SlideShare a Scribd company logo
1 of 7
Download to read offline
CURRICULUM VITAE
1
To,
Subject: Application for the post of Electrical Engineer
___________________________________________________________________________
OBJECTIVE
To be a part of progressive & dynamic organization that poses challenges & provides opportunity to excel
professionally & enhances my potential and skills by working with commitment and excellence in a dynamic and
progressive environment & also to propel the organization achieving its goals & objectives.
PERSONAL PROFILE
NAME: M. ZUHAD SIDDIQUI
FATHER’S NAME: M. ILYAS SIDDIQUI
DATE OF BIRTH & PLACE: 02/06/1988 / KARACHI
MARITAL STATUS MARRIED
NATIONALITY / RELIGION: PAKISTAN / MUSLIM
LANGUAGES KNOWN: ENGLISH, URDU, ARABIC, HINDI
PROFESSIONAL QUALIFICATION: B.E (ELECTRONICS ENGINEERING) MAJOR: ELECTRICAL & INST.
LICENSE: SAUDI ENGINEERING COUNCIL / MEMBER SHIP NO: 246453
PAKISTAN ENGINEERING COUNCIL / MEMBER SHIP NO: ELECTRO / 14832
PRESENT ADDRESS: AL – RASHID TOWER AL MAATHAR STREET, RIYADH KSA
PERMANENT ADDRESS: A-54/9 F.B AREA DASTAGIR SOCIETY, KARACHI
CONTACT NO: KSA=0549088018/PAKISTAN=+92314-2084090
PASSPORT DETAILS: PASSPORT NO. : GB5465211
DATE OF ISSUE : 24/4/2014
EXPIRY DATE : 23/4/2019
TOTAL EXPERIENCE: 6-YEARS
WORKING EXPERIENCE IN DETAILS
COMPANY NAME POSITION PROJECTS PERIOD
SAUDI SERVICES FOR ELECTRO MECHANICAL WORK
& CO. (SSEM)
ELECTRICAL ENGINEER
(A) KIC-AL KHARJ SUBSTATION
(B) DAWADMI SUBSTATION
(C) (C) SAFA SUBSTATION
10/05/2015 TO ONWARDS
GATRON INDUSTRIES LIMITED
ELECTRICAL &
INSTRUMENT ENGINEER
(A) UP-GRADE SPINNING PLANT
(B) AUTOMATION OF SCREW
COMPRESSOR ZT-250
01/07/2012 to 30/04/2015
MECCA ENGINEERING CO. (MEC) PVT. LTD.
ELECTRICAL &
INSTRUMENT CONTROL
SYSTEM ENGINEER
(A) MAINTENANCE OF RE-BOILER IN
PAKISTAN PETROLEUM LIMITED
(B) AUTOMATION OFAHMED OIL
INDUSTRY
(C) SHAHMURAD DISTILLERY
(D) SSJD BIO PROCESSORS PVT LTD
(E) BAGASSE WEIGHING SYSTEM
(F) DEWAN CEMENT LIMITED
01/01/2011 to 30/06/2012
SIEMENS PAKISTAN ENGINEERING CO. LTD TRAINEE (INTERNSHIP) ___________________________________ 15/06/2009 to 13/07/2009
PAKISTAN TELECOMMUNICATION COMPANY LTD. TRAINEE (INTERNSHIP) ___________________________________ 07/01/2010 to 06/02/2010
CURRICULUM VITAE
2
CURRENT JOB
COMPANY: SAUDI SERVICES FOR ELECTRO MECHANIC WORKS CO. (SSEM)
COMPANY INDUSTRY: Electrical & Instrumentation (Power sector) POSITION: Electrical Engineer
DURATION: May 2015 – Present LOCATION: Riyadh Saudia Arabia Al-Rashid Group
JOB DESCRIPTION: Provide services of Construction site of Power Plants & Gas Insulated Switch gear Substations,
services include Installation Commissioning & Maintenance of Field Instruments, Control Systems, Motors, &
Control Cable terminations.
KEY RESPONSIBILITIES:
 Ensure the work performed is in accordance with the drawings and specifications.
 Check, control and approve contractor's material submittals, calculation reports.
 Maintain detailed diary of daily work activities, issues, work approved or rejected, hours of operations,
labor and equipment used and sign at the end of each day.
 Coordinate with contractor's team to advice on execution of the work.
 Coordinate with contractor’s team to arrange for sampling and testing of defective work and quality
assurance of suspect materials.
 Raise RFI to consultants & clients & maintain record of status.
 Maintain records of completed works for interim and final payment and as-built drawings adhere to the
company QHSE policy at all times.
 Acting as a technical adviser for Supervisors, technicians and foreman.
 Resolving any unexpected technical difficulties and other problems that may arise in the project.
 Checking plans, drawings and quantities for accuracy of calculations.
 Orders & maintain spears parts as required.
 Overseeing the selection and requisition of materials.
 Ensuring that all materials used and work performed as per specifications & drawings.
 Day-to-day management of the site, including supervising and monitoring the site labor force and the
work of any subcontractors.
 Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
 Installation of Field Instruments including, DPS, TT, FS, PT, Programmable thermostats, Humidity sensors.
 Maintenance of Electrical equipment’s including MV, LV motors, MCC panels, Drives & Field Instruments.
 Testing instrument signals on Control systems & trouble shooting if any problem occurred.
 Develop star-delta panels for running compressors of PACU & blower motors & Installations of
Disconnectors.
 Installation & Commissioning of HVAC Control systems along Complete Field Instruments in Gas Insulated
Switch gear Substations.
 Preparing project reports as required.
EHV PROJECT:
(A) KIC ALKHARJ BSP 8049
It’s a construction project, construction of 380KV/132KV/33KV/13.8KV GIS Substation in which complete
installation & commissioning of Electrical Equipment’s of Substation along field Instruments.
ELECTRICAL EQUIPMENTS USE IN THE PROJECT
DDC Control System, SETRA DDC panels & Equipment’s, Siemens Controller POL 638.70, Siemens Climatix HMI
POL 895.51, SKM PACU Machines, AHU Panels, Lightning Systems & Panels, AC-DB Panels, SDB Panels,
Transformers, Switch gears, Exhaust fans, Smoke Purge Fans, Supply Fans, Blower Motors, Differential Pressure
Sensor Danfoss KP & KPI series, Trend DPSA-400, Siemens QBM65-1, Differential Pressure Transmitters
CURRICULUM VITAE
3
Danfoss MBS 1600, MBS 1300 Series, Actuators GEB136.1U, Humidity Sensors Siemens QFA2020, QFA3160,
Honeywell SCT series, Programmable thermostats, White Rodger 1F85-277, Honeywell Focus PRO 5000 Series.
ROLES & RESPONSIBILITIES IN THE PROJECT
 Reporting to Construction Manager & Project Manager of daily progress & activities on Site.
 Develop interface schedule of DDC panels & SKM PACU Machines by reviewing drawings.
 Work on System Design & assist contractors for Modification in Panels & Control loops.
 Rectify the issues in the design.
 Provide assistance to Designer for Control Cable selection & size of Panel breaker.
 Provide Assistance to Foreman, in order to lay complete control cables of instruments & panels in
Construction site & finalize their routes.
 Provide assistance to Foreman, Technicians for Installation of Field Instruments (above mention details),
Control Systems & their Maintenance.
 Provide Assistance to Technician for developing ferrols of the cable & termination works.
 Inspect and monitor all project activities of the project sites Take corrective actions wherever required in
the case of missing data from either the client or vendor.
 Assist contractors in order to energize Control systems & field instruments.
(B) DAWADMI SUBSTATION
It’s a Substation, constructed by SSEM & here we provide services of Maintenance of DDC Panels, Control
Systems & Field Instruments.
ELECTRICAL EQUIPMENTS USE IN THE PROJECT
DDC Control System, SAUTER DDC panels & Equipment’s, HMI, SKM PACU Machines, AHU Panels,
ROLES & RESPONSIBILITIES IN THE PROJECT
 Reporting to Project Manager of daily progress & activities on Site.
 Assist Foreman & team of Technicians for Maintenance of DDC Panels, Field Instruments, and Control
Systems.
 Trouble shoots & rectifies the faults in Control loops.
 Replace faulty HMI, Panel LED’s & Field instrument with spare.
(C) SAFA SUBSTATION BSP 9014
It’s a construction project, construction of 380KV/132KV GIS Substation in which complete installation &
commissioning of Electrical Equipment’s of Substation along field Instruments.
ELECTRICAL EQUIPMENTS USE IN THE PROJECT
Annunciator panels, LCC Panels, Control Panels, Disconnector Switches, ZAMIL DDC panels & Equipment’s,
HMI, ZAMIL PACU Machines, AHU Panels, SAS Panels, Lightning Systems & Panels, AC-DB Panels, SDB Panels,
Transformers, Switch gears, Temperature Sensors Siemens QAM2120.040, QFA3160, TRG2, Temperature
Transmitters Honeywell STT250, STT750, STT650, STT850, Actuators BELIMO AFB24, Submersible pumps, Flow
sensors LS-3 series, Rotameters, Remote Switches, SPF, EF, SF, Programmable Communicating Room
thermostats Siemens RDF800KN, Siemens Controller POL 638.x, Siemens Climatix HMI POL 895.51, Humidity
Sensors Siemens QFA2060D, QFA3160D, Differential Pressure Sensor Honeywell ST 3000, ST 700, Trend DPSA-
400.
ROLES & RESPONSIBILITIES IN THE PROJECT
 Reporting to Construction Manager & Project Manager of daily progress & activities on Site.
 Installations, testing, calibration & commissioning of Actuators.
 Installation of Remote switches for SPF
CURRICULUM VITAE
4
 Installation & Commissioning of Complete HVAC Control systems along Complete Field Instrumentation
including DPS, Thermostats, Humidity and Temperature Sensor & Transmitters (as detail mention above)
in Gas Insulated Switch Gear (GIS) Substations.
 Give target dates to Foreman & technicians in order to complete Control Cable glanding & termination
works of SAS Panels, DDC Panels, LCC Panels, and Annunciator Panels.
 Commission Zamil Machines through thermostats & through DDC Control Systems as per requirement.
PREVIOUS JOB 02
COMPANY: PETRO-CHEMICAL PROCESS PLANT OF GATRON INDUSTRIES LIMITED
COMPANY INDUSTRY: Petro-Chemical POSITION: Electrical & Instrument Engineer
DURATION: July 2012 – April 2015 LOCATION: HUB Balochistan, Pakistan Gatro-Novatex Group
JOB DESCRIPTION: Maintenance of Complete Petro-Chemical Plant including Process Section & Utility Section of
Plant, Equipment’s include Motors, Star-Delta panels, Engineering services of Medium Voltage Frequency drives &
its control, Field Instruments & Control Systems Compressors & Chillers, RO plants, Maintain Smooth operations of
Process Plant. Trouble shooting if required. Project planning, Installation Automations & Commissioning of Field
Instruments, Control Systems during Up-gradation of Plant. Maintain feasibility reports for new project planning,
Up-gradation of plants, R&D work.
KEY RESPONSIBILITIES:
 Provide engineering expertise and guidance to the operations and maintenance personnel in assuring the
integrity and reliability of the electrical, instrumentation and control systems.
 Identify Electrical and Control systems upgrade projects, prepare engineering drawings, provide budgetary
cost estimates for fund approval, plan and implement them.
 Undertake redundancy and obsolescence studies of the installed equipment and develop options and
specifications for replacement.
 Develop robust plans for the execution of any electrical, instrumentation and controls projects, and liaise
with the operation and planning teams in the development of schedules.
 Take part in preventive maintenance & schedule maintenance of Cooling towers, Chillers Compressors,
Induction motors, Winders and field instruments.
 Develop and execute software and program solutions and improvements to the installed systems.
 Provide Emergency support to Electrical and Control system break – down issues.
 Prepare procurement specifications for field instrumentation and electrical equipment.
 Participate and direct trouble shooting of issues and problems with the installed electrical,
instrumentation, control systems and equipment & in this regard leads team of electricians & other staff.
 Maintaining records, preparing reports and other related correspondence relative to work.
Scheduling, planning and organizing work history of all maintenance activities using ORACLE Based ERP
system (MOGAN).
TECHNICAL EXPERTISE:
HANDS ON EXPERIENCE OF ELECTRICAL EQUIPMENT USE IN PETRO-CHEMICAL PROCESS PLANT:
 Installation, Commissioning & Programming on PLC’s Fatek, Siemens S7-200, S7-300, and Honeywell DCS
systems HC-900, C200.
 Installation, Commissioning & Programming on HMI I-series MT-6000/8000 by using Easy builder 8000.
 Controlling speed & operations of motors by using Variable Frequency drives (VFD’S) inverters Siemens
Simovert, Shysanyu, Mitsubishi, and Danfoss.
 Installation Commissioning & Programing of Controllers Honeywell DC1000 Series DC1010, 1020, 1030,
1040, Udc3000, Fuji temperature control PXR4, Delta DTD Series.
 Installation Commissioning & Maintenance of field instruments including, Thermocouple, RTD,
Thermostats, Temperature Transmitter STT850, STT3000, Differential Pressure Sensor Honeywell ST 3000,
ST 700, SMV 3000 Flow Sensors, Rota Meters, Temp. recorder Honeywell eztrend Qxe, etc)
 Maintenance of Electrical equipment’s, Control panels, distribution panels & Motor Control centers
(MCCs), HV/ LV/ MV motors transformers & DOL circuits.
 Trouble shoots & rectify if any fault occurred.
CURRICULUM VITAE
5
HANDS ON EXPERIENCE OF ELECTRICAL EQUIPMENT USE IN UTILITY SECTION OF PROCESS PLANT:
 Perform Schedule maintenance of Motors, Atlas Capco Compressors ZR-5, ZR-315, ZR-315 VSD, ZH-7000,
Chillers LG-LSHG050, GO45SG, TRANE-ECVAD-27, SPACCO, BALTIMORE Cooling towers.
 Installation, Commissioning & Maintenance of AHU panels, Star-delta panels.
 Installation, Commissioning & Maintenance of Interlocking of relays, Protection relays.
 Installation, Commissioning & Maintenance of Control valve, Actuators & Smart Positioners.
 Maintenance of PLC based RO plant.
 Trouble shoots & rectify if any fault occurred.
TS COMPLETED ON JOB 02
UP-GRADATIONS PROJECTS IN PETRO-CHEMICAL PROCESS PLANT:
(A) UPGRADE SPINNING PLANT:
 Modified spinning plant control & its operation from WLC in to PLC.
 Mapping all signals of Field Instruments including (Analog & Digital) & made control loops as per process
requirement.
 Monitoring of Process variables & by it Control motors as per process requirement.
(B) AUTOMATION OF SCREW COMPRESSOR ZT-250:
 Replace Elektronikon integrated control system with Fatek PLC & Weintek HMI.
 Mapping all signals of Field Instruments including (Analog & Digital).
 Made control loops as per working cycle of Compressor.
 Controlling all safeties of Compressors ZT-250 & Control motor up to 355KW of compressor.
 Create operation screens on HMI & show the status of Digital Input, Digital Output & show different
Analog readings of Compressor (Including TT, PT).
ORACLE BASE ERP SYSTEM MMS & MOGAN:
MATERIAL MANAGEMENT SYSTEM (MMS):
Making DPRs, MRDs, SR, ERP (Basic Knowledge)
Prepare necessary spare parts list & its consumption on plant.
MAINTENANCE OF GATRON & NOVATEX SYSTEM (MOGAN SYSTEM):
Maintain Mogan System including;
Job Order: Entry, Authorization, Reception & Completion.
Work Permit: Entry, Authorization, Endorsment & Execution.
Schedule: Entry, checking & process.
PREVIOUS JOB 01
PREVIOUS JOB 01
COMPANY: MECCA ENGINEERING CO (MEC) PVT LTD.
COMPANY INDUSTRY: Engineering Services (Installation & Commissioning Field Inst. & Control Systems)
POSITION: Electrical & Inst. Control System Engineer DURATION: Jan 2011 – June 2012
LOCATION: Karachi, Pakistan
AUTHORIZED REPRESENTATIVE: Honey well, GE Masoneilan Control Valve,
GE Consolidated PSV,PRV, Yokogawa
JOB DESCRIPTION: Provide services to Petroleum, Petro-Chemical Process plants. Installation, Maintenance &
Commissioning of Field Instruments, Control Systems (Including Pressure, Flow, Temperature & Level Transmitters,
Control valves, Paperless Recorders, Honeywell DCS Control Systems, FSG). Automation of Process plants
KEY RESPONSIBILITIES:
 Develop programming in Honeywell DCS Systems as per requirement of Process plant.
 Develop Plant Graphic designs in Spec-view.
 Installation of FSG.
 Installation & Programing of Honey well paperless recorders (eztrend Qxe).
 Develop drawings of Marshalling Panel.
 Identifying system instrument & control loops in P & ID diagrams.
 Sizing of Safety Relief Valves of Dresser Consolidated & Control valves of Masoneilan as per process
requirement.
 Develop instrument terminations drawings in Auto cad.
 Develop & implements programming in PLC (Siemens Simatic & Fatek ) as per process requirement.
 Maintain documentation including records & Mapping excel file of P & ID drawings.
CURRICULUM VITAE
6
TECHNICAL EXPERTISE:
HANDS ON EXPERIENCE OF FIELD INSTRUMENTS & CONTROL SYSTEMS:
 Honeywell Control System Hybrid Control Designer (HC-900, C200 logic builder of Plant Automation).
 Testing instrument signal on DCS, Assigning tags, Installation & trouble shooting if any problem occurred.
 Spec view graphic designer of Plant.
 Honeywell Paperless recorder eztrend Qxe, Honeywell Chart Recorder.
 Honeywell Pressure transmitters, Honeywell Flow transmitters.
 Sizing of Control valve of Masoneilan & Safety Relief valve of Dresser Consolidated as per process
requirement.
 Boiler Control Strategy & Bagasse weighing system.
PROJECTS COMPLETED ON JOB 01S
PROJECTS COMPLETED ON DIFFERENT COMPANIES:
(A) MAINTENANCE OF RE-BOILER IN PAKISTAN PETROLEUM LIMITED:
 Maintenance of FSG system of a Re-boiler in SUI Gas Field.
 Installation & commissioning of ignition transformer & replace faulty one.
 Installation & commission of UV Sensor & replace faulty one.
 Replace faulty circuit & Installation & commission of new relay logic circuits.
(B) AUTOMATION OF AHMED OIL INDUSTRY:
 Develop programing logic as per process requirement.
 Installation & commission of field instruments including Temperature Sensors RTD, Thermostats, Orifice
plates in product lines, Differential Pressure Transmitter SMV 3000, Temperature Transmitter STT850.
 Installation & commission of GE Masoneilan control valves & control through Electro-pneumatic
Positioners & this positioners control by DCS Systems.
 Develop the graphical design of plant on spec-view.
 Testing & commission of Instrument signals on Honeywell DCS System.
 Develop the drawing in Auto-Cad to locate Instrument with the help of tag no.
(C) SHAHMURAD DISTILLERY:
 Installation & Commission of Smart Positioner GE Masoneilan SVI II AP & calibrate with control valve.
 Installation & Commission of field instruments including RTD, Smart line temperature transmitter
Honeywell STT850, Orifice Plate Differential pressure Sensors Honeywell SMV 3000, Honeywell Paperless
Recorder eztrend Qxe.
 Installation & commission of GE Masoneilan Globe valve, Ball Valve, Gate valve with Smart Positioner GE
Masoneilan SVI II AP in product line & control positioner through DCS System.
 Installation & commission of Honeywell Controller DC1040 for monitoring of Steam Pressure through
Pressure Transmitter & by it controlling of Smart Positioner & Control valve.
 Installation of Paper less Recorder Honeywell Eztrend Qxe in order to maintain Records of Different
Process variables.
 Testing instrument signal on Honeywell DCS System & troubleshoot & rectified the fault in control loops.
(D) SSJD BIO-PROCESSORS PVT LIMITED:
 Develop the logic of Plant in Honey well System HC-900 as per process requirement.
 Installation & commission of field Instruments of Distillation plant including Temperature Sensor RTD,
Orifice plate for creating Differential pressure in flow line & determine the flow rate, Differential Pressure
Transmitter Honeywell Smart line ST700 & level switches for storage tanks.
 Installation of different type of control valves including Reciprocating & Rotary valves as per process
requirement & control through Smart Electro-pneumatic Positioners.
 Testing instrument signal on DCS System & rectified the fault in control loops.
 Maintain records file & reports.
 Develop the drawing in Auto-Cad to locate Instrument with the help of tag no.
(E) BAGASSE WEIGHING SYSTEM:
 For Sugar Industries, We designed Bagasse Weighing system which use for the feeding of
Bagasse for Boiler Combustion process.
 Controlling of conveyor belts with the help of PLC.
 Make Design Sheets on HMI
CURRICULUM VITAE
7
(F) DEWAN CEMENT LIMITED:
 Installation & commission of Field Instruments Temperature Sensor RTD, Thermocouple, & Temperature
Transmitter STT750.
 Performed Maintenance of Instruments & replace faulty with new one.
 Maintain records file of Instruments.
SKILLS & TECHNICAL EXPERTISE
 Computer Proficiencies: Word, Excel, PowerPoint, AutoCAD.
 Preventive & Break down Maintenance of plants.
 Installation, Commissioning & Maintenance of different field instruments including Paperless recorder,
Chart Recorder, Temperature sensor & Transmitters, Differential Pressure Sensors & transmitters, Flow
Sensor & transmitters.
 Installation & commission of Control valves with Actuators of GE Masoneilan & Safety Relief valve of
Dresser Consolidated as per process requirement of plant.
 Installation & commission of Electro-Pneumatic Smart Line Positioners & control the movement of Control
Valves through Actuator by monitoring required value of Process variables.
 Develop terminations schedule of Site Instruments & Electrical equipment’s from Drawings.
 Installation & commission of Marshalling Panels & design scheme of control loops & routes for laying
cables of Instruments & Electrical Equipment’s.
 Installation & Commissioning of Star-delta panels, DCS Panels, DDC Panels & their Maintenance.
 Installation & commission of DOL Circuits & their Maintenance.
 Installation & Commissioning of different brand of Digital Controllers including Honeywell, Siemens, Fuji.
 Installation, Commissioning & Programing of VFD’s including Siemens Simovert, Shysanyu, Puma P5, G7,
Mitsubishi, Danfoss, Frenic & their Maintenance.
 Controlling of Motors with VFD’s on different Frequencies & their Maintenance.
 Controlling of VFD’s through Digital Controllers & PLC’S & by it controls the speed of motors by
maintaining the process variables.
 Controlling of Motor’s through Digital Controllers & PLC’S by monitoring Process Variable.
 Controlling of Blower Motors & Compressor stages of PACU Machines through Programmable
Thermostats.
 Controlling of SCR by monitoring temperature inside heaters through Controller & PLC’S.
 Controlling of Pumps by level of Storage tanks through Level Switches as per process requirement.
 Installation & Commission of PLC wiring & Programing including Fatek, Siemens, Honeywell & Honeywell
DCS systems C200, HC 900.
 Installation & Commission of HMI wiring & programing including MT6000/8000 I-series its Software Easy
builder 8000, Siemens Climatix HMI POL 895.51.
 PLC Programing & their software’s including Control Builder Designer, Spec-view, Winplc, & Logo! Soft
Comfort v6.0.
 Testing instrument signal on DCS & PLC’S, Assigning tags, Installation & trouble shooting if any problem
occurred.
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
M. Zuhad Siddiqui
Applicant

More Related Content

What's hot

resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGpappu kumar
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeAbdul Rahiman
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC EngineerSalman Faris
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CVHosam Elbanna
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CVAsif pasha
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gasvineeth ravi
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electricianjesegbue
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVAjith Chandramohan
 

What's hot (20)

resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
CV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEERCV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEER
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
B.tech electrical engineer cv
B.tech electrical engineer cvB.tech electrical engineer cv
B.tech electrical engineer cv
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electrician
 
E&I Engineer CV
E&I Engineer CVE&I Engineer CV
E&I Engineer CV
 
Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 
SUDHEESH CV .
SUDHEESH CV .SUDHEESH CV .
SUDHEESH CV .
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 

Similar to Electrical Engineer CV Search

Similar to Electrical Engineer CV Search (20)

INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
 
SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
vinodh
vinodhvinodh
vinodh
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Asim (maintenance)
Asim  (maintenance)Asim  (maintenance)
Asim (maintenance)
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
Cv
CvCv
Cv
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
scott planner resume - Copy
scott planner resume - Copyscott planner resume - Copy
scott planner resume - Copy
 
ELEC TECH F
ELEC TECH FELEC TECH F
ELEC TECH F
 
QuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCWQuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCW
 
QuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCWQuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCW
 
Fahad CV
Fahad CVFahad CV
Fahad CV
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
update 1
update 1update 1
update 1
 
Electrical Engineer 2
Electrical Engineer 2Electrical Engineer 2
Electrical Engineer 2
 
RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
 

Electrical Engineer CV Search

  • 1. CURRICULUM VITAE 1 To, Subject: Application for the post of Electrical Engineer ___________________________________________________________________________ OBJECTIVE To be a part of progressive & dynamic organization that poses challenges & provides opportunity to excel professionally & enhances my potential and skills by working with commitment and excellence in a dynamic and progressive environment & also to propel the organization achieving its goals & objectives. PERSONAL PROFILE NAME: M. ZUHAD SIDDIQUI FATHER’S NAME: M. ILYAS SIDDIQUI DATE OF BIRTH & PLACE: 02/06/1988 / KARACHI MARITAL STATUS MARRIED NATIONALITY / RELIGION: PAKISTAN / MUSLIM LANGUAGES KNOWN: ENGLISH, URDU, ARABIC, HINDI PROFESSIONAL QUALIFICATION: B.E (ELECTRONICS ENGINEERING) MAJOR: ELECTRICAL & INST. LICENSE: SAUDI ENGINEERING COUNCIL / MEMBER SHIP NO: 246453 PAKISTAN ENGINEERING COUNCIL / MEMBER SHIP NO: ELECTRO / 14832 PRESENT ADDRESS: AL – RASHID TOWER AL MAATHAR STREET, RIYADH KSA PERMANENT ADDRESS: A-54/9 F.B AREA DASTAGIR SOCIETY, KARACHI CONTACT NO: KSA=0549088018/PAKISTAN=+92314-2084090 PASSPORT DETAILS: PASSPORT NO. : GB5465211 DATE OF ISSUE : 24/4/2014 EXPIRY DATE : 23/4/2019 TOTAL EXPERIENCE: 6-YEARS WORKING EXPERIENCE IN DETAILS COMPANY NAME POSITION PROJECTS PERIOD SAUDI SERVICES FOR ELECTRO MECHANICAL WORK & CO. (SSEM) ELECTRICAL ENGINEER (A) KIC-AL KHARJ SUBSTATION (B) DAWADMI SUBSTATION (C) (C) SAFA SUBSTATION 10/05/2015 TO ONWARDS GATRON INDUSTRIES LIMITED ELECTRICAL & INSTRUMENT ENGINEER (A) UP-GRADE SPINNING PLANT (B) AUTOMATION OF SCREW COMPRESSOR ZT-250 01/07/2012 to 30/04/2015 MECCA ENGINEERING CO. (MEC) PVT. LTD. ELECTRICAL & INSTRUMENT CONTROL SYSTEM ENGINEER (A) MAINTENANCE OF RE-BOILER IN PAKISTAN PETROLEUM LIMITED (B) AUTOMATION OFAHMED OIL INDUSTRY (C) SHAHMURAD DISTILLERY (D) SSJD BIO PROCESSORS PVT LTD (E) BAGASSE WEIGHING SYSTEM (F) DEWAN CEMENT LIMITED 01/01/2011 to 30/06/2012 SIEMENS PAKISTAN ENGINEERING CO. LTD TRAINEE (INTERNSHIP) ___________________________________ 15/06/2009 to 13/07/2009 PAKISTAN TELECOMMUNICATION COMPANY LTD. TRAINEE (INTERNSHIP) ___________________________________ 07/01/2010 to 06/02/2010
  • 2. CURRICULUM VITAE 2 CURRENT JOB COMPANY: SAUDI SERVICES FOR ELECTRO MECHANIC WORKS CO. (SSEM) COMPANY INDUSTRY: Electrical & Instrumentation (Power sector) POSITION: Electrical Engineer DURATION: May 2015 – Present LOCATION: Riyadh Saudia Arabia Al-Rashid Group JOB DESCRIPTION: Provide services of Construction site of Power Plants & Gas Insulated Switch gear Substations, services include Installation Commissioning & Maintenance of Field Instruments, Control Systems, Motors, & Control Cable terminations. KEY RESPONSIBILITIES:  Ensure the work performed is in accordance with the drawings and specifications.  Check, control and approve contractor's material submittals, calculation reports.  Maintain detailed diary of daily work activities, issues, work approved or rejected, hours of operations, labor and equipment used and sign at the end of each day.  Coordinate with contractor's team to advice on execution of the work.  Coordinate with contractor’s team to arrange for sampling and testing of defective work and quality assurance of suspect materials.  Raise RFI to consultants & clients & maintain record of status.  Maintain records of completed works for interim and final payment and as-built drawings adhere to the company QHSE policy at all times.  Acting as a technical adviser for Supervisors, technicians and foreman.  Resolving any unexpected technical difficulties and other problems that may arise in the project.  Checking plans, drawings and quantities for accuracy of calculations.  Orders & maintain spears parts as required.  Overseeing the selection and requisition of materials.  Ensuring that all materials used and work performed as per specifications & drawings.  Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.  Planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.  Installation of Field Instruments including, DPS, TT, FS, PT, Programmable thermostats, Humidity sensors.  Maintenance of Electrical equipment’s including MV, LV motors, MCC panels, Drives & Field Instruments.  Testing instrument signals on Control systems & trouble shooting if any problem occurred.  Develop star-delta panels for running compressors of PACU & blower motors & Installations of Disconnectors.  Installation & Commissioning of HVAC Control systems along Complete Field Instruments in Gas Insulated Switch gear Substations.  Preparing project reports as required. EHV PROJECT: (A) KIC ALKHARJ BSP 8049 It’s a construction project, construction of 380KV/132KV/33KV/13.8KV GIS Substation in which complete installation & commissioning of Electrical Equipment’s of Substation along field Instruments. ELECTRICAL EQUIPMENTS USE IN THE PROJECT DDC Control System, SETRA DDC panels & Equipment’s, Siemens Controller POL 638.70, Siemens Climatix HMI POL 895.51, SKM PACU Machines, AHU Panels, Lightning Systems & Panels, AC-DB Panels, SDB Panels, Transformers, Switch gears, Exhaust fans, Smoke Purge Fans, Supply Fans, Blower Motors, Differential Pressure Sensor Danfoss KP & KPI series, Trend DPSA-400, Siemens QBM65-1, Differential Pressure Transmitters
  • 3. CURRICULUM VITAE 3 Danfoss MBS 1600, MBS 1300 Series, Actuators GEB136.1U, Humidity Sensors Siemens QFA2020, QFA3160, Honeywell SCT series, Programmable thermostats, White Rodger 1F85-277, Honeywell Focus PRO 5000 Series. ROLES & RESPONSIBILITIES IN THE PROJECT  Reporting to Construction Manager & Project Manager of daily progress & activities on Site.  Develop interface schedule of DDC panels & SKM PACU Machines by reviewing drawings.  Work on System Design & assist contractors for Modification in Panels & Control loops.  Rectify the issues in the design.  Provide assistance to Designer for Control Cable selection & size of Panel breaker.  Provide Assistance to Foreman, in order to lay complete control cables of instruments & panels in Construction site & finalize their routes.  Provide assistance to Foreman, Technicians for Installation of Field Instruments (above mention details), Control Systems & their Maintenance.  Provide Assistance to Technician for developing ferrols of the cable & termination works.  Inspect and monitor all project activities of the project sites Take corrective actions wherever required in the case of missing data from either the client or vendor.  Assist contractors in order to energize Control systems & field instruments. (B) DAWADMI SUBSTATION It’s a Substation, constructed by SSEM & here we provide services of Maintenance of DDC Panels, Control Systems & Field Instruments. ELECTRICAL EQUIPMENTS USE IN THE PROJECT DDC Control System, SAUTER DDC panels & Equipment’s, HMI, SKM PACU Machines, AHU Panels, ROLES & RESPONSIBILITIES IN THE PROJECT  Reporting to Project Manager of daily progress & activities on Site.  Assist Foreman & team of Technicians for Maintenance of DDC Panels, Field Instruments, and Control Systems.  Trouble shoots & rectifies the faults in Control loops.  Replace faulty HMI, Panel LED’s & Field instrument with spare. (C) SAFA SUBSTATION BSP 9014 It’s a construction project, construction of 380KV/132KV GIS Substation in which complete installation & commissioning of Electrical Equipment’s of Substation along field Instruments. ELECTRICAL EQUIPMENTS USE IN THE PROJECT Annunciator panels, LCC Panels, Control Panels, Disconnector Switches, ZAMIL DDC panels & Equipment’s, HMI, ZAMIL PACU Machines, AHU Panels, SAS Panels, Lightning Systems & Panels, AC-DB Panels, SDB Panels, Transformers, Switch gears, Temperature Sensors Siemens QAM2120.040, QFA3160, TRG2, Temperature Transmitters Honeywell STT250, STT750, STT650, STT850, Actuators BELIMO AFB24, Submersible pumps, Flow sensors LS-3 series, Rotameters, Remote Switches, SPF, EF, SF, Programmable Communicating Room thermostats Siemens RDF800KN, Siemens Controller POL 638.x, Siemens Climatix HMI POL 895.51, Humidity Sensors Siemens QFA2060D, QFA3160D, Differential Pressure Sensor Honeywell ST 3000, ST 700, Trend DPSA- 400. ROLES & RESPONSIBILITIES IN THE PROJECT  Reporting to Construction Manager & Project Manager of daily progress & activities on Site.  Installations, testing, calibration & commissioning of Actuators.  Installation of Remote switches for SPF
  • 4. CURRICULUM VITAE 4  Installation & Commissioning of Complete HVAC Control systems along Complete Field Instrumentation including DPS, Thermostats, Humidity and Temperature Sensor & Transmitters (as detail mention above) in Gas Insulated Switch Gear (GIS) Substations.  Give target dates to Foreman & technicians in order to complete Control Cable glanding & termination works of SAS Panels, DDC Panels, LCC Panels, and Annunciator Panels.  Commission Zamil Machines through thermostats & through DDC Control Systems as per requirement. PREVIOUS JOB 02 COMPANY: PETRO-CHEMICAL PROCESS PLANT OF GATRON INDUSTRIES LIMITED COMPANY INDUSTRY: Petro-Chemical POSITION: Electrical & Instrument Engineer DURATION: July 2012 – April 2015 LOCATION: HUB Balochistan, Pakistan Gatro-Novatex Group JOB DESCRIPTION: Maintenance of Complete Petro-Chemical Plant including Process Section & Utility Section of Plant, Equipment’s include Motors, Star-Delta panels, Engineering services of Medium Voltage Frequency drives & its control, Field Instruments & Control Systems Compressors & Chillers, RO plants, Maintain Smooth operations of Process Plant. Trouble shooting if required. Project planning, Installation Automations & Commissioning of Field Instruments, Control Systems during Up-gradation of Plant. Maintain feasibility reports for new project planning, Up-gradation of plants, R&D work. KEY RESPONSIBILITIES:  Provide engineering expertise and guidance to the operations and maintenance personnel in assuring the integrity and reliability of the electrical, instrumentation and control systems.  Identify Electrical and Control systems upgrade projects, prepare engineering drawings, provide budgetary cost estimates for fund approval, plan and implement them.  Undertake redundancy and obsolescence studies of the installed equipment and develop options and specifications for replacement.  Develop robust plans for the execution of any electrical, instrumentation and controls projects, and liaise with the operation and planning teams in the development of schedules.  Take part in preventive maintenance & schedule maintenance of Cooling towers, Chillers Compressors, Induction motors, Winders and field instruments.  Develop and execute software and program solutions and improvements to the installed systems.  Provide Emergency support to Electrical and Control system break – down issues.  Prepare procurement specifications for field instrumentation and electrical equipment.  Participate and direct trouble shooting of issues and problems with the installed electrical, instrumentation, control systems and equipment & in this regard leads team of electricians & other staff.  Maintaining records, preparing reports and other related correspondence relative to work. Scheduling, planning and organizing work history of all maintenance activities using ORACLE Based ERP system (MOGAN). TECHNICAL EXPERTISE: HANDS ON EXPERIENCE OF ELECTRICAL EQUIPMENT USE IN PETRO-CHEMICAL PROCESS PLANT:  Installation, Commissioning & Programming on PLC’s Fatek, Siemens S7-200, S7-300, and Honeywell DCS systems HC-900, C200.  Installation, Commissioning & Programming on HMI I-series MT-6000/8000 by using Easy builder 8000.  Controlling speed & operations of motors by using Variable Frequency drives (VFD’S) inverters Siemens Simovert, Shysanyu, Mitsubishi, and Danfoss.  Installation Commissioning & Programing of Controllers Honeywell DC1000 Series DC1010, 1020, 1030, 1040, Udc3000, Fuji temperature control PXR4, Delta DTD Series.  Installation Commissioning & Maintenance of field instruments including, Thermocouple, RTD, Thermostats, Temperature Transmitter STT850, STT3000, Differential Pressure Sensor Honeywell ST 3000, ST 700, SMV 3000 Flow Sensors, Rota Meters, Temp. recorder Honeywell eztrend Qxe, etc)  Maintenance of Electrical equipment’s, Control panels, distribution panels & Motor Control centers (MCCs), HV/ LV/ MV motors transformers & DOL circuits.  Trouble shoots & rectify if any fault occurred.
  • 5. CURRICULUM VITAE 5 HANDS ON EXPERIENCE OF ELECTRICAL EQUIPMENT USE IN UTILITY SECTION OF PROCESS PLANT:  Perform Schedule maintenance of Motors, Atlas Capco Compressors ZR-5, ZR-315, ZR-315 VSD, ZH-7000, Chillers LG-LSHG050, GO45SG, TRANE-ECVAD-27, SPACCO, BALTIMORE Cooling towers.  Installation, Commissioning & Maintenance of AHU panels, Star-delta panels.  Installation, Commissioning & Maintenance of Interlocking of relays, Protection relays.  Installation, Commissioning & Maintenance of Control valve, Actuators & Smart Positioners.  Maintenance of PLC based RO plant.  Trouble shoots & rectify if any fault occurred. TS COMPLETED ON JOB 02 UP-GRADATIONS PROJECTS IN PETRO-CHEMICAL PROCESS PLANT: (A) UPGRADE SPINNING PLANT:  Modified spinning plant control & its operation from WLC in to PLC.  Mapping all signals of Field Instruments including (Analog & Digital) & made control loops as per process requirement.  Monitoring of Process variables & by it Control motors as per process requirement. (B) AUTOMATION OF SCREW COMPRESSOR ZT-250:  Replace Elektronikon integrated control system with Fatek PLC & Weintek HMI.  Mapping all signals of Field Instruments including (Analog & Digital).  Made control loops as per working cycle of Compressor.  Controlling all safeties of Compressors ZT-250 & Control motor up to 355KW of compressor.  Create operation screens on HMI & show the status of Digital Input, Digital Output & show different Analog readings of Compressor (Including TT, PT). ORACLE BASE ERP SYSTEM MMS & MOGAN: MATERIAL MANAGEMENT SYSTEM (MMS): Making DPRs, MRDs, SR, ERP (Basic Knowledge) Prepare necessary spare parts list & its consumption on plant. MAINTENANCE OF GATRON & NOVATEX SYSTEM (MOGAN SYSTEM): Maintain Mogan System including; Job Order: Entry, Authorization, Reception & Completion. Work Permit: Entry, Authorization, Endorsment & Execution. Schedule: Entry, checking & process. PREVIOUS JOB 01 PREVIOUS JOB 01 COMPANY: MECCA ENGINEERING CO (MEC) PVT LTD. COMPANY INDUSTRY: Engineering Services (Installation & Commissioning Field Inst. & Control Systems) POSITION: Electrical & Inst. Control System Engineer DURATION: Jan 2011 – June 2012 LOCATION: Karachi, Pakistan AUTHORIZED REPRESENTATIVE: Honey well, GE Masoneilan Control Valve, GE Consolidated PSV,PRV, Yokogawa JOB DESCRIPTION: Provide services to Petroleum, Petro-Chemical Process plants. Installation, Maintenance & Commissioning of Field Instruments, Control Systems (Including Pressure, Flow, Temperature & Level Transmitters, Control valves, Paperless Recorders, Honeywell DCS Control Systems, FSG). Automation of Process plants KEY RESPONSIBILITIES:  Develop programming in Honeywell DCS Systems as per requirement of Process plant.  Develop Plant Graphic designs in Spec-view.  Installation of FSG.  Installation & Programing of Honey well paperless recorders (eztrend Qxe).  Develop drawings of Marshalling Panel.  Identifying system instrument & control loops in P & ID diagrams.  Sizing of Safety Relief Valves of Dresser Consolidated & Control valves of Masoneilan as per process requirement.  Develop instrument terminations drawings in Auto cad.  Develop & implements programming in PLC (Siemens Simatic & Fatek ) as per process requirement.  Maintain documentation including records & Mapping excel file of P & ID drawings.
  • 6. CURRICULUM VITAE 6 TECHNICAL EXPERTISE: HANDS ON EXPERIENCE OF FIELD INSTRUMENTS & CONTROL SYSTEMS:  Honeywell Control System Hybrid Control Designer (HC-900, C200 logic builder of Plant Automation).  Testing instrument signal on DCS, Assigning tags, Installation & trouble shooting if any problem occurred.  Spec view graphic designer of Plant.  Honeywell Paperless recorder eztrend Qxe, Honeywell Chart Recorder.  Honeywell Pressure transmitters, Honeywell Flow transmitters.  Sizing of Control valve of Masoneilan & Safety Relief valve of Dresser Consolidated as per process requirement.  Boiler Control Strategy & Bagasse weighing system. PROJECTS COMPLETED ON JOB 01S PROJECTS COMPLETED ON DIFFERENT COMPANIES: (A) MAINTENANCE OF RE-BOILER IN PAKISTAN PETROLEUM LIMITED:  Maintenance of FSG system of a Re-boiler in SUI Gas Field.  Installation & commissioning of ignition transformer & replace faulty one.  Installation & commission of UV Sensor & replace faulty one.  Replace faulty circuit & Installation & commission of new relay logic circuits. (B) AUTOMATION OF AHMED OIL INDUSTRY:  Develop programing logic as per process requirement.  Installation & commission of field instruments including Temperature Sensors RTD, Thermostats, Orifice plates in product lines, Differential Pressure Transmitter SMV 3000, Temperature Transmitter STT850.  Installation & commission of GE Masoneilan control valves & control through Electro-pneumatic Positioners & this positioners control by DCS Systems.  Develop the graphical design of plant on spec-view.  Testing & commission of Instrument signals on Honeywell DCS System.  Develop the drawing in Auto-Cad to locate Instrument with the help of tag no. (C) SHAHMURAD DISTILLERY:  Installation & Commission of Smart Positioner GE Masoneilan SVI II AP & calibrate with control valve.  Installation & Commission of field instruments including RTD, Smart line temperature transmitter Honeywell STT850, Orifice Plate Differential pressure Sensors Honeywell SMV 3000, Honeywell Paperless Recorder eztrend Qxe.  Installation & commission of GE Masoneilan Globe valve, Ball Valve, Gate valve with Smart Positioner GE Masoneilan SVI II AP in product line & control positioner through DCS System.  Installation & commission of Honeywell Controller DC1040 for monitoring of Steam Pressure through Pressure Transmitter & by it controlling of Smart Positioner & Control valve.  Installation of Paper less Recorder Honeywell Eztrend Qxe in order to maintain Records of Different Process variables.  Testing instrument signal on Honeywell DCS System & troubleshoot & rectified the fault in control loops. (D) SSJD BIO-PROCESSORS PVT LIMITED:  Develop the logic of Plant in Honey well System HC-900 as per process requirement.  Installation & commission of field Instruments of Distillation plant including Temperature Sensor RTD, Orifice plate for creating Differential pressure in flow line & determine the flow rate, Differential Pressure Transmitter Honeywell Smart line ST700 & level switches for storage tanks.  Installation of different type of control valves including Reciprocating & Rotary valves as per process requirement & control through Smart Electro-pneumatic Positioners.  Testing instrument signal on DCS System & rectified the fault in control loops.  Maintain records file & reports.  Develop the drawing in Auto-Cad to locate Instrument with the help of tag no. (E) BAGASSE WEIGHING SYSTEM:  For Sugar Industries, We designed Bagasse Weighing system which use for the feeding of Bagasse for Boiler Combustion process.  Controlling of conveyor belts with the help of PLC.  Make Design Sheets on HMI
  • 7. CURRICULUM VITAE 7 (F) DEWAN CEMENT LIMITED:  Installation & commission of Field Instruments Temperature Sensor RTD, Thermocouple, & Temperature Transmitter STT750.  Performed Maintenance of Instruments & replace faulty with new one.  Maintain records file of Instruments. SKILLS & TECHNICAL EXPERTISE  Computer Proficiencies: Word, Excel, PowerPoint, AutoCAD.  Preventive & Break down Maintenance of plants.  Installation, Commissioning & Maintenance of different field instruments including Paperless recorder, Chart Recorder, Temperature sensor & Transmitters, Differential Pressure Sensors & transmitters, Flow Sensor & transmitters.  Installation & commission of Control valves with Actuators of GE Masoneilan & Safety Relief valve of Dresser Consolidated as per process requirement of plant.  Installation & commission of Electro-Pneumatic Smart Line Positioners & control the movement of Control Valves through Actuator by monitoring required value of Process variables.  Develop terminations schedule of Site Instruments & Electrical equipment’s from Drawings.  Installation & commission of Marshalling Panels & design scheme of control loops & routes for laying cables of Instruments & Electrical Equipment’s.  Installation & Commissioning of Star-delta panels, DCS Panels, DDC Panels & their Maintenance.  Installation & commission of DOL Circuits & their Maintenance.  Installation & Commissioning of different brand of Digital Controllers including Honeywell, Siemens, Fuji.  Installation, Commissioning & Programing of VFD’s including Siemens Simovert, Shysanyu, Puma P5, G7, Mitsubishi, Danfoss, Frenic & their Maintenance.  Controlling of Motors with VFD’s on different Frequencies & their Maintenance.  Controlling of VFD’s through Digital Controllers & PLC’S & by it controls the speed of motors by maintaining the process variables.  Controlling of Motor’s through Digital Controllers & PLC’S by monitoring Process Variable.  Controlling of Blower Motors & Compressor stages of PACU Machines through Programmable Thermostats.  Controlling of SCR by monitoring temperature inside heaters through Controller & PLC’S.  Controlling of Pumps by level of Storage tanks through Level Switches as per process requirement.  Installation & Commission of PLC wiring & Programing including Fatek, Siemens, Honeywell & Honeywell DCS systems C200, HC 900.  Installation & Commission of HMI wiring & programing including MT6000/8000 I-series its Software Easy builder 8000, Siemens Climatix HMI POL 895.51.  PLC Programing & their software’s including Control Builder Designer, Spec-view, Winplc, & Logo! Soft Comfort v6.0.  Testing instrument signal on DCS & PLC’S, Assigning tags, Installation & trouble shooting if any problem occurred. I hereby certify that the above information is true and correct to the best of my knowledge and belief. M. Zuhad Siddiqui Applicant