Ce diaporama a bien été signalé.
Le téléchargement de votre SlideShare est en cours. ×

NAZEER AHMED GAAD (1)(1)

Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Publicité
Chargement dans…3
×

Consultez-les par la suite

1 sur 3 Publicité

Plus De Contenu Connexe

Diaporamas pour vous (20)

Publicité

NAZEER AHMED GAAD (1)(1)

  1. 1. Nazeer Ahmad Gaad B.E (ELECTRICAL) 246/2 Street No. 31 Phase-VIII Defense, Karachi. Email: nazeergaad1@hotmail.com Cell: 0333-2126946 Executive Profile Engineering professional having 40+ years of extensive experience in project management, execution, construction, supervision, inspection and monitoring in an engineering environment. Skilled in network planning and analysis with strengths in project management. Extensive background and interpretation of electrical power Design, Transmission, Distribution, Maintenance, Operation, Renovation, Augmentation and Up-gradation of systems / networks and equipment. Strong technical and methodical aptitude with an innate ability to analyze, coordinate and synthesize data. Resourceful and creative; enjoys challenges and overcoming obstacles. Interprets complex assignments and moves forward to develop and integrate technological enhancements to achieve configuration management. Equally at home with allied mechanical / civil engineering, non-engineering and general assignments. Qualification Highlights  Expertise in major power design, construction engineering, installation and deployment subject matter.  Detailed experience in design, construction, operation and maintenance of Electrical Power Transmission and Distribution networks.  Carried-out renovations, augmentations, re-routifications, re-conductoring and up-gradations of power transmission and distribution systems.  Technical knowledge of material evaluation, procurement, inspection and certifications for the projects.  Thorough understanding of test methodologies and procedures.  Establishment of master plans to direct Electrical Construction activities.  Management of allied civil and mechanical works.  Building a team and working with a team with total co-ordination. Professional Experience Presently Director with M/S EMC ENGINEERS worked with M/S GAM ARAK IND. CO as Construction Manager, 500 KV Transmission Line Project, Rahim Yar Khan, since June 2012 to November 30th 2012 Completed the project: Installation of Aerial Bundled Cable, at Memon Colony (Pilot Project), HESCO with major interaction between Consultant, Client and Project execution team, in 2011. Manager (DESCON Engineering Ltd.) 2007 to 2010 Mangla Dam Raising Project Mangla District Jehlum, Pakistan  Manager, Electrical & Instrumentation with principal interface between clients, consultants, project team, installation and other collaborative partnerships. Provided direct support to senior project manager in all internal and external contract parameters. Managed project resources, issues, costs and technical issues from conception through resolution to project completion.  Managed vendor activity, engineering, installation, customer service and other protocol to ensure timely product deployment. Follow up client’s delivery of drawings as per agreed schedule.  Ensure control of updated versions of drawings, specifications, recall of obsolete documents and that all activities at site are carried out on latest versions  Keep track record of all changes/ variations during construction and ensure that extra work is properly recorded.  Perform other related tasks assigned from time to time.
  2. 2.  Ensuring strict compliance to standard safety protocols.  Maintained excellent liaison with the consultants and the employer.  Carried-out a portion of work through sub-contractors.  Dismantled all old control cables, power cables, d.c cables, telephone cables and earthing cables, laid new control cables, xlp power cables, d.c cables, earthing cables and laid new telephone system, carried-out xlp jointing and terminations of these cables. Shifted transformers to new locations, on Mangla Dam and Jari Dam, energized and made the power, control as well as telephone systems functional. Completed the entire work within planned schedule and within very reasonable costs.  Completion of all civil, electrical and mechanical Punch List works through sub-contractors within DLP.  Managed relocations of HT lines, LT lines, power transformers and installation of new HT lines, LT lines and transformers as well as power connections, from Barquiat and WAPDA.  Carried out related civil and mechanical works and finalized all punch list items to the satisfaction of the Engineer/ Consultant. Manager Construction (Trans Asia Refinery Project, Karachi).  Establishment of entire electrical network on the site.  Worked on the Project for recovery of 200 Acres land from sea.  Under-took construction of boundary walls and installation of gates. Manager Construction (Oxy Chem. Project Sheikhupura).  Establishment of entire electrical network on the site.  Construction of Administration Building, Security Building, Laboratory and Prayer Hall.  Pre-cast Pump and Pipe Foundations / Supports. Manager Construction (MOL Project)  Establishment of entire electrical network on the site  Initiated the project at site by carrying out the cleaning and grubbing of 85 acre plot.  Established site facilities. General Manager (NWE, Karachi) Jan 1999 to May 2005 &Mar 2006 to Nov 2007 National Water Engineering Karachi, a Swedish joint venture company, pioneers in Pakistan in the field of waste water treatment and effluent plants.  In charge of all Electrical and Mechanical works, subcontracting works, ensuring quality and safety standard at site.  Ensuring proper coordination and control of all customers issued materials and keep a close watch on project material plans.  Streamlined project communications to senior and executive management detailing business impact, implications and aligning project directives. Managing Director (Indus conductor and cables ltd, Lahore) June 05 to Feb 06 Managing all affairs of 8 number factories, which included making aluminum rod, breaking Aluminum rod into strands and making AAC or ACSR Conductors, installation of high speed copper wire drawing machine and starting production. Shifting of cable factory from Lahore and erection / installation of the same at Mureedkay premises and started production. M/S OWAIS MEMON GROUP(Construction Company) Karachi Jan 1994 to Dec 1998
  3. 3. As Manager Works, responsibilities included construction work from concept to completion of 1. Colonies, Buildings, Roads and allied facilities. 2. Related Electrification / Plumbing / Mech. Works / Installation of Lifts. WAPDA (POWER WING) Jan 1975 to Nov 1993  As Assistant Manager, Dy;Manager to Manager in different parts of the country; responsibilities included:-  Being over-all in charge of a specific project in an area.  Construction, renovation, operation and maintenance of electrical power 220kv,132kv, Transmission Lines and 11kv distribution systems and allied civil, mechanical works in liaison with Design Department.  Carried-out renovations, augmentations, up-gradations of transmission, distribution lines, sub- stations as well as re- routification of lines.  Installation, operation, maintenance and renovations of Diesel power stations.  Supply chain management.  Contract management.  Making purchases through Tenders, Quotations and ensuring supplies. Subcontracting and ensuring quality work / supplies, making payments, financial management and accounting.  Inspection and certification of all Electrical/ Mechanical/ Civil engineering, non-engineering and general materials and goods as per relevant specifications / designs / drawings or standards such as B.S, A..S, WAPDA Specifications, Standards or client specifications. The materials were inspected during manufacturing stage or in finished stage. The manufacturers were also guided to make arrangements to manufacture the materials to required standards / specifications. Some of the companies dealt with are M/S Siemens, AEG Telefunken, Phlips, Jhonson&Phlips, Berger Paints, Pakistan Steel, Karachi Ship Yard & Engineering Works, Metropolitan Steel Corporation, Pakistan Cables, China Machinery Import &Export at Tianjin China, etc.  Replying to Audit observations.  Managing the Labour and Labour Unions.  Extensive inter-action with Public, Government Organizations, Local Government and Administration, Political Representatives, Military Administration and senior management at all levels. Education  B.E.ELECTRICAL S.U. ENGINEERING COLLEGE JAMSHORO Membership  Pakistan Engineering Council Elect /5307 Licenses  Electric Supervisor License KEL- 1809 Training  Practical training in Power Distribution Systems at P.T.I. WAPDA.LYALLPUR.  Training in New Commercial Procedures at WAPDA Academy Islamabad.  Junior, Middle and Senior Management Courses at Lahore and WAPDA Academy Tarbella.  PMS, PRIMAVERA Courses, with skills in Computer Applications, at DESCON Lahore.

×