Ce diaporama a bien été signalé.
Le téléchargement de votre SlideShare est en cours. ×
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Prochain SlideShare
RAHUL_CV-2015
RAHUL_CV-2015
Chargement dans…3
×

Consultez-les par la suite

1 sur 4 Publicité

Plus De Contenu Connexe

Diaporamas pour vous (20)

Publicité

Nadeem CV

  1. 1. Page 1 of 4 CURRICULUM VITAE ELECTRICAL SUPERVISOR Nadeem Akhter Mob- +918292434404/+919162306267 E-mail: nadeemakhter73@gmail.com /nadeemakhter49@yahoo.com OBJECTIVE: Around 12 year of experience in Oil & Gas Industries, Petro-chemical Industries Seeking a position as an Electrical Supervisor in a stable organization engaged in construction where I can perform my skills what I have achieved from my past and be the part of that organization. EDUCATIONAL BACKGROUND AND EXP.  Diploma in Electrical Engineering  Total work experience More than 12 years/ Function & Responsibilities  Experience in EPC,Oil & Gas, Fertilizer and Pipeline  Manage &Monitor and inspect the electrical erection/installation activities of the contractor.  Handle all aspects of Electrical Construction activities including site investigations,  Guidance on to Erection Sub-Contractor for its processes.  Computer literates Office (Excel, Word and Access).  Co-ordinate and supervise construction work teams and plan future work programs  Knowledge of how to assess and minimize risks associated with working on Hazardous area  Monitor Sub-contractor Electrical installation work is carried out to the required standard  Attending Technical and Progress Meetings  Review and Approval of Materials and Samples  Review and Approval of Method Statements,Testing & Commissioning Formats  Attending Inspections at Site & Co-ordination with other services  Replying to the "Request for Information" for the Technical Design issues WORK EXPERIENCE: Duration : April .2012 to Janl 2015 Company : SAIPEM (ABUDHABI) Project : Shah Gas Development project Client : Al-Hosn Gas Designation: Electrical Supervisor
  2. 2. Page 2 of 4 Job Responsibilities:  Involved in overall site construction work (Installation of LV, MV switch board, Transformer, cable pulling, cable termination for power and control cables, cable tray, field lighting and grounding system.  Involved in AC/DC UPS and battery bank installation.  Involved in Cathodic Protection system above/underground line  Involved in per commissioning activity, energization of transformers, switch board, function test for switch board. Function test for motor feeders, motor solo run test.  Installation and termination of lighting DB cable tray, Conduit & Street/flood light on structure  Involved in installation of heat tracing system  Complete electrical responsibility of overall project and take responsibility to complete the project on schedule to achieve the target for project completion with safety and quality  Review Construction /Project Schedule Daily work Schedules that pertain to electrical work.  Monitor all electrical work and report to Construction manager for all electrical construction work.  Involved in erection of 33kv 11 switchgear, 11kv, 6.6v and LV switchgear, 33kv/11kv/6.6 transformer, Motors and all electrical equipment  To assist Highlight Electrical Construction Department during the preparation of Project Quality Plan, and providing site activity reports to establish where corrective & preventive actions are required. Duration : May. 2010 to April 2012 Company : Hyundai Engineering & construction Co. (Qatar) Project : QAFCO-5/6 Project Client : Qatar Fertilizer Company Designation : Electrical Supervisor Job Responsibilities:  Transformer installation &eriction of switchgear power and control panels UPS.  Supervision of construction work Installation of LV, MV switch board, cable pulling, cable termination for power and control cables, cable tray, field lighting, fire alarm, communication and field grounding system  Responsibility of project schedule planning  Involved in per commissioning activity, energization of transformers, switch board, function test for switch board interlock inter trip for switch gear and transformers, all protection checks for transformer and switch gear .  Function test for motor feeders from field and from DCS, motor solo run test and all protection testing for MCC and switch gear.  Expertise in approved electrical engineering drawings, wiring diagrams pertaining to Overhead lines.
  3. 3. Page 3 of 4  Conducting Supervisory inspection that leads to earlier completion of projects.  Ensured compliance with Client quality objective.  Responsible in reviewing all procured/ Vendor supplied materials delivery/receiving, storage or handling.  Specifications Contractors’ valid RFIs and Technical Quires shall be promptly addressed to avoid delays.  Participate in site progress meetings and Highlight Areas of concern which impact schedule to Management team couldensure all interfaces Issues are promptly addressed.  Track and report daily/weekly Progress and provide monthly summaries Duration : MAY 2006 TO DEC 2008. Company : Consolidated Contractor International Company, (CCIC) SAUDI ARABIA Project : Khursaniyah Gas plant (KGP) Client : Bechtel & Technip Saudi Aramco Designation : Electrical supervisor Job Responsibilities:  Responsible in reviewing all Field Construction activities installation of Transformer /Panel Field Lighting Panel, Cable Pulling Termination and installation of all field electrical equipment, Cable tray work.  Monitor all related electrical work and report to Construction manager for all electrical construction work.  To submit daily/weekly/monthly reports to Project engineer/Manager, good communication and documentary skills suitable for any site works  Executing installation of all electrical equipment LV/MV switchboard , Transformer, lighting Panels & Control Panels  Complete electrical responsibility of overall project and take responsibility to complete the project on schedule to achieve the target for project completion with safety and quality.  Provide technical direction to Drafter, Designer and less experienced Engineers.  Involved in per commissioning activity, energization of transformers, switch board, function test for switch board, all protection checks for transformer and switch gear .  Assigned task has to supervise/manage a team of more than hundred persons which composes both skilled/unskilled persons. Duration : Sept 2004 to April 2006 Company : ALPHATEC NIRMAN PVT LTD Designation : Electrical Supervisor
  4. 4. Page 4 of 4 Job responsibility:  Supervision of electrical Construction installation work with proper quality within shortest time Perform Non-deliverable activities such as survey, studies, review, and preparation of documents like drawing,  This project involved installation of MV/ LV switchgear MCC panel& IRP UPS, lighting & Distribution Board, motors, HT/ LT cable laying termination installation of lighting fixture Ladder cable tray conduit & HVAC cable termination; Duration : Sept. 2003 to Aug .2004 Company : UNPOWER ENGG AND CONTRACTING COMPANY Designation :Electrical Supervisor Job Responsibility:  Supervision of site construction work Installation of switch board, cable pulling, cable termination For power and control cables, cable tray installation, field lighting & grounding system. Personal Skill and Competencies: Installation of Electrical and Instrumentation equipment’s and utilities, Operation and Control. Organizational and Others: Teamwork and Leadership. Personal Details: Name : Nadeem Akhter Fathers Name : Nayeem Akhter Birth Date : November15, 1983 Marital Status : Married Religion : Islam Passport No : L9196210 Date of issue ; 04-06-2014 Date of Expiry : 03-06-2024 Old Passport No :F5188654 Address :Manshatola Post Bettiah Dist. west Champaran State: Bihar-845438 India Declaration: I hereby declare that the above information provided by me is true to the best of my knowledge. Place: Yours faithfully Date: (Nadeem Akhtar)

×