Doppler-Vor-Test-Rack.pptx

Doppler-Vor-Test-Rack.pptx
Doppler-Vor-Test-Rack.pptx
'I’ Level Facility For Testing Of DVOR LRU. This is A State Or Art For Automatic Testing For
Fault Detection And Replacement Components Of Modules Of DVOR MAFI System Up To
Component Level As An Aid To Repair. It Should Also Be Capable Of Undertaking Functional
Testing Of All Modules And Sub-Modules Of DVOR With An Option To Generate Diagnostic
Test Report.
Doppler-Vor-Test-Rack.pptx
 Universal Test Racks, along with associated interfaces (jigs/fixtures Card Extenders, interface
cables, edge connectors, GPIB, accessories test software etc.) which is compatible and capable
of undertaking diagnosis of all the modules and sub-modules / shop replaceable unit (SRU)
 Testing and Fault diagnosis / rectification of following modules / spares of DVOR
 Following modules/LRU’s can be tested in DOPPLER VOR Test Rack Control Unit
 Change Over Unit
 Input/ Output Unit
 Field Monitor Unit
 Distributor Drive Unit
 Pin Unit Diode Switch
 Impedance Matching Unit
 DC Unit (For Controller)
 Central Processing Unit
 Car Unit
 Side Band Amp Unit
 Test Signal Generator Unit (SG)
 Transmitter DC DC Unit
 LCD Display Unit
 Cooling Fan Unit For Controller
 DVOR Signal Generator Unit
 Transmitter Fan Unit
Doppler-Vor-Test-Rack.pptx
Universal Test Racks, along with associated interfaces (jigs/fixtures Card Extenders, interface cables,
edge connectors, GPIB, accessories test software etc.) which is compatible and capable of undertaking
diagnosis of all the modules and sub-modules / shop replaceable unit (SRU).
Testing and Fault diagnosis / rectification of following modules / spares of DVOR
Following modules/LRU’s can be tested in DOPPLER VOR Test Rack Control Unit
Change Over Unit
Input/ Output Unit
Field Monitor Unit
Distributor Drive Unit
Pin Unit Diode Switch
Impedance Matching Unit
DC Unit (For Controller)
Central Processing Unit
Car Unit
Side Band Amp Unit
Test Signal Generator Unit (SG)
Transmitter DC DC Unit
LCD Display Unit
Cooling Fan Unit For Controller
DVOR Signal Generator Unit
Transmitter Fan Unit
Doppler-Vor-Test-Rack.pptx
Test Rack along with associated jigs/fixtures, Card Extenders, interface cables for JTAG
components, edge connectors, GPIB etc., accessories and test software should be capable of
undertaking diagnosis of all the modules and sub-modules / shop replaceable unit
(SRU).The test rack/ bench system should also possess an inbuilt self diagnostic procedure
in terms of start-up BITE to identify faults and generate remedial actions by user.
Doppler-Vor-Test-Rack.pptx
Thank You
1 sur 11

Recommandé

DCS Commissioning Steps.pdf par
DCS Commissioning Steps.pdfDCS Commissioning Steps.pdf
DCS Commissioning Steps.pdfjoshwiksai
123 vues14 diapositives
DCS Commissioning Steps EMERSON EDUARDO RODRIGUES par
DCS Commissioning Steps EMERSON EDUARDO RODRIGUESDCS Commissioning Steps EMERSON EDUARDO RODRIGUES
DCS Commissioning Steps EMERSON EDUARDO RODRIGUESEMERSON EDUARDO RODRIGUES
6 vues14 diapositives
AUDI A4 B5 1.8L 1996 ELECTRICAL EQUIPMENT 01 79 instrument cluster, on board ... par
AUDI A4 B5 1.8L 1996 ELECTRICAL EQUIPMENT 01 79 instrument cluster, on board ...AUDI A4 B5 1.8L 1996 ELECTRICAL EQUIPMENT 01 79 instrument cluster, on board ...
AUDI A4 B5 1.8L 1996 ELECTRICAL EQUIPMENT 01 79 instrument cluster, on board ...Gherghescu Gabriel
1.6K vues99 diapositives
Tools using for Repair Electronic devices.pptx. par
Tools using for Repair Electronic devices.pptx.Tools using for Repair Electronic devices.pptx.
Tools using for Repair Electronic devices.pptx.Fasial Ghazanfar
5 vues54 diapositives
Instrumentation Construction Pre- CommnEngineer RESUME par
Instrumentation Construction  Pre- CommnEngineer  RESUMEInstrumentation Construction  Pre- CommnEngineer  RESUME
Instrumentation Construction Pre- CommnEngineer RESUMEMohammed Y. Ahmed Nilangakar
530 vues6 diapositives
Bts commissioning (alcatel lucent) par
Bts commissioning (alcatel lucent)Bts commissioning (alcatel lucent)
Bts commissioning (alcatel lucent)Sayed Qaisar Shah
12.3K vues55 diapositives

Contenu connexe

Similaire à Doppler-Vor-Test-Rack.pptx

Labview based rf characterization and testing of dual mode phase shifter par
Labview based rf characterization and testing of dual mode phase shifterLabview based rf characterization and testing of dual mode phase shifter
Labview based rf characterization and testing of dual mode phase shiftereSAT Journals
303 vues7 diapositives
I&CS orintation.pptx par
I&CS orintation.pptxI&CS orintation.pptx
I&CS orintation.pptxLokeshRavichandran1
5 vues29 diapositives
I&CS orintation.pptx par
I&CS orintation.pptxI&CS orintation.pptx
I&CS orintation.pptxLokeshRavichandran1
3 vues29 diapositives
Mitsubishi ac servos melservo jn-dienhathe.vn par
Mitsubishi ac servos melservo jn-dienhathe.vnMitsubishi ac servos melservo jn-dienhathe.vn
Mitsubishi ac servos melservo jn-dienhathe.vnDien Ha The
434 vues48 diapositives
Mitsubishi ac servos melservo jn par
Mitsubishi ac servos melservo jnMitsubishi ac servos melservo jn
Mitsubishi ac servos melservo jnDien Ha The
330 vues48 diapositives
Hioki Electrical measuring instruments 2022 catalogue par
Hioki Electrical measuring instruments 2022 catalogueHioki Electrical measuring instruments 2022 catalogue
Hioki Electrical measuring instruments 2022 catalogueNIHON DENKEI SINGAPORE
118 vues148 diapositives

Similaire à Doppler-Vor-Test-Rack.pptx(20)

Labview based rf characterization and testing of dual mode phase shifter par eSAT Journals
Labview based rf characterization and testing of dual mode phase shifterLabview based rf characterization and testing of dual mode phase shifter
Labview based rf characterization and testing of dual mode phase shifter
eSAT Journals303 vues
Mitsubishi ac servos melservo jn-dienhathe.vn par Dien Ha The
Mitsubishi ac servos melservo jn-dienhathe.vnMitsubishi ac servos melservo jn-dienhathe.vn
Mitsubishi ac servos melservo jn-dienhathe.vn
Dien Ha The434 vues
Mitsubishi ac servos melservo jn par Dien Ha The
Mitsubishi ac servos melservo jnMitsubishi ac servos melservo jn
Mitsubishi ac servos melservo jn
Dien Ha The330 vues
Simocode pro presentation for simodode dp customers share by voip.com.vn par Tran Thanh
Simocode pro presentation for simodode dp customers share by voip.com.vnSimocode pro presentation for simodode dp customers share by voip.com.vn
Simocode pro presentation for simodode dp customers share by voip.com.vn
Tran Thanh3.4K vues
New IGBT Gate Driver Software par Juan Munoz
New IGBT Gate Driver SoftwareNew IGBT Gate Driver Software
New IGBT Gate Driver Software
Juan Munoz218 vues
ERAP GSE 2015_e catalogue par Sashi B
ERAP GSE  2015_e catalogueERAP GSE  2015_e catalogue
ERAP GSE 2015_e catalogue
Sashi B355 vues
Delta d product presentation par Matt Tudge
Delta d product presentationDelta d product presentation
Delta d product presentation
Matt Tudge493 vues
Catalog Biến tần Frenic Multi Fuji (Fuji Electric) - Beeteco.com par Beeteco
Catalog Biến tần Frenic Multi Fuji (Fuji Electric) - Beeteco.comCatalog Biến tần Frenic Multi Fuji (Fuji Electric) - Beeteco.com
Catalog Biến tần Frenic Multi Fuji (Fuji Electric) - Beeteco.com
Beeteco1.4K vues
Autosar-software-component_0hg.pptx par fallleaf1104
Autosar-software-component_0hg.pptxAutosar-software-component_0hg.pptx
Autosar-software-component_0hg.pptx
fallleaf110439 vues
Leading Indicator Program OverView Rev A par Phil Rochette
Leading  Indicator Program OverView Rev ALeading  Indicator Program OverView Rev A
Leading Indicator Program OverView Rev A
Phil Rochette120 vues
Obd leader u vci universal vehicle connection interface diagnostic scanner ne... par Jack Chen
Obd leader u vci universal vehicle connection interface diagnostic scanner ne...Obd leader u vci universal vehicle connection interface diagnostic scanner ne...
Obd leader u vci universal vehicle connection interface diagnostic scanner ne...
Jack Chen723 vues

Plus de Neometrix_Engineering_Pvt_Ltd

Six Clamp Perfect Binding Machine par
Six Clamp Perfect Binding MachineSix Clamp Perfect Binding Machine
Six Clamp Perfect Binding MachineNeometrix_Engineering_Pvt_Ltd
25 vues8 diapositives
oil-flooded-screw-compressor-test-rig.pptx par
oil-flooded-screw-compressor-test-rig.pptxoil-flooded-screw-compressor-test-rig.pptx
oil-flooded-screw-compressor-test-rig.pptxNeometrix_Engineering_Pvt_Ltd
24 vues10 diapositives
Hydraulic Control Valve Test Bench.pptx par
Hydraulic Control Valve Test Bench.pptxHydraulic Control Valve Test Bench.pptx
Hydraulic Control Valve Test Bench.pptxNeometrix_Engineering_Pvt_Ltd
54 vues10 diapositives
head-impact-test-rig.pptx par
head-impact-test-rig.pptxhead-impact-test-rig.pptx
head-impact-test-rig.pptxNeometrix_Engineering_Pvt_Ltd
8 vues10 diapositives
halon-reclaimation-and-refiling-facility.pptx par
halon-reclaimation-and-refiling-facility.pptxhalon-reclaimation-and-refiling-facility.pptx
halon-reclaimation-and-refiling-facility.pptxNeometrix_Engineering_Pvt_Ltd
30 vues11 diapositives
impulse-and-load-test-rig.pptx par
impulse-and-load-test-rig.pptximpulse-and-load-test-rig.pptx
impulse-and-load-test-rig.pptxNeometrix_Engineering_Pvt_Ltd
70 vues11 diapositives

Plus de Neometrix_Engineering_Pvt_Ltd(20)

Dernier

Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th... par
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...ahmedmesaiaoun
12 vues84 diapositives
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,... par
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...AakashShakya12
57 vues115 diapositives
Thermal aware task assignment for multicore processors using genetic algorithm par
Thermal aware task assignment for multicore processors using genetic algorithm Thermal aware task assignment for multicore processors using genetic algorithm
Thermal aware task assignment for multicore processors using genetic algorithm IJECEIAES
30 vues12 diapositives
Stone Masonry and Brick Masonry.pdf par
Stone Masonry and Brick Masonry.pdfStone Masonry and Brick Masonry.pdf
Stone Masonry and Brick Masonry.pdfMohammed Abdullah Laskar
20 vues6 diapositives
Investor Presentation par
Investor PresentationInvestor Presentation
Investor Presentationeser sevinç
20 vues26 diapositives
fakenews_DBDA_Mar23.pptx par
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptxdeepmitra8
12 vues34 diapositives

Dernier(20)

Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th... par ahmedmesaiaoun
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...
ahmedmesaiaoun12 vues
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,... par AakashShakya12
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...
AakashShakya1257 vues
Thermal aware task assignment for multicore processors using genetic algorithm par IJECEIAES
Thermal aware task assignment for multicore processors using genetic algorithm Thermal aware task assignment for multicore processors using genetic algorithm
Thermal aware task assignment for multicore processors using genetic algorithm
IJECEIAES30 vues
fakenews_DBDA_Mar23.pptx par deepmitra8
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptx
deepmitra812 vues
A multi-microcontroller-based hardware for deploying Tiny machine learning mo... par IJECEIAES
A multi-microcontroller-based hardware for deploying Tiny machine learning mo...A multi-microcontroller-based hardware for deploying Tiny machine learning mo...
A multi-microcontroller-based hardware for deploying Tiny machine learning mo...
IJECEIAES12 vues
7_DVD_Combinational_MOS_Logic_Circuits.pdf par Usha Mehta
7_DVD_Combinational_MOS_Logic_Circuits.pdf7_DVD_Combinational_MOS_Logic_Circuits.pdf
7_DVD_Combinational_MOS_Logic_Circuits.pdf
Usha Mehta59 vues
2_DVD_ASIC_Design_FLow.pdf par Usha Mehta
2_DVD_ASIC_Design_FLow.pdf2_DVD_ASIC_Design_FLow.pdf
2_DVD_ASIC_Design_FLow.pdf
Usha Mehta19 vues
NEW SUPPLIERS SUPPLIES (copie).pdf par georgesradjou
NEW SUPPLIERS SUPPLIES (copie).pdfNEW SUPPLIERS SUPPLIES (copie).pdf
NEW SUPPLIERS SUPPLIES (copie).pdf
georgesradjou14 vues
Design and analysis of a new undergraduate Computer Engineering degree – a me... par WaelBadawy6
Design and analysis of a new undergraduate Computer Engineering degree – a me...Design and analysis of a new undergraduate Computer Engineering degree – a me...
Design and analysis of a new undergraduate Computer Engineering degree – a me...
WaelBadawy653 vues

Doppler-Vor-Test-Rack.pptx

  • 3. 'I’ Level Facility For Testing Of DVOR LRU. This is A State Or Art For Automatic Testing For Fault Detection And Replacement Components Of Modules Of DVOR MAFI System Up To Component Level As An Aid To Repair. It Should Also Be Capable Of Undertaking Functional Testing Of All Modules And Sub-Modules Of DVOR With An Option To Generate Diagnostic Test Report.
  • 5.  Universal Test Racks, along with associated interfaces (jigs/fixtures Card Extenders, interface cables, edge connectors, GPIB, accessories test software etc.) which is compatible and capable of undertaking diagnosis of all the modules and sub-modules / shop replaceable unit (SRU)  Testing and Fault diagnosis / rectification of following modules / spares of DVOR  Following modules/LRU’s can be tested in DOPPLER VOR Test Rack Control Unit  Change Over Unit  Input/ Output Unit  Field Monitor Unit  Distributor Drive Unit  Pin Unit Diode Switch  Impedance Matching Unit  DC Unit (For Controller)  Central Processing Unit  Car Unit  Side Band Amp Unit  Test Signal Generator Unit (SG)  Transmitter DC DC Unit  LCD Display Unit  Cooling Fan Unit For Controller  DVOR Signal Generator Unit  Transmitter Fan Unit
  • 7. Universal Test Racks, along with associated interfaces (jigs/fixtures Card Extenders, interface cables, edge connectors, GPIB, accessories test software etc.) which is compatible and capable of undertaking diagnosis of all the modules and sub-modules / shop replaceable unit (SRU). Testing and Fault diagnosis / rectification of following modules / spares of DVOR Following modules/LRU’s can be tested in DOPPLER VOR Test Rack Control Unit Change Over Unit Input/ Output Unit Field Monitor Unit Distributor Drive Unit Pin Unit Diode Switch Impedance Matching Unit DC Unit (For Controller) Central Processing Unit Car Unit Side Band Amp Unit Test Signal Generator Unit (SG) Transmitter DC DC Unit LCD Display Unit Cooling Fan Unit For Controller DVOR Signal Generator Unit Transmitter Fan Unit
  • 9. Test Rack along with associated jigs/fixtures, Card Extenders, interface cables for JTAG components, edge connectors, GPIB etc., accessories and test software should be capable of undertaking diagnosis of all the modules and sub-modules / shop replaceable unit (SRU).The test rack/ bench system should also possess an inbuilt self diagnostic procedure in terms of start-up BITE to identify faults and generate remedial actions by user.