SlideShare une entreprise Scribd logo
1  sur  10
1
Name : Mr. Nithat Wongprasarn
Position Applied : QC & QA Manager
Age : 41 Years Old.
Education :
- High school Certificate : Detudom School (Science – Mathematic)
- Bachelor degree : Chemical Engineering from Suranaree
University of Technology (SUT) , Nakornratchasima
Total experience : 18 Years : Year 1998 – 2015
: May 1998 - Nov 2000  Bangkok Construction Steel : Process Control Engineer
: DEC 2000 – Jun 2006  Lion Corporation (Thailand) : Shift Leader / Personal Care Product
: Jul 2006 – Oct 2013  Auto Alliance (Thailand) : Lead Engineer / Paint quality
: Nov 2013 – Aug 2014  SAIC Motor – CP : Quality Assurance Manager
: Sep 2014 – Dec 2015  Vuteq Thai Co., Ltd. : QC & QA Department Manager
2
Quality
Management
Quality
Control
Quality
System
Quality
Assurance
Customer
Satisfaction
Target
3
Quality Management
Quality Control
RM Control
RM Quality Eng.
Inspector A
Inspector B
Coating Process
Quality Eng.
Inspector A
Inspector B
Painting Process (3)
Quality Eng.
Inspector A
Inspector B
Quality Assurance
Finished Product
Quality Eng.
In Line Inspector A
In Line Inspector B
Repair Inspector A
Repair Inspector B
Delivery Process
Delivery Supv. A
Delivery Supv. B
Market Quality
Quality Eng.
Quality System
ISO/TS 16949 &
ISO 9001
ISO 14001
Document
control
Organization
4
Quality
Control
RM
Control
Condition
Control
Finished Product
Control
1. Paint Supplied
2. Chemical Supplied
3. White body Assembly
4. White body Surface
5. Body addition part
Input Process Output
1. Paint Specification
2. COA / Sampling quality
3. Body Assemble DWG
4. Stamping & Metal finished
5. Part DWG & Specification
1. Supplied pump system
2. Coating / Painting Booth
3. Surface preparing
4. Robot painting Cond.
5. Paint baking Cond.
1. Quality Control Plan
2. Instruction Sheet Operation
3. Work Procedure Sheet
4. Work Point Guidance
5. Instruction Manual
1. Paint Film Appearance
2. Paint Film Adhs, Hard
3. Vehicle Appearance
4. Color Harmony
5. Paint spot repaired
1. Quality Control Plan
2. Color Specification
3. Quality Concern Sheet
4. Quality Delivery Sheet
5. Customer Feedback
What
How
What
How
What
How
1. Quality Control
5
1. Quality Control
Body Shop Coating Painting
Supplier
Metal
Inspect
RM
Inspect
Surface
Inspect
Paint Film
Inspect
Feed back & Correct
OK
NG
NG
OK
White
Body
Paint
Freeze & Concern
Concern &
Correction
Concern &
Paint RepairNG
OK OK
NG
= Quality Gate“Concept”
Metal Inspect & RM Inspect Gate Surface Inspection Gate Paint Film Inspection Gate
Body shop Feed back & Correction
Method : Voice & Call to monitor &
Solving
Coated Product Concern &
Correction
Method :
1) Voice & Call to solving
(correction)
2) Concern & Follow on
concern follow up sheet
Painted Product Concern &
Paint repaired
Method :
1) Voice & Call to out of line
repaired
2) Problem follow up by
concern follow up sheet
Supplier Freeze & Concern
Method : 1) Stop to applied and
keep out on NG area
2) Concern 8Ds & Follow up


 


 
6
1. Quality Control
- Supplier Concern Sheet & 8D
- Quality Concern Follow Up Sheet
- Daily & Weekly Follow Up Report
Supplier
9%
Body
Shop
17%
Coating
29%
Surface
Prepare
7%
Painting
17%
Assembl
y
15%
Repaired
6%
0
2
4
6
8
10
1 2 3 4 5 8 9 10111215161718192223242526293031
Repaired Assembly Painting Surface Prepare
Coating Body Supplier
Closed,
42, 65%
Follow,
15, 23%
Implem
ent, 8,
12%
7
2. Quality Assurance
Paint Unit Finish Car
Inspect
OK
NG
Assembly Delivery End Custm.
Repair
Assy Repair
PNT Repair Monitor&
Consider
NG
No
Yes
Customer
Claim


Finished Car Inspection Gate Customer Claim Warrantee Gate
Finished Complete Car Concern & Correction
Method :
1) Voice & Call to solving (correction)
- Out of line to repaired (Surface & Assy)
2) Concern & Follow on concern follow up
sheet
3) Daily report for problem concern & status
4) Follow up corrective action to all respond
Completely Car End customer quality follow up
Method :
1) Follow up & Survey 1MOP, 3MOP, 6MOP, 12MOP
2) Monitor & Consider on Customer claim
3) Follow up customer claim correction
4) Corrective & Preventive Action (6 Sigma)
5) Customer respond information & follow up
= Quality Gate“Concept”
 
8
2. Quality Assurance
 QA KPI Report
- Poor quality case , R/1000
- Poor quality repaired cost, CPU
 Customer Satisfaction Index
- Customer Claim, R/1000 & CPU
- Customer suggestion (Survey), TGW
- CSI = R/1000 x CPU x TGW
 Quality Management Review
- Internal Poor Quality concern, R/1000 & CPU
- Quality KPI
- Customer Satisfaction Index, CSI
 QA Improvement
- QCC, WPG, Visual tag
- 6 Sigma Project (D-M-A-I-C-R activity)
9
3. Quality System
ISO/TS 16949, ISO 9001 Implement (QMS)
- Refresh training update requirement and quality policy
- Yearly Audit Plan (internal & external audit)
- Implement internal audit (product, process, system) and
external audit (surveillance and re-certificated audit)
- Quality output summary and Management review in half yearly
ISO 14001 Implement (EMS)
- Orientation environment management to new comer
- Refresh training update new activities and requirement
- Yearly Audit Plan (internal & external audit)
- Implement environment management activities, internal audit
and external audit (surveillance and re-certificated audit)
- Environment management summary and Management review
10
- Quality & Environment Policy
- Quality & Environment KPI
- Quality & Environment System
- Quality Fundamental
- Quality Procedure
- Quality Concern Method
- Quality Improvement
- QCC & 6 Sigma
Competency Training Matrix
0%
20%
40%
60%
80%
100%
Quality Policy
Environment Policy
Quality KPI
Environment KPI
Quality System
Environment System
Quality Fundamental
Quality Procedure
Quality Concern
Method
Quality Improvement

Contenu connexe

Tendances

Tendances (20)

Cv senior qc manager mk-bencharif - english
Cv senior qc manager  mk-bencharif - englishCv senior qc manager  mk-bencharif - english
Cv senior qc manager mk-bencharif - english
 
Tamil_Updated_Resume
Tamil_Updated_ResumeTamil_Updated_Resume
Tamil_Updated_Resume
 
Resume_H (1)
Resume_H (1)Resume_H (1)
Resume_H (1)
 
Craig RESUME
Craig RESUMECraig RESUME
Craig RESUME
 
Pedro Gonzalez Resume 2016 July (1)
Pedro Gonzalez Resume 2016 July (1)Pedro Gonzalez Resume 2016 July (1)
Pedro Gonzalez Resume 2016 July (1)
 
Ayyappan Modified
Ayyappan ModifiedAyyappan Modified
Ayyappan Modified
 
1st technical dinner meeting
1st technical dinner meeting1st technical dinner meeting
1st technical dinner meeting
 
Apqp to print
Apqp to printApqp to print
Apqp to print
 
101011 Ron Stanley Resume
101011 Ron Stanley Resume101011 Ron Stanley Resume
101011 Ron Stanley Resume
 
my c.v
my c.vmy c.v
my c.v
 
Watkins q1 2nded_outlook_on_quality_final
Watkins q1 2nded_outlook_on_quality_finalWatkins q1 2nded_outlook_on_quality_final
Watkins q1 2nded_outlook_on_quality_final
 
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docxMillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
 
Paint Shop__CV_ Sagar Bhattacharjee
Paint Shop__CV_ Sagar BhattacharjeePaint Shop__CV_ Sagar Bhattacharjee
Paint Shop__CV_ Sagar Bhattacharjee
 
Rajesh mba resume - dubai
Rajesh mba resume - dubaiRajesh mba resume - dubai
Rajesh mba resume - dubai
 
FARHAD KARAMJAN1
FARHAD KARAMJAN1FARHAD KARAMJAN1
FARHAD KARAMJAN1
 
jayam
jayamjayam
jayam
 
Thanigaivel P G Exp 15years
Thanigaivel P G Exp 15years Thanigaivel P G Exp 15years
Thanigaivel P G Exp 15years
 
C.V lotfali zandieh General 94-01
C.V lotfali zandieh General 94-01C.V lotfali zandieh General 94-01
C.V lotfali zandieh General 94-01
 
Murugan Resume
Murugan ResumeMurugan Resume
Murugan Resume
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)
 

Similaire à QC Manager Resume Summary

SPE - Quality Training (Rev 3 31st Oct'14).pdf
SPE - Quality Training (Rev 3 31st Oct'14).pdfSPE - Quality Training (Rev 3 31st Oct'14).pdf
SPE - Quality Training (Rev 3 31st Oct'14).pdfAfzalRafeeque1
 
Resume-30112015
Resume-30112015Resume-30112015
Resume-30112015arun timo
 
Murali_Resume_updated[1]
Murali_Resume_updated[1]Murali_Resume_updated[1]
Murali_Resume_updated[1]Murali A
 
Cv qa- qc engineer- 14 july 2019
Cv  qa- qc engineer- 14 july 2019Cv  qa- qc engineer- 14 july 2019
Cv qa- qc engineer- 14 july 2019KeshavJoshi28
 
CV- QA- QC Engineer- 14 july 2019
CV-  QA- QC Engineer- 14 july 2019CV-  QA- QC Engineer- 14 july 2019
CV- QA- QC Engineer- 14 july 2019KeshavJoshi28
 
Cv qa- qc engineer- 14 july 2019
Cv  qa- qc engineer- 14 july 2019Cv  qa- qc engineer- 14 july 2019
Cv qa- qc engineer- 14 july 2019KeshavJoshi28
 
BE 6 years Experience - SQA
BE 6 years Experience  - SQABE 6 years Experience  - SQA
BE 6 years Experience - SQAC. Arun
 
CURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit PandyaCURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit PandyaPANDYA PULKIT
 
Marty Howard ASQ QM QE Resume 5.doc
Marty Howard ASQ QM QE Resume 5.docMarty Howard ASQ QM QE Resume 5.doc
Marty Howard ASQ QM QE Resume 5.docMarty Howard
 

Similaire à QC Manager Resume Summary (20)

Mallappa Beleri Resume
Mallappa Beleri ResumeMallappa Beleri Resume
Mallappa Beleri Resume
 
SPE - Quality Training (Rev 3 31st Oct'14).pdf
SPE - Quality Training (Rev 3 31st Oct'14).pdfSPE - Quality Training (Rev 3 31st Oct'14).pdf
SPE - Quality Training (Rev 3 31st Oct'14).pdf
 
Resume
ResumeResume
Resume
 
Resume-30112015
Resume-30112015Resume-30112015
Resume-30112015
 
Murali_Resume_updated[1]
Murali_Resume_updated[1]Murali_Resume_updated[1]
Murali_Resume_updated[1]
 
Resume-New
Resume-NewResume-New
Resume-New
 
RSL new project
RSL new projectRSL new project
RSL new project
 
JB Resume
JB ResumeJB Resume
JB Resume
 
Doc. RMD
Doc. RMDDoc. RMD
Doc. RMD
 
Pradeep CV
Pradeep CV Pradeep CV
Pradeep CV
 
Resume_Anuradha Jagadale
Resume_Anuradha JagadaleResume_Anuradha Jagadale
Resume_Anuradha Jagadale
 
Cv qa- qc engineer- 14 july 2019
Cv  qa- qc engineer- 14 july 2019Cv  qa- qc engineer- 14 july 2019
Cv qa- qc engineer- 14 july 2019
 
CV- QA- QC Engineer- 14 july 2019
CV-  QA- QC Engineer- 14 july 2019CV-  QA- QC Engineer- 14 july 2019
CV- QA- QC Engineer- 14 july 2019
 
Cv qa- qc engineer- 14 july 2019
Cv  qa- qc engineer- 14 july 2019Cv  qa- qc engineer- 14 july 2019
Cv qa- qc engineer- 14 july 2019
 
BE 6 years Experience - SQA
BE 6 years Experience  - SQABE 6 years Experience  - SQA
BE 6 years Experience - SQA
 
CURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit PandyaCURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit Pandya
 
Marty Howard ASQ QM QE Resume 5.doc
Marty Howard ASQ QM QE Resume 5.docMarty Howard ASQ QM QE Resume 5.doc
Marty Howard ASQ QM QE Resume 5.doc
 
Resume
ResumeResume
Resume
 
Deven Resume
Deven ResumeDeven Resume
Deven Resume
 
RESUME
RESUMERESUME
RESUME
 

QC Manager Resume Summary

  • 1. 1 Name : Mr. Nithat Wongprasarn Position Applied : QC & QA Manager Age : 41 Years Old. Education : - High school Certificate : Detudom School (Science – Mathematic) - Bachelor degree : Chemical Engineering from Suranaree University of Technology (SUT) , Nakornratchasima Total experience : 18 Years : Year 1998 – 2015 : May 1998 - Nov 2000  Bangkok Construction Steel : Process Control Engineer : DEC 2000 – Jun 2006  Lion Corporation (Thailand) : Shift Leader / Personal Care Product : Jul 2006 – Oct 2013  Auto Alliance (Thailand) : Lead Engineer / Paint quality : Nov 2013 – Aug 2014  SAIC Motor – CP : Quality Assurance Manager : Sep 2014 – Dec 2015  Vuteq Thai Co., Ltd. : QC & QA Department Manager
  • 3. 3 Quality Management Quality Control RM Control RM Quality Eng. Inspector A Inspector B Coating Process Quality Eng. Inspector A Inspector B Painting Process (3) Quality Eng. Inspector A Inspector B Quality Assurance Finished Product Quality Eng. In Line Inspector A In Line Inspector B Repair Inspector A Repair Inspector B Delivery Process Delivery Supv. A Delivery Supv. B Market Quality Quality Eng. Quality System ISO/TS 16949 & ISO 9001 ISO 14001 Document control Organization
  • 4. 4 Quality Control RM Control Condition Control Finished Product Control 1. Paint Supplied 2. Chemical Supplied 3. White body Assembly 4. White body Surface 5. Body addition part Input Process Output 1. Paint Specification 2. COA / Sampling quality 3. Body Assemble DWG 4. Stamping & Metal finished 5. Part DWG & Specification 1. Supplied pump system 2. Coating / Painting Booth 3. Surface preparing 4. Robot painting Cond. 5. Paint baking Cond. 1. Quality Control Plan 2. Instruction Sheet Operation 3. Work Procedure Sheet 4. Work Point Guidance 5. Instruction Manual 1. Paint Film Appearance 2. Paint Film Adhs, Hard 3. Vehicle Appearance 4. Color Harmony 5. Paint spot repaired 1. Quality Control Plan 2. Color Specification 3. Quality Concern Sheet 4. Quality Delivery Sheet 5. Customer Feedback What How What How What How 1. Quality Control
  • 5. 5 1. Quality Control Body Shop Coating Painting Supplier Metal Inspect RM Inspect Surface Inspect Paint Film Inspect Feed back & Correct OK NG NG OK White Body Paint Freeze & Concern Concern & Correction Concern & Paint RepairNG OK OK NG = Quality Gate“Concept” Metal Inspect & RM Inspect Gate Surface Inspection Gate Paint Film Inspection Gate Body shop Feed back & Correction Method : Voice & Call to monitor & Solving Coated Product Concern & Correction Method : 1) Voice & Call to solving (correction) 2) Concern & Follow on concern follow up sheet Painted Product Concern & Paint repaired Method : 1) Voice & Call to out of line repaired 2) Problem follow up by concern follow up sheet Supplier Freeze & Concern Method : 1) Stop to applied and keep out on NG area 2) Concern 8Ds & Follow up        
  • 6. 6 1. Quality Control - Supplier Concern Sheet & 8D - Quality Concern Follow Up Sheet - Daily & Weekly Follow Up Report Supplier 9% Body Shop 17% Coating 29% Surface Prepare 7% Painting 17% Assembl y 15% Repaired 6% 0 2 4 6 8 10 1 2 3 4 5 8 9 10111215161718192223242526293031 Repaired Assembly Painting Surface Prepare Coating Body Supplier Closed, 42, 65% Follow, 15, 23% Implem ent, 8, 12%
  • 7. 7 2. Quality Assurance Paint Unit Finish Car Inspect OK NG Assembly Delivery End Custm. Repair Assy Repair PNT Repair Monitor& Consider NG No Yes Customer Claim   Finished Car Inspection Gate Customer Claim Warrantee Gate Finished Complete Car Concern & Correction Method : 1) Voice & Call to solving (correction) - Out of line to repaired (Surface & Assy) 2) Concern & Follow on concern follow up sheet 3) Daily report for problem concern & status 4) Follow up corrective action to all respond Completely Car End customer quality follow up Method : 1) Follow up & Survey 1MOP, 3MOP, 6MOP, 12MOP 2) Monitor & Consider on Customer claim 3) Follow up customer claim correction 4) Corrective & Preventive Action (6 Sigma) 5) Customer respond information & follow up = Quality Gate“Concept”  
  • 8. 8 2. Quality Assurance  QA KPI Report - Poor quality case , R/1000 - Poor quality repaired cost, CPU  Customer Satisfaction Index - Customer Claim, R/1000 & CPU - Customer suggestion (Survey), TGW - CSI = R/1000 x CPU x TGW  Quality Management Review - Internal Poor Quality concern, R/1000 & CPU - Quality KPI - Customer Satisfaction Index, CSI  QA Improvement - QCC, WPG, Visual tag - 6 Sigma Project (D-M-A-I-C-R activity)
  • 9. 9 3. Quality System ISO/TS 16949, ISO 9001 Implement (QMS) - Refresh training update requirement and quality policy - Yearly Audit Plan (internal & external audit) - Implement internal audit (product, process, system) and external audit (surveillance and re-certificated audit) - Quality output summary and Management review in half yearly ISO 14001 Implement (EMS) - Orientation environment management to new comer - Refresh training update new activities and requirement - Yearly Audit Plan (internal & external audit) - Implement environment management activities, internal audit and external audit (surveillance and re-certificated audit) - Environment management summary and Management review
  • 10. 10 - Quality & Environment Policy - Quality & Environment KPI - Quality & Environment System - Quality Fundamental - Quality Procedure - Quality Concern Method - Quality Improvement - QCC & 6 Sigma Competency Training Matrix 0% 20% 40% 60% 80% 100% Quality Policy Environment Policy Quality KPI Environment KPI Quality System Environment System Quality Fundamental Quality Procedure Quality Concern Method Quality Improvement