1. CV: MOHAMMED MUBASHIR AHMED (9.6 Year Electrical Engineer/E&I QC Engineer)
Phone: +919966520756 |E-mail:-mubha_eee@yahoo.co.in
CAREER SUMMARY
A Bachelor graduate in Electrical & Electronics Engineer, with 9.6 years of experience in Electrical
Engineering /Quality Control with different disciplines of projects includes Construction, Installation,
and Commissioning of Piping for Oil, Gas & Power sector.
Professional Skills & Experience
Responsible to assure that all electrical activities was done in accordance of the Scope of work, Construction
Drawings, SAES, NEC. And ensures of implementation of work procedures and inspection and test plan.
Coordination and Supervision during Equipment Erection, installation, Pre commissioning, Start up of
Equipment’s.
Support Seniors and motivate Team members to achieve Project Success. Sound Communication skills, tactful
in resolving issues, proactive approach.
Interface with vendors & others for valuable inputs, technical support and inspection performance checks.
SAP NO:-70015392
Presently Working:- Intertek Moody International(from Jan-2015 to till date)
Client :-Saudi Aramco
Location :-L&T Hazira, Gujrat, INDIA.
Project :-MIDYAN GAS PROCESSING FACILITIES(BI-10-03157-0001)
Designation :-Saudi Aramco Project QUALITY INSPECTION DEPARTEMENT(E&I)
Job Profile:-
Responsible to assure that all E&I QC are well trained and conducting meeting with the QC
team for further improvement as per the project requirement.
Responsible for initiating, execution, tracking / monitoring, controlling and completing the
project as scheduled and in implementing operational processes for increased efficiency.
Handling various requirements & monitoring overall project operations for timely completion.
Review Electrical and instrument special process procedure as per Schedule Q requirement.
Responsible to attend weekly Quality meeting with contractor.
Coordinating projects for the set up standards with accountability for strategic utilization &
deployment of available resources to achieve organizational objectives.
Review & Maintaining monthly planning & weekly progress sheets and monthly project sheet.
Review and comments on drawings and specifications
Responsible for closure of RFI’s, LBE’s, INCR’s when the activity in completed.
Initiating Log Book entries if the work in non conforming with the requirement as per
Standards, Scope of work ,Schedule Q.
witnessing Material receiving inspection.
Ensuring effective site management and discipline to ensure safe execution of the projects.
witnessing all Structural Steels, Cable tray, Light fixtures, Earthing strips, HT/LT cables etc.
witnessing Cable splicing, cad welding & other installations prior to commissioning
Worked as: Engineer E&I, CP QA/QC : At: RAJEH AL-MARRI & SONS Company an SAUDI ARAMCO
Contractor ( From 2nd April 2012 to Dec-2014)
Company contour: RHM & sons is major contractor of Saudi Arabian oil company (ARAMCO)
involved in Oil Well Upgrading, cross country pipe line projects inter plant connecting pipeline & oil
exploration since long.
Projects:
Approved QA/QC Supervisor-Engineer Electrical, Instrumentation & CP.
PROJECT:-SAUDI ARAMCO-SHAYBAH-NGL P/L PROJECT
Contract # : 6600027195
Approved QA/QC Engineer Electrical & Instrumentation Inspector for
PROJECT:-SAUDI ARAMCO-BERRI CUASEWAY PROJECT ONSHORE FACILITIES.
Contract # : 6600026617
Approved QA/QC-Engineer C.P. Inspector for
PROJECT:-SAUDI ARAMCO- BERRI CUASEWAY PROJECT ONSHORE FACILITIES.
Contract # : 6600026617
Approved QA/QC Engineer Electrical Inspector for
PROJECT:-SAUDI ARAMCO- PIPELINE REHABILITATION PHASE – V
Contract # : 6600014404
As E&I-QC Supervisor:-
Review Electrical and instrument special process procedure as per Schedule Q requirement
2. Responsible to assure that all E&I QC are well trained and conducting meeting with the QC
team for further improvement as per the project requirement.
Responsible to attend weekly Quality meeting with client.
Responsible for closure of RFI’s, LBE’s, INCR’s when the activity in completed.
Responsible for complete project activities to perform them with the help of QC inspectors.
Any technical queries discussing with SAPID Supervisor/PMT/Construction team to avoid
nonconformity from client.
Preparing Pre-Commissioning Packages, Loop Folders, Energisation Packages.
As QC Inspector:-
Maintaining proper log for all activities which are covered by the team.
Responsible to assure that all electrical activities was done in accordance of the Scope of work,
Construction Drawings, Saudi Aramco Engineering Standards and NEC, national electrical
code. And ensures of implementation of work procedures and inspection and test plan.
Responsible to issue request for inspection to Saudi Aramco in QMIS system &as defined by
the ITP using Saudi Aramco Form # 6717.
Responsible to accompanied the Saudi Aramco Representative to carry out routine inspections
and released hold points by signing and obtaining the Saudi Aramco representative approval
signatures on various quality records as proof of inspections conforming to specifications.
To coordinate with the other quality discipline activities that requires inspections within the
electrical construction program have been inspected & approved. To prevent unnecessary
re-works to keep the activity w/ in the budget & on schedule.
To carried out an inspection of the material when it arrives in the warehouse. To ensure the
materials conformed to project specifications & standard requirements.
Material receiving inspection of Switchgear, MCC, Power & lighting panels, LV & MV cables .
To Ensure proper Cable splicing, cad welding & other installations prior to final inspection
Ensure proper cable laying arrangement and conduct all necessary testing prior to Backfilling.
Inspection of overhead line erection and (13.8KV to 480Vols) transformer installation and pre-
commissioning as per Saudi Aramco requirements.
MOV and HOV valve actuator receiving, installation and pre commissioning activities.
Check and ensure installation of warning tape and red tiles as per requirement of construction
specification and codes.
Check and ensure all the loops for the instrument, communicate to DCS.
Inspect all tubing are installed properly, and check the leak test for the impulse tubing.
Report work deficiencies to concern authorities and recommend corrective action to be taken
Inspect all electrical/instrumentation installation and ensure proper calibration prior to
installation in services.
To identify & raises non-conformances
To ensures implementation of work procedures and inspection and test plan.
Familiar with Installation of 13.8/2.2KV transformer, M.V. power cable, installation of MOV,
PIT, TIT, MPFM, FIT, Cable Tray & related tests.
For Cathodic Protection
Accountable for erection ,installation& commissioning of complete HT/LT Electrical Equipments
Installation of Rectifier, MMO anode,TA-4 Deep Anodes for thrust anchor, thrust boring.
Installation of three pin test station,2pcs for thrust boring both side 1pcs for thrust anchor
Below grade exothermic welding of cp cable of each KM for single pin Test station.
Make Bonding a parallel pipe as per the standard of SAES-X-400-01
Check the potential reading of anode & each single pin test station as Per standards.
CARAVAN Housing Solutions, Sharjah, U.A.E.
Position : Electrical Engineer (Jan-2008-Apr-2012)
Projects :-Al Midan Tower
General Responsibilities:
L.V.,M.V Cable Installation, Splicing & Terminating.
Panel Racks , Field Instruments Installation & Pre-Commissioning.
Preparation of BOMs, Rate Analysis chart for Contractors, ITPs, Erection and Pre-
Commissioning Checklists.
Preparing work procedure of cable splicing and termination in switch gear, transformer.
3. Checking all work approvals and workers approval from client
Preparing organization chart of my team, attending meetings with client.
Checking all documents which are accepted by the client and submit to auditing department
along with project approved documents for further process of bill.
Giving monthly training to the team to achieve project works to be done in time.
Attending meeting with the client for closing all issues raised by the client.
Shuffling team members to get good work performance from the client.
Report work deficiencies to concern authorities and recommend corrective action to be taken
Inspect all electrical installation and ensure proper calibration prior to installation in services.
Worked in :- ICSA (INDIA) Limited, H.Y.D.
Client : State Government of Andhrapradesh.
Position: Electrical Engineer -from 2005 May to 2007 Dec.
Projects:1)R.G.G.V.Y.(Rajeev Gandhi Gruha Vidhuth Yojana), 2) 33/11KV Sub Station Construction under
JBIC Project Govt. of A.P. , 3) H.V.D.S. (High Voltage Distribution System). (APCPDCL)
General Responsibilities:
Checking Material Requisition as per the M.T.O & drawing
To carried out an inspection of the material when it arrives in the warehouse.
Attending monthly training schedule to get improved according to project goals.
To ensure the materials conformed to project specifications & standard requirements.
To ensure proper Cable splicing & other installations prior to final inspection of client inspector.
Ensure proper cable laying arrangement and conduct all necessary testing prior to Backfilling
Check and ensure installation of warning tape and red tiles as per requirement of construction
specification and codes.
Check and ensure all the loops for the instrument, communicate to DCS.
Report work deficiencies to concern authorities and recommend corrective action to be taken
Inspect all electrical installation and ensure proper calibration prior to installation in services.
Preparing snag list of site in the final stage of the project.
C O M P U T E R S K I L L S S U M M A R Y
Microsoft Office Suite (Word, Excel, Power Point, Access, Project), basics of C programming, Basics of
computational fluid dynamics (fluent and gambit), Auto cad-2D.
Personal Information:
Date of Birth: 04th
JUNE 1984; Citizenship: Indian; Religion: Islam.
Marital status: Married. Language Known: English, Telugu, Urdu and Arabic(R).
Academic & Professional Qualifications:
ISO: 9001-2008(Successfully completed ISO: 9001-2008 training)
Academic Projects during education
Title: Design & Manufacture of two Pole Air Cooled Gas Turbo Generator
Client: BHARATH HEAVY ELECTRICALS Limited, HYD. (B.H.E.L.)
About it: The main observation was the manufacturing difference
Between two poles & four pole motors its main concept was air cooled Turbo generator. Sensor
operation, like Over Load & Heat Shut Down system. Observation on Fuel Consumption at different
loads on it. Main cause for below r.p.m. Futures of Noise less Generators.
I hereby declare that all the information provided above is true to the best of my knowledge, and I
apply with full confidence for your relevant post to serve your organization to the best of my level.
Best regards,
MOHAMMED MUBASHIR AHMED
B.TECH (E.E.E)
EDU C A T IO NA L& T EC HNIC A L Q U A LIFIC A T IO NS EDU C A T IO N C A T EGO RY INST IT U T E / U NIV ERSIT Y
Bachelor of Engineering Electrical & Electronics Engineering J.N.T.U.
Intermediate (12th Year) AP State Board Alpha J.R. College
S.S.C (10th) AP State Board St.Alphonsus High School