Risk Analysis and Control
Patient Safety Team
© NHS Improving Quality 2014
“Unfortunately, I think historically the way a lot
of issues have been identified has been in a
reactive fashion, after something has occurred.”
(Duke CEO)
© NHS Improving Quality 2014
Safety Assessment
• Enhancing the reliability of processes usually forms part of a detailed safety
assessment
• The aim of Safety Assessment (SA) is the identification and control of risks
• SA forms part of an organisational Safety Management System (SMS)
• The aim of the SMS is to identify and control known hazards (SA), to monitor safety
performance, to learn safety lessons and to identify novel risks.
© NHS Improving Quality 2014
Scope of Safety
Management System
G: System is safe
Risk from hazards is
reduced to an
acceptable level
Risk control
interventions are
implemented and
operational
Novel risks are
identified and
assessed
FMEA Proposed
intervention
Incident
reporting
Risk
monitoring
0
10
20
30
40
50
60
Jan Feb Mar Apr May June
Dose
Frequency
Drug
© NHS Improving Quality 2014
Resilience
G: System is safe
Risk from hazards is
reduced to an
acceptable level
Risk control
interventions are
implemented and
operational
Novel risks are
identified and
assessed
Intrinsic resilience
adequate
Culture of safety
established
Pro-active risk
monitoring
established
© NHS Improving Quality 2014
The Tools / Approaches
Approach Step Use
Process Mapping System Definition •Document actual process
•Create shared understanding
•Basis for analysis
Failure Mode and
Effects Analysis
Risk Analysis •Proactively identify risks
•Prioritise risks and efforts
Redundancy Risk Control •Prevent failures
•Failure detection
•Mitigate consequences of failures
Primo –software
program
Risk Monitoring •Proactively identify processes that may lead
to latent conditions
•Prioritise efforts
© NHS Improving Quality 2014
Failure Modes and
Effects Analysis (FMEA) &
Root Cause Analysis
• RCA is a retrospective method (process) to understand what
went wrong and why. It is applied after an adverse event has
happened.
• FMEA is a proactive method to understand how things could go
wrong and what could be the consequences of failure. It is
applied before things go wrong to prevent them from going
wrong.
© NHS Improving Quality 2014
FMEA is a …………….
• systematic method of identifying and preventing product and
process problems before they occur.
• Way of focussing on the prevention of
– Defects
– Enhancing safety
– Increasing customer satisfaction
Ideally this is done when designing the process BUT FMEA on
existing processes is equally valid
© NHS Improving Quality 2014
FMEA
• Systematically identify ways in which the system can cause harm
(hazard identification)
• Assessment of those situations for the risk they pose (risk analysis)
• Particularly useful for detecting conditions where a single failure
can result in a dangerous situation
• Prioritise risks to focus on those situations that pose the highest risk
© NHS Improving Quality 2014
FMEA Process
1. Select Step
2. Apply Failure Mode
3. Identify Causes
4. Determine Consequences
5. Assess Risk
7. Assess Acceptability
6. Determine Mitigation
Next Step
Next Failure
Mode
If risk is not
acceptable, determine
further mitigation
© NHS Improving Quality 2014
FMEA Template
Step Failure
Mode
Causes Consequences
Risk
MitigationFreq * Sev*Det = Risk
© NHS Improving Quality 2014
Risk Matrix
© NHS Improving Quality 2014
Variation: Detection
Step Failure
Mode
Causes Consequences
Risk
Mitigation
Freq * Sev * Det = Risk
Risk Component Low High
Frequency 1 5
Severity 1 5
Detection 5 1
© NHS Improving Quality 2014
EXAMPLE
Step Failure
Mode
Causes Consequences Risk
Freq x sevxdet
= risk
Mitigation
Establish
Medication
History
Failure to
identify the
medicines
that the
patient is
taking at
home
Patient
confused
about
medication
Relatives not
available
Medical
notes not
available
Patient did
not bring
medicines to
the hospital
Wrong medicine
or dose
prescribed
Omission of
required
medication
4x3x1=12 Raise
awareness in
community
for patients to
bring their
current
medicines into
the hospital
© NHS Improving Quality 2014
EXERCISE
• Using your process map complete the FMEA
for your process.
© NHS Improving Quality 2014
Failure Detection
(Redundancy) & Mitigation
• Using the strategies discussed earlier, we can
reduce human error, but we will never be able
to eliminate it.
• We need ways of coping with (mitigating)
failures in our systems and processes
© NHS Improving Quality 2014
Cartoon Example: Pitfall
© NHS Improving Quality 2014
Why was there a hole on the road in the first place?!
© NHS Improving Quality 2014
Redundancy & Diversity: Defences in depth
Violations & latent failures: Safety Management & Safety
Culture
© NHS Improving Quality 2014
Redundancy
• Failure detection and mitigation are
achieved by some form of redundancy
• Having a system that is more complex than
that needed simply to perform the task
© NHS Improving Quality 2014
REDUNDANCY &
MITIGATION
Failure Occurs Adverse Event
Failure Occurs Adverse Event
Mechanism
To prevent
Failure
Mechanism to
Detect and
Recover from
Failure
© NHS Improving Quality 2014
Common Failure Detection Mechanisms
Make failures visible:
Self-soiling mattress
Checking:
Double checking
Information redundancy:
Diverse patient identifiers
Consistency check:
Does the medication dose make sense?
Loopback testing:
Reading back on the phone
Watchdog timer:
If results have not come back within an hour, query the lab
© NHS Improving Quality 2014
Common Barrier Systems
Procedural / Cultural:
Procedures e.g peer pressure for hand hygiene
Symbolic:
Signs e.g. hand hygiene when entering wards
Functional:
Must fulfill a pre-condition before progressing
e.g. Keyboard will stop working if not wiped regularly
Physical:
Isolation of patients
© NHS Improving Quality 2014
Some Problems With Redundancy
• Redundant steps have to be independent, but
often are not
Over-reliance:
• On people: double-checking
• On machines: mammography reading
– Cultural aspects: hierarchy
– Unclear allocation of responsibility
• Increased system complexity
– New failure modes
– Unanticipated interactions
© NHS Improving Quality 2014
Process Map &
Standardisation
Identify and
Prioritise Risk
Barriers and
Mitigation
Test and Refine
Deliberate reliable design
© NHS Improving Quality 2014
EXERCISE
• Design a redundancy for your process.
© NHS Improving Quality 2014
© NHS Improving Quality 2014

Contenu connexe

Tendances

Lean Solutions in NHS – Midland Forum
Lean Solutions in NHS – Midland ForumLean Solutions in NHS – Midland Forum
Lean Solutions in NHS – Midland ForumKinetik Solutions Ltd
 
Quality Clinic Do-It-Yourself Kit - sample
Quality Clinic Do-It-Yourself Kit - sampleQuality Clinic Do-It-Yourself Kit - sample
Quality Clinic Do-It-Yourself Kit - sampleMark H. Davis
 
The lean hospital what is mean
The lean hospital what is meanThe lean hospital what is mean
The lean hospital what is meanEmad Kotb
 
Webinar basic service improvement tools and techniques
Webinar basic service improvement tools and techniquesWebinar basic service improvement tools and techniques
Webinar basic service improvement tools and techniquesNHS Improving Quality
 
webinar introducing measurement for improvement
webinar introducing measurement for improvementwebinar introducing measurement for improvement
webinar introducing measurement for improvementNHS Improving Quality
 
The Principles of Lean Value Stream Design
The Principles of Lean Value Stream DesignThe Principles of Lean Value Stream Design
The Principles of Lean Value Stream DesignLean Enterprise Academy
 
How to Sustain Lean – The Key Elements
How to Sustain Lean – The Key ElementsHow to Sustain Lean – The Key Elements
How to Sustain Lean – The Key ElementsKinetik Solutions Ltd
 
Successful Change Management Strategies in a Medical Practice – April 28, 2011
Successful Change Management Strategies in a Medical Practice – April 28, 2011Successful Change Management Strategies in a Medical Practice – April 28, 2011
Successful Change Management Strategies in a Medical Practice – April 28, 2011Cientis Technologies
 
Project Management in Health and Human Services
Project Management in Health and Human ServicesProject Management in Health and Human Services
Project Management in Health and Human ServicesBrandon Olson
 
New approaches to dealing with malpractice and maladministration - cskills pr...
New approaches to dealing with malpractice and maladministration - cskills pr...New approaches to dealing with malpractice and maladministration - cskills pr...
New approaches to dealing with malpractice and maladministration - cskills pr...Ofqual Slideshare
 
Creating a Lean Culture at Thedacare, USA
Creating a Lean Culture at Thedacare, USACreating a Lean Culture at Thedacare, USA
Creating a Lean Culture at Thedacare, USALean Enterprise Academy
 

Tendances (20)

Kano
KanoKano
Kano
 
Resistance change final_11_march
Resistance change final_11_marchResistance change final_11_march
Resistance change final_11_march
 
Lean Solutions in NHS – Midland Forum
Lean Solutions in NHS – Midland ForumLean Solutions in NHS – Midland Forum
Lean Solutions in NHS – Midland Forum
 
Quality Clinic Do-It-Yourself Kit - sample
Quality Clinic Do-It-Yourself Kit - sampleQuality Clinic Do-It-Yourself Kit - sample
Quality Clinic Do-It-Yourself Kit - sample
 
The lean hospital what is mean
The lean hospital what is meanThe lean hospital what is mean
The lean hospital what is mean
 
Webinar basic service improvement tools and techniques
Webinar basic service improvement tools and techniquesWebinar basic service improvement tools and techniques
Webinar basic service improvement tools and techniques
 
Lean Practice and Value Streams
Lean Practice and Value Streams Lean Practice and Value Streams
Lean Practice and Value Streams
 
webinar introducing measurement for improvement
webinar introducing measurement for improvementwebinar introducing measurement for improvement
webinar introducing measurement for improvement
 
The Principles of Lean Value Stream Design
The Principles of Lean Value Stream DesignThe Principles of Lean Value Stream Design
The Principles of Lean Value Stream Design
 
How to Sustain Lean – The Key Elements
How to Sustain Lean – The Key ElementsHow to Sustain Lean – The Key Elements
How to Sustain Lean – The Key Elements
 
Successful Change Management Strategies in a Medical Practice – April 28, 2011
Successful Change Management Strategies in a Medical Practice – April 28, 2011Successful Change Management Strategies in a Medical Practice – April 28, 2011
Successful Change Management Strategies in a Medical Practice – April 28, 2011
 
Bringing lean to life
Bringing lean to lifeBringing lean to life
Bringing lean to life
 
Project Management in Health and Human Services
Project Management in Health and Human ServicesProject Management in Health and Human Services
Project Management in Health and Human Services
 
The 15 steps challenge toolkit
The 15 steps challenge toolkitThe 15 steps challenge toolkit
The 15 steps challenge toolkit
 
New approaches to dealing with malpractice and maladministration - cskills pr...
New approaches to dealing with malpractice and maladministration - cskills pr...New approaches to dealing with malpractice and maladministration - cskills pr...
New approaches to dealing with malpractice and maladministration - cskills pr...
 
Rapid Response Supply Chains at Cordis
Rapid Response Supply Chains at CordisRapid Response Supply Chains at Cordis
Rapid Response Supply Chains at Cordis
 
Managing a Lean Organisation
Managing a Lean OrganisationManaging a Lean Organisation
Managing a Lean Organisation
 
Leading Lean Transformations
Leading Lean Transformations Leading Lean Transformations
Leading Lean Transformations
 
Lean thinking for the nhs
Lean thinking for the nhsLean thinking for the nhs
Lean thinking for the nhs
 
Creating a Lean Culture at Thedacare, USA
Creating a Lean Culture at Thedacare, USACreating a Lean Culture at Thedacare, USA
Creating a Lean Culture at Thedacare, USA
 

En vedette

Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template mediaKhem Slawson
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)DEEPAK SAHOO
 
HI 201 | Healthcare Interoperability
HI 201 | Healthcare InteroperabilityHI 201 | Healthcare Interoperability
HI 201 | Healthcare InteroperabilityJan Michael Herber
 
Building a risk management system that works
Building a risk management system that worksBuilding a risk management system that works
Building a risk management system that worksVincent O'Neil
 
Peran komite medik dan hukum
Peran komite medik dan hukumPeran komite medik dan hukum
Peran komite medik dan hukumbudi1
 
Posisi,peran da fungsi mitrabestari
Posisi,peran da fungsi mitrabestariPosisi,peran da fungsi mitrabestari
Posisi,peran da fungsi mitrabestariSofie Krisnadi
 
Introduction to FMEA/FMECA
Introduction to FMEA/FMECAIntroduction to FMEA/FMECA
Introduction to FMEA/FMECAMichael Herman
 
Contoh spk dan rkk serta rekomedasi k omite medis
Contoh spk dan rkk serta rekomedasi k omite medisContoh spk dan rkk serta rekomedasi k omite medis
Contoh spk dan rkk serta rekomedasi k omite medisAtal Tamara Setiawan
 
Faktor yang Mempengaruhi Strategi Pembelajaran Bahasa
Faktor yang Mempengaruhi Strategi Pembelajaran BahasaFaktor yang Mempengaruhi Strategi Pembelajaran Bahasa
Faktor yang Mempengaruhi Strategi Pembelajaran Bahasafaiza hasbullah
 
Akreditasi vs quality
Akreditasi vs qualityAkreditasi vs quality
Akreditasi vs qualityAriefz Will
 
Manajemen unit-kerja-5-pertemuan-4
Manajemen unit-kerja-5-pertemuan-4Manajemen unit-kerja-5-pertemuan-4
Manajemen unit-kerja-5-pertemuan-4indra gunawan
 
construction of Reservation software solution for Airline Companies project ...
construction of  Reservation software solution for Airline Companies project ...construction of  Reservation software solution for Airline Companies project ...
construction of Reservation software solution for Airline Companies project ...Hagi Sahib
 

En vedette (20)

Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template media
 
Fmea handout
Fmea handoutFmea handout
Fmea handout
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 
HI 201 | Healthcare Interoperability
HI 201 | Healthcare InteroperabilityHI 201 | Healthcare Interoperability
HI 201 | Healthcare Interoperability
 
Building a risk management system that works
Building a risk management system that worksBuilding a risk management system that works
Building a risk management system that works
 
Peran komite medik dan hukum
Peran komite medik dan hukumPeran komite medik dan hukum
Peran komite medik dan hukum
 
FMEA.DR. K. BARANIDHRAN
FMEA.DR. K. BARANIDHRANFMEA.DR. K. BARANIDHRAN
FMEA.DR. K. BARANIDHRAN
 
Posisi,peran da fungsi mitrabestari
Posisi,peran da fungsi mitrabestariPosisi,peran da fungsi mitrabestari
Posisi,peran da fungsi mitrabestari
 
Introduction to FMEA/FMECA
Introduction to FMEA/FMECAIntroduction to FMEA/FMECA
Introduction to FMEA/FMECA
 
Hbl&msbl rsu kartini mojosari
Hbl&msbl rsu kartini mojosariHbl&msbl rsu kartini mojosari
Hbl&msbl rsu kartini mojosari
 
Contoh spk dan rkk serta rekomedasi k omite medis
Contoh spk dan rkk serta rekomedasi k omite medisContoh spk dan rkk serta rekomedasi k omite medis
Contoh spk dan rkk serta rekomedasi k omite medis
 
Faktor yang Mempengaruhi Strategi Pembelajaran Bahasa
Faktor yang Mempengaruhi Strategi Pembelajaran BahasaFaktor yang Mempengaruhi Strategi Pembelajaran Bahasa
Faktor yang Mempengaruhi Strategi Pembelajaran Bahasa
 
Audit medis meningkatkan mutu pelayanan medis
Audit medis meningkatkan mutu pelayanan medisAudit medis meningkatkan mutu pelayanan medis
Audit medis meningkatkan mutu pelayanan medis
 
Presentation pok 4 hbl
Presentation pok 4 hblPresentation pok 4 hbl
Presentation pok 4 hbl
 
Penyelenggaraan Komite Medis
Penyelenggaraan Komite MedisPenyelenggaraan Komite Medis
Penyelenggaraan Komite Medis
 
Akreditasi vs quality
Akreditasi vs qualityAkreditasi vs quality
Akreditasi vs quality
 
Manajemen unit-kerja-5-pertemuan-4
Manajemen unit-kerja-5-pertemuan-4Manajemen unit-kerja-5-pertemuan-4
Manajemen unit-kerja-5-pertemuan-4
 
patient safety
patient safety patient safety
patient safety
 
construction of Reservation software solution for Airline Companies project ...
construction of  Reservation software solution for Airline Companies project ...construction of  Reservation software solution for Airline Companies project ...
construction of Reservation software solution for Airline Companies project ...
 
Patient safety
Patient safetyPatient safety
Patient safety
 

Similaire à Risk analysis and control nhsiq 2014

Quality and Safety in Primary Care by VLE
Quality and Safety in Primary Care by VLEQuality and Safety in Primary Care by VLE
Quality and Safety in Primary Care by VLEAtlantic Training, LLC.
 
FMEA training for Healthcare - Sample
FMEA training for Healthcare - SampleFMEA training for Healthcare - Sample
FMEA training for Healthcare - SampleMark H. Davis
 
The secret to professional investigations
The secret to professional investigationsThe secret to professional investigations
The secret to professional investigations3Sixty Systems Ltd
 
Risk Management (1) (1).ppt
Risk Management (1) (1).pptRisk Management (1) (1).ppt
Risk Management (1) (1).pptAjjuSingh2
 
Various steps of risk assessment. md. anwar ibrahim miraz
Various steps of risk assessment. md. anwar ibrahim mirazVarious steps of risk assessment. md. anwar ibrahim miraz
Various steps of risk assessment. md. anwar ibrahim mirazMDAnwarIbrahimMiraz
 
NHS CSP Screening Quality Assurance Service update
NHS CSP Screening Quality Assurance Service update NHS CSP Screening Quality Assurance Service update
NHS CSP Screening Quality Assurance Service update Mike Harris
 
OSHA and National Safety Council - What is a Near Miss?
OSHA and National Safety Council - What is a Near Miss?OSHA and National Safety Council - What is a Near Miss?
OSHA and National Safety Council - What is a Near Miss?Garrett Foley
 
Serious Incident Prevention ™ 16 - 17 April 2014 Muscat, Oman
Serious Incident Prevention ™ 16 - 17 April 2014 Muscat, OmanSerious Incident Prevention ™ 16 - 17 April 2014 Muscat, Oman
Serious Incident Prevention ™ 16 - 17 April 2014 Muscat, Oman360 BSI
 
An Orientation to quality and patient safety for new hire in health care faci...
An Orientation to quality and patient safety for new hire in health care faci...An Orientation to quality and patient safety for new hire in health care faci...
An Orientation to quality and patient safety for new hire in health care faci...kiran
 
Nebosh Health and Safety at Work Qualification
Nebosh Health and Safety at Work QualificationNebosh Health and Safety at Work Qualification
Nebosh Health and Safety at Work Qualification3S Life Safe Akademie
 
Health and safety Inspections
Health and safety Inspections Health and safety Inspections
Health and safety Inspections MireGreyling
 
Drug Diversion Webinar Series #4: Save Lives, Money, and Reputation - Take th...
Drug Diversion Webinar Series #4: Save Lives, Money, and Reputation - Take th...Drug Diversion Webinar Series #4: Save Lives, Money, and Reputation - Take th...
Drug Diversion Webinar Series #4: Save Lives, Money, and Reputation - Take th...Omnicell
 
BSBWHS501presentation3
BSBWHS501presentation3BSBWHS501presentation3
BSBWHS501presentation3Michael Brown
 
QRM-ICH Q9 & ISO 31000.pdf
QRM-ICH Q9 & ISO 31000.pdfQRM-ICH Q9 & ISO 31000.pdf
QRM-ICH Q9 & ISO 31000.pdfssuser708be0
 
Infection control key performance indicators selection and establishment
Infection control key performance indicators selection and establishmentInfection control key performance indicators selection and establishment
Infection control key performance indicators selection and establishmentRania Elsharkawy
 

Similaire à Risk analysis and control nhsiq 2014 (20)

Reliability nhsiq 2014
Reliability   nhsiq 2014Reliability   nhsiq 2014
Reliability nhsiq 2014
 
Quality and Safety in Primary Care by VLE
Quality and Safety in Primary Care by VLEQuality and Safety in Primary Care by VLE
Quality and Safety in Primary Care by VLE
 
FMEA training for Healthcare - Sample
FMEA training for Healthcare - SampleFMEA training for Healthcare - Sample
FMEA training for Healthcare - Sample
 
The secret to professional investigations
The secret to professional investigationsThe secret to professional investigations
The secret to professional investigations
 
Human factors nhsiq 2014
Human factors nhsiq 2014Human factors nhsiq 2014
Human factors nhsiq 2014
 
Risk Management (1) (1).ppt
Risk Management (1) (1).pptRisk Management (1) (1).ppt
Risk Management (1) (1).ppt
 
Various steps of risk assessment. md. anwar ibrahim miraz
Various steps of risk assessment. md. anwar ibrahim mirazVarious steps of risk assessment. md. anwar ibrahim miraz
Various steps of risk assessment. md. anwar ibrahim miraz
 
Lab management l100
Lab management l100Lab management l100
Lab management l100
 
NHS CSP Screening Quality Assurance Service update
NHS CSP Screening Quality Assurance Service update NHS CSP Screening Quality Assurance Service update
NHS CSP Screening Quality Assurance Service update
 
OSHA and National Safety Council - What is a Near Miss?
OSHA and National Safety Council - What is a Near Miss?OSHA and National Safety Council - What is a Near Miss?
OSHA and National Safety Council - What is a Near Miss?
 
Serious Incident Prevention ™ 16 - 17 April 2014 Muscat, Oman
Serious Incident Prevention ™ 16 - 17 April 2014 Muscat, OmanSerious Incident Prevention ™ 16 - 17 April 2014 Muscat, Oman
Serious Incident Prevention ™ 16 - 17 April 2014 Muscat, Oman
 
An Orientation to quality and patient safety for new hire in health care faci...
An Orientation to quality and patient safety for new hire in health care faci...An Orientation to quality and patient safety for new hire in health care faci...
An Orientation to quality and patient safety for new hire in health care faci...
 
Hazard analysis
Hazard analysisHazard analysis
Hazard analysis
 
Nebosh Health and Safety at Work Qualification
Nebosh Health and Safety at Work QualificationNebosh Health and Safety at Work Qualification
Nebosh Health and Safety at Work Qualification
 
Health and safety Inspections
Health and safety Inspections Health and safety Inspections
Health and safety Inspections
 
Drug Diversion Webinar Series #4: Save Lives, Money, and Reputation - Take th...
Drug Diversion Webinar Series #4: Save Lives, Money, and Reputation - Take th...Drug Diversion Webinar Series #4: Save Lives, Money, and Reputation - Take th...
Drug Diversion Webinar Series #4: Save Lives, Money, and Reputation - Take th...
 
BSBWHS501presentation3
BSBWHS501presentation3BSBWHS501presentation3
BSBWHS501presentation3
 
Deviation management new (1)
Deviation management new (1)Deviation management new (1)
Deviation management new (1)
 
QRM-ICH Q9 & ISO 31000.pdf
QRM-ICH Q9 & ISO 31000.pdfQRM-ICH Q9 & ISO 31000.pdf
QRM-ICH Q9 & ISO 31000.pdf
 
Infection control key performance indicators selection and establishment
Infection control key performance indicators selection and establishmentInfection control key performance indicators selection and establishment
Infection control key performance indicators selection and establishment
 

Plus de NHS Improving Quality

Learning Disabilities: Share and Learn webinar - 26 May 2016
Learning Disabilities: Share and Learn webinar - 26 May 2016Learning Disabilities: Share and Learn webinar - 26 May 2016
Learning Disabilities: Share and Learn webinar - 26 May 2016NHS Improving Quality
 
Changing behaviours: the power of social & platforms
Changing behaviours: the power of social & platformsChanging behaviours: the power of social & platforms
Changing behaviours: the power of social & platformsNHS Improving Quality
 
How do we ensure that we sustain the great work from each vanguard and spread...
How do we ensure that we sustain the great work from each vanguard and spread...How do we ensure that we sustain the great work from each vanguard and spread...
How do we ensure that we sustain the great work from each vanguard and spread...NHS Improving Quality
 
Building the future: perspectives on large scale change
Building the future: perspectives on large scale changeBuilding the future: perspectives on large scale change
Building the future: perspectives on large scale changeNHS Improving Quality
 
Respiratory Quality Improvement Programme - Breathlessness project
Respiratory Quality Improvement Programme - Breathlessness projectRespiratory Quality Improvement Programme - Breathlessness project
Respiratory Quality Improvement Programme - Breathlessness projectNHS Improving Quality
 
Evaluation of the Breathlessness Pilots (OPM)
Evaluation of the Breathlessness Pilots (OPM)Evaluation of the Breathlessness Pilots (OPM)
Evaluation of the Breathlessness Pilots (OPM)NHS Improving Quality
 
Leicester, Leicestershire, Rutland Breathlessness Pathway (University Hospita...
Leicester, Leicestershire, Rutland Breathlessness Pathway (University Hospita...Leicester, Leicestershire, Rutland Breathlessness Pathway (University Hospita...
Leicester, Leicestershire, Rutland Breathlessness Pathway (University Hospita...NHS Improving Quality
 
The greatest pleasure in life is doing what people say you cannot do. Anonymo...
The greatest pleasure in life is doing what people say you cannot do. Anonymo...The greatest pleasure in life is doing what people say you cannot do. Anonymo...
The greatest pleasure in life is doing what people say you cannot do. Anonymo...NHS Improving Quality
 
Presentation slides Frailty: building understanding, empathy and the skills t...
Presentation slides Frailty: building understanding, empathy and the skills t...Presentation slides Frailty: building understanding, empathy and the skills t...
Presentation slides Frailty: building understanding, empathy and the skills t...NHS Improving Quality
 
Early Implementers Workshop 23rd March 2016
Early Implementers Workshop 23rd March 2016Early Implementers Workshop 23rd March 2016
Early Implementers Workshop 23rd March 2016NHS Improving Quality
 
Self-management in the community and on the Internet - Presentation 22nd Marc...
Self-management in the community and on the Internet - Presentation 22nd Marc...Self-management in the community and on the Internet - Presentation 22nd Marc...
Self-management in the community and on the Internet - Presentation 22nd Marc...NHS Improving Quality
 
Electronic Palliative Care Coordination Systems (EPaCCS): Improving Patient C...
Electronic Palliative Care Coordination Systems (EPaCCS): Improving Patient C...Electronic Palliative Care Coordination Systems (EPaCCS): Improving Patient C...
Electronic Palliative Care Coordination Systems (EPaCCS): Improving Patient C...NHS Improving Quality
 
Fire service as an asset: providing telecare support in the community Webinar...
Fire service as an asset: providing telecare support in the community Webinar...Fire service as an asset: providing telecare support in the community Webinar...
Fire service as an asset: providing telecare support in the community Webinar...NHS Improving Quality
 
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...NHS Improving Quality
 
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...NHS Improving Quality
 
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...NHS Improving Quality
 
We need to talk about person-centred care #A4PCC
We need to talk about person-centred care #A4PCCWe need to talk about person-centred care #A4PCC
We need to talk about person-centred care #A4PCCNHS Improving Quality
 
Commissioning Integrated models of care 160211 slides
Commissioning Integrated models of care 160211 slidesCommissioning Integrated models of care 160211 slides
Commissioning Integrated models of care 160211 slidesNHS Improving Quality
 

Plus de NHS Improving Quality (20)

OUSR
OUSROUSR
OUSR
 
Learning Disabilities: Share and Learn webinar - 26 May 2016
Learning Disabilities: Share and Learn webinar - 26 May 2016Learning Disabilities: Share and Learn webinar - 26 May 2016
Learning Disabilities: Share and Learn webinar - 26 May 2016
 
Changing behaviours: the power of social & platforms
Changing behaviours: the power of social & platformsChanging behaviours: the power of social & platforms
Changing behaviours: the power of social & platforms
 
How do we ensure that we sustain the great work from each vanguard and spread...
How do we ensure that we sustain the great work from each vanguard and spread...How do we ensure that we sustain the great work from each vanguard and spread...
How do we ensure that we sustain the great work from each vanguard and spread...
 
Building the future: perspectives on large scale change
Building the future: perspectives on large scale changeBuilding the future: perspectives on large scale change
Building the future: perspectives on large scale change
 
Leading in a complex world:
Leading in a complex world: Leading in a complex world:
Leading in a complex world:
 
Respiratory Quality Improvement Programme - Breathlessness project
Respiratory Quality Improvement Programme - Breathlessness projectRespiratory Quality Improvement Programme - Breathlessness project
Respiratory Quality Improvement Programme - Breathlessness project
 
Evaluation of the Breathlessness Pilots (OPM)
Evaluation of the Breathlessness Pilots (OPM)Evaluation of the Breathlessness Pilots (OPM)
Evaluation of the Breathlessness Pilots (OPM)
 
Leicester, Leicestershire, Rutland Breathlessness Pathway (University Hospita...
Leicester, Leicestershire, Rutland Breathlessness Pathway (University Hospita...Leicester, Leicestershire, Rutland Breathlessness Pathway (University Hospita...
Leicester, Leicestershire, Rutland Breathlessness Pathway (University Hospita...
 
The greatest pleasure in life is doing what people say you cannot do. Anonymo...
The greatest pleasure in life is doing what people say you cannot do. Anonymo...The greatest pleasure in life is doing what people say you cannot do. Anonymo...
The greatest pleasure in life is doing what people say you cannot do. Anonymo...
 
Presentation slides Frailty: building understanding, empathy and the skills t...
Presentation slides Frailty: building understanding, empathy and the skills t...Presentation slides Frailty: building understanding, empathy and the skills t...
Presentation slides Frailty: building understanding, empathy and the skills t...
 
Early Implementers Workshop 23rd March 2016
Early Implementers Workshop 23rd March 2016Early Implementers Workshop 23rd March 2016
Early Implementers Workshop 23rd March 2016
 
Self-management in the community and on the Internet - Presentation 22nd Marc...
Self-management in the community and on the Internet - Presentation 22nd Marc...Self-management in the community and on the Internet - Presentation 22nd Marc...
Self-management in the community and on the Internet - Presentation 22nd Marc...
 
Electronic Palliative Care Coordination Systems (EPaCCS): Improving Patient C...
Electronic Palliative Care Coordination Systems (EPaCCS): Improving Patient C...Electronic Palliative Care Coordination Systems (EPaCCS): Improving Patient C...
Electronic Palliative Care Coordination Systems (EPaCCS): Improving Patient C...
 
Fire service as an asset: providing telecare support in the community Webinar...
Fire service as an asset: providing telecare support in the community Webinar...Fire service as an asset: providing telecare support in the community Webinar...
Fire service as an asset: providing telecare support in the community Webinar...
 
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
 
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
 
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
Long Term Conditions Year of Care Commissioning Programme - Early Implementer...
 
We need to talk about person-centred care #A4PCC
We need to talk about person-centred care #A4PCCWe need to talk about person-centred care #A4PCC
We need to talk about person-centred care #A4PCC
 
Commissioning Integrated models of care 160211 slides
Commissioning Integrated models of care 160211 slidesCommissioning Integrated models of care 160211 slides
Commissioning Integrated models of care 160211 slides
 

Dernier

Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...scanFOAM
 
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
2025 Inpatient Prospective Payment System (IPPS) Proposed RuleShelby Lewis
 
College Call Girls Mumbai Alia 9910780858 Independent Escort Service Mumbai
College Call Girls Mumbai Alia 9910780858 Independent Escort Service MumbaiCollege Call Girls Mumbai Alia 9910780858 Independent Escort Service Mumbai
College Call Girls Mumbai Alia 9910780858 Independent Escort Service Mumbaisonalikaur4
 
Hi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbers
Hi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbersHi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbers
Hi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbersnarwatsonia7
 
Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...
Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...
Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...narwatsonia7
 
EMS and Extrication: Coordinating Critical Care
EMS and Extrication: Coordinating Critical CareEMS and Extrication: Coordinating Critical Care
EMS and Extrication: Coordinating Critical CareRommie Duckworth
 
Low Rate Call Girls In Bommanahalli Just Call 7001305949
Low Rate Call Girls In Bommanahalli Just Call 7001305949Low Rate Call Girls In Bommanahalli Just Call 7001305949
Low Rate Call Girls In Bommanahalli Just Call 7001305949ps5894268
 
Call Girls Ghaziabad 9999965857 Cheap and Best with original Photos
Call Girls Ghaziabad 9999965857 Cheap and Best with original PhotosCall Girls Ghaziabad 9999965857 Cheap and Best with original Photos
Call Girls Ghaziabad 9999965857 Cheap and Best with original Photosparshadkalavatidevi7
 
Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...
Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...
Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...satishsharma69855
 
Single Assessment Framework - What We Know So Far
Single Assessment Framework - What We Know So FarSingle Assessment Framework - What We Know So Far
Single Assessment Framework - What We Know So FarCareLineLive
 
Call Girls Service Bommasandra - Call 7001305949 Rs-3500 with A/C Room Cash o...
Call Girls Service Bommasandra - Call 7001305949 Rs-3500 with A/C Room Cash o...Call Girls Service Bommasandra - Call 7001305949 Rs-3500 with A/C Room Cash o...
Call Girls Service Bommasandra - Call 7001305949 Rs-3500 with A/C Room Cash o...narwatsonia7
 
Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...ggsonu500
 
Call Girls Nandini Layout - 7001305949 Escorts Service with Real Photos and M...
Call Girls Nandini Layout - 7001305949 Escorts Service with Real Photos and M...Call Girls Nandini Layout - 7001305949 Escorts Service with Real Photos and M...
Call Girls Nandini Layout - 7001305949 Escorts Service with Real Photos and M...narwatsonia7
 
2024 HCAT Healthcare Technology Insights
2024 HCAT Healthcare Technology Insights2024 HCAT Healthcare Technology Insights
2024 HCAT Healthcare Technology InsightsHealth Catalyst
 
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...delhimodelshub1
 
Russian Call Girls in Goa Samaira 7001305949 Independent Escort Service Goa
Russian Call Girls in Goa Samaira 7001305949 Independent Escort Service GoaRussian Call Girls in Goa Samaira 7001305949 Independent Escort Service Goa
Russian Call Girls in Goa Samaira 7001305949 Independent Escort Service Goanarwatsonia7
 
Air-Hostess Call Girls Shanti Nagar - Call 7001305949 Rs-3500 with A/C Room C...
Air-Hostess Call Girls Shanti Nagar - Call 7001305949 Rs-3500 with A/C Room C...Air-Hostess Call Girls Shanti Nagar - Call 7001305949 Rs-3500 with A/C Room C...
Air-Hostess Call Girls Shanti Nagar - Call 7001305949 Rs-3500 with A/C Room C...narwatsonia7
 
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...ggsonu500
 
Call Girl Bangalore Aashi 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Aashi 7001305949 Independent Escort Service BangaloreCall Girl Bangalore Aashi 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Aashi 7001305949 Independent Escort Service Bangalorenarwatsonia7
 

Dernier (20)

Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
Experience learning - lessons from 25 years of ATACC - Mark Forrest and Halde...
 
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
2025 Inpatient Prospective Payment System (IPPS) Proposed Rule
 
College Call Girls Mumbai Alia 9910780858 Independent Escort Service Mumbai
College Call Girls Mumbai Alia 9910780858 Independent Escort Service MumbaiCollege Call Girls Mumbai Alia 9910780858 Independent Escort Service Mumbai
College Call Girls Mumbai Alia 9910780858 Independent Escort Service Mumbai
 
Hi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbers
Hi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbersHi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbers
Hi,Fi Call Girl In Marathahalli - 7001305949 with real photos and phone numbers
 
Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...
Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...
Hi,Fi Call Girl In Whitefield - [ Cash on Delivery ] Contact 7001305949 Escor...
 
Russian Call Girls South Delhi 9711199171 discount on your booking
Russian Call Girls South Delhi 9711199171 discount on your bookingRussian Call Girls South Delhi 9711199171 discount on your booking
Russian Call Girls South Delhi 9711199171 discount on your booking
 
EMS and Extrication: Coordinating Critical Care
EMS and Extrication: Coordinating Critical CareEMS and Extrication: Coordinating Critical Care
EMS and Extrication: Coordinating Critical Care
 
Low Rate Call Girls In Bommanahalli Just Call 7001305949
Low Rate Call Girls In Bommanahalli Just Call 7001305949Low Rate Call Girls In Bommanahalli Just Call 7001305949
Low Rate Call Girls In Bommanahalli Just Call 7001305949
 
Call Girls Ghaziabad 9999965857 Cheap and Best with original Photos
Call Girls Ghaziabad 9999965857 Cheap and Best with original PhotosCall Girls Ghaziabad 9999965857 Cheap and Best with original Photos
Call Girls Ghaziabad 9999965857 Cheap and Best with original Photos
 
Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...
Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...
Russian Call Girls Delhi Cantt | 9711199171 | High Profile -New Model -Availa...
 
Single Assessment Framework - What We Know So Far
Single Assessment Framework - What We Know So FarSingle Assessment Framework - What We Know So Far
Single Assessment Framework - What We Know So Far
 
Call Girls Service Bommasandra - Call 7001305949 Rs-3500 with A/C Room Cash o...
Call Girls Service Bommasandra - Call 7001305949 Rs-3500 with A/C Room Cash o...Call Girls Service Bommasandra - Call 7001305949 Rs-3500 with A/C Room Cash o...
Call Girls Service Bommasandra - Call 7001305949 Rs-3500 with A/C Room Cash o...
 
Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 90 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
 
Call Girls Nandini Layout - 7001305949 Escorts Service with Real Photos and M...
Call Girls Nandini Layout - 7001305949 Escorts Service with Real Photos and M...Call Girls Nandini Layout - 7001305949 Escorts Service with Real Photos and M...
Call Girls Nandini Layout - 7001305949 Escorts Service with Real Photos and M...
 
2024 HCAT Healthcare Technology Insights
2024 HCAT Healthcare Technology Insights2024 HCAT Healthcare Technology Insights
2024 HCAT Healthcare Technology Insights
 
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
Russian Call Girls Hyderabad Saloni 9907093804 Independent Escort Service Hyd...
 
Russian Call Girls in Goa Samaira 7001305949 Independent Escort Service Goa
Russian Call Girls in Goa Samaira 7001305949 Independent Escort Service GoaRussian Call Girls in Goa Samaira 7001305949 Independent Escort Service Goa
Russian Call Girls in Goa Samaira 7001305949 Independent Escort Service Goa
 
Air-Hostess Call Girls Shanti Nagar - Call 7001305949 Rs-3500 with A/C Room C...
Air-Hostess Call Girls Shanti Nagar - Call 7001305949 Rs-3500 with A/C Room C...Air-Hostess Call Girls Shanti Nagar - Call 7001305949 Rs-3500 with A/C Room C...
Air-Hostess Call Girls Shanti Nagar - Call 7001305949 Rs-3500 with A/C Room C...
 
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
Gurgaon Sector 68 Call Girls ( 9873940964 ) Book Hot And Sexy Girls In A Few ...
 
Call Girl Bangalore Aashi 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Aashi 7001305949 Independent Escort Service BangaloreCall Girl Bangalore Aashi 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Aashi 7001305949 Independent Escort Service Bangalore
 

Risk analysis and control nhsiq 2014

  • 1. © NHS Improving Quality 2014 Risk Analysis and Control Patient Safety Team
  • 2. © NHS Improving Quality 2014 “Unfortunately, I think historically the way a lot of issues have been identified has been in a reactive fashion, after something has occurred.” (Duke CEO)
  • 3. © NHS Improving Quality 2014 Safety Assessment • Enhancing the reliability of processes usually forms part of a detailed safety assessment • The aim of Safety Assessment (SA) is the identification and control of risks • SA forms part of an organisational Safety Management System (SMS) • The aim of the SMS is to identify and control known hazards (SA), to monitor safety performance, to learn safety lessons and to identify novel risks.
  • 4. © NHS Improving Quality 2014 Scope of Safety Management System G: System is safe Risk from hazards is reduced to an acceptable level Risk control interventions are implemented and operational Novel risks are identified and assessed FMEA Proposed intervention Incident reporting Risk monitoring 0 10 20 30 40 50 60 Jan Feb Mar Apr May June Dose Frequency Drug
  • 5. © NHS Improving Quality 2014 Resilience G: System is safe Risk from hazards is reduced to an acceptable level Risk control interventions are implemented and operational Novel risks are identified and assessed Intrinsic resilience adequate Culture of safety established Pro-active risk monitoring established
  • 6. © NHS Improving Quality 2014 The Tools / Approaches Approach Step Use Process Mapping System Definition •Document actual process •Create shared understanding •Basis for analysis Failure Mode and Effects Analysis Risk Analysis •Proactively identify risks •Prioritise risks and efforts Redundancy Risk Control •Prevent failures •Failure detection •Mitigate consequences of failures Primo –software program Risk Monitoring •Proactively identify processes that may lead to latent conditions •Prioritise efforts
  • 7. © NHS Improving Quality 2014 Failure Modes and Effects Analysis (FMEA) & Root Cause Analysis • RCA is a retrospective method (process) to understand what went wrong and why. It is applied after an adverse event has happened. • FMEA is a proactive method to understand how things could go wrong and what could be the consequences of failure. It is applied before things go wrong to prevent them from going wrong.
  • 8. © NHS Improving Quality 2014 FMEA is a ……………. • systematic method of identifying and preventing product and process problems before they occur. • Way of focussing on the prevention of – Defects – Enhancing safety – Increasing customer satisfaction Ideally this is done when designing the process BUT FMEA on existing processes is equally valid
  • 9. © NHS Improving Quality 2014 FMEA • Systematically identify ways in which the system can cause harm (hazard identification) • Assessment of those situations for the risk they pose (risk analysis) • Particularly useful for detecting conditions where a single failure can result in a dangerous situation • Prioritise risks to focus on those situations that pose the highest risk
  • 10. © NHS Improving Quality 2014 FMEA Process 1. Select Step 2. Apply Failure Mode 3. Identify Causes 4. Determine Consequences 5. Assess Risk 7. Assess Acceptability 6. Determine Mitigation Next Step Next Failure Mode If risk is not acceptable, determine further mitigation
  • 11. © NHS Improving Quality 2014 FMEA Template Step Failure Mode Causes Consequences Risk MitigationFreq * Sev*Det = Risk
  • 12. © NHS Improving Quality 2014 Risk Matrix
  • 13. © NHS Improving Quality 2014 Variation: Detection Step Failure Mode Causes Consequences Risk Mitigation Freq * Sev * Det = Risk Risk Component Low High Frequency 1 5 Severity 1 5 Detection 5 1
  • 14. © NHS Improving Quality 2014 EXAMPLE Step Failure Mode Causes Consequences Risk Freq x sevxdet = risk Mitigation Establish Medication History Failure to identify the medicines that the patient is taking at home Patient confused about medication Relatives not available Medical notes not available Patient did not bring medicines to the hospital Wrong medicine or dose prescribed Omission of required medication 4x3x1=12 Raise awareness in community for patients to bring their current medicines into the hospital
  • 15. © NHS Improving Quality 2014 EXERCISE • Using your process map complete the FMEA for your process.
  • 16. © NHS Improving Quality 2014 Failure Detection (Redundancy) & Mitigation • Using the strategies discussed earlier, we can reduce human error, but we will never be able to eliminate it. • We need ways of coping with (mitigating) failures in our systems and processes
  • 17. © NHS Improving Quality 2014 Cartoon Example: Pitfall
  • 18. © NHS Improving Quality 2014 Why was there a hole on the road in the first place?!
  • 19. © NHS Improving Quality 2014 Redundancy & Diversity: Defences in depth Violations & latent failures: Safety Management & Safety Culture
  • 20. © NHS Improving Quality 2014 Redundancy • Failure detection and mitigation are achieved by some form of redundancy • Having a system that is more complex than that needed simply to perform the task
  • 21. © NHS Improving Quality 2014 REDUNDANCY & MITIGATION Failure Occurs Adverse Event Failure Occurs Adverse Event Mechanism To prevent Failure Mechanism to Detect and Recover from Failure
  • 22. © NHS Improving Quality 2014 Common Failure Detection Mechanisms Make failures visible: Self-soiling mattress Checking: Double checking Information redundancy: Diverse patient identifiers Consistency check: Does the medication dose make sense? Loopback testing: Reading back on the phone Watchdog timer: If results have not come back within an hour, query the lab
  • 23. © NHS Improving Quality 2014 Common Barrier Systems Procedural / Cultural: Procedures e.g peer pressure for hand hygiene Symbolic: Signs e.g. hand hygiene when entering wards Functional: Must fulfill a pre-condition before progressing e.g. Keyboard will stop working if not wiped regularly Physical: Isolation of patients
  • 24. © NHS Improving Quality 2014 Some Problems With Redundancy • Redundant steps have to be independent, but often are not Over-reliance: • On people: double-checking • On machines: mammography reading – Cultural aspects: hierarchy – Unclear allocation of responsibility • Increased system complexity – New failure modes – Unanticipated interactions
  • 25. © NHS Improving Quality 2014 Process Map & Standardisation Identify and Prioritise Risk Barriers and Mitigation Test and Refine Deliberate reliable design
  • 26. © NHS Improving Quality 2014 EXERCISE • Design a redundancy for your process.
  • 27. © NHS Improving Quality 2014
  • 28. © NHS Improving Quality 2014