Eight types of Waste (MUDA) Defined
Any task or activity that does not add value is waste.
The Three Ms of Waste
MUDA (Any Waste) MURA (Uneven Work) MURI (Overburden)
Waste
DOWNTIME
Definition
Development
Example
Office Example
Manufacturing
Example
Lack of attention to detail Incorrect information being shared Scrap
Poorly written code Data entry errors Rework
Inadequate documentation Forwarding incomplete documents Missing parts
Developing extra features Creating reports no one reads/needs Producing more products than demand
Duplicating effort Making extra copies Batch process resulting in extra output
Documents with more detail
than required
Providing more information than
needed
Having a “push” production system
Waiting for timezones Ineffective meetings Waiting for tools, parts, information
Systems unavailable Waiting for meetings to start Broken machines waiting to be fixed
Insuffcient skills for the task Files awaiting signatures/approvals Raw materials not ready
Assign staff to wrong tasks Insufficient training Employing people in the wrong position
Wasteful admin tasks High absenteeism and turnover Not fully training employees
Poor planning Inadequate performance
Missing improvements by failing to
listen to employees
Outsourcing work that is
best done in house
Hand carrying paper to the next
process
Moving products around before
shipping
Handoffs between teams Delivering unneeded documents
Moving product from different
workstations
Endless emails Going to get signatures Moving inventory around to take stock
Partially done work Purchasing excessive office supplies More finished products than demand
Unfinished testing Searching for computer files Extra materials taking up work space
Incomplete documentation Obsolete files or office equipment Broken machines sitting around
Constantly switching tasks Searching for files Reaching to make adjustments
Ineffective prioritization Walking/reaching to get materials Walking to get a tool multiple times
Travel between offices
Sifting through inventory to find what
is needed
Repetitive movements that could
overwork/injure an employee
Poor tools creating delays Unnecessary signatures on a document Adding unneeded value to a product
Retesting
Making more copies of a document
than will be needed
Using a more high-tech machine than
needed
Relearning
Saving multiple copies of the same file
in multiple locations
Extra steps to correct avoidable mistakes
Motion Movement of people that
does not add value
Extra
Processing
Non Value Added Processing.
Not Utilizing
Talent
Not, or under utilizing the
talent of employees
Transportation
Movement of materials or
information that does not
add value
Inventory
Excess materials on hand
that the customers or
employees do not need right
now
Defect Work that contains errors or
lacks something necessary
Overproduction
Producing more materials or
information than customer
demand calls for
Waiting
Idle time created when
material, information,
people or equipment is not
ready

More Related Content

What's hot

5S For The Office by Operational Excellence Consulting
5S For The Office by Operational Excellence Consulting5S For The Office by Operational Excellence Consulting
5S For The Office by Operational Excellence Consulting
Operational Excellence Consulting
 

What's hot (20)

TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Kaizen bcic
Kaizen bcicKaizen bcic
Kaizen bcic
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
5S For The Office by Operational Excellence Consulting
5S For The Office by Operational Excellence Consulting5S For The Office by Operational Excellence Consulting
5S For The Office by Operational Excellence Consulting
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Lean Transformation ~ A Journey
Lean Transformation ~ A JourneyLean Transformation ~ A Journey
Lean Transformation ~ A Journey
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Dwm overview
Dwm overviewDwm overview
Dwm overview
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change Over
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
 
Spaghetti Diagrams
Spaghetti DiagramsSpaghetti Diagrams
Spaghetti Diagrams
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 

Viewers also liked

Scrum Meetings Infographic v12
Scrum Meetings Infographic v12Scrum Meetings Infographic v12
Scrum Meetings Infographic v12
Nigel Thurlow
 

Viewers also liked (12)

Waste Cartoons 3
Waste Cartoons 3Waste Cartoons 3
Waste Cartoons 3
 
Waste Cartoons 2
Waste Cartoons 2Waste Cartoons 2
Waste Cartoons 2
 
Waste Cartoons 1
Waste Cartoons 1Waste Cartoons 1
Waste Cartoons 1
 
LEAN Cheat Sheet
LEAN Cheat SheetLEAN Cheat Sheet
LEAN Cheat Sheet
 
DOWNTIME: The Eight Types of Waste
DOWNTIME: The Eight Types of WasteDOWNTIME: The Eight Types of Waste
DOWNTIME: The Eight Types of Waste
 
My Projects Portfolio
My Projects PortfolioMy Projects Portfolio
My Projects Portfolio
 
Green Belt Training
Green Belt TrainingGreen Belt Training
Green Belt Training
 
Scrum Meetings Infographic v12
Scrum Meetings Infographic v12Scrum Meetings Infographic v12
Scrum Meetings Infographic v12
 
Makigami
MakigamiMakigami
Makigami
 
Ina Gjikondi & Sheryl Vogt: Lean Six Sigma & the Balanced Scorecard
Ina Gjikondi & Sheryl Vogt: Lean Six Sigma & the Balanced ScorecardIna Gjikondi & Sheryl Vogt: Lean Six Sigma & the Balanced Scorecard
Ina Gjikondi & Sheryl Vogt: Lean Six Sigma & the Balanced Scorecard
 
Lean seminar - Reduce waste, add more value to your customers 20th-jan2014 ...
Lean seminar  -  Reduce waste, add more value to your customers 20th-jan2014 ...Lean seminar  -  Reduce waste, add more value to your customers 20th-jan2014 ...
Lean seminar - Reduce waste, add more value to your customers 20th-jan2014 ...
 
6S cartoons 2
6S cartoons 26S cartoons 2
6S cartoons 2
 

Similar to Downtime 8 Wastes

Storage And Retrieval Of Information
Storage And Retrieval Of InformationStorage And Retrieval Of Information
Storage And Retrieval Of Information
Marcus9000
 
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
Guillermo (Bill/Gil) Echeverria
 
May 10 Design UoStrath managing course info
May 10 Design UoStrath managing course infoMay 10 Design UoStrath managing course info
May 10 Design UoStrath managing course info
curricsupport
 

Similar to Downtime 8 Wastes (20)

WHAT IS LEAN
WHAT IS LEANWHAT IS LEAN
WHAT IS LEAN
 
Cause Effect Diagram.pdf
Cause Effect Diagram.pdfCause Effect Diagram.pdf
Cause Effect Diagram.pdf
 
Lesson 6 - Lean in Office
Lesson 6 - Lean in OfficeLesson 6 - Lean in Office
Lesson 6 - Lean in Office
 
Lean Six Sigma Course Training Part 7
Lean Six Sigma Course Training Part 7Lean Six Sigma Course Training Part 7
Lean Six Sigma Course Training Part 7
 
Storage And Retrieval Of Information
Storage And Retrieval Of InformationStorage And Retrieval Of Information
Storage And Retrieval Of Information
 
Office Layout
Office LayoutOffice Layout
Office Layout
 
Eight Wastes of Lean Poster
Eight Wastes of Lean PosterEight Wastes of Lean Poster
Eight Wastes of Lean Poster
 
Implementation 5S Training at Office.pptx
Implementation 5S Training at Office.pptxImplementation 5S Training at Office.pptx
Implementation 5S Training at Office.pptx
 
7 Types of Muda
7 Types of Muda7 Types of Muda
7 Types of Muda
 
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
 
Ian's 7 wastes of production
Ian's 7 wastes of productionIan's 7 wastes of production
Ian's 7 wastes of production
 
20110428 ARMA Amarillo Inventory Your Electronic Records
20110428 ARMA Amarillo Inventory Your Electronic Records20110428 ARMA Amarillo Inventory Your Electronic Records
20110428 ARMA Amarillo Inventory Your Electronic Records
 
Why we need document management
Why we need document managementWhy we need document management
Why we need document management
 
Kaizen_ presentation
Kaizen_ presentationKaizen_ presentation
Kaizen_ presentation
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Heda
 
May 10 Design UoStrath managing course info
May 10 Design UoStrath managing course infoMay 10 Design UoStrath managing course info
May 10 Design UoStrath managing course info
 
What is Lean ?
What is Lean ?What is Lean ?
What is Lean ?
 
The 8 wastes - Luciana Paulise
The 8 wastes - Luciana PauliseThe 8 wastes - Luciana Paulise
The 8 wastes - Luciana Paulise
 
Downtime,
Downtime, Downtime,
Downtime,
 
Km In Ca Office
Km In Ca OfficeKm In Ca Office
Km In Ca Office
 

More from Nigel Thurlow

The Buffer Interupt Pattern v2
The Buffer Interupt Pattern v2The Buffer Interupt Pattern v2
The Buffer Interupt Pattern v2
Nigel Thurlow
 
Scrum Clock Instructions
Scrum Clock InstructionsScrum Clock Instructions
Scrum Clock Instructions
Nigel Thurlow
 
Definition of Done Statement
Definition of Done StatementDefinition of Done Statement
Definition of Done Statement
Nigel Thurlow
 
The Product Owner Role
The Product Owner RoleThe Product Owner Role
The Product Owner Role
Nigel Thurlow
 
The Scrum Master Role
The Scrum Master RoleThe Scrum Master Role
The Scrum Master Role
Nigel Thurlow
 
Continuous Integration Approach
Continuous Integration ApproachContinuous Integration Approach
Continuous Integration Approach
Nigel Thurlow
 
User Story Composition
User Story CompositionUser Story Composition
User Story Composition
Nigel Thurlow
 
Lifecycle of an Idea
Lifecycle of an IdeaLifecycle of an Idea
Lifecycle of an Idea
Nigel Thurlow
 
Understanding Agile 11x17
Understanding Agile 11x17Understanding Agile 11x17
Understanding Agile 11x17
Nigel Thurlow
 
Continuous Improvement - Kaizen vs Problem Solving
Continuous Improvement - Kaizen vs Problem SolvingContinuous Improvement - Kaizen vs Problem Solving
Continuous Improvement - Kaizen vs Problem Solving
Nigel Thurlow
 
TPS Lean Production System
TPS Lean Production SystemTPS Lean Production System
TPS Lean Production System
Nigel Thurlow
 
Problem Solving A3 Approach
Problem Solving A3 ApproachProblem Solving A3 Approach
Problem Solving A3 Approach
Nigel Thurlow
 

More from Nigel Thurlow (18)

The Buffer Interupt Pattern v2
The Buffer Interupt Pattern v2The Buffer Interupt Pattern v2
The Buffer Interupt Pattern v2
 
Story Mapping v4
Story Mapping v4Story Mapping v4
Story Mapping v4
 
Scrum Clock Instructions
Scrum Clock InstructionsScrum Clock Instructions
Scrum Clock Instructions
 
Scrum Clock 2 week
Scrum Clock 2 weekScrum Clock 2 week
Scrum Clock 2 week
 
Test Driven Agile
Test Driven AgileTest Driven Agile
Test Driven Agile
 
Definition of Done Statement
Definition of Done StatementDefinition of Done Statement
Definition of Done Statement
 
The Product Owner Role
The Product Owner RoleThe Product Owner Role
The Product Owner Role
 
The Scrum Master Role
The Scrum Master RoleThe Scrum Master Role
The Scrum Master Role
 
Continuous Integration Approach
Continuous Integration ApproachContinuous Integration Approach
Continuous Integration Approach
 
User Story Composition
User Story CompositionUser Story Composition
User Story Composition
 
Lifecycle of an Idea
Lifecycle of an IdeaLifecycle of an Idea
Lifecycle of an Idea
 
Understanding Agile 11x17
Understanding Agile 11x17Understanding Agile 11x17
Understanding Agile 11x17
 
Nemawashi
NemawashiNemawashi
Nemawashi
 
Prioritise
PrioritisePrioritise
Prioritise
 
PDCA
PDCAPDCA
PDCA
 
Continuous Improvement - Kaizen vs Problem Solving
Continuous Improvement - Kaizen vs Problem SolvingContinuous Improvement - Kaizen vs Problem Solving
Continuous Improvement - Kaizen vs Problem Solving
 
TPS Lean Production System
TPS Lean Production SystemTPS Lean Production System
TPS Lean Production System
 
Problem Solving A3 Approach
Problem Solving A3 ApproachProblem Solving A3 Approach
Problem Solving A3 Approach
 

Downtime 8 Wastes

  • 1. Eight types of Waste (MUDA) Defined Any task or activity that does not add value is waste. The Three Ms of Waste MUDA (Any Waste) MURA (Uneven Work) MURI (Overburden) Waste DOWNTIME Definition Development Example Office Example Manufacturing Example Lack of attention to detail Incorrect information being shared Scrap Poorly written code Data entry errors Rework Inadequate documentation Forwarding incomplete documents Missing parts Developing extra features Creating reports no one reads/needs Producing more products than demand Duplicating effort Making extra copies Batch process resulting in extra output Documents with more detail than required Providing more information than needed Having a “push” production system Waiting for timezones Ineffective meetings Waiting for tools, parts, information Systems unavailable Waiting for meetings to start Broken machines waiting to be fixed Insuffcient skills for the task Files awaiting signatures/approvals Raw materials not ready Assign staff to wrong tasks Insufficient training Employing people in the wrong position Wasteful admin tasks High absenteeism and turnover Not fully training employees Poor planning Inadequate performance Missing improvements by failing to listen to employees Outsourcing work that is best done in house Hand carrying paper to the next process Moving products around before shipping Handoffs between teams Delivering unneeded documents Moving product from different workstations Endless emails Going to get signatures Moving inventory around to take stock Partially done work Purchasing excessive office supplies More finished products than demand Unfinished testing Searching for computer files Extra materials taking up work space Incomplete documentation Obsolete files or office equipment Broken machines sitting around Constantly switching tasks Searching for files Reaching to make adjustments Ineffective prioritization Walking/reaching to get materials Walking to get a tool multiple times Travel between offices Sifting through inventory to find what is needed Repetitive movements that could overwork/injure an employee Poor tools creating delays Unnecessary signatures on a document Adding unneeded value to a product Retesting Making more copies of a document than will be needed Using a more high-tech machine than needed Relearning Saving multiple copies of the same file in multiple locations Extra steps to correct avoidable mistakes Motion Movement of people that does not add value Extra Processing Non Value Added Processing. Not Utilizing Talent Not, or under utilizing the talent of employees Transportation Movement of materials or information that does not add value Inventory Excess materials on hand that the customers or employees do not need right now Defect Work that contains errors or lacks something necessary Overproduction Producing more materials or information than customer demand calls for Waiting Idle time created when material, information, people or equipment is not ready