  1. 1. Industrial training presentation By Nurul Raihan Sabrina Binti Mohamad Zaidi
  2. 2. Week 1 Activities: • Students learned about JKR job scopes. • Learned about circuit testing and the instrument used in testing. • Learned about calculating the distribution factor. 1. Instruments used in circuit testing.
  3. 3. Week 2 Activities: • Students went to the school site to do site monitoring. That includes circuit testing and complaints. • Fixing the lamp at JKR Sri Gading. • Drew plan and schematic drawing using Autocad. 1.Plan and schematic drawing using Autocad. 2.Lamp fixing at JKR Sri Gading. 3.Site monitoring at schools around Batu Pahat.
  4. 4. Week 3 Activities: • Students has drawn floor plan for schools. This is for the upgrading process at the schools. • Went for site visit at a school for tender calling process. • Went for visit site for complaints. 1.Site visit for tender calling process and complaints.
  5. 5. Week 4 Activities: • Students has done accepting letter (surat sah terima) for rewiring project at civil courts and schools. • Has done temporary installation for Merdeka Day at Dataran Batu Pahat. • Went to the Batu Pahat veterinar site visit. • Doing EMAL (electrical material approve list) to ensure the materials used in the project are certified by JKR standards. 2.Temporary installation at Dataran Batu Pahat for Merdeka Day event. 1.Site visiting at Batu Pahat Veterinar.
  6. 6. Week 5 Activities: • Students fixing the lamp at JKR Sri Gading Mechanical division. • Students went to JKR Batu Pahat to fix the accesory lamps and done temporary wiring for Merdeka Day event. • Went to site visit at Nursing College Parit Raja to inspect wiring. 1.Fixing the accesory lamps and done temporary wiring for Merdeka Day event at JKR Batu Pahat. 2.Fixing the lamp at JKR Sri Gading Mechanical division. 3.Site visiting at Nursing College Parit Raja.
  7. 7. Week 6 Activities: • Students had been fixing the gate shutter at JKR Sri Gading. • Went to SK Seri Bengkal for full payment process. The wiring was monitored to make sure the wiring done has met JKR standards. • Knowing the staffs at JKR Sri Gading. 1. Went to SK Seri Bengkal for full payment process. The wiring was monitored to make sure the wiring done has met JKR standards. 2. Students had been fixing the gate shutter at JKR Sri Gading.
  8. 8. Week 7 Activities: • Students went to site visit at Pejabat Tanah Batu Pahat because there was a complaint about a faulty lamp. • Went to Electrical engineer office at Johor Bahru. 1. Went to Electrical engineer office at Johor Bahru. 2. Students went to site visit at Pejabat Tanah Batu Pahat because there was a complaint about a faulty lamp.
  9. 9. Week 8 Activities: • Students had went to the school because of the complaints of burned fuse and MCB trip caused by overload. Both caused by the air conditioning. • Went to the Batu Pahat Civil Court because of a complaint about the air conditioner that tripped the MCCB. • Went to the elementary school because the ground floor of a block experiencing black out. • Went to civil courts in Batu Pahat and Yong Peng for security inspection from the government security officer (CGSO). 1. Went to school because of the complaints of burned fuse caused by overload. 3. Batu Pahat Civil Court because of a complaint about the air conditioner that tripped. 2.The elementary school because the ground floor of a block experiencing black out. 4. Went to civil courts in Batu Pahat and Yong Peng for security inspection from the government security officer (CGSO).

×