¬ne the project.                                                                                           ļ¬rst phase of development that can build momentum for the
                                                                                                                                                       overall completion of RiverFIRST over time. They can be pursued
                                                                                                                                                       simultaneously, with support from multiple stakeholders, or in smaller
                                                                                                                                                       combinations, depending on resource availability.




                                                                                       DRAFT
                                                                                                                                                                                                                                5
Long Term Vision: 5 Years and Beyond                                        Operations and Maintenance Funding                                        Institutional Partnerships: Portions of the RiverFIRST plan
    Farview Park Extension: Builds on priority projects with the            Similar to capital costs, operating expenses and ongoing maintenance      should be stewarded by major institutions in Minneapolis and
    establishment of the 26th Avenue and 28th Avenue connections.           of these sites will be sourced from a combination of public and           the region. Allowing existing organizations to operate programs
    The longer-term vision would realize a green cap over I-94 and          private funding, as well as in-kind landscape management and              on the sites contemplated for redevelopment can support the
    transform the existing garbage transfer station into a river-related    strategies for developing earned income. A substantial portion of         planā€™s operational sustainability by displacing a need for public
    community education facility.                                           funds for operations and maintenance must be provided by MPRB,            funds to maintain the lands. MPRB, the City of Minneapolis, and
                                                                            as is standard practice in Minneapolis and cities across the country.     other project stakeholders should explore how organizations like
    Northeast Riverfront Park: Long-term acquisition of land and                                                                                      the St. Anthony Falls Laboratory or the University of Minnesota,
                                                                            A stable and substantial base of City funding is a prerequisite for
    easements allows the creation of park, storm water cleaning ravines,                                                                              among others, might support the ongoing operations of certain
                                                                            maximizing philanthropy, and will be required to ensure the park
    neighborhood connections and river access.                                                                                                        RiverFIRST proposals through institutional programming.
                                                                            meets its civic aspirations.
                                                                                                                                                      Certain sites may even be deeded (within the bounds of certain
    Spirit Island: Begins a process of substantive engagement with
                                                                            RiverFIRST will need to maximize opportunities for raising funds          restrictions due to regional park funding) to such organizations
    the Dakota community to determine interest in the creation of a
                                                                            from private resources for ongoing maintenance of the new parks           with agreements for public access and programming in
    commemorative art project and long-term collaboration to realize
                                                                            wherever possible to ensure that the costs of maintaining new parks is    perpetuity.
    the project.
                                                                            sustainable within MPRBā€™s operating budget.
                                                                                                                                                      Environmental Beneļ¬ts: Implementation of certain elements
Capital Funding                                                             In the initial years of the park development and operations, MPRB         of the RiverFIRST plan, such as the wetlands at Upper Harbor
Great ideas supported by great designsā€”like those envisioned for            funding will likely be the only major source of operating revenue         Terminal and the stormwater ravines along the Northeast Bluffs,
River FIRSTā€”paired with strong leadership from government, citizens,        for the park. Over time, however, as the vision is implemented and        can reduce the amount of impervious surface along the riverfront
businesses and institutions, have signiļ¬cant capacity to attract capital.   the MR|DI system becomes more successful ā€“ and requires more              and can also clean stormwater. As a result, property owners may
Groundswells of popular support for compelling projects can secure          investment ā€“ MPRB will need to rely on several potential sources of       be able to avert stormwater fees, which can run into the tens of
substantial capital funds from local, state, and federal governments.       additional revenue to ļ¬ll the likely funding gap. These sources should    thousands of dollars every year. Where there is a net saving of
While a strategy for capital funding is being developed for each            include the following:                                                    stormwater runoff, MPRB should seek to capture the excess in
project consideration should be given to:                                                                                                             stormwater fees that a property owner would have to pay if runoff
                                                                                Real Estate Development and Assessments: With the
                                                                                                                                                      were not averted or cleaned, so long as the property ownersā€™ net
     Investment from local institutions interested in particular portions       implementation of Scherer Park, new value will be created for
                                                                                                                                                      operating income is not disproportionately negatively affected.
     of the RiverFIRST plan should be priority stewards                         the surrounding district. Therefore, since real estate is typically
                                                                                the greatest potential source of privately-generated funds for        Philanthropy, Sponsorships, and Programming: In addition
     Portions of signature projects should be targeted for                      parkland operations and maintenance, and since either MPRB or         to the three primary sources targeted above, RiverFIRST
     philanthropic investments from individuals, foundations,                   the City of Minneapolis control developable land in the district,     stakeholders should cultivate the philanthropic community,
     and not-for-proļ¬t organizations                                            development on and/or around Scherer, Boom Island, and                potential corporate and institutional project sponsors, and major
     Use of the Elwell law and other funding strategies should be               Sheridan Park should be prioritized. And, in exchange for the right   events like those held at Boom Island, to help offset the costs of
     investigated to supplement other sources with funding from                 to develop, development agreements should outline long-term           operating the new parks. While these sources will be important
     special assessments                                                        participation in operating expenses.                                  for the sustainability of the plan, they are likely to be limited in
                                                                                                                                                      terms of total dollar value.
     MRPB, the City of Minneapolis, Hennepin County, and the
     Metropolitan Council should be prepared to make capital




                                                                                            AFT
     funds available for each of these projects to help leverage




                                                                                          DR
     third-party sources




6
Governance                                                               Suggested Next Steps
Implementation of the RiverFirst plan will affect lands owned by many    The project team will present and deliver copies of the RiverFIRST
different parties, each of whom will have responsibilities for plan      proposal and implementation framework to the Minneapolis Park and
stewardship. It also will have economic and ļ¬scal impacts of interest    Recreation Board on September 21, 2011.
not only to MPRB, but also the City of Minneapolis, Hennepin County,
                                                                         MPRB Staff intent for the project from this point forward is to allow an
and the entire Twin Cities Metropolitan Region. Stewardship of the
                                                                         ā€œincubation periodā€ for the revised RiverFIRST plan over the next two
RiverFIRST plan, both in terms of implementation guidance and
                                                                         months. That time could include a formal public comment period,
ongoing parkland operations and maintenance, must, therefore, be a
                                                                         ongoing project management and communication activities, as well as
collaborative effort.
                                                                         preparation by Staff of proposed next steps for consideration by the
The City Department of Planning and Economic Development should          Board later this year. Examples of next-step actions are:
work closely with MPRB as it ļ¬nalizes the revised Above the Falls plan
                                                                             Formal approval of the report
to ensure that land use recommendations and investments in public
infrastructure are properly coordinated. These two agencies must also        Authorization of phase 1 implementation/construction documents
work together to attract appropriate development to riverfront sites
and set in place agreements for such real estate developments to             Authorization to initiate a collaborative effort with the City of
provide ongoing sources of funds for parkland beneļ¬ts.                       Minneapolis to update the Above the Falls Master Plan.

The ļ¬ve priority projects for RiverFIRST should follow an action plan
established by lead organizations:

    MPRB should spearhead the completion of the Riverfront Trail
    System/Farview Park connections and the recreational/supportive
    development of Scherer Park.

    The City Department of Planning and Economic Development
    should advance the comprehensive redevelopment of the Upper
    Harbor Terminal site, implementing the proposed wetlands as
    part of its plan.

    The Trust for Public Land should continue to work with downtown
    stakeholders, the City of Minneapolis and MPRB to implement




                                                                                                                   AFT
    the Downtown Gateway Park.




                                                                                                                 DR
    Multiple key organizations should collaborate to implement
    BioHavens (ļ¬‚oating islands).




                                                                                                                                                    7

More Related Content

Similar to Executive Summary - Draft RiverFIRST Proposal

RiverFIRST: A Parks Design Proposal and Implementation Framework for the Min...
 RiverFIRST: A Parks Design Proposal and Implementation Framework for the Min... RiverFIRST: A Parks Design Proposal and Implementation Framework for the Min...
RiverFIRST: A Parks Design Proposal and Implementation Framework for the Min...RiverFirst Initiative
Ā 
SRP Metro Phoenix Business Study
SRP Metro Phoenix Business StudySRP Metro Phoenix Business Study
SRP Metro Phoenix Business Studyaztechcouncil
Ā 
Grag final report - rough draft
Grag final report - rough draftGrag final report - rough draft
Grag final report - rough draftLeah79
Ā 
RiverFirst Vision (Final 2012)
RiverFirst Vision (Final 2012)RiverFirst Vision (Final 2012)
RiverFirst Vision (Final 2012)RiverFirst Initiative
Ā 
Disintegrated development in the rural urban fringe
Disintegrated development in the rural urban fringe Disintegrated development in the rural urban fringe
Disintegrated development in the rural urban fringe ruralfringe
Ā 
Design for public services- The fourth way
Design for public services- The fourth wayDesign for public services- The fourth way
Design for public services- The fourth wayforumvirium
Ā 
Green Asset Management Toolkit: for Multifamily Housing
Green Asset Management Toolkit: for Multifamily HousingGreen Asset Management Toolkit: for Multifamily Housing
Green Asset Management Toolkit: for Multifamily HousingRashard Dyess-Lane
Ā 
GREEN ROOF ADVISORY GROUP, Austin TX
GREEN ROOF ADVISORY GROUP, Austin TXGREEN ROOF ADVISORY GROUP, Austin TX
GREEN ROOF ADVISORY GROUP, Austin TXFlanna489y
Ā 
The Brewery Sustainability Guidelines Milwaukee, Wi
The Brewery Sustainability Guidelines  Milwaukee, WiThe Brewery Sustainability Guidelines  Milwaukee, Wi
The Brewery Sustainability Guidelines Milwaukee, Wiswhayland
Ā 
Economics Of Sustainable Development
Economics Of Sustainable DevelopmentEconomics Of Sustainable Development
Economics Of Sustainable Developmentjseder
Ā 
Mapping environmental risks Evaluating Preformance Standards Zoning
Mapping environmental risks  Evaluating Preformance Standards ZoningMapping environmental risks  Evaluating Preformance Standards Zoning
Mapping environmental risks Evaluating Preformance Standards ZoningDiane Dreyfus
Ā 
High Performance Green Building: What is it worth?
High Performance Green Building: What is it worth?High Performance Green Building: What is it worth?
High Performance Green Building: What is it worth?scottbrooker
Ā 
Group Violence Intervention: Implementation Guide
Group Violence Intervention: Implementation GuideGroup Violence Intervention: Implementation Guide
Group Violence Intervention: Implementation GuidePatricia Hall
Ā 
Technical Proposal Hrsa Dvta Ii
Technical Proposal Hrsa Dvta IiTechnical Proposal Hrsa Dvta Ii
Technical Proposal Hrsa Dvta Iiriverasierra
Ā 
James c. schwab, editor hazard mitigation integrating be
James c. schwab, editor hazard mitigation integrating beJames c. schwab, editor hazard mitigation integrating be
James c. schwab, editor hazard mitigation integrating bessuserd93c47
Ā 
Complete Thesis Draft 2.2compress
Complete Thesis   Draft 2.2compressComplete Thesis   Draft 2.2compress
Complete Thesis Draft 2.2compressMusstanser Tinauli
Ā 
2020 EDUCAUSE Horizon Report ā„¢ Teaching and Learning Edition
2020 EDUCAUSE Horizon Report ā„¢ Teaching and Learning Edition 2020 EDUCAUSE Horizon Report ā„¢ Teaching and Learning Edition
2020 EDUCAUSE Horizon Report ā„¢ Teaching and Learning Edition eraser Juan JosĆ© CalderĆ³n
Ā 
SSTRM - StrategicReviewGroup.ca - Human and Systems Integration Workshop - Vo...
SSTRM - StrategicReviewGroup.ca - Human and Systems Integration Workshop - Vo...SSTRM - StrategicReviewGroup.ca - Human and Systems Integration Workshop - Vo...
SSTRM - StrategicReviewGroup.ca - Human and Systems Integration Workshop - Vo...Phil Carr
Ā 

Similar to Executive Summary - Draft RiverFIRST Proposal (20)

RiverFIRST: A Parks Design Proposal and Implementation Framework for the Min...
 RiverFIRST: A Parks Design Proposal and Implementation Framework for the Min... RiverFIRST: A Parks Design Proposal and Implementation Framework for the Min...
RiverFIRST: A Parks Design Proposal and Implementation Framework for the Min...
Ā 
SRP Metro Phoenix Business Study
SRP Metro Phoenix Business StudySRP Metro Phoenix Business Study
SRP Metro Phoenix Business Study
Ā 
Grag final report - rough draft
Grag final report - rough draftGrag final report - rough draft
Grag final report - rough draft
Ā 
RiverFirst Vision (Final 2012)
RiverFirst Vision (Final 2012)RiverFirst Vision (Final 2012)
RiverFirst Vision (Final 2012)
Ā 
Disintegrated development in the rural urban fringe
Disintegrated development in the rural urban fringe Disintegrated development in the rural urban fringe
Disintegrated development in the rural urban fringe
Ā 
A Placemaking Vision for Downtown Detroit
A Placemaking Vision for Downtown DetroitA Placemaking Vision for Downtown Detroit
A Placemaking Vision for Downtown Detroit
Ā 
Design for public services- The fourth way
Design for public services- The fourth wayDesign for public services- The fourth way
Design for public services- The fourth way
Ā 
Green Asset Management Toolkit: for Multifamily Housing
Green Asset Management Toolkit: for Multifamily HousingGreen Asset Management Toolkit: for Multifamily Housing
Green Asset Management Toolkit: for Multifamily Housing
Ā 
GREEN ROOF ADVISORY GROUP, Austin TX
GREEN ROOF ADVISORY GROUP, Austin TXGREEN ROOF ADVISORY GROUP, Austin TX
GREEN ROOF ADVISORY GROUP, Austin TX
Ā 
The Brewery Sustainability Guidelines Milwaukee, Wi
The Brewery Sustainability Guidelines  Milwaukee, WiThe Brewery Sustainability Guidelines  Milwaukee, Wi
The Brewery Sustainability Guidelines Milwaukee, Wi
Ā 
Economics Of Sustainable Development
Economics Of Sustainable DevelopmentEconomics Of Sustainable Development
Economics Of Sustainable Development
Ā 
Mapping environmental risks Evaluating Preformance Standards Zoning
Mapping environmental risks  Evaluating Preformance Standards ZoningMapping environmental risks  Evaluating Preformance Standards Zoning
Mapping environmental risks Evaluating Preformance Standards Zoning
Ā 
High Performance Green Building: What is it worth?
High Performance Green Building: What is it worth?High Performance Green Building: What is it worth?
High Performance Green Building: What is it worth?
Ā 
Group Violence Intervention: Implementation Guide
Group Violence Intervention: Implementation GuideGroup Violence Intervention: Implementation Guide
Group Violence Intervention: Implementation Guide
Ā 
Iwspm2006proceeding
Iwspm2006proceedingIwspm2006proceeding
Iwspm2006proceeding
Ā 
Technical Proposal Hrsa Dvta Ii
Technical Proposal Hrsa Dvta IiTechnical Proposal Hrsa Dvta Ii
Technical Proposal Hrsa Dvta Ii
Ā 
James c. schwab, editor hazard mitigation integrating be
James c. schwab, editor hazard mitigation integrating beJames c. schwab, editor hazard mitigation integrating be
James c. schwab, editor hazard mitigation integrating be
Ā 
Complete Thesis Draft 2.2compress
Complete Thesis   Draft 2.2compressComplete Thesis   Draft 2.2compress
Complete Thesis Draft 2.2compress
Ā 
2020 EDUCAUSE Horizon Report ā„¢ Teaching and Learning Edition
2020 EDUCAUSE Horizon Report ā„¢ Teaching and Learning Edition 2020 EDUCAUSE Horizon Report ā„¢ Teaching and Learning Edition
2020 EDUCAUSE Horizon Report ā„¢ Teaching and Learning Edition
Ā 
SSTRM - StrategicReviewGroup.ca - Human and Systems Integration Workshop - Vo...
SSTRM - StrategicReviewGroup.ca - Human and Systems Integration Workshop - Vo...SSTRM - StrategicReviewGroup.ca - Human and Systems Integration Workshop - Vo...
SSTRM - StrategicReviewGroup.ca - Human and Systems Integration Workshop - Vo...
Ā 

More from RiverFirst Initiative

Finance Strategy: Initial Findings (May 2013)
Finance Strategy: Initial Findings (May 2013)Finance Strategy: Initial Findings (May 2013)
Finance Strategy: Initial Findings (May 2013)RiverFirst Initiative
Ā 
Executive Summary: Schematic Design, Finance Strategy and Next Steps
Executive Summary: Schematic Design, Finance Strategy and Next StepsExecutive Summary: Schematic Design, Finance Strategy and Next Steps
Executive Summary: Schematic Design, Finance Strategy and Next StepsRiverFirst Initiative
Ā 
RiverFirst Schematic Design: Mid-term Presentation
RiverFirst Schematic Design: Mid-term PresentationRiverFirst Schematic Design: Mid-term Presentation
RiverFirst Schematic Design: Mid-term PresentationRiverFirst Initiative
Ā 
Themes Emerge from Funding Strategy Research
Themes Emerge from Funding Strategy ResearchThemes Emerge from Funding Strategy Research
Themes Emerge from Funding Strategy ResearchRiverFirst Initiative
Ā 
2012 11-30 RiverFirst dnr-usace presentation
2012 11-30 RiverFirst dnr-usace presentation2012 11-30 RiverFirst dnr-usace presentation
2012 11-30 RiverFirst dnr-usace presentationRiverFirst Initiative
Ā 
R1 Steering Committee 2012 10-11
R1 Steering Committee 2012 10-11R1 Steering Committee 2012 10-11
R1 Steering Committee 2012 10-11RiverFirst Initiative
Ā 
Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)
Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)
Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)RiverFirst Initiative
Ā 
Design Concepts & Implementation Plan - Draft RiverFIRST Proposal
Design Concepts & Implementation Plan - Draft RiverFIRST ProposalDesign Concepts & Implementation Plan - Draft RiverFIRST Proposal
Design Concepts & Implementation Plan - Draft RiverFIRST ProposalRiverFirst Initiative
Ā 
Appendices - Draft RiverFIRST Proposal
Appendices - Draft RiverFIRST ProposalAppendices - Draft RiverFIRST Proposal
Appendices - Draft RiverFIRST ProposalRiverFirst Initiative
Ā 
Riverfront Projects Summer 2010
Riverfront Projects Summer 2010Riverfront Projects Summer 2010
Riverfront Projects Summer 2010RiverFirst Initiative
Ā 
RiverFIRST site design and analysis-book
RiverFIRST site design and analysis-bookRiverFIRST site design and analysis-book
RiverFIRST site design and analysis-bookRiverFirst Initiative
Ā 
Business Planning for a 21st Century Park System
Business Planning for a 21st Century Park SystemBusiness Planning for a 21st Century Park System
Business Planning for a 21st Century Park SystemRiverFirst Initiative
Ā 
TLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 MayTLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 MayRiverFirst Initiative
Ā 
Upper Riverfront Map+Timeline Presentation (24-25 May 2011)
Upper Riverfront Map+Timeline Presentation (24-25 May 2011)Upper Riverfront Map+Timeline Presentation (24-25 May 2011)
Upper Riverfront Map+Timeline Presentation (24-25 May 2011)RiverFirst Initiative
Ā 
Minneapolis Riverfront Design Competition Siteseeing Youth Engagement
Minneapolis Riverfront Design Competition Siteseeing Youth Engagement Minneapolis Riverfront Design Competition Siteseeing Youth Engagement
Minneapolis Riverfront Design Competition Siteseeing Youth Engagement RiverFirst Initiative
Ā 
Land, Water, People: New Parks in Practice
Land, Water, People: New Parks in PracticeLand, Water, People: New Parks in Practice
Land, Water, People: New Parks in PracticeRiverFirst Initiative
Ā 

More from RiverFirst Initiative (18)

Finance Strategy: Initial Findings (May 2013)
Finance Strategy: Initial Findings (May 2013)Finance Strategy: Initial Findings (May 2013)
Finance Strategy: Initial Findings (May 2013)
Ā 
Executive Summary: Schematic Design, Finance Strategy and Next Steps
Executive Summary: Schematic Design, Finance Strategy and Next StepsExecutive Summary: Schematic Design, Finance Strategy and Next Steps
Executive Summary: Schematic Design, Finance Strategy and Next Steps
Ā 
RiverFirst Schematic Design: Mid-term Presentation
RiverFirst Schematic Design: Mid-term PresentationRiverFirst Schematic Design: Mid-term Presentation
RiverFirst Schematic Design: Mid-term Presentation
Ā 
Themes Emerge from Funding Strategy Research
Themes Emerge from Funding Strategy ResearchThemes Emerge from Funding Strategy Research
Themes Emerge from Funding Strategy Research
Ā 
2012 11-30 RiverFirst dnr-usace presentation
2012 11-30 RiverFirst dnr-usace presentation2012 11-30 RiverFirst dnr-usace presentation
2012 11-30 RiverFirst dnr-usace presentation
Ā 
R1 Steering Committee 2012 10-11
R1 Steering Committee 2012 10-11R1 Steering Committee 2012 10-11
R1 Steering Committee 2012 10-11
Ā 
Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)
Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)
Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)
Ā 
Design Concepts & Implementation Plan - Draft RiverFIRST Proposal
Design Concepts & Implementation Plan - Draft RiverFIRST ProposalDesign Concepts & Implementation Plan - Draft RiverFIRST Proposal
Design Concepts & Implementation Plan - Draft RiverFIRST Proposal
Ā 
Appendices - Draft RiverFIRST Proposal
Appendices - Draft RiverFIRST ProposalAppendices - Draft RiverFIRST Proposal
Appendices - Draft RiverFIRST Proposal
Ā 
Riverfront Projects Summer 2010
Riverfront Projects Summer 2010Riverfront Projects Summer 2010
Riverfront Projects Summer 2010
Ā 
RiverFIRST site design and analysis-book
RiverFIRST site design and analysis-bookRiverFIRST site design and analysis-book
RiverFIRST site design and analysis-book
Ā 
Business Planning for a 21st Century Park System
Business Planning for a 21st Century Park SystemBusiness Planning for a 21st Century Park System
Business Planning for a 21st Century Park System
Ā 
TLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 MayTLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 May
Ā 
Upper Riverfront Map+Timeline Presentation (24-25 May 2011)
Upper Riverfront Map+Timeline Presentation (24-25 May 2011)Upper Riverfront Map+Timeline Presentation (24-25 May 2011)
Upper Riverfront Map+Timeline Presentation (24-25 May 2011)
Ā 
Minneapolis Riverfront Design Competition Siteseeing Youth Engagement
Minneapolis Riverfront Design Competition Siteseeing Youth Engagement Minneapolis Riverfront Design Competition Siteseeing Youth Engagement
Minneapolis Riverfront Design Competition Siteseeing Youth Engagement
Ā 
Stoss video
Stoss videoStoss video
Stoss video
Ā 
Turenscape
TurenscapeTurenscape
Turenscape
Ā 
Land, Water, People: New Parks in Practice
Land, Water, People: New Parks in PracticeLand, Water, People: New Parks in Practice
Land, Water, People: New Parks in Practice
Ā 

Recently uploaded

Top Rated Pune Call Girls Saswad āŸŸ 6297143586 āŸŸ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad āŸŸ 6297143586 āŸŸ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad āŸŸ 6297143586 āŸŸ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad āŸŸ 6297143586 āŸŸ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
Ā 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation decktbatkhuu1
Ā 
Top Rated Pune Call Girls Koregaon Park āŸŸ 6297143586 āŸŸ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park āŸŸ 6297143586 āŸŸ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park āŸŸ 6297143586 āŸŸ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park āŸŸ 6297143586 āŸŸ Call Me For Genuine S...Call Girls in Nagpur High Profile
Ā 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
Ā 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxmirandajeremy200221
Ā 
VVIP CALL GIRLS Lucknow šŸ’“ Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow šŸ’“ Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow šŸ’“ Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow šŸ’“ Lucknow < Renuka Sharma > 7877925207 Escorts Servicearoranaina404
Ā 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfParomita Roy
Ā 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
Ā 
šŸ’«āœ…jodhpur 24Ɨ7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
šŸ’«āœ…jodhpur 24Ɨ7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...šŸ’«āœ…jodhpur 24Ɨ7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
šŸ’«āœ…jodhpur 24Ɨ7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...sonalitrivedi431
Ā 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
Ā 
call girls in Vasundhra (Ghaziabad) šŸ” >ą¼’8448380779 šŸ” genuine Escort Service šŸ”...
call girls in Vasundhra (Ghaziabad) šŸ” >ą¼’8448380779 šŸ” genuine Escort Service šŸ”...call girls in Vasundhra (Ghaziabad) šŸ” >ą¼’8448380779 šŸ” genuine Escort Service šŸ”...
call girls in Vasundhra (Ghaziabad) šŸ” >ą¼’8448380779 šŸ” genuine Escort Service šŸ”...Delhi Call girls
Ā 
CALL ON āž„8923113531 šŸ”Call Girls Aminabad Lucknow best Night Fun service
CALL ON āž„8923113531 šŸ”Call Girls Aminabad Lucknow best Night Fun serviceCALL ON āž„8923113531 šŸ”Call Girls Aminabad Lucknow best Night Fun service
CALL ON āž„8923113531 šŸ”Call Girls Aminabad Lucknow best Night Fun serviceanilsa9823
Ā 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneLukeKholes
Ā 
Escorts Service Nagavara ā˜Ž 7737669865ā˜Ž Book Your One night Stand (Bangalore)
Escorts Service Nagavara ā˜Ž 7737669865ā˜Ž Book Your One night Stand (Bangalore)Escorts Service Nagavara ā˜Ž 7737669865ā˜Ž Book Your One night Stand (Bangalore)
Escorts Service Nagavara ā˜Ž 7737669865ā˜Ž Book Your One night Stand (Bangalore)amitlee9823
Ā 
Brookefield Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Brookefield Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...Brookefield Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Brookefield Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...amitlee9823
Ā 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdftbatkhuu1
Ā 
Call Girls Basavanagudi Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service ...Call Girls Basavanagudi Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service ...amitlee9823
Ā 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Delhi Call girls
Ā 

Recently uploaded (20)

Top Rated Pune Call Girls Saswad āŸŸ 6297143586 āŸŸ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad āŸŸ 6297143586 āŸŸ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad āŸŸ 6297143586 āŸŸ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad āŸŸ 6297143586 āŸŸ Call Me For Genuine Sex Serv...
Ā 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
Ā 
Top Rated Pune Call Girls Koregaon Park āŸŸ 6297143586 āŸŸ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park āŸŸ 6297143586 āŸŸ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park āŸŸ 6297143586 āŸŸ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park āŸŸ 6297143586 āŸŸ Call Me For Genuine S...
Ā 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
Ā 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptx
Ā 
VVIP CALL GIRLS Lucknow šŸ’“ Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow šŸ’“ Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow šŸ’“ Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow šŸ’“ Lucknow < Renuka Sharma > 7877925207 Escorts Service
Ā 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Ā 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
Ā 
šŸ’«āœ…jodhpur 24Ɨ7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
šŸ’«āœ…jodhpur 24Ɨ7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...šŸ’«āœ…jodhpur 24Ɨ7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
šŸ’«āœ…jodhpur 24Ɨ7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
Ā 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Ā 
call girls in Vasundhra (Ghaziabad) šŸ” >ą¼’8448380779 šŸ” genuine Escort Service šŸ”...
call girls in Vasundhra (Ghaziabad) šŸ” >ą¼’8448380779 šŸ” genuine Escort Service šŸ”...call girls in Vasundhra (Ghaziabad) šŸ” >ą¼’8448380779 šŸ” genuine Escort Service šŸ”...
call girls in Vasundhra (Ghaziabad) šŸ” >ą¼’8448380779 šŸ” genuine Escort Service šŸ”...
Ā 
Call Girls Service Mukherjee Nagar @9999965857 Delhi šŸ«¦ No Advance VVIP šŸŽ SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi šŸ«¦ No Advance  VVIP šŸŽ SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi šŸ«¦ No Advance  VVIP šŸŽ SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi šŸ«¦ No Advance VVIP šŸŽ SER...
Ā 
CALL ON āž„8923113531 šŸ”Call Girls Aminabad Lucknow best Night Fun service
CALL ON āž„8923113531 šŸ”Call Girls Aminabad Lucknow best Night Fun serviceCALL ON āž„8923113531 šŸ”Call Girls Aminabad Lucknow best Night Fun service
CALL ON āž„8923113531 šŸ”Call Girls Aminabad Lucknow best Night Fun service
Ā 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, Pune
Ā 
Escorts Service Nagavara ā˜Ž 7737669865ā˜Ž Book Your One night Stand (Bangalore)
Escorts Service Nagavara ā˜Ž 7737669865ā˜Ž Book Your One night Stand (Bangalore)Escorts Service Nagavara ā˜Ž 7737669865ā˜Ž Book Your One night Stand (Bangalore)
Escorts Service Nagavara ā˜Ž 7737669865ā˜Ž Book Your One night Stand (Bangalore)
Ā 
Brookefield Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Brookefield Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...Brookefield Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Brookefield Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Ā 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
Ā 
Call Girls Basavanagudi Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service ...Call Girls Basavanagudi Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service ...
Ā 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
Ā 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Ā 

Executive Summary - Draft RiverFIRST Proposal

  • 1. Executive Summary RiverFIRST: A Park Design Proposal and Implementation Framework for the Minneapolis Upper Riverfront DRAFT
  • 2. Table of Contents MR|DI Team Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Minneapolis Park and Recreation Board Design Team Jayne Miller, Superintendent KVA Architecture & Planning Executive Summary . . . . . . . . . . . . . . . . 4 ā€“ 7 Bruce Chamberlain, Assistant Superintendent for Planning Sheila Kennedy, AIA KVA RiverFIRST . . . . . . . . . . . . . . . . . . . . . . . . 8 Dawn Sommers, Communications & Marketing Manager Frano Violich, FAIA Guiding Principles . . . . . . . . . . . . . . . . . . . . . . . . . . 8 ā€“15 John Goodrich, Executive Assistant Jungmin Nam Overall Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 ā€“17 Tom Johnson, Engineering Technician II Kyle Coburn Priority Projects Tyler Stearns, Communications Intern Jeffrey Mansļ¬eld Riverfront Trail System: Katie Heinrich Loops . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 ā€“ 21 Knot Bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Project Management Team TLS Landscape Architecture BioHaven . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Mary deLaittre, MR|DI Project Manager, Principal, Groundwork: The Tom Leader, ASLA Foundation for City Building Farview Park Extension . . . . . . . . . . . . . . . . . . . . . 24 ā€“ 27 Sara Peschel Janette Law, Public Relations, Tableau Pro Scherer Park District . . . . . . . . . . . . . . . . . . . . . . . . 28 ā€“ 31 Erik Prince Northside Wetlands Park. . . . . . . . . . . . . . . . . . . . 32 ā€“ 37 Pamela Miller, Graphic Design Lily Ciammaichella Downtown Gateway Park . . . . . . . . . . . . . . . . . . . . . . . 38 Jeff Lin, BustOut Solutions Visionary Projects Structural Engineering Spirit Island . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 Economic Advisors Hauke Jungjosian, Knippers Helbig, New York, NY/ Northeast Riverfront Park . . . . . . . . . . . . . . . . . 40 ā€“ 43 HR&A Advisors Stuttgart, Germany Candace Damon Implementation Ecology Danny Fuchs Framework . . . . . . . . . . . . . . . . . . . . . . . . . . 44 ā€“ 47 Peter MacDonagh, Kestrel Design Group, Minenapolis, MN Dara Goldberg Appendix A . . . . . . . . . . . . . . . . . . . . . . . . . 48 ā€“ 51 Sarah Sutherland, Kestrel Design Group, Minneapolis, MN Marty Melchoir, Inter-Fluve, Madison, WI Appendix B . . . . . . . . . . . . . . . . . . . . . . . . . 52 ā€“ 70 Step-Up Interns Ciera McDufļ¬e Construction Management Appendix C . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71 Nate Pearson, Mortensen Construction, Minneapolis, MN Kendall Ray Thanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72 Abdifatah Yusuf Clark White Martice Creamer Ahmad Aly AFT LaJeanna Fuller DR 2
  • 3. Introduction 20 September 2011 and urban design teams as ļ¬nalists.The four teams included Ken Smith Strategy Workshop, New York; Stoss Landscape Urbanism, Boston; TLS/KVA, Berkeley; The MR|DI has operated along seven strategic tracks to produce Minneapolis Park and Recreation Board and Turenscape, Beijing. Each were paid $30,000 and given two and a half the development plan for the Upper Riverfront. This design-based 2117 West River Road months to create a vision. During this time, the MR|DC sponsored a series process incorporated research, analysis and synthesis to produceā€”and Minneapolis, MN 55411 of community engagement events to cultivate support, provide information realizeā€”a feasible implementation process that is equal parts inspiration Dear Commissioners, to the designers about our community and its river, and educate the next and sustainability. generation of park stewards. The competing design teams made a public We are at an historic moment. Just as Minneapolisā€™ civic leaders 125 years presentation of their work at the Walker Art Center to an overļ¬‚ow crowd Organizational Development. Create community-based Steering, ago had the opportunity and foresight to create the park system we all in January, and the following day the jury selected the winning team. TLS/ Technical and Advisory committees to help shape the design enjoy today, the Minneapolis Park and Recreation Board (MPRB) now has KVA and their RiverFIRST proposal were selected for their depth of research, development strategy. the opportunity to substantively plan for future generations of park users. innovative and inspiring design, and fulļ¬llment of the competition goals. Planning and Design. Research, analyze and synthesize information There was tremendous interest in and support of the design competitionā€”a to create the ļ¬nal deliverable: recommendations for a long-term In this spirit, the Minneapolis Riverfront Development Initiative (MR|DI) testament to the communityā€™s love of parks, passion for the Mississippi River development framework and short- term project(s) identiļ¬cation. submits a comprehensive vision, recommendation and implementation and desire to be inspired by innovative city building. plan for the RiverFIRST design proposal. The work of a team comprised of Community Engagement. Reconnect the broader community with the Kennedy & Violich Architecture (KVA), Boston; Tom Leader Studio (TLS), In April 2011, MPRB established the Minneapolis Riverfront Development river and provide opportunities for community members to substantively Berkeley; HR&A Advisorsā€”a real estate and economic development Initiative (MR|DI) as an interdisciplinary, comprehensive and integrated engage in the creation of the design development strategy and planning ļ¬rm from New York City; and Groundwork: The Foundation for City planning endeavor to follow through with the promise of the competition, contribute their knowledge of the river and neighborhoods. Buildingā€”a Minneapolis-based planning ļ¬rm which managed the processā€” to connect citizens and visitors with new multi-functional Upper Riverfront this report is the culmination of a 12-month process and a milestone in what parks. The MR|DI team was charged with taking the RiverFIRST proposal Resource Identiļ¬cation. Identify public and private ļ¬nancing to ensure will be a long-term Upper Mississippi River development strategy. from vision to reality, researching the feasibility of the eight sites and 3 sustainable development. systems that made up the plan and creating workable plan for short- and Political. Cultivate support and advocacy. Process long-term development. Beginning in April, TLS/KVA and HR&A Advisors In September of 2010, the MPRB and The Minneapolis Parks Foundation, Integration. Analyze existing plans, projects, proposals and launched a three-month, in-depth information gathering process that along with creative partners The University of Minnesota College organizational structures to coordinate efforts and outcomes, including was led by the MR|DI project team and included the Steering, Advisory of Design and Walker Art Center, launched an international design Above the Falls and the Park Boardā€™s Comprehensive Plan(s). and Technical committees and the public. From June through August, competition addressing Minneapolisā€™ Upper Riverfront. The competition, as the team continued to reļ¬ne its proposal, the MR|DI implemented Communication. Maintain the open exchange of information among the the Minneapolis Riverfront Design Competition (MR|DC) sought design a multidimensional community engagement process to present the MR|DI, the public and stakeholders, communicate clearly, frequently and proposals for the area of the Mississippi River extending from the Stone RiverFIRST concept to interested communities, gather input and identify with transparency. Arch Bridge, north 5.5 miles to Minneapolisā€™ city limits, including land along priority projects. What follows are the results of that intensive effort. both sides of the river. It is within this context that we submit this report, to assist the Approach Commissioners to imagine what could be and to make informed decisions. The goals of the competition were to create a vision that: Our hope is that we can continue to work together, as a community, to The RiverFIRST proposal is critical to the creation of a larger regional Established parks as the engine for economic development build on our past success and create an even better region for the future. parks and trails network, as well as ecological and infrastructure systems. along the river It ļ¬lls a gap in the Mississippi River parks and trails system and contributes Thank you for this historic opportunity, Knit both sides of the riverfront together with their surrounding signiļ¬cantly to the improved water quality of the river, completes a critical communities, thereby transforming the river from a barrier to a connector connection in the larger City of Minneapolis Grand Rounds and links into the existing corridor initiatives taking place on both sides of the river. Re-focused the city toward one of the three great rivers of the world, Mary deLaittre Furthermore, it creates a healthy community network and opportunities for an extraordinary environmental amenity that deļ¬nes Minneapolisā€™ civic MR|DI Project Manager economic development, by tying into the expansive regional parks and trails identityā€”past, present and future Principal, Groundwork: The Foundation for City Building system managed by the Three Rivers Park District and the Metropolitan AFT The competition attracted 55 preliminary designs from 14 countries on ļ¬ve Council. When realized, the RiverFIRST proposal will enhance our regional identity and reinforce our role as civic leaders in the 21st century. DR continents. From that pool of applicants a jury of 14 community decision makers and design professionals selected four award-winning landscape 3
  • 4. Executive Summary The Minneapolis Riverfront Development Initiative (MR|DI) RiverFIRST Farview Park Expansion: This major new park extension bridges is a visionary planning effort for the Minneapolis Upper The KVA/TLS concept, RiverFIRST, offers a dynamic vision for a Interstate 94 and reconnects the high point of the city and renewed and revitalized Upper River corridor through a proposed communities in North Minneapolis with the Mississippi River. The Mississippi River corridor that has comprised extensive series of eight areas of opportunity. RiverFIRST well fulļ¬lls the three proposal could ultimately cap the portion of I-94 between 26th and research and analysis, design inquiry, community outreach, 28th Streets North with a major expansion of Farview Park and the goals of the design competition: and consensus building. The Initiative is a collaboration greening of both streets. among its sponsor, the Minneapolis Park and Recreation Establish parks as the engine for economic development along the river Northside Wetlands Park: A molded alluvial wetland landscape is Board (MPRB); two design ļ¬rmsā€”Kennedy & Violich reclaimed to create a civic-scaled climate change eco-infrastructure, Architecture (KVA), Boston and Tom Leader Studio (TLS) Knit both sides of the riverfront together with their surrounding providing bio-ļ¬ltration for storm water ļ¬‚ows, increased ļ¬‚ood Berkeley; HR&A Advisors, a real estate and economic communities, thereby transforming the river from a barrier protection, and new riverfront habitats. development planning ļ¬rm from New York City; and to a connector Northeast Riverfront Park: Ravine landscapes remediate storm Groundwork City Building, a Minneapolis-based planning Re-focus the city toward one of the three great rivers of the world, water and form stepped eco-stairs for ļ¬‚ows of water, people, and ļ¬rm which is responsible for guiding the process, with an extraordinary environmental amenity that deļ¬nes Minneapolisā€™ wildlife, and serve as high points to overlook the Mississippi, as well public relations ļ¬rm Tableau Pro. civic identityā€”past, present and future as downtown Minneapolis. The 5-month long collaboration of the MR|DI followed a The eight RiverFIRST areas of opportunity include: Scherer Park: With the restoration of Hallā€™s Island and the creation 12-month process that began with an international design Riverfront Trails: The RiverFIRST trail systemā€”a combination of of a river beach cove, Scherer Park will serve as a recreational entry point to the Mississippi trail and park system for kayaks, bikes, skiers, competition which awarded the commission to KVA/TLS out pedestrian and bicycle trails along the riverā€™s banks and ā€œKnot Bridgesā€ attached to existing bridgesā€”will complete critical runners and walkers. The park will become a signature 21st-century of 55 entries from around the world. It culminates with this urban park landscape. It will be the center of a riverfront destination comprehensive vision and implementation framework for 5.5 connections in the Grand Rounds system, and better connect North Minneapolis to Northeast Minneapolis for pedestrians and cyclists. ļ¬‚anked by Boom Island and Sheridan Park and surrounded by a miles of the Minneapolis Upper Mississippi River corridor. vibrant mix of development that will energize the riverfront. BioHavens: A protected network of ļ¬‚oating islands made of robust, lightweight geo-textiles and 100% recycled PET materials, the Spirit Island: A sacred place for the Dakota Indians for generations, BioHavens will create riparian habitat for endangered species and the now vanished Spirit Island will be symbolized by an illuminated migratory birds by providing nesting and staging areas for endangered river weir, which marks the site as the oracle and soul of the river. This aquatic and land animals and plants while also cleaning water. visual gesture will mark a commitment to a much deeper cross-cultural AFT understanding so important to the life of our city. DR Downtown Gateway Park: A dramatic gateway to Minneapolis at the historic gateway site of the Hennepin Avenue Bridge, linked to the new Public Library via a proposed signature park and to Nicollet Mall via a linear park. This project is lead by Trust for Public Land and downtown interests. 4
  • 5. Implementation Flexibility Priority Projects: 0-5 Year Plan Local Solutions, Regional Impact The RiverFIRST proposal offers built-in ļ¬‚exibility to phase investments Based on the reļ¬nement of preliminary plans, extensive community The Minneapolis park system is renown for the network of parkways, and to be opportunistic. Land availability, funding changes, engagement, and the ļ¬ve guiding implementation criteria listed trails and greenways that interlink regional park destinations. The philanthropy and development interests prompt the importance of above, a series of systems and sites have emerged as priority RiverFIRST proposal builds on this powerful legacy with the creation altering course to capitalize on opportunities. The RiverFIRST proposal demonstration projects for implementation in the near term: of riverfront regional parks connected by a sophisticated network of facilitates ļ¬‚exibility for those overseeing implementation. Riverfront Trail System + Farview Park Connections: ecological, infrastructure trail systems. It ļ¬lls a gap in the Mississippi Phasing Development of pedestrian and bike trails, ā€œKnot Bridgesā€ and River parks and trails system and contributes signiļ¬cantly to the Given its ambition, RiverFIRST will likely be built over a generation, implementation of the Farview Park connections to the River via the improved water quality of the river, completes a critical connection or more. Successful completion of the plan will depend in substantial North 26th Avenue Greenway and 28th Avenue connection. in the larger Minneapolis Grand Rounds and links into the existing part on thoughtful phasing. Getting the ļ¬rst phases right will set the corridor initiatives taking place on both sides of the river. Furthermore, stage for the long-term build-out of the grand vision presented in this BioHavens: Builds on the highly successful demonstration project it creates a healthy community network and opportunities for document. The early phases will need to embrace at least four criteria launched in August, 2011 by ASLA at Spring Lake in Minneapolis. economic development, by tying into the expansive regional parks for success: and trails system managed by the Three Rivers Park District and the Scherer Park: The proposal leverages a new signature riverfront Metropolitan Council. When realized, the RiverFIRST proposal will Bring the city from all neighborhoods and backgrounds park for economic development, and captures a portion of that enhance our regional identity and reinforce our role as civic leaders in to the river value for the long-term operations and maintenance of that park the 21st century. Northside Wetlands Park: Re-establishes historic ļ¬‚oodplain Foster advocacy for plan completion from citizens, businesses, A Focus of City-Building and institutions alike wetlands that create a public and ecological amenity offering an Like the Minneapolis Grand Rounds have done throughout history, the opportunity to partner with research and education institutions. The Secure positive media attention and promote a Minneapolis park could anchor and create value for the Upper Harbor Terminal RiverFIRST proposal establishes the Minneapolis Upper River corridor brand of 21st century parks redevelopment. as a central public amenity around which economic development in this part of the City will focus. Cooperation among public sector agencies and partnership Downtown Gateway Park: Establishes a downtown park with private sector organizations and institutions destination of national signiļ¬cance, reestablishes an open space Multiple Leaders The proposal provides the opportunity for multiple organizations, link between downtown and the riverfront, and leverages existing institutions and community interests to take leadership and/or efforts led by the Trust for Public Land and downtown stakeholders. collaborative and supporting roles in implementation, depending on These ļ¬ve projects each have the potential to establish a successful the project and the myriad variables that deļ¬ne the project. ļ¬rst phase of development that can build momentum for the overall completion of RiverFIRST over time. They can be pursued simultaneously, with support from multiple stakeholders, or in smaller combinations, depending on resource availability. DRAFT 5
  • 6. Long Term Vision: 5 Years and Beyond Operations and Maintenance Funding Institutional Partnerships: Portions of the RiverFIRST plan Farview Park Extension: Builds on priority projects with the Similar to capital costs, operating expenses and ongoing maintenance should be stewarded by major institutions in Minneapolis and establishment of the 26th Avenue and 28th Avenue connections. of these sites will be sourced from a combination of public and the region. Allowing existing organizations to operate programs The longer-term vision would realize a green cap over I-94 and private funding, as well as in-kind landscape management and on the sites contemplated for redevelopment can support the transform the existing garbage transfer station into a river-related strategies for developing earned income. A substantial portion of planā€™s operational sustainability by displacing a need for public community education facility. funds for operations and maintenance must be provided by MPRB, funds to maintain the lands. MPRB, the City of Minneapolis, and as is standard practice in Minneapolis and cities across the country. other project stakeholders should explore how organizations like Northeast Riverfront Park: Long-term acquisition of land and the St. Anthony Falls Laboratory or the University of Minnesota, A stable and substantial base of City funding is a prerequisite for easements allows the creation of park, storm water cleaning ravines, among others, might support the ongoing operations of certain maximizing philanthropy, and will be required to ensure the park neighborhood connections and river access. RiverFIRST proposals through institutional programming. meets its civic aspirations. Certain sites may even be deeded (within the bounds of certain Spirit Island: Begins a process of substantive engagement with RiverFIRST will need to maximize opportunities for raising funds restrictions due to regional park funding) to such organizations the Dakota community to determine interest in the creation of a from private resources for ongoing maintenance of the new parks with agreements for public access and programming in commemorative art project and long-term collaboration to realize wherever possible to ensure that the costs of maintaining new parks is perpetuity. the project. sustainable within MPRBā€™s operating budget. Environmental Beneļ¬ts: Implementation of certain elements Capital Funding In the initial years of the park development and operations, MPRB of the RiverFIRST plan, such as the wetlands at Upper Harbor Great ideas supported by great designsā€”like those envisioned for funding will likely be the only major source of operating revenue Terminal and the stormwater ravines along the Northeast Bluffs, River FIRSTā€”paired with strong leadership from government, citizens, for the park. Over time, however, as the vision is implemented and can reduce the amount of impervious surface along the riverfront businesses and institutions, have signiļ¬cant capacity to attract capital. the MR|DI system becomes more successful ā€“ and requires more and can also clean stormwater. As a result, property owners may Groundswells of popular support for compelling projects can secure investment ā€“ MPRB will need to rely on several potential sources of be able to avert stormwater fees, which can run into the tens of substantial capital funds from local, state, and federal governments. additional revenue to ļ¬ll the likely funding gap. These sources should thousands of dollars every year. Where there is a net saving of While a strategy for capital funding is being developed for each include the following: stormwater runoff, MPRB should seek to capture the excess in project consideration should be given to: stormwater fees that a property owner would have to pay if runoff Real Estate Development and Assessments: With the were not averted or cleaned, so long as the property ownersā€™ net Investment from local institutions interested in particular portions implementation of Scherer Park, new value will be created for operating income is not disproportionately negatively affected. of the RiverFIRST plan should be priority stewards the surrounding district. Therefore, since real estate is typically the greatest potential source of privately-generated funds for Philanthropy, Sponsorships, and Programming: In addition Portions of signature projects should be targeted for parkland operations and maintenance, and since either MPRB or to the three primary sources targeted above, RiverFIRST philanthropic investments from individuals, foundations, the City of Minneapolis control developable land in the district, stakeholders should cultivate the philanthropic community, and not-for-proļ¬t organizations development on and/or around Scherer, Boom Island, and potential corporate and institutional project sponsors, and major Use of the Elwell law and other funding strategies should be Sheridan Park should be prioritized. And, in exchange for the right events like those held at Boom Island, to help offset the costs of investigated to supplement other sources with funding from to develop, development agreements should outline long-term operating the new parks. While these sources will be important special assessments participation in operating expenses. for the sustainability of the plan, they are likely to be limited in terms of total dollar value. MRPB, the City of Minneapolis, Hennepin County, and the Metropolitan Council should be prepared to make capital AFT funds available for each of these projects to help leverage DR third-party sources 6
  • 7. Governance Suggested Next Steps Implementation of the RiverFirst plan will affect lands owned by many The project team will present and deliver copies of the RiverFIRST different parties, each of whom will have responsibilities for plan proposal and implementation framework to the Minneapolis Park and stewardship. It also will have economic and ļ¬scal impacts of interest Recreation Board on September 21, 2011. not only to MPRB, but also the City of Minneapolis, Hennepin County, MPRB Staff intent for the project from this point forward is to allow an and the entire Twin Cities Metropolitan Region. Stewardship of the ā€œincubation periodā€ for the revised RiverFIRST plan over the next two RiverFIRST plan, both in terms of implementation guidance and months. That time could include a formal public comment period, ongoing parkland operations and maintenance, must, therefore, be a ongoing project management and communication activities, as well as collaborative effort. preparation by Staff of proposed next steps for consideration by the The City Department of Planning and Economic Development should Board later this year. Examples of next-step actions are: work closely with MPRB as it ļ¬nalizes the revised Above the Falls plan Formal approval of the report to ensure that land use recommendations and investments in public infrastructure are properly coordinated. These two agencies must also Authorization of phase 1 implementation/construction documents work together to attract appropriate development to riverfront sites and set in place agreements for such real estate developments to Authorization to initiate a collaborative effort with the City of provide ongoing sources of funds for parkland beneļ¬ts. Minneapolis to update the Above the Falls Master Plan. The ļ¬ve priority projects for RiverFIRST should follow an action plan established by lead organizations: MPRB should spearhead the completion of the Riverfront Trail System/Farview Park connections and the recreational/supportive development of Scherer Park. The City Department of Planning and Economic Development should advance the comprehensive redevelopment of the Upper Harbor Terminal site, implementing the proposed wetlands as part of its plan. The Trust for Public Land should continue to work with downtown stakeholders, the City of Minneapolis and MPRB to implement AFT the Downtown Gateway Park. DR Multiple key organizations should collaborate to implement BioHavens (ļ¬‚oating islands). 7